You are on page 1of 62

Specification report

Specification report to accompany the Recasted/Working


estimate for the work “Providing B.T road from Valasa Road Junction to
Ravvagedda Km 0/0 to 9/0 in Y.Ramavaram Mandal" of East Godavari District

Estimate Cost.Rs.:- 340.00 / 340.00 Lakhs

The work was administratively sanctioned vide Prcgs.No. 333(M)/018

The working estimate is prepared due to following reasons.

1 The original estimate is sanctioned with WBM layers as base of BT. As per site condtion the
working estimate is prepared with WMM layers.

2 Construction of embankment & shoulders by providing selected earth, due to side earth is not
available, the road is passing in forest area.

3 Construction of Granular sub-base by providing HBG material is proposed for patches & 1500mtr,
for connecting road fromRampachodavaram Mandal Head quarter.

4 Construction of 5mtr span x 2 vents slab culvert is proposed in the palce of old collapsed pipe
culvert in Appalarajupeta toRampachodavaram Road.

5 Construction of 5mtr span x 1 vent slab culverts - 2 Nos is proposed as per site condition.

6 Construction of 1000mm dia Single Row Pipe Culvert - 1 No is proposed as per site condition.

7 Necessary provsions for KM, HM Stones and QC @ 0.5% Charges and seigniorage charges are
provided in the estimate.
The working estimate is prepared with 2018-19 Post GST Rates and

ASST.EXE.ENGINEER DY.EXE.ENGINEER EXECUTIVE ENGINEER


TRIBAL WELFARE TRIBAL WELFARE TRIBAL WELFARE
MAREDUMILLI Rampachodavaram RAMPACHODAVARAM
B.T. ROAD GENERAL ABSTRACT

Name of Work:- Providing BT Road from R&B Road to Lankalapalli in Buttayagudem


Mandal of West Godavari Dist.

Amount In
Sl. No. Description
Lakhs

PART- A

1 Road work #REF!

Construction of 1000mm dia Single Row Pipe Culvert - 7 Nos, Double Row
2 1904738
- 1 No

Sub Total:- #REF! #REF!

4 Provision for Q.C. Charges @ 1% #REF!

5 Provision for Seigniorage Charges-LS- #REF!

6 PROVISION for price variation-LS- #REF!

7 Provisoin for unforeseen items -LS- 13710

Rs. #REF! 34000000


Lakhs #REF!
#REF!
DETAILED CUM ABSRACT ESTIMATE
Name of Work:- Providing BT Road from R&B Road to Lankalapalli in Buttayagudem Mandal of West Godavari
Dist.
USL-
Sl. Material-
Description of Item No Length Breadth Depth Qty Rate / Per Amount
No Rate / Per
Engaging Unskilled labour for earth work excavation in ordinary soils at
1 site with initial lift and breaking clods and sectioning for formation of
Embankment- for Road (RSSR).
From Km 0/0 to 9/0 1 x 2 9000 0.50 0.50 4500

Total 4500 120.71 - 543195


Cum 1 Cum

Construction of Granular sub-baseby providing well graded meterial (i.e.,


stone aggregates(Gravel) of 9.50mm to 4.75mm size 75% and Stone Dust
-25%) of MoRT&H Table 400-2 and Table 400.1 of MORD including cost
and conveyance of all materials to work site and spreading in uniform
layers with motor grader on prepared surface mixing by mix in place
2
method with Rotavator / approved means at OMC and compacting with
vibratory roller to achieve the desired density etc., as per technical
specification 401 MORTH (4th revision) and 401 MORD and as directed
by the Engineer-in-charge complete for finished item of work ( Payment
will be made based on levels for finished item of work ).

From Km 0/0 to 9/0 1 x 1 9000 4.00 0.225 8100.00

Total 8100.00 - #REF! #REF!


Cum 1 Cum
Providing, Laying, Spreading and compacting graded HBG crushed stone
aggregate as per table 400.11 and 400.12 of MORD to Wet Mix macadem
specification including cost and including premixing the material with water
at OMC in Mechanical mix plant (pug mill) carriag of mixed material by
3 tipper to site , laying in uniform layers with motor grader on base course
on well prepared surface and compacting with Vibratory roller to acheive
the desired density etc., as directed by the Engineer-in-Charge and as per
MoRT&H specification.406 (4th revision) and 406 MORD complete for
finished item of work. (Payment based on levels for finished item of work)

From Km 0/0 to 9/0 1 x 1 9000 3.75 0.150 5062.50

Total 5062.50 - 1993.70 10093106


Cum 1 Cum

Providing and applying prime coat with bitumen emulsion (SS1) Bulk using
emulsion pressure distributor on prepared surface of granular base
including clearing of road surface and spraying emulsion at the rate of
4
0.70 kg/sqm using emulsion pressure distributor for finished item of work
etc., complete as per MoRT&H Specification 502 (5th revision) and as
directed by the Engineer-in-charge.

From Km 0/0 to 9/0 1 x 1 9000 3.75 - 33750.00

Total 33750.00 - 40.74 1374975


Sqm 1 Sqm
Providing and applying tack coat with bitumen Emulsion (Rapid settting-1)
using Emulsion pressure distributor at the rate of 0.275kgs per sqm on the
5 prepared bituminous surface cleaned with hydralic broom as per MoRT&H
Specification 503 (4th revision) and 503 MORD as directed by the
Engineer-in-Charge complete for finished item of work.

From Km 0/0 to 9/0 1 x 1 9000 3.75 - 33750.00

Total 33750.00 - 11.70 394875 1769850


Sqm 1 Sqm

Providing, laying and rolling of close-graded mix seal surfacing material of


25 mm thickness composed of 13.2 mm to 0.09 mm (Type-B) aggregates
as per Table 500-26 of MORTH and Table 500.15 of MORD using 60/100
penetration grade bitumen to the required line, grade and level to serve as
wearing course on a previously prepared base, including mixing in a hot
6 mix plant of 40 to 60 tonnes per hour capacity, laying with paver finisher
hydrostatic with sensor attachment and rolling with a Smooth wheeled
roller 8-10 tonne capacity and finishing to required level and grade as per
technical specification 512 MORTH and 509 MORD including cost and
conveyance of all materials, seigniorage charges etc., complete for
finished item of work.

From Km 0/0 to 9/0 1 x 1 9000 3.75 - 33750.00

Total 33750.00 - 149.10 5032125


Sqm 1 Sqm
Construction of un-reinforced, dowel jointed at expansion and
construction joint only, plain cement concrete pavement, thickness as per
design, over a prepared sub base, with 43 grade cement or as per Clause
1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383,
maximum in a concrete mixer of not less than 0.2 cum capacity and
appropeiate weigh batcher using approved mix design, laid in approved
fixed side formwork (steel channel, laying and fixing of 125 mictron thick
polythene film, wedges, steel plates including levelling the formwork as
per drawing), spreading the concrete with sholvels, rakes, compacted
7 using needle, scareed and plate vibrators and finished in continuous
operation including provision of contraction and expansion, construction
joints, applying debonding strips, primer, sealant, dowel bars, near
approaches to bridge / culvert and construction joints, admixtures as
approved, curing of concrete slabs for 14- days, with water finishing to
lines and grade as per drawing and Technical Specification Clause 1501
MORD.

CC PAVEMENT 1 X 1 0 3.75 0.19 0 5392.70 0

Construction of Gravel shoulders with naturally occuring gravel including


cost, seigniorage charges and conveyance of all materials to work site and
spreading in uniform layers by with motor graded on prepared surface, by
8 mixing by mix in place method with rotovator and compacting with smooth
wheeled roller to achieve the desired density at OMC etc., as per
MoRT&H Specification 401& 407 (4th revision) and 408 MORD as
directed by the Engineer-in-charge complete for finished item of work.

For Shoulders 1 x 2 9000 1.00 0.150 2700.00


.
Total 2700.00 - 370.10 999270
Cum 1 Cum

9 Supply and fixing of KM stones including painting and required lettering 10.00 - 1626.51 16265 4936
Nos 1 No

10 Supply and fixing of HM stones including painting and required lettering 36.00 - #REF! #REF! 5693

Nos 1 No 10629

11 Supply and fixing of MS name board of size 2'.6" x 4' including painting and 1.00 - LS 3500
required lettering Nos

To and fro transportation charges of 8-10 T Power Road Roller with lead 1.00 4782.50 4783
12 upto 40 KM
Nos 1 No

Road work Total #REF!


Forming embankment with approved material obtained from borrowpits
with a lead upto 1000 meters useful from outside road boundary by
mechanical means upto SDR with all leads and lifts, including pre-watering
of soil at borrow area, removal of top soil, excavation and conveyance of
soils and depositing the soil on the embankment, spreading, breaking
3 clods, sectioning, grading and consilodation with vibratory roller at OMC to
meet the requirement of table 300-2 of MoRT&H and table 300.1 and
300.2, of MORD including all hire and operational charges of T&P and
seigniorage charges, as per MoRT&H specification 305 (4th revision)
301.5 of MORD complete for finished item of work. (Payment will be made
based on level for finished item of work).

From Km 0/0 to 5/0 1 x 2 5000 0.40 0.4 1600


From Rjvm to Applrjupeta 1 x 2 1000 0.40 0.4 320

Total 0 155.70 0 0
Cum 1 Cum

Forming embankment with side earth useful from outside road boundary
by mechanical means upto SDR with all leads and lifts, including pre-
watering of soil at borrow area, removal of top soil, excavation and
conveyance of soils and depositing the soil on the embankment,
spreading, breaking clods, sectioning, grading and consilodation with
2
vibratory roller at OMC to meet the requirement of table 300-2 of MoRT&H
and table 300.1 and 300.2, of MORD including all hire and operational
charges of T&P and seigniorage charges, as per MoRT&H specification
305 (4th revision) 301.5 of MORD complete for finished item of work.
(Payment will be made based on level for finished item of work).

5000.00
5000.00 65.10 cum 325500.00
Clearing and grubbing road land by mechanical means including uprooting
wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto
300mm, removal of stumps of such trees cut earlier and disposal of
unserviceable materials and stacking of serviceable material to be used or
1
auctioned, upto a lead of 1000m including removal and disposal of top
organic soil not exceeding 150mm in thickness as per Technical
Specification Clause 201 MORD / MORTH complete for finished item of
work.

2 2250 4.00 18000


18000
Deduct 40% voids -7200

Total 10800 461.12 Sqm 4980100.00

Forming embankment with side earth useful from outside road boundary
by mechanical means upto SDR with all leads and lifts, including pre-
watering of soil at borrow area, removal of top soil, excavation and
conveyance of soils and depositing the soil on the embankment,
spreading, breaking clods, sectioning, grading and consilodation with
2
vibratory roller at OMC to meet the requirement of table 300-2 of MoRT&H
and table 300.1 and 300.2, of MORD including all hire and operational
charges of T&P and seigniorage charges, as per MoRT&H specification
305 (4th revision) 301.5 of MORD complete for finished item of work.
(Payment will be made based on level for finished item of work).

