Professional Documents
Culture Documents
Bridge proper
Sl. No./
Rate Amount In
SOR Item Unit Quantity
(Rs.) Rs.
Clause
Dismantling
Labour for dismantling all members of the timber
bridge (except piles) and stacking them at suitable
1/16.10 places as directed (all members will be under Rm 577.00 24.00 13848.00
custody of the contractor till taken over by the
department)
Foundation
3/11.1
Excavation for structures : Earth work in
excavation for foundation of structures as per
drawings and technical specification clause 305.1,
including setting out, construction of shoring and
bracing, removal of stumps and other deeleterious
matter and disposal up to 50m,, dressing of sides
and bottom and back filling in trenches with
excavated suitable material.
I. Ordinary soil
A. Manual
means
(I) upto 3.0m depth m3 61.00 0.000 0.00
(ii) 3m to 6m depth m3 90.00 200.820 18073.80
4/16.56
Bored cast-in-situ M35 grade R.C.C. pile
excluding reinforcement complete as per drawing
and technical specification and removal of m 11101.00 256.000 2841856.00
excavated earth with all lifts and lead upto
1000m.(Pile diameter-1000mm)
5/16.61 Pile load test on single vertical pile in accordance
with IS:2911 (Part-IV)
433251862.xlsx
Br. No 1/2 Estimate .Bridge proper
7/16.63
Providing and laying of PCC M15 levelling
course 100mm thick below the pile cap as per
m3 5086.00 12.15 61794.90
drawing and technical specification of MORTH
Section 1100 & 1700
8/11.8
Supplying , fitting and placing TMT bar
reinforcement in foundation complete as per
tonne 67337.00 31.647 2131021.98
drawing and Technical Specifications clause 1000
& 1202.
9/16.41
Providing and construction of temporary island to
A(iii)
accommodate pile rig and other assessories
including casting of pile cap, all complete in Each 151360.00 0.000 0.00
depth of water up to 400cm (rate taken from item
no. 16.41)
10/16.4 Providing and construction of one span service
1D road to reach island location from one pier Rm 2051.00 0.000 0.00
location to another pier location
Substructure
11/12.5 Plain/Reinforced Cement concrete, in
Substructure complete as per Drawing and
Technical Specifications as per MORTH Section
1500,1700,2200
433251862.xlsx
Br. No 1/2 Estimate .Bridge proper
Superstructure
Furnishing and placing reinforced / Prestressed
15/16.8 cement concrete in superstructure as per drawing
and Technical Specifications at clause 800,1205
and 1205 . A with crushed Stone.
18/13.6
Construction of RCC railing of M25Grade in cast
insitu with 20mm nominal size aggregate, true to
line and grade, tolerance of vertical RCC post not
to exceed 1 in 500 centre to centre spacing m 2722.00 65.040 177038.88
between vertical post not to exceed 2000mm as
per drawing and technical specifications clauses
800,900 and 1208.3.
19/16.92
Drainage spouts complete as per approved
Each 8012.00 20 160240.00
drawings and technical specification clause 1209.
20/16.98
Burried Joint (Providing and laying a burried
expansion joint, expansion gap being 20mm,
covered with 12mm thick, 200mm wide
galvanised wieldable structural steel plate as per
IS:2062, placed symmetrical to centre line of the m 1406.00 16.90 23761.40
join, resting freely over the top surface of deck
concrete, welding of 8mm dia. 100mm long
galvanised nails spaced 300mm c/c along center
line of the plate, all as specified in clause 2604.
433251862.xlsx
Br. No 1/2 Estimate .Bridge proper
24
Carrying out SSI and preparation of DPR
including design and drawing of bridge including
approaches and protection complete as directed m 0.00 43.500 0.00
by the Engineer. A) For Bridge length less than
25 m ( as per accepted rate)
#NAME?
433251862.xlsx
Br. No 1/2 Estimate .Bridge proper
Sl. No./
Rate Amount In
SOR Item Unit Quantity
(Rs.) Rs.
