Professional Documents
Culture Documents
2 EXCAVATION WORK
Earth work in excavation below existing ground level in foundations, trenches, in all class
of soil / murrrum except rock up to a depth of 1.50 mtrs. Including shoring, strutting,
dewatering, and disposing off the un useful soil outside the plot boundary complete as
directed by Engineer IN charge.
a ( upto 1.50 )
Do--- as above in depth 0 mtrs. To 1.50 mtrs. 1284.86 cmt. 0.00
b ( upto 3.00 )
Do--- as above in depth 1.50 mtrs. To 3.00 mtrs. 905.15 cmt. 0.00
c Do--- as above in depth 3.0 mtrs. To 4.50 mtrs. R/O cmt.
4 Metalling [ 63-90 mm ]
Providing and laying metal (size 63mm x 90mm) in a layer of 175mm each well
compacted with power roller without damaging foundation filling voids with quarry dust,
watering, ramming, compacting if required for edges and corners use plate compactor 827.28 cmt 0.00
etc. complete as directed by Engineer In charge.
PAGE NO:1
8 REINFORCEMENT STEEL FE 500
Providing & Supplying & fixing in position High yield deformed bar Reinforcement
confirming to IS – 1139 or cold Twisted bars, TOR steel / TMT / or Equivalent
Reinforcement bars confirming to IS – 1786 for RCC construction including transporting
(i.e. loading & unloading) the steel from store/issue points to site of works including
unloading from Trucks/Trailers, cleaning, de coiling, cutting, bending to required shape
and lengths as per detailed drawing, binding with 16 SWG black soft annealed binding
wire, placing with proper cover block, support chairs, overlap, spacers, etc. complete in all
respect as directed by Engineer IN charge in foundation and up to Plinth level.
9 SHUTTERING
Providing and erecting in position form work with plate shuttering materials of
approved quality for all type of concrete elements vertical, horizontal or inclined including
scaffolding, stagging, fasteners,locking ,Ties at respective levels necessary nails, wires,
locking pins,Guggus etc keeping in position till concrete is laid and members have 1342.63 sqm 0.00
acquired required strength, removal thereafter, applying shuttering oil etc. complete as
directed by Engineer-in-Charge.
13 Groove cutting
Providing and constructing groove cutting of size 5mm x 50mm deep for floor , including
saw cutting of concrete floors / pavement to the required depth, filling the same with 2068.20 rmt 0.00
polysulpide, etc. complete.as per instruction of Engg in charge.
15 GP2 Grouting
Filling the gap between RCC column, base plate and floor with GP2 Grout of M45 I S I
grout to consume shall confirm to company Equavalient of SIKA make / Fair mate / Dr.
fixit etc. as per I S Specification including the all the over head expesnes and the edges 3.24 cmt 0.00
shall be shampered etc completed as directed by Engineer Incharge.
16 Re-bar
Providing, drilling & fixing anchor bars in concrete using Hilti HY-150 chemical grout as
per as per manufacturer's specifications. [ necessary pull out test --if recommended by
consulltant have to be proved , which rate shall not be extra paid etc complete as
directed by engg. incharge .
PAGE NO:2
a 8mm dia #NAME? NOS #NAME?
b 16mm dia 110.00 NOS 0.00
PAGE NO:3
TIE BEAM
Sr.