5000.00
5000.00 0.00 cum 0.00
Forming embankment with approved material obtained from borrowpits
with a lead upto 1000 meters useful from outside road boundary by
mechanical means upto SDR with all leads and lifts, including pre-watering
of soil at borrow area, removal of top soil, excavation and conveyance of
soils and depositing the soil on the embankment, spreading, breaking
3 clods, sectioning, grading and consilodation with vibratory roller at OMC to
meet the requirement of table 300-2 of MoRT&H and table 300.1 and
300.2, of MORD including all hire and operational charges of T&P and
seigniorage charges, as per MoRT&H specification 305 (4th revision)
301.5 of MORD complete for finished item of work. (Payment will be made
based on level for finished item of work).

2000.00
2000.00 0.00 cum 0.00

Construction of Granular sub-base by providing HBG material confirming


to Grading - III of MoRT&H Table 400-2 and Table 400.1 of MORD
including cost, seigniorage charges and conveyance of all materials to
work site and spreading in uniform layers with motor grader on prepared
surface mixing by mix in place method with Rotavator / approved means
4
at OMC and compacting with vibratory roller to achieve the desired density
etc., as per technical specification 401 MORTH (4th revision) and 401
MORD and as directed by the Engineer-in-charge complete for finished
item of work ( Payment will be made based on levels for finished item of
work ).

Km 0/00 to 2/000 1 2000 4.00 0.20 1600.00


448568.2 717709253.0
Total 1600.00 cum
8 0
Providing, Laying, Spreading and compacting graded HBG crushed stone
aggregate as per table 400.11 and 400.12 of MORD to Wet Mix macadem
specification including cost,seignorage of all materials and including
premixing the material with water at OMC in Mechanical mix plant (pug
mill) carriag of mixed material by tipper to site , laying in uniform layers
5
with motor grader on base course on well prepared surface and
compacting with Vibratory roller to acheive the desired density etc., as
directed by the Engineer-in-Charge and as per MoRT&H specification.406
(4th revision) and 406 MORD complete for finished item of work.
(Payment based on levels for finished item of work)

Km 0/00 to 2/000 1 2000 3.75 0.15 1125.00

Total 1125.00 0.00 Cum 0.00

Providing and laying surface dressing in single coat using 6 mm nominal


size IRC HBG machine crushed stone aggregates @ 0.004 cum / sqm on
a layer of bitumen binder of 80/100 grade @ 0.75 kg / sqm laid on
6
prepared surface and rolling with 8-10 T Power Road Roller etc.,
complete for finished item of work as per MORT&H Specification 510 (4th
Revision) and as directed by the Engineer-in-charge.

Km 0/00 to 2/000 2000 3.75 7500.00


Total 7500.00 0.00 Sqm 0.00

Providing and applying tack coat with bitumen Emulsion (Rapid settting-1)
using Emulsion pressure distributor at the rate of 0.275kgs per sqm on the
7 prepared bituminous surface cleaned with hydralic broom as per MoRT&H
Specification 503 (4th revision) and 503 MORD as directed by the
Engineer-in-Charge complete for finished item of work.

Km 0/00 to 2/000 2000 3.75 7500.00


Total 7500.00 0.00 Sqm 0.00
Providing, laying and rolling of close-graded mix seal surfacing material of
25 mm thickness composed of 13.2 mm to 0.09 mm (Type-B) aggregates
as per Table 500-26 of MORTH and Table 500.15 of MORD using 80/100
penetration grade bitumen to the required line, grade and level to serve as
wearing course on a previously prepared base, including mixing in a hot
8 mix plant of 40 to 60 tonnes per hour capacity, laying with paver finisher
hydrostatic with sensor attachment and rolling with a Smooth wheeled
roller 8-10 tonne capacity and finishing to required level and grade as per
technical specification 512 MORTH and 509 MORD including cost and
conveyance of all materials, seigniorage charges etc., complete for
finished item of work.

Km 0/00 to 2/000 2000 3.75 7500.00


472500000.0
7500.00 63000.00 Sqm
0
DETAILED CUM ABSRACT ESTIMATE

Name of Work:- Providing BT Road from R&B Road to Lankalapalli in Buttayagudem Mandal of West Godavari
Dist.

Sub Work:- Construction of 1000mm dia Single Row Pipe Culvert - 7 Nos, Double Row - 1 No
USL-
Sl. Material-
Description of Item No Length Breadth Depth Qty Rate / Per Amount
No Rate / Per
Engaging Unskilled labour for earth work excavation in ordinary soils at
1 site with initial lift and breaking clods and sectioning for formation of
Embankment- for Road (RSSR).
For Pipes portion 7 x 1 4.50 1.50 0.30 14.18
For Body walls 7 x 2 7.00 1.60 1.50 235.20
Double Row
For Pipes portion 1 x 1 4.50 6.00 0.30 8.10
For Body walls 1 x 2 10.00 1.60 1.50 48.00

Total 305.48 120.71 - 36874


Cum 1 Cum

Back filling behind Abutments with gravel including cost and conveyance
of all materials to site, and seigniorage charges of all materials and labour
2 charges etc., complete as per Clause 710.1.4 of IRC : 78 and as per
MoRT&H Specification No. 2200 (4th Revision) and 1204.3.8 MORD as
per Drawing and complete for finished item of work.

For Pipes portion 7 x 1 4.50 1.50 0.15 7.09


For Body walls 7 x 2 7.00 1.60 0.30 47.04
Cushion over pipes 7 x 1 6.60 5.00 0.60 138.60
Double Row (AVG)
For Pipes portion 1 x 1 4.50 6.00 0.15 4.05
For Body walls 1 x 2 10.00 1.60 0.30 9.60
Cushion over pipes 1 x 1 6.60 5.00 0.40 13.20
(AVG)

Total 219.58 - 215.10 47232


Cum 1 Cum
Providing Plain Cement Concrete (1:4:8) mix M7.50 Grade using 40mm
(SS5) size HBG crushed stone aggregate and fine aggregate conforming
to table 1000-2 of MoRT&H including cost and conveyance of all materials
to site, seigniorage charges and labour charges for centering, machine
mixing, laying concrete in position, Vibrating, curing etc., including all other
3 incidental and operational charges of all T&P etc., as per technical
specification MoRT&H 1500, 1700, 2100 (4th Revision), and 802, 803,
1202 and 1203 MORDas directed by the Engineer-in-Charge complete for
finished item of work for levelling course.

Under pipes 7 x 1 4.50 1.50 0.15 7.09


For Body walls 7 x 2 7.00 1.60 0.20 31.36
Double Row
Under pipes 1 x 1 4.50 1.60 0.15 1.08
For Body walls 1 x 2 10.00 1.60 0.20 6.40

Total 45.93 - 3450.69 158490


Cum 1 Cum
Vibrated plain / reinforced cement concrete M 15 Grade Concrete using
40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming to
table 1000-2) including cost and sconveyance of all materials to site,
seigniorage charges and all labour charges for machine mixing, laying
4 concrete in position,Compacting, Vibrating and curing including all other
incidental and all other operational charges of T&P required etc., complete
as per technical specification MoRT&H 1500,1700, 2200 (4th Revision),
and 802, 804, 805, 806, 807, 1202 and 1204 MORD complete for finished
item of work for Sub structure for body walls, parapet walls, Abutments,
Piers and wing walls.

For Body walls 7 x 2 7.00 1.5+0.50/ 2.70


2 264.60
Deduct pipe portion 14 x ∏/ 1.00 x 1.00 0.90 -9.90
4
Parapet walls 7 x 2 3.00 0.40 0.45 7.56

Double Row
For Body walls 1 x 2 10.00 1.25+0.40 2.50
/2 50.00
Deduct pipe portion 4 x ∏/ 1.00 x 1.00 0.90 -2.83
4
Parapet walls 1 x 2 3.00 0.40 0.45 1.08

Total 311.59 - 3600.40 1121866


Cum 1 Cum
Providing, laying Reinforced cement concrete Hume pipes of 1000 mm
diameter NP-3 class for pipe culverts including cost and conveyance of
Pipes etc., complete and Labour charges for laying, jointing of 1000 mm
diameter R.C.C Hume pipes in position including lifting, aligning, lowering
5
and hoisting etc., as per drawing and as per MoRT&H (4th Revision)
Specification Clauses 2900, 2905 & 2906, IRC Special Publication No: 13
and 1106 MORD as directed by the Engineer-in-Charge, complete for
finished item of work.

For Single Row 7 x 1 7.5 - - 52.50


For Double Row 1 x 2 7.5 - - 15.00

Total 67.50 - 7474.60 504536


Rmt 1 Rmt
6 Plastering with 12mm thickness in CM (1:3) including cost and conveyance
of all materials, centering charges, labour charges and curing Body Walls
(CSSR)

Single Row
Body walls I/s & O/s 7 x 2 7.00 - 1.80 176.40
Sides 7 x 2 0.90+0.40/2 1.80 16.38
Parapet 3 sides 7 x 2 3.00 - 1.30
54.60
Sides 7 x 4 0.40 - 0.45 5.04
Double Row
Body walls 1 x 2 10.00 - 1.50 30.00
Sides 1 x 2 0.90+0.40/2 1.50 1.95
Parapet 3 sides 1 x 2 3.00 - 1.30
7.80
Sides 1 x 4 0.40 - 0.45 0.72

292.89 1220.27 35740


Sqm 10 Sqm

1904738
Forming embankment with approved material obtained from borrowpits
with a lead upto 1000 meters useful from outside road boundary by
mechanical means upto SDR with all leads and lifts, including pre-watering
of soil at borrow area, removal of top soil, excavation and conveyance of
soils and depositing the soil on the embankment, spreading, breaking
3 clods, sectioning, grading and consilodation with vibratory roller at OMC to
meet the requirement of table 300-2 of MoRT&H and table 300.1 and
300.2, of MORD including all hire and operational charges of T&P and
seigniorage charges, as per MoRT&H specification 305 (4th revision)
301.5 of MORD complete for finished item of work. (Payment will be made
based on level for finished item of work).

