Professional Documents
Culture Documents
INSPECTION & TEST PLAN (ITP) For CHILLED WATER PIPING AND TESTING
Emirates Link
Maltauro LLC, Date Page …15……. of …
Contractor Abu Dhabi 07/11/2017 Page No.
Works Location (This ITP reflects status of testing/ inspection in the following area/ zone within the Project)
Responsibility
Page 1 of 3
Form Ref. TMT129, Rev- 000, Date: 05-Nov-17
will be
joined
together by
threaded
joints and
65mm and
bigger sizes
will be
approved welded;
shall be
shop
tightened
Drawing with pipe
wrench to
the
required
tightening
pressures.
Ensure
proper
length of
pipe
required
for
threading;
Threaded
joints shall
Work As per As per be cleaned,
5 Inspection 1 Approved approved pulled by W P W A
Drawings. Drawing tightly and
made with
an
approved
jointing
compound
and long
stranded
fine hemp.
Ensure
calibrated
pressure
gauge is
connected
to suitable
location or
test point,
ensure
piping is
subject to
static
pressure of
Pass the Section 1.7
pressure 232100 - working
6 Pressure 1 test as per 3.9.B times or 10
Test specificati (Hydronic bars using W P W A
on piping and a
standard pump) mechanical
pump,
holding
time must
be two
hours or as
per the
manufactur
es
requiremen
t or
standard
7 Pipe 1 Check for Volume 3- Shall be W P W A
Insulation condensation Specification clean, dry
on piping Part IV- and free
after Mechanical from rust
insulation, if Specification and other
foreign
there is no Section
matter.
condensation 404213; shall be
inspection Approved neat and
passed. Drawings symmetrica
l
appearance
running
true in-line
Page 2 of 3
Form Ref. TMT129, Rev- 000, Date: 05-Nov-17
with the
pipe
layouts;
each
service
shall be
individually
insulated;
shall not
come in
contact
with the
building
fabric.
Note (1): H: Hold Point, W: Witness, R: Review, S: Surveillance, A: Approval, P: Perform / Execute
Page 3 of 3
Form Ref. TMT129, Rev- 000, Date: 05-Nov-17