1 The Site
(i) Site of the Six-Lane Project Highway shall include the land, buildings, structures, and
road works as described in Annex-I of this Schedule-A.
(ii) The dates of handing over the Right of Way to the Contractor are specified in Annex-
II of this Schedule-A.
(iii) An inventory of the Site including the land, buildings, structures, road works, trees
and any other immovable property on, or attached to, the Site shall be prepared jointly by the
Authority Representative and the Contractor, and such inventory shall form part of the
memorandum referred to in Clause 8.2 (i) of this Agreement.
The alignment plans of the Project Highway are specified in Annex-III. In the case of sections
where no modification in the existing alignment of the Project Highway is contemplated, the
alignment plan has not been provided. Alignment plans have only been given for sections
where the existing alignment is proposed to be upgraded. The proposed profile of the Project
Highways shall be followed by the contractor with minimum FRL as indicated in the alignment
plan. The Contractor, however, improve/upgrade the Road Profile as indicated in Annex-III
based on site/design requirement.
(iv) The status of the environment clearances obtained or awaited is given in Annex-IV.
6 laning of Guwahati Bypass Schedule A, B, C, D
Annex – I
(Schedule-A)
Site
1. Site
The Site of the Six-Lane Project Highway is the section of NH 37 from Km 146+172 (Design
Chainage Km 146+172) to Km 162+620 (Design Chainage Km 162+620) in the State of
Assam.
2. Land
The Site of the Project Highway comprises the land (sum total of land already in possession
and land to be possessed) as described below:
Chainage (km)
Sl. No. Right of Way (m) Remarks
From To
Exiting ROW is 45m to 60m and no additional land is required
3. Carriageway
The present carriageway of the project highway is Four Lane. The type of the existing
pavement is flexible.
4. Major Bridges
The Site includes the following ROB (road over railway line)/RUB (road under railway line):
6. Grade separators
7. Minor bridges
9. Pedestrian Underpasses
No. of Spans
S. No. Chainage (km) Type of Structure with span Width (m)
length (m)
NIL
6 laning of Guwahati Bypass Schedule A, B, C, D
10. Culverts
Location Type
S. No. Side Masonry/cc Earthen
From km to km
(Pucca) (Kutcha)
1 147+160 149+300 RHS Pucca
2 149+300 154+000 LHS Pucca -
3 154+150 161+100 LHS Pucca -
4 149+090 152+100 RHS Pucca -
5 152+700 153+900 RHS Pucca -
6 154+050 158+800 RHS Pucca -
7 161+100 161+300 RHS Pucca -
Both
8 161+300 162+620 Pucca -
Sides
(NH: National Highway, SH: State Highway, MDR: Major District Road)
16. Bypasses
The details of the existing road sections proposed to be bypassed are as follows:
Name of bypass Chainage (km) From km
S. No. Length (in Km)
(town) to km
NIL
Existing Chainage
S. No Type of Structure Height (m) Remarks
(Km)
NIL
6 laning of Guwahati Bypass Schedule A, B, C, D
No existing road has been utilized as part of the project alignment hence submergence
location is not applicable.
19. Utilities
All the existing Over Head (EHT, LT/HT) lines which are presently a cause of hindrance in the road
widening and construction of proposed flyovers are presented below:
The details are provided in the tabular form change wise, to assess exact total length to be shifted
for entire project corridor.
a. 33 KV Overhead Line
b. 11 KV Overhead Line
Whether to be
Size of shifted as O/H
Sl. Location Line length in Height and Type
existing Line or to be
No. (Chainage) meters. of existing Pole
ACSR converted with
UG cable.
