P340 EUPE - MIXED DEVELOPMENT AT SUNGAI PETANI 3.

1/1

Item Description Unit Qty Rate (RM) Amount (RM)

SCHEDULE OF WORKS NO: 3

EXTERNAL WORKS & SERVICES

ROAD & HARDSTANDING WORKS

Notes:-

1. This Schedule of Works shall be read in conjunction


with the foregoing Specifications, Preliminaries and
General Conditions, Preambles and Tender
Drawings prepared by the Civil and Structural
Engineers.

2. The amount appearing in the Final Summary and


Form of Tender shall be the Final Sum and deemed
to include all works as indicate in the Tender
Drawings and Specifications contain therein.

3. Any ambiguity, omission or discrepancy detected


in or between any items stated in this Schedule of
Works, Drawings and / or Specifications shall be
reported to the S.O. one (1) week before the date
fixed for closing of tender. Who shall in turn
take the necessary clarification which shall be
binding and final.

4. Items not specifically stated in this Schedule of


Works but are shown in the Drawings or stated in
the Specifications and necessary for the proper and
satisfactory completion of the Works shall either be
added and priced by the Tenderer in the spaces
provided or be deemed to have been priced in the
stated items.

5. The scope of works under this Contract are


demarcated in the enclosed layout plan.

6. The tenderer deemed to have visited the site to


ascertain quantum of works prior to his pricing of
their Schedule of Works.

7. The Contractor shall implement a traffic


management system, when implementing works on
public roads such as road resurfacing, etc., including
engaging a traffic consultant if required, in
compliance with the requirements of the Local
Authorities.

To Collection

PKB/P340/VN/P1/NSC/Infra
P340 EUPE - MIXED DEVELOPMENT AT SUNGAI PETANI 3.1/2

Item Description Unit Qty Rate (RM) Amount (RM)

SCHEDULE OF WORKS NO: 3

EXTERNAL WORKS & SERVICES

ROAD & HARDSTANDING WORKS (CONT'D)

GENERAL LEVELLING

A Cut and fill oversite or in bulk through all classes Item


of material than solid rock) to final requisite road
level and building platform; include compaction to
Engineer's specification; all constructed to the
dimensions, lines levels, grades and cross
section as per drawing

MAIN ROAD; SIMPANAN JALAN 66'

ROAD WORKS

B Excavate oversite to sub-grade formation level; get


out and remove excavated material from site. m3 6,118 -

C Trim, grade and roll sub-grade with 10 tons roller


CBR>5% to required cambers and gradient as
described. m2 13,598 -

D 50mm thick sand blanket; rolled to the required


cambers and gradients m2 13,598 -

E 300mm thick (consolidated) of 50mm down


crusher run as base course CBR>95% rolled in 2
layers to the required cambers and gradients,
watered and blinded as described. m2 13,598 -

F 60mm thick (consolidated) of 20mm bituminous


macadam as binder course rolled to the required
cambers and gradients. m2 13,598 -

G 40mm thick (consolidated) of 14mm bituminous


macadam as wearing course rolled to the required
cambers and gradients. m2 13,598 -

To Collection -

PKB/P340/VN/P1/NSC/Infra
P340 EUPE - MIXED DEVELOPMENT AT SUNGAI PETANI 3.1/3

Item Description Unit Qty Rate (RM) Amount (RM)

SCHEDULE OF WORKS NO: 3

EXTERNAL WORKS & SERVICES

ROAD & HARDSTANDING WORKS (CONT'D)

MAIN ROAD; SIMPANAN JALAN 66' (CONT'D)

REINFORCED CONCRETE

Concrete Grade 20

Supply and lay semi-mountable kerb; laid on well


compacted base; including finishing fair on exposed
surfaces; including all necessary formwork,
reinforcement, excavation, backing, disposal and
prepare and apply two costs of approved thermoplastic
road kerb painting to exposed surfaces with
connection and forming opening to scupper drains; all
as per Engineer's drawings and approval:-

A Overall size 800mm x 465mm high m 2,681 -

B Extra over for kerb opening Nr 907 -

C Extra over for 150mm diamter UPVC pipe at every


3,000mm c/c connecting kerb opening to nearest m 2,405 -
drain

CONCRETE WALKWAY

D To construct concrete walkway for side table;


50mm thick concrete Grade 20; laid on 150mm
thick crusher run as described base; including all
necessary finishes, formwork, reinforcement,
excavation, backing and disposal; all as per m2 3,349 -
Engineer's drawing and approval.

