0% found this document useful (0 votes)
3K views1 page

Analysis Rate For E/W in Embankment: 3.4 301.5 Construction of Embankment With Material Obtained From Borrow Pits

This document provides a cost estimate for constructing an embankment by obtaining material from borrow pits and transporting it to the site. It estimates the unit rate per cubic meter of embankment construction to be 148.31 rupees. The estimate breaks down costs for labor, machinery, materials, contractor profit/overheads, and totals to 14,830.53 rupees to construct 100 cubic meters of embankment. Labor, machinery, and materials costs are provided along with their quantities and rates.

Uploaded by

Hoque joynul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3K views1 page

Analysis Rate For E/W in Embankment: 3.4 301.5 Construction of Embankment With Material Obtained From Borrow Pits

This document provides a cost estimate for constructing an embankment by obtaining material from borrow pits and transporting it to the site. It estimates the unit rate per cubic meter of embankment construction to be 148.31 rupees. The estimate breaks down costs for labor, machinery, materials, contractor profit/overheads, and totals to 14,830.53 rupees to construct 100 cubic meters of embankment. Labor, machinery, and materials costs are provided along with their quantities and rates.

Uploaded by

Hoque joynul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
  • Construction Analysis Table

Analysis Rate For E/W in Embankment Unit= 100 CUM

3.4 301.5 Construction of Embankment with Material Obtained from Unit Quantity Amount
Rate
Borrow Pits (Rs.)
Construction of embankment with approved material obtained
from borrow pits with a lift upto 1.5 m, transporting to site,
spreading, grading to required slope and compacting to meet
requirement of Tables 300.1 and 300.2 with a lead upto 250 m
as per Technical Specification Clause 301.5

Unit = cum

Taking output = 100 cum

a) Labour
Mate day 0.02 356.65 7.13

Mazdoor (Unskilled) day 0.60 244.56 146.74

b) Machinery 0.00

Hydraulic Excavator 0.9 cum bucket capacity @ 60 hour 1.67 1,635.00 2,730.45
cum per hour
Tipper 5.5 cum with 10 t capacity hour 1.37 850.00 1,164.50

Loading & unloading of earth cum 100.00 55.42 5,542.29

Dozer D-50 for spreading @ 200 cum per hour hour 0.50 2,260.00 1,130.00

Motor grader for grading @ 200 cum per hour hour 0.00 3,075.00 0.00

Water tanker 6 kl capacity hour 2.00 440.00 880.00

Three wheel 80-100 kN Static Roller @ 80 cum per ho hour 1.25 652.00 815.00

c) Material

Water kl 12.00 40.00 480.00


Compensation for earth taken from private land/ Fores cum 0.00 33.00 0.00

d) Contractor’s profit & Overheads @ 15% on (a+b+c) 1,934.42

Cost for 100 cum = a+b+c+d+e 14,830.53

Rate per cum = (a+b+c+d+e)/100 148.31

ii From Govt. land 148.31

Ananta Kr. Deka


Noonmati, Guwahati-20

Analysis Rate For E/W in Embankment
Unit=
100 CUM
3.4
301.5
Unit
Quantity
Rate
Unit = cum