From Km 0/0 to 5/0 1 x 2 5000 0.40 0.4 1600


From Rjvm to Applrjupeta 1 x 2 1000 0.40 0.4 320
Total 0 155.70 0 0
Cum 1 Cum

Forming embankment with side earth useful from outside road boundary
by mechanical means upto SDR with all leads and lifts, including pre-
watering of soil at borrow area, removal of top soil, excavation and
conveyance of soils and depositing the soil on the embankment,
spreading, breaking clods, sectioning, grading and consilodation with
2
vibratory roller at OMC to meet the requirement of table 300-2 of MoRT&H
and table 300.1 and 300.2, of MORD including all hire and operational
charges of T&P and seigniorage charges, as per MoRT&H specification
305 (4th revision) 301.5 of MORD complete for finished item of work.
(Payment will be made based on level for finished item of work).

5000.00
5000.00 65.10 cum 325500.00

Clearing and grubbing road land by mechanical means including uprooting


wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto
300mm, removal of stumps of such trees cut earlier and disposal of
unserviceable materials and stacking of serviceable material to be used or
1
auctioned, upto a lead of 1000m including removal and disposal of top
organic soil not exceeding 150mm in thickness as per Technical
Specification Clause 201 MORD / MORTH complete for finished item of
work.

2 2250 4.00 18000


18000
Deduct 40% voids -7200

Total 10800 461.12 Sqm 4980100.00


Forming embankment with side earth useful from outside road boundary
by mechanical means upto SDR with all leads and lifts, including pre-
watering of soil at borrow area, removal of top soil, excavation and
conveyance of soils and depositing the soil on the embankment,
spreading, breaking clods, sectioning, grading and consilodation with
2
vibratory roller at OMC to meet the requirement of table 300-2 of MoRT&H
and table 300.1 and 300.2, of MORD including all hire and operational
charges of T&P and seigniorage charges, as per MoRT&H specification
305 (4th revision) 301.5 of MORD complete for finished item of work.
(Payment will be made based on level for finished item of work).

5000.00
5000.00 0.00 cum 0.00

Forming embankment with approved material obtained from borrowpits


with a lead upto 1000 meters useful from outside road boundary by
mechanical means upto SDR with all leads and lifts, including pre-watering
of soil at borrow area, removal of top soil, excavation and conveyance of
soils and depositing the soil on the embankment, spreading, breaking
3 clods, sectioning, grading and consilodation with vibratory roller at OMC to
meet the requirement of table 300-2 of MoRT&H and table 300.1 and
300.2, of MORD including all hire and operational charges of T&P and
seigniorage charges, as per MoRT&H specification 305 (4th revision)
301.5 of MORD complete for finished item of work. (Payment will be made
based on level for finished item of work).

2000.00
2000.00 0.00 cum 0.00
Construction of Granular sub-base by providing HBG material confirming
to Grading - III of MoRT&H Table 400-2 and Table 400.1 of MORD
including cost, seigniorage charges and conveyance of all materials to
work site and spreading in uniform layers with motor grader on prepared
surface mixing by mix in place method with Rotavator / approved means
4
at OMC and compacting with vibratory roller to achieve the desired density
etc., as per technical specification 401 MORTH (4th revision) and 401
MORD and as directed by the Engineer-in-charge complete for finished
item of work ( Payment will be made based on levels for finished item of
work ).

Km 0/00 to 2/000 1 2000 4.00 0.20 1600.00


448568.2 717709253.0
Total 1600.00 cum
8 0

Providing, Laying, Spreading and compacting graded HBG crushed stone


aggregate as per table 400.11 and 400.12 of MORD to Wet Mix macadem
specification including cost,seignorage of all materials and including
premixing the material with water at OMC in Mechanical mix plant (pug
mill) carriag of mixed material by tipper to site , laying in uniform layers
5
with motor grader on base course on well prepared surface and
compacting with Vibratory roller to acheive the desired density etc., as
directed by the Engineer-in-Charge and as per MoRT&H specification.406
(4th revision) and 406 MORD complete for finished item of work.
(Payment based on levels for finished item of work)

Km 0/00 to 2/000 1 2000 3.75 0.15 1125.00

Total 1125.00 0.00 Cum 0.00

Providing and laying surface dressing in single coat using 6 mm nominal


size IRC HBG machine crushed stone aggregates @ 0.004 cum / sqm on
a layer of bitumen binder of 80/100 grade @ 0.75 kg / sqm laid on
6
prepared surface and rolling with 8-10 T Power Road Roller etc.,
complete for finished item of work as per MORT&H Specification 510 (4th
Revision) and as directed by the Engineer-in-charge.
Km 0/00 to 2/000 2000 3.75 7500.00
Total 7500.00 0.00 Sqm 0.00

Providing and applying tack coat with bitumen Emulsion (Rapid settting-1)
using Emulsion pressure distributor at the rate of 0.275kgs per sqm on the
7 prepared bituminous surface cleaned with hydralic broom as per MoRT&H
Specification 503 (4th revision) and 503 MORD as directed by the
Engineer-in-Charge complete for finished item of work.

Km 0/00 to 2/000 2000 3.75 7500.00


Total 7500.00 0.00 Sqm 0.00

Providing, laying and rolling of close-graded mix seal surfacing material of


25 mm thickness composed of 13.2 mm to 0.09 mm (Type-B) aggregates
as per Table 500-26 of MORTH and Table 500.15 of MORD using 80/100
penetration grade bitumen to the required line, grade and level to serve as
wearing course on a previously prepared base, including mixing in a hot
8 mix plant of 40 to 60 tonnes per hour capacity, laying with paver finisher
hydrostatic with sensor attachment and rolling with a Smooth wheeled
roller 8-10 tonne capacity and finishing to required level and grade as per
technical specification 512 MORTH and 509 MORD including cost and
conveyance of all materials, seigniorage charges etc., complete for
finished item of work.

Km 0/00 to 2/000 2000 3.75 7500.00


472500000.0
7500.00 63000.00 Sqm
0
Name of Work:- Providing BT Road from R&B Road to Lankalapalli in Buttayagudem Mandal of West
Godavari Dist.

Index Code S.No Description Unit Quantity Rate Amount

Clearing the MEDIUM jungle and burning into ash including all labour charges for
RSSR 1
cutting, buring and clearing the site etc complete
As per Rural RSSR Sqm 1.00 6.61 6.61
Rate per 1 sqm 6.61
3
Filling in Gravel foundation trenches as per drawing and technical specification
Clause 305.3.9 MORD & 304 MORTH (CSSR)
Unit = Cum
Material
Gravel for filling Cum 1.00 118.38 118.38
Water Kl 0.00 80.00 0.00
118.38
Conveyance Charges
Gravel for filling Cum 1.00 45.81 45.81
Final Rate per 1 cum (a+b+c) 164.19

Engaging Unskilled labour for earth work excavation in


ordinary soils at site with initial lift and breaking clods
RSSR 1 Cum 1.00 124.24 124.24
and sectioning for formation of Embankment- for Road
(RSSR) & shoulders

Collection & Supply of Gravel to obtain CBR Value not less then 15 and Plasticity index < 6% in Soaked condition
when compacted including cost, conyance, seigniorage and labour charges and stocking to Departmental guage for Pre-
2
measurements of Sub- base as per technical specification clause 408 MORD & as per Table 400.13 for compaction to
OMC conditions.
Unit = Cum, Taking out put = 1.00 Cum (Compacted
thickness)
Material (Cost only)
Gravel cum 1.28 118.38 151.53
Conveyance of Materials
Gravl cum 1.28 45.81 58.64
Rate per 1 Cum 210.17
GO.129 un Engaging (US) labour for Spreading the Collected
connected 5 Gravel/ granular material and Sectioning to sub- Base &
roads. Shoulders (RSSR)
Rate as per 1.00 cum cum 1.00 25.59 25.59

Compaction of Spreaded gravel /granular material to


OMC with three wheel 8 to 10 M Tons static roller to
achieve the desired density, with requiled watering and
6
keeping the rolled surface wet for a period of 15 days
complete as per technical specification for Sub- Base
(CSSR)
Unit = Cum
Taking out put = 300 Cum
Machinery
Water tanker 6 kl capacity hour 3.00 655.20 1965.60
Vibratory Roller 80-100KN hour 30.00 1285.40 38562.00
Rate per 300 Cum 40527.60
Rate per 1 Cum 135.09

RBR-SBBS-11 7 Wet Mix Macadam

Providing, Laying, Spreading and compacting


graded HBG crushed stone aggregate as per table
400.11 and 400.12 of MORD to Wet Mix macadem
specification including cost,seignorage of all
materials and including premixing the material with
water at OMC in Mechanical mix plant (pug mill)
Chapter-4
carriag of mixed material by tipper to site , laying in
Page-
uniform layers with motor grader on base course
336&337
on well prepared surface and compacting with
Vibratory roller to acheive the desired density etc.,
as directed by the Engineer-in-Charge and as per
MoRT&H specification.406 (4th revision) and 406
MORD complete for finished item of work.
(Payment based on levels for finished item of work)

By Mechanical Means with 1 km lead


Rural Works
Unit = cum
Taking output = 100 cum
a)  Labour
Mate day -
Dresser (Skilled) for alignment day 8.00 460.00 3680.00
Mazdoor (Skilled) day 2.40 460.00 1104.00
b) Machinery
Front end loader 1 cum capacity hour 4.00 1594.70 6378.80
Wet mix plant (Pug Mill) hour 4.00 1679.70 6718.80
Tipper 10 t capacity hour 5.00 941.60 4708.00
Motor Grader @ 50 cum per hour hour 2.00 3020.40 6040.80
Water tanker 6 kl capacity hour 1.33 655.20 871.42
vibratory roller 80-100 kN @ 60 cum per hour hour 1.67 2688.50 4489.80
c) Material
Coarse aggregate 45 mm to 22.4 mm @ 30 per
cum 39.90 1593.81 63592.89
cent
Aggregates 22.4 mm to 2.36 mm @ 40 per cent cum 53.20 1368.34 72795.56
Fine aggregate 2.36 mm to & below @ 30 per cent cum 39.90 1004.84 40093.12
210473.17
Sub-Total :: 210473.17
210473.17
f) Rate per cum = (a+b+c+d+e)/100 2104.73
Rate per cum 2104.80