RAISE UP ISLAND

E To construct raise-up island; c/w semi-mountable


kerb and premix finishing, and base; including
finishing fair on exposed surfaces; including all
necessary formwork, reinforcement, excavation, m2 342 -
backing and disposal; all as per Engineer's
drawings and approval:-

To Collection -

PKB/P340/VN/P1/NSC/Infra
P340 EUPE - MIXED DEVELOPMENT AT SUNGAI PETANI 3.1/4

Item Description Unit Qty Rate (RM) Amount (RM)

SCHEDULE OF WORKS NO: 3

EXTERNAL WORKS & SERVICES

ROAD & HARDSTANDING WORKS (CONT'D)

MAIN ROAD; SIMPANAN JALAN 66' (CONT'D)

SEEDING AND TURFING

Soiling, cultivating, treating top surfaces, fertilize and


seeding; including digging over ground to necessary
depth; including selected black vegetable soil;
removing large stones, debris and weeds;

A Turfing, spot turfing over site m2 859 -

B Turfing, close turfing over site m2 Rate only

SUNDRIES

ROAD SIGNAGE

Supply and install signboard of JKR approved colour


and specifications at road junction, c/w 300mm x
1,000mm (minimum) mass concrete footing and
100mm x 100mm x 5mm MS plate, including all
necessary excavation, concrete (G20) base, formwork,
reinforcement, painting finishes and sign post of
2,200mm height (minimum); all as per Engineer's
drawing

C "Keep Left and Obstruction" sign (RM. 4 & WD.23) Nr 1 -

D "Obstruction and Double Arrow" sign (WD. 23 & Nr 1 -


WD. 36)

E "Berhenti" sign (RP.1) Nr 3 -

F "Position Warning Sign" sign (S1) Nr 3 -

G Signboard X Nr 1 -

H MPSPK Signboard Nr 1 -

To Collection -

PKB/P340/VN/P1/NSC/Infra
P340 EUPE - MIXED DEVELOPMENT AT SUNGAI PETANI 3.1/5

Item Description Unit Qty Rate (RM) Amount (RM)

SCHEDULE OF WORKS NO: 3

EXTERNAL WORKS & SERVICES

ROAD & HARDSTANDING WORKS (CONT'D)

MAIN ROAD; SIMPANAN JALAN 66' (CONT'D)

SUNDRIES (CONT'D)

EXTERNAL PAINTING

Road marking paint; preparing and applying


thermoplastic paint

Lines

A Continuous line m 1,811 -

B Stop line m 28 -

C Edge line m 2,995 -

D Double line m 396 -

E Double continuos line m 14 -

F Tranvers bar m 102 -

G Yellow box m 298 -

Motifs

H Chevron marking (Diverging Traffic) m2 301 -

I Direction arrows; "Straight Arrows" Nr 22 -

J Direction arrows; "Turn Right/ Left Arrows" Nr 9 -

K Direction arrows; Double head "Straight and Turn Nr 4 -


Right/ Left Arrows"

L Direction arrows; Double head "Turn Right & Left Nr 1 -


Arrows"

To Collection -

PKB/P340/VN/P1/NSC/Infra
P340 EUPE - MIXED DEVELOPMENT AT SUNGAI PETANI 3.1/6

Item Description Unit Qty Rate (RM) Amount (RM)

SCHEDULE OF WORKS NO: 3

EXTERNAL WORKS & SERVICES

ROAD & HARDSTANDING WORKS (CONT'D)

MAIN ROAD; SIMPANAN JALAN 66' (CONT'D)

SUNDRIES (CONT'D)

SPEED HUMP

A To construct speed hump; 3,725mm wide; m 21 -


complete with 150mm thick circular curve shape
premix, laid on finished road level; 300mm wide
yellow and 250mm wide white thermoplastic paint
applied on finished surfaces; including all
necessary works, all as per Engineer's drawings
and approval.

