This document provides a summary of quantity estimates for the construction of a bridge overpass on the East-West Highway from Kakarbhitta to Laukahi in Nepal. It includes estimates for 6 bridge structures with quantities listed for various construction elements including earthworks, concrete works, reinforcement, drainage, railings and other miscellaneous items. The summary contains over 30 line items with descriptions, quantities, units and total estimated quantities for each construction element.

Uploaded by

sujankhanal10
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
470 views21 pages

Bridge Overpass SP-2

This document provides a summary of quantity estimates for the construction of a bridge overpass on the East-West Highway from Kakarbhitta to Laukahi in Nepal. It includes estimates for 6 bridge structures with quantities listed for various construction elements including earthworks, concrete works, reinforcement, drainage, railings and other miscellaneous items. The summary contains over 30 line items with descriptions, quantities, units and total estimated quantities for each construction element.

Uploaded by

sujankhanal10
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

SHIP-PPC East - West Highway Kakarbhitta - Laukahi Section

Bridge Overpass

Summary of Quantity
Sn Description of Works No Quantity Total Quantity Unit Remarks
1 FOUNDAATION / SUBSTRUCTURE / ABUTEMENT / PIER
FOUNDATION
1.1 Earthwork in Excavation for foundation of structure
in all type of soil including shoring, struting, bracing,
dewatering and disposal with necessary haulage and
lift, removal of stumps and other deleterious matter
and backfilling with approved Material all complete as 6.00 253.08 1,518.48 Cum
per design drawings, technical specification and to
the satisfaction of Engineer. [SS/SP 900]

1.2 Providing and placing machine mixed Cement


Concrete M15/40 for Levelling Course, including
compaction, curing, testing and necessary lead,
including necessary form works [F1 Finish] all
6.00 13.68 82.08 Cum
complete as per design drawings, technical
specification and to the satisfaction of
Engineer.[SS/SP 1800 and 2000]

1.3 Providing and laying of Stone


Soling/Pitching/Packing Works for levelling in line
and level, all complete as per design drawings,
6.00 20.52 123.12 Cum
technical specification and to the satisfaction of
Engineer. [SS/SP 2600]

1.4 Providing and laying Granular sub-base on


prepared surface, mixing at OMC, and compacting
to achieve the desired density, complete all complete
as per design drawings, technical specification and to 6.00 68.40 410.40 Cum
the satisfaction of Engineer. [SS/SP 1200]

1.5 Providing and placing machine mixed Cement


Concrete M30/20 for Foundation & Footings,
including compaction, curing, testing and necessary
lead, including necessary form works [F1 Finish] all
complete as per design drawings, technical 6.00 143.74 862.44 Cum
specification and to the satisfaction of Engineer.
[SS/SP 1800 and 2000]

1.6 Providing and laying , fitting and placing un-coated


Mild steel / HYSD reinforcement complete in
foundationas all complete as per design drawings,
6.00 11.40 68.41 Mt
technical specification and to the satisfaction of
Engineer. [SS/SP 2000]

SOOSUNG/ERMC/TSE Cost Estimate/Bridge_Overpass1


SHIP-PPC East - West Highway Kakarbhitta - Laukahi Section

Bridge Overpass

Summary of Quantity
Sn Description of Works No Quantity Total Quantity Unit Remarks

SOOSUNG/ERMC/TSE Cost Estimate/Bridge_Overpass2


SHIP-PPC East - West Highway Kakarbhitta - Laukahi Section

Bridge Overpass

Summary of Quantity
Sn Description of Works No Quantity Total Quantity Unit Remarks
SUBSTRUCTURE
1.7 Providing and placing machine mixed Cement
Concrete M30/20 for Abutment Stem, Cap,
Approach Slab, Pedestal and Stopper including
compaction, curing, testing and necessary lead,
including necessary form works [F3 Finish] all 6.00 133.48 800.88 Cum
complete as per design drawings, technical
specification and to the satisfaction of Engineer.
[SS/SP 1800/2000]

1.8 Providing and laying , fitting and placing HYSD bar


reinforcement in substructure complete all complete
as per design drawings, technical specification and to 6.00 14.79 88.71 Mt
the satisfaction of Engineer. [SS/SP 2000]

1.9 Providing and filling with graded Pervious Filter


Material behind abutment in layer with necessary
watering and compaction, all complete as per design 6.00 67.02 402.12 Cum
drawings, technical specification and to the
satisfaction of Engineer.[SS/SP 900]