LHS- 50M LHS - SP66 LHS -Raccon To be shifted as
1 At Km 150.440
RHS-100M RHS - SP66 RHS - Raccon O/H Line
LHS-100M LHS- SP76, SP66 LHS -Raccon To be shifted as
2 At Km 152.850
RHS-100 RHS- SP66 RHS - Raccon O/H Line
To be converted
150+150 = PSC of 9.75M Raccon
From Km 156.400 with UG cable
3 300M SP66
to Km 157.800 To be shifted as
2×500=1000M Raccon
O/H Line
Whether to be
Line length in
shifted as O/H
Sl. Location meters, along Height and Type Size existing
line or to be
No. (Chainage) with name of of existing Pole ACSR
converted with
Road
UG cable
LHS - SP66
LHS - 100M LHS-Rabbit To be shifted as
1 At Km 150.440 RHS- Composite
RHS -50M RHS-Rabbit O/H Line
with HKV SP66
LHS-
LHS-PSC 7.5M
LHS - 100M Rabbit To be shifted as
2 At Km 152.850 SP76
RHS-50M O/H Line
RHS-SP66
RHS-Rabbit
225 PSC 9.75M
225 SP76
From Km 156.400 To be shifted as
3 600 SP66 (All are Rabbit
to Km 157.800 O/H Line
1050M (total) composite
manner)
6 laning of Guwahati Bypass Schedule A, B, C, D
Km 156.400 to Km
2 11KV ACSR Raccon 2×75M
157.800
Km 157.000 to Km
3 33KV Wolf Conductor 100M
158.000
Annex – II
(Schedule-A)
The dates on which the Authority shall provide Right of Way of Construction Zone to the
Contractor on different stretches of the Site are stated below:
Annex - III
(Schedule-A)
Alignment Plans
(i) The existing alignment of the Project Highway shall be modified as per the enclosed
alignment plan:
(ii) The proposed alignment of the Project Highway shall be as per enclosed plan. The
proposed profile of the Project Highway & cross road as indicated in this Annex shall be
followed by the contractor with minimum FRL limit indicated in the alignment plan. Based
on site/design requirement, the contractor may, however, improve/upgrade upon the
alignment plans and profiles as indicated in this Annex and raise the finished roadway
level (FRL) with approval from the Authority’s Engineer within the available Right of Way.
6 laning of Guwahati Bypass Schedule A, B, C, D
Annex – IV
(Schedule-A)
Environment Clearances
Not Applicable
6 laning of Guwahati Bypass Schedule A, B, C, D
Schedule - B
Development of the Project Highway shall include design and construction of the Project
Highway as described in this Schedule-B and in Schedule-C.
The Project Highway shall be designed and constructed in conformity with the Specifications
and Standards specified in Annex-I of Schedule-D.
6 laning of Guwahati Bypass Schedule A, B, C, D
Annex – I
(Schedule-B)
Description of Six-Laning
Construction of 6 lane flyovers at Boragaon, Gorchuk, Lokhra & Basistha Junction along with
six laning of approaches from section Ch. Km 146+172 to Km 162+620 on Guwahati Bypass
(NH-37)
(i) The Project Highway shall follow the existing alignment unless otherwise specified by
the Authority and shown in the alignment plans specified in Annex-III of Schedule-A.
Geometric deficiencies, if any, in the existing horizontal and vertical profiles shall be
corrected as per the prescribed standards for [plain/rolling] terrain to the extent land is
available.
(a) Six-laning with paved shoulders shall be undertaken. The paved carriageway shall be
provided as indicated below and referred to in paragraph 2(xi) of this Annexure of Schedule
B and Annexure I of Schedule D.
(b) Except as otherwise provided in this agreement, the width of the paved carriageway
and cross-sectional features shall conform to paragraph 1(ii) (a) above.
(i) General
Geometric design and general features of the Project Highway shall be in accordance with
Section 2 of the Manual.
The design speed shall be considered as specified in the manual for plain/ rolling terrain i.e.
100/80 Kmph (Ruling/Minimum)
In the following sections, where improvement of the existing road geometrics to the
prescribed standards is not possible, the existing road geometrics shall be improved to the
extent possible within the given right of way and proper road signs and safety measures
shall be provided:
6 laning of Guwahati Bypass Schedule A, B, C, D
Lateral and vertical clearances at overpasses shall be as per the provision of relevant
Manual.
Lateral clearance: The width of the opening at the overpasses shall be as follows:
Service roads shall be constructed at the locations and for the lengths indicated below:
Grade separated structures shall be provided as per provision of the relevant manual. The
requisite particulars are given below:
(a) Light Vehicular Underpasses:
Number
Sl. Existing Design NH Length and length Approach
Remarks
No. Chainage Chainage No. (m) of spans Gradient
(m))
NIL
20m
1 - 159+420 - 1x20 (Clear) - New Construction
Clear
(c) Flyovers:
Proposed Span
Proposed Total
Structure Type
Arrangement
Skew Angle
Width (m)
Chainage
Remarks
Existing
(SK)(m)
NH No.
Sr. No.
NIL
Proposed
Chainage
Chainage
Structure
Width(m)
Remarks
Existing
Design
NH No.
S. No
type
NIL
Pedestrian Underpass:
S.
From To Length TCS Description
No.
EXISTING 4 - LANE TO 6 LANE
WIDENING OF MAIN CARRIAGEWAY
1 146+172 146+500 328 TCS-15
WITH NEW SERVICE ROAD ON LHS
AND RHS
EXISTING 4 - LANE TO 6 LANE
WIDENING OF MAIN CARRIAGEWAY
2 146+500 146+744 244 TCS-11
AT RUB LOCATION WITH SERVICE
ROAD ON LHS AND RHS
6 laning of Guwahati Bypass Schedule A, B, C, D
S.
