Name of work:-
PHLC Project.
Schedule B
Item Estimated Rate
Qty. Description of Item Unit
No. In Figure In Words
1 2 3 4 5 6
Excavation for foundation trenches in all sorts
of soil sand clay, hard clay, soft murrum Three
including shoring, strutting and depositing the Hundred
excavated stuff, refilling the remaining Eleven
1 5.85 excavated trenches upto G.L. as and where 311.90 Cu.M
Rupees and
directed within a lead of 50 m. etc. complete as Ninety Paisa
directed. (For Special situation up to 10 cum) only
(a) lift up to 1.5 m
Providing & Laying in position "NOMINAL
MIX" cement concrete using cement, sand and
crushed aggregate by mass and machine mix for
Three
C.C./R.C.C work incl. necessary formworks
Thousand
centering, scaffolding, compaction by vibrator,
Three
2 2.66 curing as directed with all lead & lift etc 3346.00 Cu.M
Hundred
complete Without Dewatering and excluding
Fourty-Six
cost of steel reinforcement.
Rupees only
a) C.C.Nominal Mix, M-10 and MSA-40 mm
Total…..
Say…….
Note 1 : All work shall be carried out as per Public Works Department Handbook and other specifications of
Division or directed.
Note 2 : All the columns in schedule should be filled in ink and the total of the entries in the last coulmn
should be struck by the contractor under his signature.
Note 3 : Rates quoted include clearance of site (prior commencement of work and at its close) in all respects
and hold good for work under all conditions, site, moisture, weather etc.
Note 4 : To be continued on additional sheets, if found necessary.
Executive Engineer
Panam Project Division
Godhra
distributary of RBMC of
Amount
7
1824.62
8900.36
391878.00
402602.98
402603.00
Rs. …………
Rs. …………
Rs. …………
……………………………..
specifications of
Executive Engineer
nam Project Division
Godhra