Particular
no. L B H
→ STIRRUPS
→ STIRRUPS
→ STIRRUPS
BAR BENDING SCHEDULE - GB/PB
Dia of
No. of No. of
Shape of Bar Bar in
bar item
mm
0.250 3.023
12 0 24
0.180
0.075 8 42 24
0.400 0.075 0.400
0.180
0.180
0.075 8 48 18
0.400 0.075 0.400
0.180
0.250 3.023
0 2 24
0.180
0.075 8 42 24
0.400 0.075 0.400
0.180
ING SCHEDULE - GB/PB
Weig
Total wt
Spacing in Length in Total length
8mm Total wt 10mm
mtr mtr in mtr
(0.395 (0.617 kg/mt)
kg/mt)
6.546 471.312 - -
6.546 471.312 - -
3.273 0.000 - -
7.562 408.348 - -
18.155 980.370 - -
9.078 0.000 - -
6.546 471.312 - -
6.546 471.312 - -
3.273 157.104 - -
419.468 - - -
419.468 - - -
- - - -
- - - -
363.430 - - -
872.529 - - -
- - - -
- - - -
419.468 - - -
419.468 - - -
- - - -
- - - -
Distribution bars
2 FLIGHT 2 WIDTH 1.000 M
→
Main bar
Number of same flight 1.0
Distribution bars
Distribution bars
BAR BENDING SCHEDULE - STAIR
Dia of
No. of No. of
Shape of Bar Bar in
bar item
mm
1.220 10 11 1
1.220
1.000
10 11 1
1.220
1.000
0.900 10 11 1
1.220
8 53 1
1.000
3.660 10 11 1
4.120
1.220
10 11 1
1.030
1.220
3.660 10 11 1
1.030
8 107 1
1.000
0.500 12 13 0
3.000
0.450
12 13 0
0.750
0.450
0.500 12 13 0
0.750
12 65 0
1.200
NG SCHEDULE - STAIR
Weig
Total wt
Spacing in Length in Total length
8mm Total wt 10mm
mtr mtr in mtr
(0.395 (0.617 kg/mt)
kg/mt)
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
→ STIRRUPS
→ STIRRUPS
→ STIRRUPS
→ STIRRUPS
→ STIRRUPS
6 B5 7.000 0.230 0.425
→
Number of beams 1.000
→ STIRRUPS
→ STIRRUPS
BAR BENDING SCHEDULE - SLAB BEAM
Dia of
No. of No. of
Shape of Bar Bar in
bar item
mm
0.250 16.115
0 2 1
0.180
0.075 8 216 1
0.375 0.075 0.375
0.180
0.180
0.075 8 15 1
0.375 0.075 0.375
0.180
0.250 15.713
12 2 1
0.180
0.075 8 141 1
0.375 0.075 0.375
0.180
0.250 4.550
16 3 1
0.180
0.075 8 62 1
0.525 0.075 0.525
0.180
0.250 2.275
16 1 1
0.180
0.075 8 32 1
0.375 0.075 0.375
0.180
0.250 6.950 0.250 12 2 1
0.250 8.802
0 2 1
0.180
0.075 8 48 1
0.375 0.075 0.375
0.180
0.250 1.070
0 2 1
0.180
0.075 8 16 1
0.065 0.075 0.065
0.180
G SCHEDULE - SLAB BEAM
Weig
Total wt
Spacing in Length in Total length
8mm Total wt 10mm
mtr mtr in mtr
(0.395 (0.617 kg/mt)
kg/mt)
32.730 98.190 - -
32.730 65.460 - -
32.730 98.190 - -
16.365 32.730 - -
2.550 5.100 - -
2.550 5.100 - -
5.625 22.500 - -
2.813 5.625 - -
21.450 85.800 - -
31.925 63.850 - -
15.963 31.925 - -
9.600 57.600 - -
9.600 19.200 - -
9.600 28.800 - -
4.800 14.400 - -
5.050 15.150 - -
5.050 10.100 - -
2.525 2.525 - -
18.105 36.210 - -
9.052 18.105 - -
2.640 5.280 - -
2.640 5.280 - -
1.320 2.640 - -
87.389 - - -
- - - -
87.389 - - -
- - - -
- - - -
4.539 - - -
- - - -
20.025 - - -
- - - -
- - - -
76.362 - - -
56.827 - - -
28.413 - - -
- - - -
- 91.008 - -
17.088 - - -
- 45.504 - -
- 22.752 - -
- - - -
- 23.937 - -
- 15.958 - -
- 3.989 - -
- - - -
13.261 - - -
32.227 - - -
- - - -
- - - -
4.699 - - -
4.699 - - -
- - - -
- - - -
432.918 203.148 0.000 0.000
903.276
SLAB
Sr.