RAILING

Supply and install Mild Steel railing along road;


including concrete pad footing and all necessary
fittings, accessories and finishes for complete
installation; all as per Engineer's drawing and approval

B 900mm high MS railing m 1,579 -

INTERNAL ROAD; SIMPANAN JALAN 40'

ROAD WORKS

C Excavate oversite to sub-grade formation level; get


out and remove excavated material from site. m3 5,705 -

D Trim, grade and roll sub-grade with 10 tons roller


CBR>5% to required cambers and gradient as
described. m2 12,679 -

E 50mm thick sand blanket; rolled to the required


cambers and gradients m2 12,679 -

F 300mm thick (consolidated) of 50mm down


crusher run as base course CBR>95% rolled in 2
layers to the required cambers and gradients,
watered and blinded as described. m2 12,679 -

G 60mm thick (consolidated) of 20mm bituminous


macadam as binder course rolled to the required
cambers and gradients. m2 12,679 -

To Collection -

PKB/P340/VN/P1/NSC/Infra
P340 EUPE - MIXED DEVELOPMENT AT SUNGAI PETANI 3.1/7

Item Description Unit Qty Rate (RM) Amount (RM)

SCHEDULE OF WORKS NO: 3

EXTERNAL WORKS & SERVICES

ROAD & HARDSTANDING WORKS (CONT'D)

INTERNAL ROAD; SIMPANAN JALAN 40' (CONT'D)

ROAD WORKS (CONT'D)

A 40mm thick (consolidated) of 14mm bituminous


macadam as wearing course rolled to the required
cambers and gradients. m2 12,679 -

REINFORCED CONCRETE

Concrete Grade 20

Supply and lay semi-mountable kerb; laid on well


compacted base; including finishing fair on exposed
surfaces; including all necessary formwork,
reinforcement, excavation, backing, disposal and
prepare and apply two costs of approved thermoplastic
road kerb painting to exposed surfaces with
connection and forming opening to scupper drains; all
as per Engineer's drawings and approval:-

B Overall size 800mm x 465mm high m 2,256 -

C Extra over for kerb opening Nr 757 -

D Extra over for 150mm diamter UPVC pipe at every


3,000mm c/c connecting kerb opening to nearest m 3,240 -
drain

PREMIX WALKWAY

E To construct premix type walkway for side table;


constructed of 75mm thick consolidated m2 1,937 -
thickness of 50mm down crusher run base
course, and 50mm thick consolidated thickness
of 14mm premix course; including all
necessary excavation, backing and disposal; all
as per Engineer's drawing and approval.

To Collection -

PKB/P340/VN/P1/NSC/Infra
P340 EUPE - MIXED DEVELOPMENT AT SUNGAI PETANI 3.1/8

Item Description Unit Qty Rate (RM) Amount (RM)

SCHEDULE OF WORKS NO: 3

EXTERNAL WORKS & SERVICES

ROAD & HARDSTANDING WORKS (CONT'D)

INTERNAL ROAD; SIMPANAN JALAN 40' (CONT'D)

PREMIX WALKWAY (ENTRANCE)

A To construct premix type walkway for side table;


constructed of 350mm thick consolidated m2 1,794 -
thickness of 50mm down crusher run base
course, and 100mm thick consolidated thickness
of 14mm premix course; including all
necessary excavation, backing and disposal; all
as per Engineer's drawing and approval.

GILI-GILI

B To construct premix type Gili-gili; constructed of


150mm thick consolidated thickness of 50mm m2 580 -
down crusher run base course, and 50mm thick
consolidated thickness of 14mm premix course;
including all necessary excavation, backing and
disposal; all as per Engineer's drawing and
approval.

