Professional Documents
Culture Documents
a PARAMEDICS COLLEGE
i) Civil Works
44 15-36-m-03 Supply & Erection of CFL 18 Watt Each 500.000 219.608 109,804.16
Supply, installation, connecting, testing
and commissioning of Surface mounting
45 15-36-k-01 No 15.000 7,233.603 108,504.05
LED tube light with 2x2000 lumens,
complete in all respects