Professional Documents
Culture Documents
1 OF 11
- SDCC : Original
- Client : Copy
SKETCH
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
Applicable Code :
Welder Result
Line No Joint No Process Thickness Diameter Remarks
Stamp Accepted Rejected
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
SKETCH
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
E L E V A T I O N (mm)
NO. POSITION RESULT
Design Actual Dev. N
1 0
2 0 1 2 3
3 0
8 4
4 0
5
7 6 5
6
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
Tier 1
6
7
T7-B
T7-A
N North
West East
South
T7-A
T7-A
T7-1T7-1 T7-2
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
Inspection Result :
VALUE (NM)
NO STRUCTURAL PART NAME SPEC SIZE METHOD RESULT
PLAN ACT
33 34
32
31 29 35
30
SKETCH:
36
21 22 23
18 19 20
17
24
16
15 25
26
14
27
2835
77
12 11 10
13
9
4 5
7
6
3 8
2 1
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
Inspection Result :
VALUE (NM)
NO STRUCTURAL PART NAME SPEC SIZE METHOD RESULT
PLAN ACT
31 32
30
29 27 33
28 35
SKETCH: 77
34
20 21
17 18 19
16 22
15
23
14
24
13
25
26
12 11 10
9
4 5
7
6
3 8
2 1
Notes:
Every point we check four bolt for test the torqie…!!!
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
Applicable Code :
Welder Result
Line No Joint No Process Thickness Diameter Remarks
Stamp Accepted Rejected
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
Tier 1
6
7
T7-B
N North
West East
South
T7-A
T7-1 T7-2
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
Inspection Result :
VALUE (NM)
NO STRUCTURAL PART NAME SPEC SIZE METHOD RESULT
PLAN ACT
11
10 12
13
9 14
SKETCH: N
8 5
15
4 7
16
6
2
1
Notes:
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
DEVIATION (mm)
deviation
NO. POSITION Vertical Degree Center Line RESULT
North South West East e1 e2
1 CH-1A 2 - - 1
2 CH-1B 4 - - 10
3 CH-1C - 1 - 1
4 CH-1D - 3 - 1
5 CH-1E 5 - - 5
6 CH-2A 2 7 - -
Tier 1
7 CH-2B - 5 - -
8 CH-2C - - - 2
9 CH-2D 6 - - -
10 CH-2E 5 3 - -
11 CH-3A 2 - - -
12 CH-3B 2 - 8 -
13 CH-3C 3 - 3 -
14 CH-3D 4 - 3 -
North
15 CH-3E - 1 2 -
CH-E
West East
CH-D N
South
CH-C
CH-B
CH-A
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
Applicable Code :
Welder Result
Line No Joint No Process Thickness Diameter Remarks
Stamp Accepted Rejected
SKETCH:
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
SKETCH
N
V
A A A
###
A A
F E D C B A
A A A A
4 3 2 1
MSL: 19750
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
SKETCH
N
V
6 5 4 1
A 3 2
MSL+14800
2
0 B
0
0 8 877.5
7 `
7 MSL:+14880
5 C
877.5
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
SKETCH
N
V
A MSL+14800
2 4 3 2 1
0 B
0
0 8 877.5
7 `
7 MSL:+14880
5 C
877.5
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
SKETCH
N
V
A MSL+14800
2
0 B
0
0 8 877.5
7 `
7 MSL:+14880
5 C
877.5
4 3 2 1
C C
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
NO.