Particular
no. T
1 S1 Thickness 0.150
→ Number of Slab 1.000
Straight bars Length 9.150 m
Distribuition 1 0.000 m
Distribuition 2 0.000 m
2 S1 Thickness 0.150
→ Number of Slab 1.000
Straight bars Length 3.400 m
Distribuition 1 0.000 m
Distribuition 2 0.000 m
3 S2 Thickness 0.150
→ Number of Slab 1.000
Straight bars Length 5.460 m
Distribuition 1 0.000 m
Distribuition 2 0.000 m
4 S2 Thickness 0.150
→ Number of Slab 1.000
Straight bars Length 3.560 m
Distribuition 1 0.000 m
Distribuition 2 0.000 m
5 S3 Thickness 0.150
→ Number of Slab 1.000
Straight bars Length 2.570 m
Distribuition 1 4.880 m
Distribuition 2 0.000 m
6 S4 Thickness 0.150
→ Number of Slab 1.000
Straight bars Length 3.350 m
Bentup bars Length 3.350 m
Distribuition 1 0.000 m
Distribuition 2 0.000 m
7 S4 Thickness 0.150
→ Number of Slab 1.000
Straight bars Length 4.320 m
Distribuition 1 0.000 m
Distribuition 2 0.000 m
8 S5 Thickness 0.150
→ Number of Slab 1.000
Straight bars Length 2.000 m
Bentup bars Length 2.000 m
Distribuition 1 3.560 m
Distribuition 2 0.000 m
9 S6 Thickness 0.150
→ Number of Slab 1.000
Straight bars Length 3.660 m
Distribuition 1 2.980 m
Distribuition 2 0.000 m
BAR BENDING SCHEDULE - SLAB
Dia of
No. of No. of
Shape of Bar Bar in
bar item
mm
2.670 10 12 1
0.000 8 91 1
0.000 12 5 1
0.000 8 23 1
0.000 8 4 1
4.120 10 13 1
0.000 8 14 1
0.000 0 0 1
0.000 0 0 1
0.000 0 0 1
0.920 10 17 1
4.880 8 18 1
0.000 8 0 1
0.000 10 15 1
0.000 8 13 1
0.000 8 0 1
1.070 10 12 1
0.000 8 21 1
0.000 0 21 1
0.700 10 13 1
3.560 8 14 1
0.000 10 0 1
2.290 10 11 1
2.980 8 26 1
0.000 10 0 1
ING SCHEDULE - SLAB
Weig
Total wt
Number of Length in Total length
8mm Total wt 10mm
bend mtr in mtr
(0.395 (0.617 kg/mt)
kg/mt)
0.000 0.000 - -
0.000 0.000 - -
0.000 0.000 - -
0.000 0.000 - -
0.000 0.000 - -
0.000 0.000 - -
0.000 0.000 - -
0.000 0.000 - -
0.000 0.000 - -
0.000 0.000 - -
0.000 0.000 - -
0.000 0.000 - -
0.000 0.000 - -
0.000 0.000 - -
0.000 0.000 - -
0.000 0.000 - -
TOTAL 84.988 870.423
GRAND TOTAL 955
Weight in Kg
Total wt
Total wt Total wt Total wt
12mm
16mm 20mm 25mm (3.85
(0.89
(1.58 kg/mt) (2.47 kg/mt) kg/mt)
kg/mt)
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
0.000 0.000 0.000 0.000
955.411
REINFORCEMENT STEEL CONSUMPTION STATEMENT
REINFORCEMENT STEEL Total Qty
Sr. No. Item Description
8mm 10mm 12mm 16mm 20mm 25mm
1 GB/PB 1,490.256 ----- 2,913.830 ----- ----- ----- 4404.086
2 STAIR 63.200 160.988 ----- ----- ----- ----- 224.188
3 BEAM 267.210 ----- 432.918 203.149 ----- ----- 903.276
4 GF SLAB 84.988 870.423 ----- ----- ----- ----- 955.411