8 Providing and applying prime coat with bitumen emulsion (SS1) Bulk using emulsion pressure
distributor on prepared surface of granular base including clearing of road surface and spraying
emulsion at the rate of 0.60 kg/sqm using emulsion pressure distributor for finished item of
work etc., complete as per MoRT&H Specification 502 (5th revision) and as directed by the
Engineer-in-charge
Unit = sqm
Taking output = 3500 sqm
a) Labour
Mate 0.000 460.00 day 0.00
Mazdoor 2.080 420.00 day 873.60
873.60
873.60
b) Machinery
Mechanical broom @ 1250 sqm per hour 2.800 381.80 hour 1069.04
Air compressor 250 cfm 2.800 566.20 hour 1585.36
Emulsion pressure distributor @ 1750 sqm 2.000 875.60 hour 1751.20
per hour
Water tanker 6 KL capacity @ 1 trip per hour 1.000 655.20 hour 655.20
5060.80
c) Material
Bitumen emulsion @ 0.6 kg per sqm 2.100 65068.7 MT 136644.27
a+b+c 142578.67
Cost for 3500 sqm = a+b+c+d+e 142578.67
Rate per sqm = (a+b+c+d+e)/3500 40.74
40.74
1 Sqm
9 Providing and applying tack coat with bitumen Emulsion (Rapid settting-1) using Emulsion
RBR-BASC - pressure distributor at the rate of 0.275kgs per sqm on the prepared bituminous surface
2 cleaned with hydralic broom as per MoRT&H Specification 503 (4th revision) and 503
Chapter - 5 MORD as directed by the Engineer-in-Charge complete for finished item of work.
Page - 353

Unit = sqm
Taking output = 1750 sqm
a)  Labour
Mate day -
Mazdoor (Unskilled) day 1.040 420.00 436.80
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.400 381.80 534.52
Air compressor 210 cfm hour 1.400 566.20 792.68
Emulsion pressure distributor @1750 sqm per hour hour 1.000 875.60 875.60
c) Material
Bitumen emulsion (RS-1) @ 0.275 kg per sqm t 0.480 37013.02 17766.25
Sub-Total : 20405.85
Cost of 1750 sqm = (a+b+c+d) 20405.85
Rate per sqm = a+b+c+d/1750 11.66
Rate per sqm 11.70

RBR-BASC-16 Mix seal surfacing


Providing, laying and rolling of close-graded mix seal surfacing material of 20 mm thickness
composed of 13.2 mm to 0.09 mm (Type-B) aggregates as per Table 500-26 of MORTH and
Table 500.15 of MORD using 60/70 penetration grade bitumen to the required line, grade
and level to serve as wearing course on a previously prepared base, including mixing in a
Chapter - 5
10 hot mix plant of 40 to 60 tonnes per hour capacity, laying with paver finisher hydrostatic with
Page - 387
sensor attachment and rolling with a Smooth wheeled roller 8-10 tonne capacity and
finishing to required level and grade as per technical specification 512 MORTH and 509
MORD including cost and conveyance of all materials, seigniorage charges etc., complete
for finished item of work.

Type - B
Unit = sqm
Taking output = 10250 sqm (205 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) working with HMP, road
day 16.000 420.00 6720.00
sweeper, paver and roller
Skilled mazdoor for checking line & levels day 5.840 460.00 2686.40
b) Machinery
i) Hot Mix Plant of capacity. Not less than 40 to 60
hour 6.000 19546.00 117276.00 6
t / hour
ii) Electric Generator Set 250 KVA hour 6.000 2162.60 12975.60
iii) Front end loader 1 cum bucket capacity hour 6.000 1594.70 9568.20
iv) Tipper 10 tonne capacity tkm 450 x 1 4.81 2164.50

Add 10 per cent of cost of carriage to cover cost


216.45
of loading and unloading
v) Paver finisher hydrostatic with sensor
hour 6.000 3115.20 18691.20
attachment
iv) Smooth wheeled 8-10 tonnes weight hour 6.000 1285.40 7712.40
c) Material
Type - B
Bitumen (60/70) @ 19 kg per 10 sqm t 19.480 36825.40 717358.79
Stone crushed aggregates 13.2 mm to 0.09 mm @
cum 276.750 1181.14 326879.39
0.27 cum per 10 sqm
1222248.93
Sub-Total : 1222248.93
1222248.93
Rate per sqm = (a+b+c+d+e)/10250 119.24
Rate per sqm for 20mm thick 119.24
29.81
Rate per sqm for 25mm thick 149.05
Say 149.10
C.C ROAD

Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain
cement concrete pavement, thickness as per design, over a prepared sub base, with 43
grade cement or as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates
conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and
appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork
RBR-CCPV-5 (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates
Chapter - 6 11 Construction of un-reinforced,
including levelling the formworkdowelas perjointed at expansion
drawing), spreadingandthe concrete with sholvels,
Page - 414 construction joint only, plain cement concrete pavement,
rakes, compacted using needle, scareed and plate vibrators and finished in continuous
thickness
operation as per design,
including overof
provision a contraction
prepared sub base,
and with 43 construction joints, applying
expansion,
grade cement
debonding or any
strips, othersealant,
primer, type asdowel
per Clause 1501.2.2
bars, near M30 to bridge / culvert and
approaches
(Grade), coarse
construction andadmixtures
joints, fine aggregates conforming
as approved, to IS
curing : 383,
of concrete slabs for 14- days, with
maximum in a concrete
water finishing to lines andmixer of not
grade as less than 0.2 and
per drawing cumTechnical
capacity Specification Clause 1501
and
MORD.appropeiate weigh batcher using approved mix design, laid
in approved fixed side formwork (steel channel, laying and
fixing
Cement of 125 mictronPavement
Concrete thick polythene film, wedges, steel plates
including levelling the formwork as per drawing), spreading the
concrete with sholvels, rakes, compacted using needle,
Unit = cum
scareed and plate vibrators and finished in continuous
Taking
operationoutput = 75 cum
including (172.50
provision t)
of contraction and expansion,
(100 x 3.75 x 0.200)
construction joints, applying debonding strips, primer, sealant,
dowel bars, near approaches to bridge / culvert and
a)  Labour
construction
Mate joints, admixtures as approved, curing of concrete day -
slabs for 14-
Mason (1st class)days, curing compound (where specified) and day 5.00 500.00 2500.00
water finishing to lines and grade as per drawing and Technical
Mason (2nd class) day 5.00 460.00 2300.00
Specification Clause 1501 MORD.
Mazdoor
(Chapter-VI)(Unskilled) day 150.00 420.00 63000.00
Mazdoor (Skilled) day 6.00 460.00 2760.00
Surveyor day 2.00 750.00 1500.00
Mazdoor (Semi-Skilled) day 6.00 420.00 2520.00
Blacksmith for cutting of dowel bars including
removal of burrs, fabrications & fixing of dowel day 1.00 495.00 495.00
bars.
b) Machinery
Concrete mixer 0.28 / 0.4 cum capacity (6 mixers)
with weigh batcher and suitable capacity calibrated hour 36.00 524.70 18889.20
water tank
Needle vibrator 40mm (petrol) hour 9.00 209.10 1881.90
Screed vibrator hour 9.00 0.00 0.00
Plate vibrator hour 9.00 59.10 531.90
Concrete joint cutting machine for initial & final cuts hour 4.00 135.50 542.00
Water tanker 6 kl capacity hour 5.00 655.20 3276.00
Air Compressor (1 hour initial + 1 hour final) hour 2.00 566.20 1132.40
c) Material
Crushed stone coarse aggregates, grading will be
as per Clause 1501.2.4.1 (Table 1500.1) of
specifications @ 0.90 cum/cum of concrete .
20mm cum 44.50 1878.97 83614.17
10mm cum 22.95 1437.97 33001.41
Sand as per IS:383 and conforming to Clause
cum 33.75 894.21 30179.59
1500.2.4.2 @ 0.45 cum/cum of concrete
Cement @ 310 kg/cum of concrete t 26.25 4800.00 126000.00
Polythene sheet 125 micron sqm 281.25 15.25 4289.06

Mild steel dowel bar 25 mm dia of grade S 240.


500 mm long 20 Nos. at culvert/bridge slab and at
construction joint including 5 per cent wastage.

(4 x 20 x 0.500) + 5 per cent wastage = 42 m @


t 0.118 41300.00 4856.88
2.80 kg per m = 117.6 kg.
Bitumen primer @ 200 ml per joint for 23 joints t 0.005 36825.40 184.13
Bituminous sealant 800 ml per joint for 23 joints
litre 19.00 60.00 1140.00
Rate as per SSR M-120

Jute rope 12 mm dia including 5 per cent wastage m 90.00 8.35 751.50

Debonding strips 3.75 m (length) x 10 mm (width) x


5 mm (thick) cut-out of rubber filler board or similar m 90.00 8.55 769.50
material including 5 per cent wastage

Polythene sheathing, covering 2/3rd dowel bars


No. 483.00 0.50 241.50
(20x23) and tight fit including 5 per cent wastage

Plasticizer 0.5 per cent by weight of cement


litre 122.00 45.00 5490.00
(M.180, P.336)
Curing compound (if used) @ 0.33 litre per sqm litre 131.25 0.00 0.00
Water for curing kl 0.00 80.00 0.00
Joint filler board 20 mm thick as per IS:1838
sqm 3.00 273.00 819.00
(4 x 3.75 x 0.200 = 3 sqm) M-141
(a+b+c) 392665.13
d) Formwork @ 3% of (a+b+c) 3% 392665.13 11779.95
404445.09
Sub-Total :: 404445.09
404445.09
g) Rate per cum = (a+b+c+d+e)/75 5392.60
5392.70
Kilometer Stones
Reinforced cement concrete M15 grade kilometer stone/local stone of standard
RBR-TSRA-13 12 design as per IRC 8 fixing in position including painting and printing etc., as per
technical specification clause 1703
i 5th KM Stone (precast)
Unit = each
Taking output = 6 Nos.
a) M-15 grade concrete
As per item No. cum 2.35 3372.20 7924.67
b) Steel reinforcement @ 5 Kg per Sqm
As per item No.= Kg 22.08 49.68 1096.85
c) Excavation in soil for foundation
As per item No. cum 1.68 124.24 208.72
d) Paining two coats on concrete surfaces
As per item No. sqm 9.85 110.91 1092.46
Letter on km post (average 30 letters of 10cm height
e)
each)
As per item No. per Lt 1800.00 0.69 1242.00
Transportation and fixing
f) Labour
Mate day - - -
Mason (1st Class) day 0.60 500.00 300.00
Mazdoor day 6.26 420.00 2629.20
g) Machinery
50 HP tactor with trolley hour 6.00 423.60 2541.60
Cost per each 5th KM stone 6 Nos 17035.50
Cost per each 5th KM 2839.25
Ordinary KM Stone (Precast)
Unit = each
Taking output = 14 Nos.
a) M-15 grade concrete
As per item No. cum 3.77 3372.20 12713.19
b) Steel reinforcement @ 5 Kg per Sqm
As per item No.= Kg 26.32 49.68 1307.48
c) Excavation in soil for foundation
As per item No. cum 2.77 124.24 344.14
d) Paining two coats on concrete surfaces
As per item No. sqm 11.41 110.91 1265.48
Letter on km post (average 30 letters of 10cm height
e)
each)
As per item No. per Letter 1680.00 0.69 1159.20