From To Length TCS Description
No.
TYPICAL CROSS SECTION FOR 6-
3 146+744 146+764 20 TCS-14 LANE (3X3) AT BRIDGE LOCATION
WITH SERVICE ROADS
EXISTING 4 - LANE TO 6 LANE
WIDENING OF MAIN CARRIAGEWAY
4 146+764 147+150 386 TCS-15
WITH NEW SERVICE ROAD ON LHS
AND RHS
EXISTING 4 - LANE TO 6 LANE
WIDENING OF MAIN CARRIAGEWAY
5 147+150 148+400 1250 TCS-2
WITH WIDENING OF SERVICE
ROAD ON LHS AND RHS
EXISTING 4 - LANE TO 6 LANE
WIDENING OF MAIN CARRIAGEWAY
6 148+400 148+750 350 TCS-9
WITH SERVICE ROAD ON LHS AND
RHS (HILL AREA)
EXISTING 4 - LANE TO 6 LANE
WIDENING OF MAIN CARRIAGEWAY
7 148+750 149+100 350 TCS-10
WITH SERVICE ROAD ON LHS AND
RHS (LAND CONSTRAINT)
EXISTING 4 - LANE TO 6 LANE
WIDENING OF MAIN CARRIAGEWAY
8 149+100 149+300 200 TCS-9A WITH NEW SERVICE ROAD ON LHS
AND SERVICE ROAD WIDENING ON
RHS
EXISTING 4 - LANE TO 6 LANE
WIDENING OF MAIN CARRIAGEWAY
9 149+300 150+000 700 TCS-2
WITH WIDENING OF SERVICE
ROAD ON LHS AND RHS
NEW CONSTRUCTION 6 - LANE
10 150+000 150+534 534 TCS-1 FLYOVER APPROACHES WITH
SERVICE ROAD ON BOTH SIDE
11 150+534 150+614 80 FLYOVER BORAGAON
NEW CONSTRUCTION 6 - LANE
12 150+614 151+110 496 TCS-1 FLYOVER APPROACHES WITH
SERVICE ROAD ON BOTH SIDE
EXISTING 4 - LANE TO 6 LANE
WIDENING OF MAIN CARRIAGEWAY
13 151+110 152+085 975 TCS-2
WITH WIDENING OF SERVICE
ROAD ON LHS AND RHS
EXISTING 4 - LANE TO 6 LANE
WIDENING OF MAIN CARRIAGEWAY
14 152+085 152+390 305 TCS-5A WITH WIDENING OF SERVICE
ROAD ON LHS & NEW SERVICE
ROAD ON RHS
NEW CONSTRUCTION 6 - LANE
FLYOVER APPROACHES WITH
15 152+390 152+600 210 TCS-5 WIDENING OF SERVICE ROAD ON
LHS & NEW SERVICE ROAD ON
RHS
6 laning of Guwahati Bypass Schedule A, B, C, D
S.
From To Length TCS Description
No.
NEW CONSTRUCTION 6 - LANE
16 152+600 152+953 353 TCS-3 FLYOVER APPROACHES WITH
SERVICE ROAD ON BOTH SIDE
17 152+953 153+033 80 FLYOVER GORCHUK
NEW CONSTRUCTION 6 - LANE
18 153+033 153+600 567 TCS-3 FLYOVER APPROACHES WITH
SERVICE ROAD ON BOTH SIDE
EXISTING 4 - LANE TO 6 LANE
WIDENING OF MAIN CARRIAGEWAY
19 153+600 154+170 570 TCS-4
WITH WIDENING OF SERVICE
ROAD ON LHS AND RHS
NEW 2 LANE AT-GRADE
CARRIAGEWAY ON LHS &
20 154+170 154+790 620 TCS-8
WIDENING OF AT-GRADE
CARRIAGEWAY ON RHS
EXISTING 4 - LANE TO 6 LANE
WIDENING OF MAIN CARRIAGEWAY
21 154+790 156+480 1690 TCS-7
WITH WIDENING OF SERVICE
ROAD ON LHS AND RHS
NEW CONSTRUCTION 6 - LANE
22 156+480 157+093 613 TCS-6 FLYOVER APPROACHES WITH
SERVICE ROAD ON BOTH SIDE
23 157+093 157+173 80 FLYOVER LOKHRA
NEW CONSTRUCTION 6 - LANE
24 157+173 157+780 607 TCS-6 FLYOVER APPROACHES WITH
SERVICE ROAD ON BOTH SIDE
EXISTING 4 - LANE TO 6 LANE
WIDENING OF MAIN CARRIAGEWAY
25 157+780 158+886 1106 TCS-7
WITH WIDENING OF SERVICE
ROAD ON LHS AND RHS
NEW CONSTRUCTION 6 - LANE
26 158+886 159+410 524 TCS-12 FLYOVER APPROACHES WITH
SERVICE ROAD ON BOTH SIDE
27 159+410 159+430 20 VUP LALMATI
NEW CONSTRUCTION 6 - LANE
28 159+430 159+937 507 TCS-12 FLYOVER APPROACHES WITH
SERVICE ROAD ON BOTH SIDE
EXISTING 4 - LANE TO 6 LANE
WIDENING OF MAIN CARRIAGEWAY
29 159+937 161+400 1463 TCS-13
WITH WIDENING OF SERVICE
ROAD ON LHS AND RHS
NEW CONSTRUCTION 6 - LANE
30 161+400 161+936 536 TCS-16 FLYOVER APPROACHES WITH
SERVICE ROAD ON BOTH SIDE
31 161+936 162+016 80 (FLYOVER) BASISTHA
6 laning of Guwahati Bypass Schedule A, B, C, D
S.
