SEQUENCE OF PRESENTATION

Problem
troduction Objectives
Statement

Research Work
gnificance
Methodology Schedule
2
INTRODUCTION

Construction industry is one of the most booming industry in


the world.
Construction industry produces 30% wastage of materials,
cost and time [4].
Construction industry is the largest employment producing
sector in Pakistan with an annual growth rate of 9.05%
(2016-2017) [1].

3
INTRODUCTION

Developing Countries like Pakistan has a poor record in


terms of completing projects in allotted time [2].

Traditional management practices should be replaced by


modern techniques like BIM.

4
INTRODUCTION

Building Information
Modeling (BIM) is an
intelligent 3D model based
process for

5
INTRODUCTION
BIM is a process of
designing a building in
collaboration.

6
PROBLEM STATEMENT

For sustainable development, losses (material, cost and


time) should be minimized.
Projects should be made Economical, Qualitative and
Time efficient.
Traditional management techniques should be replaced
by advance technologies.
BIM has the potential to overcome these challenges.

7
OBJECTIVES

To Re-model an existing structure using BIM.

To Identify the present state of BIM adoption and


Highlight the barriers in adoption of BIM in Pakistan.

To Increase efficiency of construction industry in Pakistan.

8
SIGNIFICANCE OF BIM

Saves time and cost of a project.


Detailed information.
Improve collaboration.
Less rework.
Resolves clashes.
Mobility.
Control and Management.
9
RESEARCH METHODOLOGY

Literature review of BIM Adoption and Applications.

Our research methodology will consist of Two Phases

10
RESEARCH METHODOLOGY
Phase-1 :
Re-modeling of an existing structure using BIM and
comparing it with the previous results.
Phase-2 :
 Identification of barriers in BIM Adoption taxonomy
in Pakistan through questionnaire based survey.
 Sharing Findings of Phase-1 of our project with
construction firms for the awareness of BIM in
Pakistan.
11
FLOW CHART
Phase-1 Phase-2
Remodeling Survey

Questionnaire
Collection of Data

Analysis of data
Modeling in BIM

Distribution of
Analysis of data results

Comparison of
12 results
GANTT CHART
Topic Selection

Literature Review

Proposal Writing

Data Collection
Pending
Data Modeling In Progress

Data Analyzing Completed

Comparison of models

Questionnaire survey

Data Analysis

Theisis Writing

Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19

13
REFERENCES
1. Maqsoom, A., C. Charoenngam, and M. Awais, Internationalization process of Pakistani contractors:
An exploratory study, in ICCREM 2013: Construction and Operation in the Context of
Sustainability. 2013. p. 59-72.
2. Gardezi, S.S.S., I.A. Manarvi, and S.J.S. Gardezi, Time extension factors in construction industry of
Pakistan. Procedia Engineering, 2014. 77: p. 196-204.
3. Maqsoom, A. and C. Charoenngam, Motives and competitive assets of Pakistani international
construction contracting firms: impact of size and international experience. Journal of Financial
Management of Property and Construction, 2014. 19(2): p. 138-151.
4. Memon, N.A., M.A. Laghari, and F.A. Memon, Factors contributing to the waste generation in
building projects of Pakistan. Mehran University Research Journal Of Engineering & Technology,
2016. 35(1): p. 95.
5. Mendelsohn, R., The Constructibility Review Process: A Constructor's Perspective. Journal of
Management in Engineering, 1997. 13(3): p. 17-19.
6. Masood, R., M. Kharal, and A. Nasir, Is BIM adoption advantageous for construction industry of
Pakistan? Procedia Engineering, 2014. 77: p. 229-238.

14
15

You might also like