Transportation and fixing


f) Labour
Mate day - - -
Mason (1st Class) day 1.00 500.00 500.00
Mazdoor day 7.00 420.00 2940.00 7.32
g) Machinery
50 HP tactor with trolley hour 6.00 423.60 2541.60
Cost per KM stone 14 Nos 22771.09
Cost per each KM Stone 1626.51

Ordinary HM Stone (Precast)


Unit = each
Taking output = 33 Nos.
a) M-15 grade concrete
As per item No. cum 1.58 3372.20 5328.08
b) Steel reinforcement @ 5 Kg per Sqm
As per item No.= Kg 66.00 49.68 3278.64
c) Excavation in soil for foundation
As per item No. cum 1.39 124.24 172.69
d) Paining two coats on concrete surfaces
As per item No. sqm 6.27 110.91 695.41
Letter on km post (average 30 letters of 10cm height
e)
each)
As per item No. per Letter 330.00 0.69 227.70
Transportation and fixing
f) Labour
Mate day - - -
Mason (1st Class) day 1.50 500.00 750.00
Mazdoor day 7.34 420.00 3082.80
g) Machinery
50 HP tactor with trolley hour 6.00 423.60 2541.60
Cost per KM stone 33 Nos #REF!
Cost per each HM Stone #REF!
2450
LABOUR RATES AS PER SCHEDULE OF RATES OF ROAD AND BRIDGE WORKS FOR THE YEAR 2019-2020
0%

Labour rate Labour rate


Sl.No. Description without Agency Agency allowance with Agency of Unit
allowance allowance

01 1st Class Mason 500.00 0.00 500.00 PER DAY


02 2nd Class Mason 460.00 0.00 460.00 PER DAY
03 Dresser (Skilled) for alignment 460.00 0.00 460.00 PER DAY
04 Mate 460.00 0.00 460.00 PER DAY
05 Surveyor 750.00 0.00 750.00 PER DAY
06 Mazdoor Skilled 460.00 0.00 460.00 PER DAY
07 Black Smith 495.00 0.00 495.00 PER DAY
08 Welder 510.00 0.00 510.00 PER DAY
09 Bar bender 625.00 0.00 625.00 PER DAY
10 Mazdoor Un Skilled 420.00 0.00 420.00 PER DAY

HIRE CHARGES OF MACHINERY - 2019-2020


01 Dozer D - 80 1 2445.70 Per Hour
02 Dozer D - 50 2 1546.80 Per Hour
03 Motor Grader 3 3020.40 Per Hour
04 Motor Grader - 110HP 3 3020.40 Per Hour
05 Hydraulic Excator - 0.90 Cum 4 2761.20 Per Hour
Bucket Capacity
06 Frontend Loader 5 1594.70 Per Hour
07 Tipper 5.50 Cum / 10T Capacity 6 941.60 Per Hour

08 Vibratory 80-100Kn Roller 7 2688.50 Per Hour


09 Three Wheeled 80-100Kn Static 8 1285.40 Per Hour
Roller
10 Water Tanker - 6Kl Capacity 10 655.20 Per Hour
11 Tractor with Rotovator 12 423.60 Per Hour
12 Air Compressor 14 566.20 Per Hour
13 Wet Mix Plant - 60TPH 15 1679.70 Per Hour
14 Hydraulic Broom 16 381.80 Per Hour
15 Mechanical Broom 16 381.80 Per Hour
16 Bitumen Pressure distributor 17 1527.10 Per Hour
17 Emulsion Pressure Distributor 18 875.60 Per Hour
18 Hot Mix Plant 40 to 60t per hour 22 19546.00 Per Hour

19 Hydrostatic with sensor attachment - 23 3115.20 Per Hour


Paver Finisher - 100T/Hr
20 Paver Finisher - Mechanical 24 2290.60 Per Hour
21 Hydraulic Selfpropelled chip 25 2743.70 Per Hour
spreader
22 Bitumen Boiler oil fired 1000Lt 29 223.00 Per Hour
capacity
23 Concrete Mixer 0.28 cum 38 524.70 Per Hour
24 Concrete Mixer 1 cum 38 b 661.50 Per Hour
25 Electric Generator - 250 KvA 43 2162.60 Per Hour
26 Electric Generator - 125 KvA 43 1543.10 Per Hour
27 Electric Generator - 100 KvA 43 1316.30 Per Hour
28 Electric Generator - 30 KvA 43 987.70 Per Hour
29 Hot mix plant - 120 TPH 19 28708.00 Per Hour
30 Hot mix plant - 100 TPH 20 24636.00 Per Hour
31 Hot mix plant - 60 TPH 21 22092.00 Per Hour
32 Hot mix plant -40 to 60 TPH 22 19546.00 Per Hour
33 Paver Finisher Hydrostatic with 23 3115.20 Per Hour
sensor control 100 TPH
34 Paver finisher Mechanical 24 2290.60 Per Hour
35 Hydraulic chip spreader 25 2743.70 Per Hour
36 Tandem Road roller 26 1856.50 Per Hour
37 Pneumatic road roller 27 1515.60 Per Hour
38 Pot hole repair machine 28 903.00 Per Hour
39 Bitumen boiler oil fired 29 223.00 Per Hour
40 GSB Plant 50 cum 30 1279.70 Per Hour
41 Mastic cooker 31 79.50 Per Hour
42 Batching & Mixing plant- 30 cum 32 1310.90 Per Hour
43 Batching & Mixing plant- 15-20 cum 32 b 1107.10 Per Hour
44 Transit mixer 33 2026.60 Per Hour
45 Concrete pump 34 1534.30 Per Hour
46 Concrete bucket 36 13.20 Per Hour
47 Kerb casting machine 37 671.90 Per Hour
48 concrete mixer- 0.28 cum 38 524.70 Per Hour
49 concrete mixer- 1.0 cum 38 b 661.50 Per Hour
50 Concrete paver 40 3247.20 Per Hour
51 Integrated stone crusher- 100 TPH 41 9755.20 Per Hour
52 Integrated stone crusher- 200 TPH 41 20570.00 Per Hour
53 Generator- 250 KVA 43 2162.60 Per Hour
54 Generator- 125 KVA 43 1543.10 Per Hour
55 Generator- 100 KVA 43 1316.30 Per Hour
56 Generator- 30 KVA 43 987.70 Per Hour
57 Truck 5.5 cum per 10t 45 914.50 per tonne Km
58 Road marking machine 46 135.50 Per Hour
59 Mobile slurry seal equipment 47 1261.40 Per Hour
60 Plate compactor 48 59.10 Per Hour
61 Drilling equipment 49 879.70 Per Hour
62 Needle Vibrator 209.10 Per Hour
63 Screed Vibrator 0.00 Per Hour
64 Mixall 0.28 cum capcity 38 394.40 Per Hour
65 Concrete Joint cutting Machine or Road 46 135.50 Per Hour
marking machine
66 Mixall 1.00cum capacity 38 b 524.70 Per Hour
LEAD STATEMENT 2019-2020
Name of Work:- Providing BT Road from R&B Road to Lankalapalli in Buttayagudem Mandal of West Godavari Dist

Sl No. Description in Material Name of the Quarry Lead in Km Initial Conveyance charges Deduct 13.615% over Heads and contract profit on LEAD
Net Lead Charges Blasting Charges Machine Crushing Charges Loading and Unloading Charges

1 2 3 4 5 6 7 8 9 10 11

FOR ROAD WORKS


1 Gravel Local 6.00 113.00 58.30 6.99 51.31 0.00 0.00

2 Selected Earth Local 6.00 86.00 58.30 6.99 51.31 0.00 0.00

2 Sand for filling polavaram 39.00 375.00 414.10 49.62 364.48 0.00 0.00
60-63mm HBG M/c metal
3 I pangidi 53.00 399.05 546.60 65.50 481.10 0.00 99.76
IRC, MORTH & MORD
50 -55mm HBG M/c Metal
4 I pangidi 53.00 434.30 546.60 65.50 481.10 70.00 108.58
IRC, MORTH & MORD

40-45mm HBG hard broken M/c Metal


6 IRC, MORTH & MORD I pangidi 53.00 560.00 546.60 65.50 481.10 70.00 140.00

25-27mm M/c HBGMetal


7 I pangidi 53.00 899.05 546.60 65.50 481.10 70.00 224.76
IRC, MORTH & MORD

19 - 22mm HBG Hard broken M/c metal


9 IRC, MORTH & MORD I pangidi 53.00 937.15 546.60 65.50 481.10 70.00 234.29

12-14 mm HBG M/c Metal


10 I pangidi 53.00 742.85 546.60 65.50 481.10 70.00 185.71
IRC, MORTH & MORD

9.5-11.2 mm HBG M/c Metal


11 IRC, MORTH & MORD I pangidi 53.00 624.75 546.60 65.50 481.10 70.00 156.19
5-7 mm HBG M/c Metal
12 I pangidi 53.00 480.00 546.60 65.50 481.10 70.00 120.00
IRC, MORTH & MORD

2.36 - 5 mmHBG M/c Metal


13 I pangidi 53.00 350.00 546.60 65.50 481.10 70.00 87.50
IRC, MORTH & MORD

15 65mm size IRC and Morth (OTG) metal I pangidi 53.00 135.25 546.60 65.50 481.10 0.00 0.00

FOR CD WORKS
17 Coarse sand for mortor polavaram 39.00 510.00 414.10 49.62 364.48 0.00 0.00

40 mmHBG M/c Metal-SS5


19 I pangidi 53.00 608.00 546.60 65.50 481.10 70.00 152.00

20 20 mm HBG M/c Metal-SS5 I pangidi 53.00 1016.00 546.60 65.50 481.10 70.00 254.00

12 mm HBG M/c Metal-SS5


21 I pangidi 53.00 808.00 546.60 65.50 481.10 70.00 202.00

10 mm HBG M/c Metal-SS5


22 I pangidi 53.00 680.00 546.60 65.50 481.10 70.00 170.00

23 2.36 mm Below HBG chips (crusher stone dust) I pangidi 53.00 350.00 546.60 65.50 481.10 0.00 0.00

24 Rough stone 300 mm thick (Revetment) OTG local 10.00 160.00 104.40 12.51 91.89 0.00 108.95

27 BT (60/70 grade) (Chennai/Vizaq)(Initial+Conve) Vizag 256.00 30850.00 422.40

28 BT Emulsion RS 1 ( Haldiya)(Initial+Conve) Vizag 256.00 31009.00 422.40

29 BT Emulsion SS 1 ( Haldiya)(Initial+Conve) Vizag 256.00 54785.00 422.40


30 1000mm Dia NP3 Class tadepalligudem 62.00 5227.00 892.72

31 1000mm Dia Collar tadepalligudem 62.00 961.00

32 900mm Dia NP3 Class tadepalligudem 62.00 4284.00 852.15

33 900mm Dia Collar tadepalligudem 62.00 770.00

34 600mm Dia NP3 Class tadepalligudem 62.00 2068.00 411.52

35 600mm Dia Collar tadepalligudem 62.00 385.00

36 Cement At Site 3750.00


37 HYSD Steel Fe 415 At Site 36500.00
38 6mm MS rods At Site 35000.00
39 Mild/ Structure Steel At Site 38000.00
1) Certified that the HBG metal obtained by Blasting
2) Certified that the Metal below 25 mm Mechine crushing allowed.