From To Length TCS Description
No.
NEW CONSTRUCTION 6 - LANE
32 162+016 162+620 604 TCS-16 FLYOVER APPROACHES WITH
SERVICE ROAD ON BOTH SIDE
6 laning of Guwahati Bypass Schedule
A, B, C, D
All intersections and grade separators shall be as per the provision of relevant Manual.
Existing intersections which are deficient shall be improved to the prescribed standards.
Properly designed intersections shall be provided at the locations and of the types and
features given in the tables below:
Sl. No. Section Length Extent of raising [Top of finished road level]
At the Flyover locations
5. Pavement Design
(i) Pavement design shall be carried out in accordance with section 5 manual.
Type of pavement shall be flexible for entire length of project highway including approaches
of grade separators and Service road/Slip Roads.
(iii) Design requirements
The reconstruction of main carriageway/service road shall be carried out from GSB onwards
and the pavement layers shall be considered as per the new pavement design. GSB layer of
reconstruction section shall be matched with the existing GSB layer for the complete
formation width of the carriageway. The reconstruction stretches shall be considered as
specified in TCS schedule.
Initially construction of service roads with design traffic of 35 mSA of two lanes
configurations on both sides of the main carriageway shall be undertaken. During
construction of service roads the traffic shall use the existing main carriageway. Once
service road is constructed, all the main carriageway traffic shall be diverted on to the newly
constructed service roads till the time the main carriageway has been completed.
6 laning of Guwahati Bypass Schedule
A, B, C, D
7. Roadside Drainage
Drainage system including surface and subsurface drains for the Project Highway shall be
provided as per the provision given in Section 6 of IRC: SP:87-2019.
8. Design of Structures
(i) General
All bridges, culverts and structures shall be designed and constructed in accordance with the
provision of relevant Manual and shall conform to the cross- sectional features and other
details specified therein.
Width of the carriageway of new bridges and structures shall be as follows:
Width of carriageway and cross-sectional
Sl. No. Bridge at km
features
NIL
The following structures shall be provided with footpaths:
(c) Additional new culverts shall be constructed as per particulars given in the table below:
(xi) Bridges
(d) The railings of existing bridges shall be replaced by crash barriers at the following
locations:
Type Structure
Proposed Span
Proposed Total
Arrangement
Skew Angle
Width (m)
Chainage
Remarks
Existing
(SK)(m)
NH No.
Sr. No.
NIL
Road under-bridges
Road under-bridges (road under railway line) shall be provided at the following level
crossings, as per GAD drawings attached:
Location of Level crossing Number and length of
Sl. No.
(Chainage km) span (m)
NIL
Limited Height Subway:
The grade separated structures shall be provided at the locations and of the type and length
specified in paragraphs 2 (ix) and 3 of this Annex-I.
The existing bridges and structures to be repaired/strengthened, and the nature and extent
of repairs /strengthening required are given below:
Bridges
(i) Traffic control devices and road safety works shall be provided in accordance with
the provision of relevant Manual.
(ii) Specifications of the reflective sheeting: Specifications of the reflective sheeting shall
be as per manual.
(i) Roadside furniture shall be provided in accordance with the provision of relevant Manual.
(ii) Overhead traffic signs: Overhead traffic signs shall be provided as per manual.