1 2
4 3
Top Elev. of Padding
ELEVATION ELEVATION
MAX MAX
NO DEV. TOERANCE
NO DEV. TOLERANCE
PLAN ACTUAL PLAN ACTUAL
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
SKETCH
N
V
A A
###
A A
D C B A
A A A A
4 3 2 1
MSL: 19750
±10MM
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
Tier 1
N
T7-B
North
West East
South
T7-A
T7-1 T7-2
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
SKETCH
N
V
B ` DETAIL "A"
POINT JOIN NO
THICKNESS RESULT REMARKS
TF 01 12 mm ACC
A WEB 02 12 mm ACC
BF 03 12 mm ACC
TF 01 12 mm ACC
B WEB 02 12 mm ACC
BF 03 12 mm ACC
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
Tier 1
COAL CRUSHER BUILDING
C1-D
North
West East
South
C1-C
C1-4 C1-5
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
SKETCH
V
N
B ` DETAIL "A"
Welder Result
Line No Joint No Process Thickness Diameter Remarks
Stamp Accepted Rejected
TF-01 SCED-009 SMAW 12 MM - ACC -
A WEB-02 SCED-009 SMAW 12 MM - ACC -
BF-03 SCED-009 SMAW 12 MM - ACC -
TF-01 SCED-009 SMAW 12 MM - ACC -
B WEB-02 SCED-009 SMAW 12 MM - ACC -
BF-03 SCED-009 SMAW 12 MM - ACC -
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
DEVIATION (mm)
deviation
NO. POSITION Vertical Degree Center Line RESULT
North South West East e1 e2
1 CH-1A - - - 3
2 CH-1B - 5 - 5
3 CH-1C - - 5 -
4 CH-1D - 3 4 -
5 CH-1E - 7 - 5.5
6 CH-2A 7 - 4 -
Tier 1
7 CH-2B 5 - 5 -
8 CH-2C 1 - - 1
9 CH-2D - 2 - 4
10 CH-2E - 3 5 -
11 CH-3A - - 5 -
12 CH-3B 3 - - 5
13 CH-3C - - - -
14 CH-3D - 7 1 -
North
15 CH-3E - 5 3 -
CH-E
West East
CH-D N
South
CH-C
CH-B
CH-A
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
Tier 1
D-J-1/2 D-J-1/4
North
West East
South
D-J-1/1 D-J-1/3
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
DEVIATION (mm)
deviation
NO. POSITION Vertical Degree Center Line RESULT
North South West East e1 e2
1 T1-1 A 2 - - 2 ACC
2 T1-1-B - 2 4 - ACC
3 T1-2-A 2 - - - ACC
4 T1-2-B - - - - ACC
Tier 1
T1-2 A
T1-2 B
C-101
T1-1 A
T1-1 B
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
Tier 1
T1-2 A
T1-2 B
North
C-101
West East
T1-1 A
T1-1 B
South
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
DEVIATION (mm)
deviation
NO. POSITION Vertical Degree Center Line RESULT
North South West East e1 e2
1 CH-1A 4 - 2 -
2 CH-1B - 9 - 6
3 CH-1C - 5 3 -
4 CH-1D - 3 - 1
5 CH-1E 9 - - 5
6 CH-2A - 5 - 2
Tier 1
7 CH-2B - 2 - 10
8 CH-2C - - - -
9 CH-2D - 3 - 3
10 CH-2E - 7 - -
11 CH-3A 5 - - -
12 CH-3B - 5 - -
13 CH-3C - 2 - 6
14 CH-3D - 4 - -
North
15 CH-3E 1 - - 4
CH-E
West East
CH-D N
South
CH-C
CH-B
CH-A
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
DEVIATION (mm)
deviation
NO. POSITION Vertical Degree Center Line RESULT
North South West East e1 e2
1 CH-1A - 4 7 -
2 CH-1B - 4 8 -
3 CH-1C - - - -
4 CH-1D - 2 2 -
5 CH-1E 10 - - 3
6 CH-2A 1 - 5 -
Tier 1
7 CH-2B - - - -
8 CH-2C - - - -
9 CH-2D - - - -
10 CH-2E 5 - 4 -
11 CH-3A - 2 - 3
12 CH-3B - 3 7 -
13 CH-3C - - - -
14 CH-3D - 2 8 -
North
15 CH-3E - 2 1 -
CH-E
West East
CH-D N
South
CH-C
CH-B
CH-A
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
Inspection Result :
VALUE (NM)
NO STRUCTURAL PART NAME SPEC SIZE METHOD RESULT
PLAN ACT
31 32
30
29 27 33
28 35
SKETCH: 77
34
20 21
17 18 19
16 22
15
23
14
24
13
25
26
12 11 10
9
4 5
7
6
3 8
2 1
Notes:
Every point we check random, carried out four bolt for test the torqie use 400nm…!!!