3) Certified that the work lies within (a) Municipal limits (or) (b) Agency limits & up to 16 km from all weather road (Yes/ No). Yes

4) Certified that the leads are true and nearer to the site to the best of my Knowledge.
5) Water is to be procured from private source (Y/N) N

6) Certified that Steel rates adopted for the Month of October 2019 TRANSPORT, ROADS AND BUILDINGS (R-I)DEPARTMENT G.O.RT.No. 1 Dated: 02.01.2020 cement as per GO.RT.No.289 o
of West Godavari Dist.

Deduct for stacking


GST % GST Over Initial Cost Total Amount

12 11 12 13

5.50 5% 5.38 164.19

5.50 5% 4.03 135.84

5.50 5% 18.48 752.46

8.70 5% 24.51 995.72

8.70 5% 30.21 1115.49

8.70 5% 38.07 1280.47

8.70 5% 59.26 1725.47

8.70 5% 61.64 1775.48

1304.436
8.70 5% 49.49 1520.45

8.70 5% 42.11 1365.45


1270.46
8.70 5% 33.07 1175.47

1090.155
8.70 5% 24.94 1004.84

8.70 5% 6.33 613.98

5.50 5% 25.23 894.21

8.70 5% 41.07 1343.47

8.70 5% 66.57 1878.97

8.70 5% 53.57 1605.97

8.70 5% 45.57 1437.97

8.70 5% 17.07 839.47

Considering mechanical loading and unloading for all items except Rough stone/ Jeddy stone, the loadin
8.70 5% 13.01 365.15

One side lead to be entered


5553.00 36825.40

Emulsion rate @ Haldia is to be adopted


5581.62 37013.02

9861.30 65068.70
18% 940.86 7060.58

961.00

18% 771.12 5907.27

770.00

18% 372.24 2851.76

385.00

28% 1050.00 4800.00


18% 6570.00 43070.00
18% 6300.00 41300.00
18% 6840.00 44840.00

C.P 13.615%

%= 0%

0 cement as per GO.RT.No.289 of T, R&B, Dt.08.11.2019


/ Jeddy stone, the loading & unloading charges not allowed. For Rough stone/ Jeddy stone also mechanical unloading considered.
COST OF BITUMEN/MT

Name of Work:- Providing BT Road from R&B Road to Lankalapalli in Buttayagudem Mandal of West Godavari Dist.

Bulk 60/70 Grade Emulsion (RS-1) Emulsion (SS-1)


Description
Vizag (Bulk)Vizag (Bulk)Vizag

Price list w.e.f 06.12.2019. 06.12.2019. 06.12.2019.

BT Rates 30850.00 31009.00 54785.00

GST 18% 5553.00 5581.62 9861.30

Lead from Vizag in Km


256.00

Lead charges for @ Rs.1.65 Per Km.


422.40 422.40 422.40

Total ::
36825.40 37013.02 65068.70
Rate per Metric Tonne

Bulk 90% 30240 27216


Packed 10% 36340 3634
30850
Name of Work:- Providing BT Road from R&B Road to Lankalapalli in Buttayagudem
Mandal of West Godavari Dist.
Sl.
Description Size of metal Rate
No.
Granular Sub-base
1 9.5mm to 4.75mm 1) 9.5mm to 11.20mm 1365.45
2) 5.0mm to 7.00mm 1175.47
Average rate of 1 & 2 1270.46

2) 4.75mm to 2.36mm 1) 2.36mm to 5.00mm 1004.84


3) 2.36mm & below 1) 2.36mm & below 839.47

Wet Mix Macadam


1) 45mm to 22.4mm 1) 40mm to 45mm 1280.47
2) 25mm to 27mm 1725.47
3) 19mm to 22mm 1775.48
Average rate of 1, 2 & 3 1593.81

2) 22.4mm to 2.36mm 1) 19mm to 22mm 1775.48


2) 12mm to 14mm 1520.45
3) 9.5mm to 11.2mm 1365.45
4) 5mm to 7mm 1175.47
5) 2.36mm to 5mm 1004.84
Average rate of 1 to 5 1368.34

3) 2.36mm & below 1) 2.36mm & below 1004.84

Mix Seal Surfacing

1) 13.2mm to 0.09mm 1) 12mm to 14mm 1520.45


2) 9.5mm to 11.2mm 1365.45
3) 5mm to 7mm 1175.47
4) 2.36mm to 5mm 1004.84
5) 2.36mm & below 839.47
Average rate of 1 to 5 1181.14

SDBC

1 13.2mm to 10mm 1) 12mm – 14mm 1520.45


2) 9.5mm – 11.2mm 1365.45
Average rate of 1 to 2 1442.95

2 10mm to 5mm 1) 9.5mm to 11.2mm 1365.45


2) 5mm to 7mm 1175.47
Average rate of 1 to 2 1270.46

3 5mm and Below 1) 5mm to 7mm 1175.47


2) 2.36mm to 5mm 1004.84
3) 2.36mm and below 839.47
Average rate of 1 to 3 1006.59

WBM Grading – 2

1) 63mm to 45mm 1) 60mm to 63mm 995.72


2) 50mm to 55mm 1115.49
3) 40mm to 45mm 1059.97
Average rate of 1 to 3 1057.06

WBM Grading – 3

1) 53mm to 22.4mm 1) 50mm to 55mm 1115.49


2) 40mm to 45mm 1059.97
3) 25mm to 27mm 1725.47
4) 19mm to 22mm 1775.48
Average rate of 1 to 4 1419.10

