MATRIK SCOPE OF WORK

for
Fit - up & Welding s/d Finishing ( Order Medium PV / 19.116.1 ) ITEM : C335-01
No Item SOW Remark
BBI Subkont
1 Engineering Document
Detail Drawing o
WPS o
Welder Certificate o o Migas
Fabrication Tolerance o
2 Quality Document
ITP o
NDE Procedure o
Inspection Report o
NDE Personel Vendor o
3 Material
Main material ( Plate) o
Temporary material o Jig/temporary Support/ Bolting
4 Equipment
Welding machine SMAW & SAW o
Mesin gouging & Compressor o
Stang Gouging o jika di perlukan
Grinding,Gas cutting dll o
Cable power, stop contatc, dll o
Blower o
Lampu penerangan o
Scafolding ( ssesuai kebutuhan ) o
5 Consumable fabrication
Kawat Las o
Carbon gouging dll o
Gas - Gas ( argon, elpiji, oxsigen) o
Batu Gerinda o
NDE o
6 Man Power
Supervisor o
Fitter o
Qualified welder o
Finishing o
SHE Officer o o
QC & NDE Operator o
7 Pekerjaan
6.1 Workshop preparation
Fabrication Workshop o
6.2 Fabrication
Fit Up / Assembly o
Welding ( incl. gouging ) o
Finishing o
Repair welding ( visual / NDE ) o
Handling/ lifting o o untuk Crane cap.50T Opr.BBI
6.3 Inspection job
Document preparation o
NDE o
Dimention test & Visual Inspection o o Witness
Inspection Report o
7 APD Pekerja o
8 Box peralatan o
9 BPJS Pekerja o
10 Supervisor room di workshop o
11 Progress report o Per hari