You are on page 1of 1

Analysis of rate for construction of embankment with Flyash confirming to table 1 of IRC :SP:58-2001 Analyse for Sr.

No A 1 2 B 1 4 5 6 7 C Item LABOUR MATE MAZOOR MACHINERY Hydraulic Excavator 0.9 cum bucket Dozer- 80 HP for spreading Motor Grader for rading Water Tanker Vibratory Roller 8-10 T MATERIAL Hr. Hr. Hr. Hr. Hr. CUM 6 1.8 3.6 12 3.6 0 1092 1850 2009 20.28 1292 280 MAN DAY MAN DAY 0.16 4 130 90 20.80 360.00 6,552.00 60 cm/ hr. 3,329.82 200 cum/hr. 7,230.60 100 ccum/hr. 243.36 6 KL capasity 4,651.92 100 cum/hr 22,388.50 O.H & Profit Total Rate / unit 15% 3,358.28 25,746.78 71.52 Cum U.O.M 360 Qty Rate Amount
OUT PUT CAPASITY OF m/c