1.10 Providing, laying and fixing of Geotextile (filter


fabric) all complete as per design drawings, technical
specification and to the satisfaction of Engineer. 6.00 111.68 670.08 Sqm
[SS/SP 2400]

2 SUPERSTRUCTURE
Providing and placing machine mixed Cement
Concrete M30/20 for Deck Slab, including
compaction, curing, testing and necessary lead,
including necessary form works [F3 Finish] all
2.1 6.00 34.47 206.82 Cum
complete as per design drawings, technical
specification and to the satisfaction of Engineer.
[SS/SP 1800 and 2000]

Tack coat with Bitumen By Mechanical Means


Providing and applying tack coat with hot Bitumen
(VG-30) at specified rate on the prepared non-
bituminous/bituminous surfaces including cleaning all
2.2 complete as per design drawings, technical 6.00 124.64 747.84 Sqm
specification and to the satisfaction of Engineer.
[SS/SP 1300]

Bituminous Concrete / Asphalt Concrete Providing


and laying Bituminous concrete/ Asphalt concrete
using crushed aggregates of specified grading,
premixed with bituminous binder (VG-30) and filler all
2.3 6.00 8.72 52.32 Cum
complete as per design drawings, technical
specification and to the satisfaction of Engineer.
[SS/SP 1300]

SOOSUNG/ERMC/TSE Cost Estimate/Bridge_Overpass3


SHIP-PPC East - West Highway Kakarbhitta - Laukahi Section

Bridge Overpass

Summary of Quantity
Sn Description of Works No Quantity Total Quantity Unit Remarks

Providing and placing machine mixed Cement


Concrete M30/20 Main Girders, including
compaction, curing, testing and necessary lead,
including necessary form works [F3 Finish] all
2.4 6.00 18.72 112.32 Cum
complete as per design drawings, technical
specification and to the satisfaction of Engineer.
[SS/SP 1800, 2000 and 2100]

Providing and placing machine mixed Cement


Concrete M30/20 Cross Girders, including
compaction, curing, testing and necessary lead,
including necessary form works [F3 Finish] all
2.5 complete as per design drawings, technical 6.00 2.03 12.18 Cum
specification and to the satisfaction of Engineer.
[SS/SP 1800, 2000 and 2100]

Providing and placing machine mixed Cement


Concrete M30/20 for Crash Barrier, including
compaction, curing, testing and necessary lead,
including necessary form works [F3 Finish] all
2.6 6.00 8.02 48.10 Cum
complete as per design drawings, technical
specification and to the satisfaction of Engineer.
[SS/SP 1800 and 2000]

Providing and laying Reinforcement Bars in Super-


Structure, HYSD, TMT, minimum 0.2% prof stress
500 MPA (Fe 500) for RCC works including cutting,
bending, binding, fixing in position and necessary
2.7 6.00 10.00 59.98 Mt
lead, all complete as per design drawings, technical
specification and to the satisfaction of Engineer.
[SS/SP 2000]

Providing and fixing of Expansion Joints (Strip Seal


Type) including necessary assesories,all complete as
2.8 per design drawings, technical specification and to 6.00 21.90 131.40 Rm
the satisfaction of Engineer. [SS/SP 1900

Providing and fixing of Elastomeric Bearing all


complete as per design drawings, technical
2.9 specification and to the satisfaction of Engineer. 6.00 8.00 48.00 No
[1900]

Providing and fixing of Drainage Spouts all complete


as per design drawings, technical specification and to
2.10 the satisfaction of Engineer. [3100] 6.00 12.00 72.00 No

SOOSUNG/ERMC/TSE Cost Estimate/Bridge_Overpass4


SHIP-PPC East - West Highway Kakarbhitta - Laukahi Section

Bridge Overpass

Summary of Quantity
Sn Description of Works No Quantity Total Quantity Unit Remarks
Providing and fixing of GI Ralling Pipe all complete
2.11 as per design drawings, technical specification and to 6.00 338.63 2,031.78 Kg
the satisfaction of Engineer. [2200 and 3100]

Providing and fixing of Steel Plates and other parts


all complete as per design drawings, technical
2.12 specification and to the satisfaction of Engineer. 6.00 84.08 504.48 Kg
[SS/SP 2200]

SOOSUNG/ERMC/TSE Cost Estimate/Bridge_Overpass5


SHIP-PPC East - West Highway Kakarbhitta - Laukahi Section

Bridge Overpass

Quantity Calculation of Foundation & Sub-structure

3.5
0.25 0.40 0.90 0.25
0.25 Width of Abutment = 9.00 m
0.3
Panel Thickness = 0.40 m
1.36 Width of Pedestal = 0.60 m
0.20 Number of Pedestal = 4.00 No
0.60 Avg. Depth of Excavation = 1.85 m
0.52 Depth of PCC = 0.10 m
1.00
1.0
0.30 4.85