Plantation & landscaping shall be done as per IRC SP 21 and Green Highway Policy 2015
The safety barriers shall also be provided at the following hazardous locations:
Not Required
Note I:
D. The utilities shall be handed over after shifting work is completed to Utility Owning
Department to their entire satisfaction. The maintenance liability shall rest with the Utility
Owning Department after handing over process is complete as far as utility shifting works
are concerned.
1. Felling of trees if any shall be carried out by the Contractor. The cost of the same
shall be borne by the Authority.
6 laning of Guwahati Bypass Schedule
A, B, C, D
Schedule - C
Project Facilities
1. Project Facilities
The Contractor shall construct the Project Facilities in accordance with the provisions of this
Agreement. Such Project Facilities shall include:
Each of the Project Facilities to be completed on or before project completion date have
been described in Annex-I of this Schedule-C:
Annex - I
(Schedule-C)
1 Project Facilities
The Contractor shall construct the Project Facilities described in this Annex-I to form part of
the Project Highway. The Project Facilities shall include:
(a) toll plaza[s];
(b) roadside furniture.
(c) Way side amenities/service areas
(d) pedestrian facilities/cattle crossing
(e) Lighting
(f) Environmental management plan
(g) Advance traffic management system (ATMS)
(h) Utilities
(i) Crash Barrier
(j) Noise barrier
Toll Booth location and Minimum Lane Requirement in the Opening Year
Design
S. No Type of Interchange Road crossing
Chainage
NIL
The roadside furniture shall be provided as per the manual with following minimum
requirement. However, any increase in nos. shall not constitute any change of scope.
The minimum reflective pavement markers & solar studs on Highway shall be provided is as
follows:
Reflective Studs:
The Project shall be constructed in conformity with the Specifications and Standards
specified in this schedule and Schedule-D.
The Contractor shall provide lighting as per Schedule - D at following locations of the
Project Highway.
(i) Flyovers
(ii) Underpasses and Overpasses
(iii) Traffic aid posts, vehicle rescue posts, medical aid posts and all other facility &
service buildings.
6 laning of Guwahati Bypass Schedule
A, B, C, D
Minimum level illumination on locations of the Project Highway where exterior lighting is
provided shall be 40 lux. In general, ‘code of practice for lighting of public thoroughfare IS
1944 shall be followed. All facility buildings shall be illuminated adequately.
The lighting fittings (with LED features) shall be powered by solar system with back up
facilities (power and battery both) at all locations.
The solar system will be used for the entire highway. The solar panel at interchange toll
Booths and bridges shall be grid connected whereas the other places shall be battery
backup. The electrical connection with all its infrastructures shall be done by the Contractor.
The energy charges shall be borne by Authority. Additional battery backup shall be provided.
Provision for accommodating utilities shall be made below Service Road Edge adjacent to
footpath cum drain or under the separator island between RE Wall and Service Road due to
ROW Constraints.
New Jersey type of barriers with antiglare screens shall be provided in the entire stretch of
the road from Km 146+172 to Km 162+620 except for the structure location where crash
barrier has to be discontinued and should be flared to tie-in with Crash barrier of structure.
Noise Barrier to be provided at the following Flyover and VUP locations on both sides
including the approaches.
Design Chainage
S. No Structure
(km)
1 150+574 (Boragaon) Flyover
2 152+993 (Garchuk) Flyover
3 157+133 (Lokhara) Flyover
4 159+420 VUP
5 161+976 (Basistha) Flyover
SCHEDULE – D
1. Construction
The Contractor shall comply with the Specifications and Standards set forth in Annex-I of this
Schedule-D for construction of the Project Highway:
2. Design Standards
The Project Highway including Project Facilities shall conform to design requirements set out
in the following documents.
6 laning of Guwahati Bypass Schedule
A, B, C, D
Annex - I
(Schedule-D)
S.
Clause No. Details of Item Description of Deviation
No.
Design speed shall be restricted to 65 Kmph in
1 2.2 Speed the stretches of project highway given in para
2(iii) of Annex I of Schedule B
Typical Cross Typical cross-sections shall be as specified in
2 2.17
section Annexure I of Schedule B
Junction layout
Typical cross-sections shall be as specified in
3 Figure no 3.12 for flyover with
Annexure I of Schedule B
viaduct span
Width of Width of structures shall be as specified in
4 7.3
Structure Annexure I of Schedule B
Minimum design traffic to be adopted is 35MSA
Service Road
5 5.5.4 and minimum effective design CBR to be
MSA & CBR
adopted is 8%.
6 12.5 Street Lighting The Energy charges shall be borne by Authority.