OGPC

1) 13.2mm to 5.6mm 1) 12mm to 14mm 1520.45


2) 9.5mm to 11.20mm 1365.45
3) 5mm to 7mm 1175.47
Average rate of 1 to 3 1353.79

SEAL COAT

1) 6.7mm 1) 5mm to 7mm 1175.47


Lead charges of 2019-2020

Metal Earth, Gravel & Sand pipes 1000 pipes 900 pipes 600 pipes 700

Rate del
lead in 1st Km lead lead Rate lead Rate Rate Rate
11.30 11.30 extra from 6 to 30 km 11.48 11.48 5.24 6.08 extra for every km beyond 5 km
9.40 9.40 extra above 30 km
1 2 3 4 5 6 7 8 9 10 11 12 13
0.5 0.00 0.5 0.00 0.5 238.36 0.5 197.79 0.5 112.84 0.5 125.52
1 0.00 1 0.00 1 238.36 1 197.79 1 112.84 1 125.52
2 11.00 2 11.20 2 238.36 2 197.79 2 112.84 2 125.52
3 25.30 3 24.40 3 238.36 3 197.79 3 112.84 3 125.52
4 36.60 4 35.70 4 238.36 4 197.79 4 112.84 4 125.52
5 47.90 5 47.00 5 238.36 5 197.79 5 112.84 5 125.52
6 59.20 6 58.30 6 249.84 6 209.27 6 118.08 6 131.60
7 70.50 7 69.60 7 261.32 7 220.75 7 123.32 7 137.68
8 81.80 8 80.90 8 272.80 8 232.23 8 128.56 8 143.76
9 93.10 9 92.20 9 284.28 9 243.71 9 133.80 9 149.84
10 104.40 10 103.50 10 295.76 10 255.19 10 139.04 10 155.92
11 115.70 11 114.80 11 307.24 11 266.67 11 144.28 11 162.00
12 127.00 12 126.10 12 318.72 12 278.15 12 149.52 12 168.08
13 138.30 13 137.40 13 330.20 13 289.63 13 154.76 13 174.16
14 149.60 14 148.70 14 341.68 14 301.11 14 160.00 14 180.24
15 160.90 15 160.00 15 353.16 15 312.59 15 165.24 15 186.32
16 172.20 16 171.30 16 364.64 16 324.07 16 170.48 16 192.40
17 183.50 17 182.60 17 376.12 17 335.55 17 175.72 17 198.48
18 194.80 18 193.90 18 387.60 18 347.03 18 180.96 18 204.56
19 206.10 19 205.20 19 399.08 19 358.51 19 186.20 19 210.64
20 217.40 20 216.50 20 410.56 20 369.99 20 191.44 20 216.72
21 228.70 21 227.80 21 422.04 21 381.47 21 196.68 21 222.80
22 240.00 22 239.10 22 433.52 22 392.95 22 201.92 22 228.88
23 251.30 23 250.40 23 445.00 23 404.43 23 207.16 23 234.96
24 262.60 24 261.70 24 456.48 24 415.91 24 212.40 24 241.04
25 273.90 25 273.00 25 467.96 25 427.39 25 217.64 25 247.12
26 285.20 26 284.30 26 479.44 26 438.87 26 222.88 26 253.20
27 296.50 27 295.60 27 490.92 27 450.35 27 228.12 27 259.28
28 307.80 28 306.90 28 502.40 28 461.83 28 233.36 28 265.36
29 319.10 29 318.20 29 513.88 29 473.31 29 238.60 29 271.44
30 330.40 30 329.50 30 525.36 30 484.79 30 243.84 30 277.52
31 339.80 31 338.90 31 536.84 31 496.27 31 249.08 31 283.60
32 349.20 32 348.30 32 548.32 32 507.75 32 254.32 32 289.68
33 358.60 33 357.70 33 559.80 33 519.23 33 259.56 33 295.76
34 368.00 34 367.10 34 571.28 34 530.71 34 264.80 34 301.84
35 377.40 35 376.50 35 582.76 35 542.19 35 270.04 35 307.92
36 386.80 36 385.90 36 594.24 36 553.67 36 275.28 36 314.00
37 396.20 37 395.30 37 605.72 37 565.15 37 280.52 37 320.08
38 405.60 38 404.70 38 617.20 38 576.63 38 285.76 38 326.16
39 415.00 39 414.10 39 628.68 39 588.11 39 291.00 39 332.24
40 424.40 40 423.50 40 640.16 40 599.59 40 296.24 40 338.32
41 433.80 41 432.90 41 651.64 41 611.07 41 301.48 41 344.40
42 443.20 42 442.30 42 663.12 42 622.55 42 306.72 42 350.48
43 452.60 43 451.70 43 674.60 43 634.03 43 311.96 43 356.56
44 462.00 44 461.10 44 686.08 44 645.51 44 317.20 44 362.64
45 471.40 45 470.50 45 697.56 45 656.99 45 322.44 45 368.72
46 480.80 46 479.90 46 709.04 46 668.47 46 327.68 46 374.80
47 490.20 47 489.30 47 720.52 47 679.95 47 332.92 47 380.88
48 499.60 48 498.70 48 732.00 48 691.43 48 338.16 48 386.96
49 509.00 49 508.10 49 743.48 49 702.91 49 343.40 49 393.04
50 518.40 50 517.50 50 754.96 50 714.39 50 348.64 50 399.12
51 527.80 51 526.90 51 766.44 51 725.87 51 353.88 51 405.20
52 537.20 52 536.30 52 777.92 52 737.35 52 359.12 52 411.28
53 546.60 53 545.70 53 789.40 53 748.83 53 364.36 53 417.36
54 556.00 54 555.10 54 800.88 54 760.31 54 369.60 54 423.44
55 565.40 55 564.50 55 812.36 55 771.79 55 374.84 55 429.52
56 574.80 56 573.90 56 823.84 56 783.27 56 380.08 56 435.60
57 584.20 57 583.30 57 835.32 57 794.75 57 385.32 57 441.68
58 593.60 58 592.70 58 846.80 58 806.23 58 390.56 58 447.76
59 603.00 59 602.10 59 858.28 59 817.71 59 395.80 59 453.84
60 612.40 60 611.50 60 869.76 60 829.19 60 401.04 60 459.92
61 621.80 61 620.90 61 881.24 61 840.67 61 406.28 61 466.00
62 631.20 62 630.30 62 892.72 62 852.15 62 411.52 62 472.08
63 640.60 63 639.70 63 904.20 63 863.63 63 416.76 63 478.16
64 650.00 64 649.10 64 915.68 64 875.11 64 422.00 64 484.24
65 659.40 65 658.50 65 927.16 65 886.59 65 427.24 65 490.32
66 668.80 66 667.90 66 938.64 66 898.07 66 432.48 66 496.40
67 678.20 67 677.30 67 950.12 67 909.55 67 437.72 67 502.48
68 687.60 68 686.70 68 961.60 68 921.03 68 442.96 68 508.56
69 697.00 69 696.10 69 973.08 69 932.51 69 448.20 69 514.64
70 706.40 70 705.50 70 984.56 70 943.99 70 453.44 70 520.72
71 715.80 71 714.90 71 996.04 71 955.47 71 458.68 71 526.80
72 725.20 72 724.30 72 1007.52 72 966.95 72 463.92 72 532.88
73 734.60 73 733.70 73 1019.00 73 978.43 73 469.16 73 538.96
74 744.00 74 743.10 74 1030.48 74 989.91 74 474.40 74 545.04
75 753.40 75 752.50 75 1041.96 75 1001.39 75 479.64 75 551.12
76 762.80 76 761.90 76 1053.44 76 1012.87 76 484.88 76 557.20
77 772.20 77 771.30 77 1064.92 77 1024.35 77 490.12 77 563.28
78 781.60 78 780.70 78 1076.40 78 1035.83 78 495.36 78 569.36
79 791.00 79 790.10 79 1087.88 79 1047.31 79 500.60 79 575.44
80 800.40 80 799.50 80 1099.36 80 1058.79 80 505.84 80 581.52
81 809.80 81 808.90 81 1110.84 81 1070.27 81 511.08 81 587.60
82 819.20 82 818.30 82 1122.32 82 1081.75 82 516.32 82 593.68
83 828.60 83 827.70 83 1133.80 83 1093.23 83 521.56 83 599.76
84 838.00 84 837.10 84 1145.28 84 1104.71 84 526.80 84 605.84
85 847.40 85 846.50 85 1156.76 85 1116.19 85 532.04 85 611.92
86 856.80 86 855.90 86 1168.24 86 1127.67 86 537.28 86 618.00
87 866.20 87 865.30 87 1179.72 87 1139.15 87 542.52 87 624.08
88 875.60 88 874.70 88 1191.20 88 1150.63 88 547.76 88 630.16
89 885.00 89 884.10 89 1202.68 89 1162.11 89 553.00 89 636.24
90 894.40 90 893.50 90 1214.16 90 1173.59 90 558.24 90 642.32
91 903.80 91 902.90 91 1225.64 91 1185.07 91 563.48 91 648.40
92 913.20 92 912.30 92 1237.12 92 1196.55 92 568.72 92 654.48
93 922.60 93 921.70 93 1248.60 93 1208.03 93 573.96 93 660.56
94 932.00 94 931.10 94 1260.08 94 1219.51 94 579.20 94 666.64
95 941.40 95 940.50 95 1271.56 95 1230.99 95 584.44 95 672.72
96 950.80 96 949.90 96 1283.04 96 1242.47 96 589.68 96 678.80
97 960.20 97 959.30 97 1294.52 97 1253.95 97 594.92 97 684.88
98 969.60 98 968.70 98 1306.00 98 1265.43 98 600.16 98 690.96
99 979.00 99 978.10 99 1317.48 99 1276.91 99 605.40 99 697.04
100 988.40 100 987.50 100 1328.96 100 1288.39 100 610.64 100 703.12
101 997.80 101 996.90 101 1340.44 101 1299.87 101 615.88 101 709.20
102 1007.20 102 1006.30 102 1351.92 102 1311.35 102 621.12 102 715.28
103 1016.60 103 1015.70 103 1363.40 103 1322.83 103 626.36 103 721.36
104 1026.00 104 1025.10 104 1374.88 104 1334.31 104 631.60 104 727.44
105 1035.40 105 1034.50 105 1386.36 105 1345.79 105 636.84 105 733.52
106 1044.80 106 1043.90 106 1397.84 106 1357.27 106 642.08 106 739.60
107 1054.20 107 1053.30 107 1409.32 107 1368.75 107 647.32 107 745.68
108 1063.60 108 1062.70 108 1420.80 108 1380.23 108 652.56 108 751.76
109 1073.00 109 1072.10 109 1432.28 109 1391.71 109 657.80 109 757.84
110 1082.40 110 1081.50 110 1443.76 110 1403.19 110 663.04 110 763.92
111 1091.80 111 1090.90 111 1455.24 111 1414.67 111 668.28 111 770.00
112 1101.20 112 1100.30 112 1466.72 112 1426.15 112 673.52 112 776.08
113 1110.60 113 1109.70 113 1478.20 113 1437.63 113 678.76 113 782.16
114 1120.00 114 1119.10 114 1489.68 114 1449.11 114 684.00 114 788.24
115 1129.40 115 1128.50 115 1501.16 115 1460.59 115 689.24 115 794.32
116 1138.80 116 1137.90 116 1512.64 116 1472.07 116 694.48 116 800.40
117 1148.20 117 1147.30 117 1524.12 117 1483.55 117 699.72 117 806.48
118 1157.60 118 1156.70 118 1535.60 118 1495.03 118 704.96 118 812.56
119 1167.00 119 1166.10 119 1547.08 119 1506.51 119 710.20 119 818.64
120 1176.40 120 1175.50 120 1558.56 120 1517.99 120 715.44 120 824.72
121 1185.80 121 1184.90 121 1570.04 121 1529.47 121 720.68 121 830.80
122 1195.20 122 1194.30 122 1581.52 122 1540.95 122 725.92 122 836.88
123 1204.60 123 1203.70 123 1593.00 123 1552.43 123 731.16 123 842.96
124 1214.00 124 1213.10 124 1604.48 124 1563.91 124 736.40 124 849.04
125 1223.40 125 1222.50 125 1615.96 125 1575.39 125 741.64 125 855.12
126 1232.80 126 1231.90 126 1627.44 126 1586.87 126 746.88 126 861.20
127 1242.20 127 1241.30 127 1638.92 127 1598.35 127 752.12 127 867.28
128 1251.60 128 1250.70 128 1650.40 128 1609.83 128 757.36 128 873.36
129 1261.00 129 1260.10 129 1661.88 129 1621.31 129 762.60 129 879.44
130 1270.40 130 1269.50 130 1673.36 130 1632.79 130 767.84 130 885.52
131 1279.80 131 1278.90 131 1684.84 131 1644.27 131 773.08 131 891.60
132 1289.20 132 1288.30 132 1696.32 132 1655.75 132 778.32 132 897.68
133 1298.60 133 1297.70 133 1707.80 133 1667.23 133 783.56 133 903.76