Clause
Dismantling
Labour for dismantling all members of the timber
bridge (except piles) and stacking them at suitable
1/16.10 places as directed (all members will be under Rm 577.00 31.00 17887.00
custody of the contractor till taken over by the
department)
Foundation
3/11.1
Excavation for structures : Earth work in
excavation for foundation of structures as per
drawings and technical specification clause 305.1,
including setting out, construction of shoring and
bracing, removal of stumps and other deeleterious
matter and disposal up to 50m,, dressing of sides
and bottom and back filling in trenches with
excavated suitable material.
I. Ordinary soil
A. Manual
means
(I) upto 3.0m depth m3 86.00 0.000 0.00
(ii) 3m to 6m depth m3 113.00 200.820 22692.66
4/16.56
Bored cast-in-situ M35 grade R.C.C. pile
excluding reinforcement complete as per drawing
and technical specification and removal of m 11694.00 430.080 5029355.52
excavated earth with all lifts and lead upto 1000m.
(Pile diameter-1000mm)
5/16.61 Pile load test on single vertical pile in accordance
with IS:2911 (Part-IV)
433251862.xlsx
Br. No 1/2 Estimate .Bridge proper
7/16.63
Providing and laying of PCC M15 levelling course
100mm thick below the pile cap as per drawing
m3 5776.00 17.83 102962.98
and technical specification of MORTH Section
1100 & 1700
8/11.8
Supplying , fitting and placing TMT bar
reinforcement in foundation complete as per
tonne 64721.00 52.421 3392744.23
drawing and Technical Specifications clause 1000
& 1202.
9/16.41
Providing and construction of temporary island to
A(iii)
accommodate pile rig and other assessories
including casting of pile cap, all complete in depth Each 41153.00 1.000 41153.00
of water up to 400cm (rate taken from item no.
16.41)
10/16.4 Providing and construction of one span service
1D road to reach island location from one pier location Rm 2258.00 21.750 49111.50
to another pier location
Substructure
11/12.5 Plain/Reinforced Cement concrete, in Substructure
complete as per Drawing and Technical
Specifications as per MORTH Section
1500,1700,2200
433251862.xlsx
Br. No 1/2 Estimate .Bridge proper
Superstructure
Furnishing and placing reinforced / Prestressed
15/16.8 cement concrete in superstructure as per drawing
and Technical Specifications at clause 800,1205
and 1205 . A with crushed Stone.
18/13.6
Construction of RCC railing of M25Grade in cast
insitu with 20mm nominal size aggregate, true to
line and grade, tolerance of vertical RCC post not
to exceed 1 in 500 centre to centre spacing m 2255.00 82.680 186443.40
between vertical post not to exceed 2000mm as per
drawing and technical specifications clauses
800,900 and 1208.3.
19/16.92
Drainage spouts complete as per approved
Each 8615.00 16 137840.00
drawings and technical specification clause 1209.
20/16.98
Burried Joint (Providing and laying a burried
expansion joint, expansion gap being 20mm,
covered with 12mm thick, 200mm wide galvanised
wieldable structural steel plate as per IS:2062,
placed symmetrical to centre line of the join, m 1492.00 12.80 19097.60
resting freely over the top surface of deck
concrete, welding of 8mm dia. 100mm long
galvanised nails spaced 300mm c/c along center
line of the plate, all as specified in clause 2604.
433251862.xlsx
Br. No 1/2 Estimate .Bridge proper
24
Carrying out SSI and preparation of DPR
including design and drawing of bridge including
approaches and protection complete as directed by m 0.00 43.500 0.00
the Engineer. A) For Bridge length less than 25
m ( as per accepted rate)
#NAME?
433251862.xlsx
Estimate of Bridge Proper and Protection Works
AS per APWD's SOR for Rural Roads for All Divisions for 2016-17
Supplying , fitting
II) Height 5.0m and placing
to 10.0m m3 6683.00 0.000 0.00
TMT bar reinforcement (Fe
12/12.7 415) in substructure complete as
Backfill behind abutment, wing tonne 67418.00 3.702 249601.36
per
walldrawing andwall
Technical
and return complete as
Supplying, fitting
Specifications and1002,
clause
13/12.10 per drawings and technical fixing in
position true&to1202.