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
Inspection Result :
VALUE (NM)
NO STRUCTURAL PART NAME SPEC SIZE METHOD RESULT
PLAN ACT
SKETCH:
20 21
17 18 19
16 22
15
23
14
24
13
25
26
12 11 10
9
4 5
7
6
3 8
2 1
Notes:
Every point we check random, carried out four bolt for test the torqie use 420nm…!!!
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
Tier 1
center line C-105 A
North
West East
South
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
SKETCH
V
N
B ` DETAIL "A"
Welder Result
Line No Joint No Process Thickness Diameter Remarks
Stamp Accepted Rejected
TF-01 SCED-W-081 SMAW 12 MM - ACC -
A WEB-02 SCED-W-081 SMAW 12 MM - ACC -
BF-03 SCED-W-081 SMAW 12 MM - ACC -
TF-01 SCED-W-081 SMAW 12 MM - ACC -
B WEB-02 SCED-W-081 SMAW 12 MM - ACC -
BF-03 SCED-W-081 SMAW 12 MM - ACC -
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
Tier 1
6 C4-6 - 5 - 9
7 C4-7 1 - - 3
8 C4-8 4 - 2 -
N
C4-8 C4-7 C4-4 C4-3
North
West East
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
VERTICALITY deviation
NO. POSITION Vertical Degree Center Line RESULT
North South West East e1 e2
1 C1 1 3 - -
2 C2 2 - 5 -
3 C3 - 3 - 2
4 C4 - C3
center line C-105C4
B 5 - 6
Tier 1
LEVELING
NO DEV REMARKS
PLAN ACTUAL
1 3650 3650 0
2 3650 3651 1
3 3650 3651 1
West
4 3650 3650 0
North
N
C2 C1 west East
Take up tower grafity
South
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
SKETCH
V
N
A 2 6 5 4 3 2 1
0
0
0
2
0
0
0 `
B 6 5 4 3 2 1
MSL BOS:+17650
A
1,3
2,4
1,2= EAST
VIEW 'A'
LEVELING LINEARITY max
POINT POINT
NO PLAN ACTUAL DEV. NO PLAN NO ACTUAL DEV. tolerance
1 17650 17564 -86 1 2000 1 2009
2
2 17650 17565 -85 2 2000 2 2007
3 17650 17565 -85 A 3 2000 3 2007
0
A 4 17650 17568 -82 4 2000 4 2007
5 17650 17569 -81
6 17650 17569 -81 1 2000 1 2007
2
2 2000 2 2005
1 17650 17564 -86 3 2000 3 2005
2
2 17650 17564 -86 B 4 2000 4 2003
3 17650 17564 -86
B 4 17650 17565 -85
5 17650 17566 -84
6 17650 17570 -80
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
SKETCH
V
N
B ` DETAIL "A"
Welder Result
Line No Joint No Process Thickness Diameter Remarks
Stamp Accepted Rejected
TF-01 - - 12 MM - ACC - 100% PENETRANT TEST
A WEB-02 - - 12 MM - ACC - 100% PENETRANT TEST
BF-03 - - 12 MM - ACC - 100% PENETRANT TEST
TF-01 - - 12 MM - ACC - 100% PENETRANT TEST
B WEB-02 - - 12 MM - ACC - 100% PENETRANT TEST
BF-03 - - 12 MM - ACC - 100% PENETRANT TEST
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
B A
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
Tier 5
N
North
T9-B
West
South
T9-A
T9-1 T9-2
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
VIEW "A"
B A
West
South North
East
16
DETAIL "A"
Notes.
Prepared & Inspected by, Witnessed / Approved by, Witnessed by, Reviewed / Approved by,
EQUIPMENT PARTICLES
NOTE: "A" FOR CONVERYOR C-101 A & "B" FOR CONVERYOR C-101 B
SKETCH :
VIEW "A"
B A
16
Examiner & Inspected by, Witnessed / Approved by, Witnessed / Approved by, Reviewed / Approved by,