134 1308.00 134 1307.10 134 1719.28 134 1678.71 134 788.80 134 909.84
135 1317.40 135 1316.50 135 1730.76 135 1690.19 135 794.04 135 915.92
136 1326.80 136 1325.90 136 1742.24 136 1701.67 136 799.28 136 922.00
137 1336.20 137 1335.30 137 1753.72 137 1713.15 137 804.52 137 928.08
138 1345.60 138 1344.70 138 1765.20 138 1724.63 138 809.76 138 934.16
139 1355.00 139 1354.10 139 1776.68 139 1736.11 139 815.00 139 940.24
140 1364.40 140 1363.50 140 1788.16 140 1747.59 140 820.24 140 946.32
141 1373.80 141 1372.90 141 1799.64 141 1759.07 141 825.48 141 952.40
142 1383.20 142 1382.30 142 1811.12 142 1770.55 142 830.72 142 958.48
143 1392.60 143 1391.70 143 1822.60 143 1782.03 143 835.96 143 964.56
144 1402.00 144 1401.10 144 1834.08 144 1793.51 144 841.20 144 970.64
145 1411.40 145 1410.50 145 1845.56 145 1804.99 145 846.44 145 976.72
146 1420.80 146 1419.90 146 1857.04 146 1816.47 146 851.68 146 982.80
147 1430.20 147 1429.30 147 1868.52 147 1827.95 147 856.92 147 988.88
148 1439.60 148 1438.70 148 1880.00 148 1839.43 148 862.16 148 994.96
149 1449.00 149 1448.10 149 1891.48 149 1850.91 149 867.40 149 1001.04
150 1458.40 150 1457.50 150 1902.96 150 1862.39 150 872.64 150 1007.12
151 1467.80 151 1466.90 151 1914.44 151 1873.87 151 877.88 151 1013.20
152 1477.20 152 1476.30 152 1925.92 152 1885.35 152 883.12 152 1019.28
153 1486.60 153 1485.70 153 1937.40 153 1896.83 153 888.36 153 1025.36
154 1496.00 154 1495.10 154 1948.88 154 1908.31 154 893.60 154 1031.44
155 1505.40 155 1504.50 155 1960.36 155 1919.79 155 898.84 155 1037.52
156 1514.80 156 1513.90 156 1971.84 156 1931.27 156 904.08 156 1043.60
157 1524.20 157 1523.30 157 1983.32 157 1942.75 157 909.32 157 1049.68
158 1533.60 158 1532.70 158 1994.80 158 1954.23 158 914.56 158 1055.76
159 1543.00 159 1542.10 159 2006.28 159 1965.71 159 919.80 159 1061.84
160 1552.40 160 1551.50 160 2017.76 160 1977.19 160 925.04 160 1067.92
161 1561.80 161 1560.90 161 2029.24 161 1988.67 161 930.28 161 1074.00
162 1571.20 162 1570.30 162 2040.72 162 2000.15 162 935.52 162 1080.08
163 1580.60 163 1579.70 163 2052.20 163 2011.63 163 940.76 163 1086.16
164 1590.00 164 1589.10 164 2063.68 164 2023.11 164 946.00 164 1092.24
165 1599.40 165 1598.50 165 2075.16 165 2034.59 165 951.24 165 1098.32
166 1608.80 166 1607.90 166 2086.64 166 2046.07 166 956.48 166 1104.40
167 1618.20 167 1617.30 167 2098.12 167 2057.55 167 961.72 167 1110.48
168 1627.60 168 1626.70 168 2109.60 168 2069.03 168 966.96 168 1116.56
169 1637.00 169 1636.10 169 2121.08 169 2080.51 169 972.20 169 1122.64
170 1646.40 170 1645.50 170 2132.56 170 2091.99 170 977.44 170 1128.72
171 1655.80 171 1654.90 171 2144.04 171 2103.47 171 982.68 171 1134.80
172 1665.20 172 1664.30 172 2155.52 172 2114.95 172 987.92 172 1140.88
173 1674.60 173 1673.70 173 2167.00 173 2126.43 173 993.16 173 1146.96
174 1684.00 174 1683.10 174 2178.48 174 2137.91 174 998.40 174 1153.04
175 1693.40 175 1692.50 175 2189.96 175 2149.39 175 1003.64 175 1159.12
176 1702.80 176 1701.90 176 2201.44 176 2160.87 176 1008.88 176 1165.20
177 1712.20 177 1711.30 177 2212.92 177 2172.35 177 1014.12 177 1171.28
178 1721.60 178 1720.70 178 2224.40 178 2183.83 178 1019.36 178 1177.36
179 1731.00 179 1730.10 179 2235.88 179 2195.31 179 1024.60 179 1183.44
180 1740.40 180 1739.50 180 2247.36 180 2206.79 180 1029.84 180 1189.52
181 1749.80 181 1748.90 181 2258.84 181 2218.27 181 1035.08 181 1195.60
182 1759.20 182 1758.30 182 2270.32 182 2229.75 182 1040.32 182 1201.68
183 1768.60 183 1767.70 183 2281.80 183 2241.23 183 1045.56 183 1207.76
184 1778.00 184 1777.10 184 2293.28 184 2252.71 184 1050.80 184 1213.84
185 1787.40 185 1786.50 185 2304.76 185 2264.19 185 1056.04 185 1219.92
186 1796.80 186 1795.90 186 2316.24 186 2275.67 186 1061.28 186 1226.00
187 1806.20 187 1805.30 187 2327.72 187 2287.15 187 1066.52 187 1232.08
188 1815.60 188 1814.70 188 2339.20 188 2298.63 188 1071.76 188 1238.16
189 1825.00 189 1824.10 189 2350.68 189 2310.11 189 1077.00 189 1244.24
190 1834.40 190 1833.50 190 2362.16 190 2321.59 190 1082.24 190 1250.32
191 1843.80 191 1842.90 191 2373.64 191 2333.07 191 1087.48 191 1256.40
192 1853.20 192 1852.30 192 2385.12 192 2344.55 192 1092.72 192 1262.48
193 1862.60 193 1861.70 193 2396.60 193 2356.03 193 1097.96 193 1268.56
194 1872.00 194 1871.10 194 2408.08 194 2367.51 194 1103.20 194 1274.64
195 1881.40 195 1880.50 195 2419.56 195 2378.99 195 1108.44 195 1280.72
196 1890.80 196 1889.90 196 2431.04 196 2390.47 196 1113.68 196 1286.80
197 1900.20 197 1899.30 197 2442.52 197 2401.95 197 1118.92 197 1292.88
198 1909.60 198 1908.70 198 2454.00 198 2413.43 198 1124.16 198 1298.96
199 1919.00 199 1918.10 199 2465.48 199 2424.91 199 1129.40 199 1305.04
200 1928.40 200 1927.50 200 2476.96 200 2436.39 200 1134.64 200 1311.12
201 1937.80 200 1936.90 201 2488.44 201 2447.87 201 1139.88 201 1317.20
202 1947.20 200 1946.30 202 2499.92 202 2459.35 202 1145.12 202 1323.28
203 1956.60 200 1955.70 203 2511.40 203 2470.83 203 1150.36 203 1329.36
204 1966.00 200 1965.10 204 2522.88 204 2482.31 204 1155.60 204 1335.44
205 1975.40 200 1974.50 205 2534.36 205 2493.79 205 1160.84 205 1341.52
206 1984.80 200 1983.90 206 2545.84 206 2505.27 206 1166.08 206 1347.60
207 1994.20 200 1993.30 207 2557.32 207 2516.75 207 1171.32 207 1353.68
208 2003.60 200 2002.70 208 2568.80 208 2528.23 208 1176.56 208 1359.76
209 2013.00 200 2012.10 209 2580.28 209 2539.71 209 1181.80 209 1365.84
210 2022.40 200 2021.50 210 2591.76 210 2551.19 210 1187.04 210 1371.92
211 2031.80 200 2030.90 211 2603.24 211 2562.67 211 1192.28 211 1378.00
212 2041.20 200 2040.30 212 2614.72 212 2574.15 212 1197.52 212 1384.08
213 2050.60 200 2049.70 213 2626.20 213 2585.63 213 1202.76 213 1390.16
214 2060.00 200 2059.10 214 2637.68 214 2597.11 214 1208.00 214 1396.24
215 2069.40 200 2068.50 215 2649.16 215 2608.59 215 1213.24 215 1402.32
216 2078.80 200 2077.90 216 2660.64 216 2620.07 216 1218.48 216 1408.40
217 2088.20 200 2087.30 217 2672.12 217 2631.55 217 1223.72 217 1414.48
218 2097.60 200 2096.70 218 2683.60 218 2643.03 218 1228.96 218 1420.56
219 2107.00 200 2106.10 219 2695.08 219 2654.51 219 1234.20 219 1426.64
220 2116.40 200 2115.50 220 2706.56 220 2665.99 220 1239.44 220 1432.72
221 2125.80 200 2124.90 221 2718.04 221 2677.47 221 1244.68 221 1438.80
222 2135.20 200 2134.30 222 2729.52 222 2688.95 222 1249.92 222 1444.88
223 2144.60 200 2143.70 223 2741.00 223 2700.43 223 1255.16 223 1450.96
224 2154.00 200 2153.10 224 2752.48 224 2711.91 224 1260.40 224 1457.04
225 2163.40 200 2162.50 225 2763.96 225 2723.39 225 1265.64 225 1463.12
226 2172.80 200 2171.90 226 2775.44 226 2734.87 226 1270.88 226 1469.20
227 2182.20 200 2181.30 227 2786.92 227 2746.35 227 1276.12 227 1475.28
228 2191.60 200 2190.70 228 2798.40 228 2757.83 228 1281.36 228 1481.36
229 2201.00 200 2200.10 229 2809.88 229 2769.31 229 1286.60 229 1487.44
230 2210.40 200 2209.50 230 2821.36 230 2780.79 230 1291.84 230 1493.52
231 2219.80 200 2218.90 231 2832.84 231 2792.27 231 1297.08 231 1499.60
232 2229.20 200 2228.30 232 2844.32 232 2803.75 232 1302.32 232 1505.68
233 2238.60 200 2237.70 233 2855.80 233 2815.23 233 1307.56 233 1511.76
234 2248.00 200 2247.10 234 2867.28 234 2826.71 234 1312.80 234 1517.84
235 2257.40 200 2256.50 235 2878.76 235 2838.19 235 1318.04 235 1523.92
236 2266.80 200 2265.90 236 2890.24 236 2849.67 236 1323.28 236 1530.00
237 2276.20 200 2275.30 237 2901.72 237 2861.15 237 1328.52 237 1536.08
238 2285.60 200 2284.70 238 2913.20 238 2872.63 238 1333.76 238 1542.16
239 2295.00 200 2294.10 239 2924.68 239 2884.11 239 1339.00 239 1548.24
240 2304.40 200 2303.50 240 2936.16 240 2895.59 240 1344.24 240 1554.32
241 2313.80 200 2312.90 241 2947.64 241 2907.07 241 1349.48 241 1560.40
242 2323.20 200 2322.30 242 2959.12 242 2918.55 242 1354.72 242 1566.48
243 2332.60 200 2331.70 243 2970.60 243 2930.03 243 1359.96 243 1572.56
244 2342.00 200 2341.10 244 2982.08 244 2941.51 244 1365.20 244 1578.64
245 2351.40 200 2350.50 245 2993.56 245 2952.99 245 1370.44 245 1584.72
246 2360.80 200 2359.90 246 3005.04 246 2964.47 246 1375.68 246 1590.80
247 2370.20 200 2369.30 247 3016.52 247 2975.95 247 1380.92 247 1596.88
248 2379.60 200 2378.70 248 3028.00 248 2987.43 248 1386.16 248 1602.96
249 2389.00 200 2388.10 249 3039.48 249 2998.91 249 1391.40 249 1609.04
250 2398.40 200 2397.50 250 3050.96 250 3010.39 250 1396.64 250 1615.12
ROAD
Qty. Rate Amount Qty. Rate
4760.00 6.61 31464.00 82.03125 5392.7
1836.00 124.24 228105.00
SEIGNO
843.75 2104.80 1775925.00
RAGE
5625.00 40.74 229163.00 QC
5625.00 11.70 65813.00 U/S
5625.00 149.10 838688.00
170.00 210.17 35728.90
217.60 25.59 5568.00
170.00 135.09 22965.00
131.25 5392.70 707792.00
2.00 1626.51 3253.00
6.00 487.18 2923.00
1.00 4250.00 4250.00
3951637.90
Seignora
357659.19
ge
QC @
19758.19
0.5%
U/s 470944.72
4800000.00
Amount
442369.9219
442369.9219
26964.062
2211.849609
78454.17
550000.0035