1005, 1010 line and level m3 1048.00 128.225 134379.41
specification clause 1204.3.8
elastomeric bearing conforming
14/12.12 to IRC:83(pt.II) section IX i.
Granular material. cm3 1.08 80640.00 87091.20
complete including all
Furnishing
accessories and placing
as per drawing and
Superstructure
reinforced / Prestressed cement
Technical Specification clause
concrete
1207.1. in superstructure as
15/16.8 per drawing and Technical
Specifications at clause
800,1205 and 1205 . A( with
B. RCC Grade M25 Using
crushed Stone.
Concrete Mixer)
Supplying,
(q) Height 5.0 fitting
m toand 10.0placing
m m3 8331.00 0.000 0.00
un-coated TMT bar
16/13.3 Providing
reinforcement and laying supercement
Construction ofinRCC structure
railing of tonne 70236.00 12.080 848450.88
concrete
complete wearing
as per coat
drawing M30 and
M25Grade in cast insitu with
grade
20mmincluding
17/13.5 technical reinforcement
specifications clauses
nominal size aggregate,
complete
1000
Burried& as
1202.
Joint per drawing
(Providing and
and m3 12292.00 10.913 134136.45
true to line and grade, tolerance
technical
laying specifications
a burried expansion clauses
18/13.6 of vertical RCC post not to joint,
800 and 1206.3.
expansion gap (B) With
being 20mm,
exceed 1 in 500 centre to centre m 2722.00 53.200 144810.40
crushed
covered
Drainage stone.
with
spouts12mm thick,post
complete as per
spacing between vertical
19/16.92 200mm
approved wide
not to exceed galvanised
drawings
2000mm and as per
Each 8012.00 8 64096.00
wieldable
technical
drawing and structural
specification
technical steel plate
clause
20/16.98 as per IS:2062,clauses
1209.
specifications placed800,900
symmetrical
and to centre line of the m 1406.00 15.00 21090.00
PCC1208.3.
M15 ordinary grade
join, resting freely over the top
(1:2.5:5) in levelling course
21/13.11 surface of deck concrete,
below approach slab complete m3 5196.00 13.500 70146.00
A Providing
welding ofand 8mm fixing
dia. 20mm
100mm
as
RCCperapproach
drawing and slab technical
with M25
thick compressible
long galvanised nailsfibre board
spaced
22/16.99 specifications clause 800 &1211
grade
in
300mm approach
expansion
c/c along slab
joint including
complete
center lineas
of m 325.00 15.000 4875.00
(ii)
reinforcent
per
the drawing
plate, and
all &
as form
Technical
specifiedwork in
Carrying out SSI and
complete
Specificationas per drawing2605.and
23/13.12 clause 2604.
preparation ofclause
DPR including m 11471.00 13.500 154858.50
technical specifications clauses
design and drawing of bridge
24 800 & 1211.
including approaches and
Construction of cold A. withweather m 2500.00 0.000 0.00
protection complete as directed
Bamboo
crushed bridge over all width
stone.
by the Engineer. A) For
3.70m and clear road way 3.0m
26/16.1 Bridge length less than 25 m m 9805.00 15.000 147075.00
with jungle wood post 20 to 25
( as5 per
nos accepted rate)
cm dia in each row and
rows being 2.0m apart
Sub Total (A) = Rs. 8831663.57
PROTECTION WORKS
Providing and laying pitching
on slopes laid over prepared
filter media as per drawing and
19 Technical Specification Clause
Cum 1091.000 53.216
1302
Providing and laying filter 58058.41
(i) Stone/Boulder
material underneath pitching in
20 slopes complete as per drawing Cum 1455.000 53.216
and Technical Specification 77428.96
21 Clause 1302
Proiding and laying boulder apron
for bed protection with stone
boulder of minimum size and
weight as per table 1300.1, no
fragment weighing less than 25 kg
Cum
laid dry complete as per drawing
and technical specification Clause
1301 1091.00 100.98 110166.15
Sub Total (B) = Rs. 187595.10
Total (A) + (B) =Rs. 9019258.68
#NAME?