SUNDRIES

ROAD SIGNAGE

Supply and install signboard of JKR approved colour


and specifications at road junction, c/w 300mm x
1,000mm (minimum) mass concrete footing and
100mm x 100mm x 5mm MS plate, including all
necessary excavation, concrete (G20) base, formwork,
reinforcement, painting finishes and sign post of
2,200mm height (minimum); all as per Engineer's
drawing

C "Berhenti" sign (RP.1) Nr 10 -

D Road name sign Nr 5 -

To Collection -

PKB/P340/VN/P1/NSC/Infra
P340 EUPE - MIXED DEVELOPMENT AT SUNGAI PETANI 3.1/9

Item Description Unit Qty Rate (RM) Amount (RM)

SCHEDULE OF WORKS NO: 3

EXTERNAL WORKS & SERVICES

ROAD & HARDSTANDING WORKS (CONT'D)

INTERNAL ROAD; SIMPANAN JALAN 40' (CONT'D)

SUNDRIES (CONT'D)

EXTERNAL PAINTING

Road marking paint; preparing and applying


thermoplastic paint

Lines

A Continuous line m 1,339 -

B Stop line m 77 -

C Edge line m 2,256 -

Motifs

D Chevron marking (Diverging Traffic) m2 87 -

E Direction arrows; "Straight Arrows" Nr 4 -

F Direction arrows; "Turn Right/ Left Arrows" Nr 5 -

G Direction arrows; Double head "Straight and Turn Nr 7 -


Right/ Left Arrows"

MAKING GOOD TO EXISITNG WORK

H Allow for any remedial works and making goods


to site area, existing road and drainage, public Item
services, etc: contractor to visit site to determine
the extend of making good works; to the complete
satisfaction of the Employer and Local
Authorities.

TESTING

Testing to the Engineer's specifications and to


authorities requirement; all to approval of the Engineer
and statutory authorities; making good all defects and
re-testing as necessary.

I the whole road & hardstanding system Item

To Collection -

PKB/P340/VN/P1/NSC/Infra
P340 EUPE - MIXED DEVELOPMENT AT SUNGAI PETANI 3.1/10

Item Description Unit Qty Rate (RM) Amount (RM)

SCHEDULE OF WORKS NO: 3

EXTERNAL WORKS & SERVICES

ROAD & HARDSTANDING WORKS (CONT'D)

MARRYING OLD & NEW WORKS

A Connect new works with existing works complete


with all necessary connection method and fittings Item
including making sure the existing completed
works are in accordance with Authority
Requirements; including making good to all
existing works disturbed; all to the satisfaction of
Authorities/ or S.O.

To Collection -

PKB/P340/VN/P1/NSC/Infra
P340 EUPE - MIXED DEVELOPMENT AT SUNGAI PETANI 3.1/11

Item Description Unit Qty Rate (RM) Amount (RM)

SCHEDULE OF WORKS NO: 3

EXTERNAL WORKS & SERVICES

ROAD & HARDSTANDING WORKS (CONT'D)

Allow for works not specifically mentioned herein in


the above but which are necessary to complete the
works. (Tenderer shall state below any such works
necessary):-

A …..…………………………………………………………
…..…………………………………………………………

B …..…………………………………………………………
…..…………………………………………………………

C …..…………………………………………………………
…..…………………………………………………………

To Collection -

PKB/P340/VN/P1/NSC/Infra
P340 EUPE - MIXED DEVELOPMENT AT SUNGAI PETANI 3.1/12

Item Description Unit Qty Rate (RM) Amount (RM)

SCHEDULE OF WORKS NO: 3

EXTERNAL WORKS & SERVICES

ROAD & HARDSTANDING WORKS (CONT'D)

Collection

Page No. 3.1/1 ……………………………………… …… …………….. …………... -

Page No. 3.1/2 ……………………………………… …… …………….. …………... -

Page No. 3.1/3 ……………………………………… …… …………….. …………... -

Page No. 3.1/4 ……………………………………… …… …………….. …………... -

Page No. 3.1/5 ……………………………………… …… …………….. …………... -

Page No. 3.1/6 ……………………………………… …… …………….. …………... -

Page No. 3.1/7 ……………………………………… …… …………….. …………... -

Page No. 3.1/8 ……………………………………… …… …………….. …………... -

Page No. 3.1/9 ……………………………………… …… …………….. …………... -

Page No. 3.1/10 ……………………………………… …… …………….. …………... -

Page No. 3.1/11 ……………………………………… …… …………….. …………... -

Total Carried to Summary Page


-
(Page No.3.SUM/1)

PKB/P340/VN/P1/NSC/Infra