INSPECTION TEST FORM

INSPECTION & TEST PLAN (ITP) For CHILLED WATER PIPING AND TESTING

Employer Project Construction of Federal Supreme Court, Prepare  SREEJESH.M


Musanada Abu Dhabi, U.A.E. d By

Discipline CHILLED WATER PIPING AND


PMC TESTING

Altorath ITP Ref. No.


Engineer International

Emirates Link
Maltauro LLC, Date Page …15……. of …
Contractor Abu Dhabi 07/11/2017 Page No.

Works Location (This ITP reflects status of testing/ inspection in the following area/ zone within the Project)

Responsibility

Inspection / Frequency Applicable Contractor


S Acceptance Control Inspection
Test to be of Test / Specification
N Criteria Data / Forms Method Sub Third
carried out Inspection / Standard Engineer
contractor Main Party
(if Contractor
applicable)
In
accordance
with the
Volume 3- project
Specification specification,
Part IV- issued for
 1 Shop  Consultant Mechanical construction
drawing  1 Approval Specification drawing and  R  P R  A
Section approved
232100; coordinated
Approved shop
Drawings drawings
Volume 3-
Specification
Part IV-
Mechanical   Approved
Approved Consultant Specification method
 2 Method of  1 Approval Section statement and R P R A
Statement 232100; drawing Result
Approved for CHW.
Drawings .
Volume 3-
Specification
Part IV-
Mechanical
Specification
Section
3 Material  1 Consultant 232100; As per the
Approval Approval Approved project R P R  A
Drawings specification
4 CHW Pipe  1 Approved Pipes and W P W A
Installation Installation Shop fittings up
s as per Drawing to the size
of 50mm

Page 1 of 3
Form Ref. TMT129, Rev- 000, Date: 05-Nov-17
will be
joined
together by
threaded
joints and
65mm and
bigger sizes
will be
approved welded;
shall be
shop
tightened
Drawing with pipe
wrench to
the
required
tightening
pressures.
Ensure
proper
length of
pipe
required
for
threading;

Threaded
joints shall
 Work  As per  As per be cleaned,
5 Inspection  1 Approved approved pulled by W  P W A
Drawings. Drawing tightly and
made with
an
approved
jointing
compound
and long
stranded
fine hemp.
Ensure
calibrated
pressure
gauge is
connected
to suitable
location or
test point,
ensure
piping is
subject to
static
pressure of
 Pass the  Section 1.7
pressure 232100 - working
 6 Pressure  1 test as per 3.9.B times or 10
Test specificati (Hydronic bars using W P W A
on piping and a
standard pump) mechanical
pump,
holding
time must
be two
hours or as
per the
manufactur
es
requiremen
t or
standard
7 Pipe  1 Check for   Volume 3- Shall be W P  W A
Insulation condensation Specification clean, dry
on piping Part IV- and free
after Mechanical from rust
insulation, if Specification and other
foreign
there is no Section
matter.
condensation 404213; shall be
inspection Approved neat and
passed. Drawings symmetrica
l
appearance
running
true in-line

Page 2 of 3
Form Ref. TMT129, Rev- 000, Date: 05-Nov-17
with the
pipe
layouts;
each
service
shall be
individually
insulated;
shall not
come in
contact
with the
building
fabric.

Note (1): H: Hold Point, W: Witness, R: Review, S: Surveillance, A: Approval, P: Perform / Execute

Page 3 of 3
Form Ref. TMT129, Rev- 000, Date: 05-Nov-17