3.3 1 Filter material thickness = 0.60 m


Backfill slope = 62.50 dg
Depth of Soling = 0.15 m
1.1 Depth of Soling = 1.50 m
1.100 0.75

7.60

Sn Particulars No Length Breadth Height Area Volume Unit


FOUNDATION
1 Earthwork in Excavation for foundation of
structure in all type of soil including shoring,
struting, bracing, dewatering and disposal
with necessary haulage and lift, removal of
stumps and other deleterious matter and
backfilling with approved Material all
complete as per design drawings, technical
specification and to the satisfaction of
Engineer. [SS/SP 900]

Left Abutment 1 7.60 9.00 1.85 126.54


Right Abutment 1 7.60 9.00 1.85 126.54
Total 253.08 Cum

SOOSUNG/ERMC/TSE Cost Estimate/Bridge_Overpass6


SHIP-PPC East - West Highway Kakarbhitta - Laukahi Section

Bridge Overpass

Quantity Calculation of Foundation & Sub-structure


2 Providing and placing machine mixed
Cement Concrete M15/40 for Levelling
Course, including compaction, curing,
testing and necessary lead, including
necessary form works [F1 Finish] all
complete as per design drawings, technical
specification and to the satisfaction of
Engineer. [SS/SP 1800 and 2000]

Left Abutment 1 7.60 9.00 0.10 6.84


Right Abutment 1 7.60 9.00 0.10 6.84
Total 13.68 Cum

3 Providing and laying of Stone


Soling/Pitching/Packing Works for
levelling in line and level, all complete as per
design drawings, technical specification and
to the satisfaction of Engineer. [SS/SP 2600]

Left Abutment 1 7.60 9.00 0.15 10.26


Right Abutment 1 7.60 9.00 0.15 10.26
Total 20.52 Cum

4 Providing and laying Granular sub-base


on prepared surface, mixing at OMC, and
compacting to achieve the desired density,
complete all complete as per design
drawings, technical specification and to the
satisfaction of Engineer. [SS/SP 1200]

Left Abutment 1 7.60 9.00 0.50 34.20


Right Abutment 1 7.60 9.00 0.50 34.20
Total 68.40 Cum

5 Providing and placing machine mixed


Cement Concrete M30/20 for Foundation
& Footings, including compaction, curing,
testing and necessary lead, including
necessary form works [F1 Finish] all
complete as per design drawings, technical
specification and to the satisfaction of
Engineer. [SS/SP 1800 and 2000]

Left Abutment 1 7.60 9.00 1.05 71.87


Right Abutment 1 7.60 9.00 1.05 71.87
Total 143.74 Cum

SOOSUNG/ERMC/TSE Cost Estimate/Bridge_Overpass7


SHIP-PPC East - West Highway Kakarbhitta - Laukahi Section

Bridge Overpass

Quantity Calculation of Foundation & Sub-structure


SUB-STRUCTURE
6 Providing and placing machine mixed
Cement Concrete M30/20 for Abutment
stem, Cap, including compaction, curing,
testing and necessary lead, including
necessary form works [F3 Finish] all
complete as per design drawings, technical
specification and to the satisfaction of
Engineer. [SS/SP 1800/2000]

Left Abutment
Stem 1 1.00 9.00 4.85 43.65
Abutment Cap 1 1.30 9.00 0.60 7.02
Ballast Wall 1 0.40 9.00 1.36 4.90
Heel side hunch 1 0.30 9.00 1.00 1.35
Corbel rectangular portion 1 0.25 8.20 0.25 0.51
Corbel traingular portion 1 0.25 8.20 0.25 0.26
Right Abutment
Stem 1 1.00 9.00 4.85 43.65
Abutment Cap 1 1.30 9.00 0.60 7.02
Ballast Wall 1 0.40 9.00 1.36 4.90
Heel side hunch 1 0.30 9.00 1.00 1.35
Corbel rectangular portion 1 0.25 8.20 0.25 0.51
Corbel traingular portion 1 0.25 8.20 0.25 0.26
Total 115.38 Cum

7 Providing and placing machine mixed


Cement Concrete M30/20 for Approach
Slab including compaction, curing, testing
and necessary lead, including necessary
form works [F3 Finish] all complete as per
design drawings, technical specification and
to the satisfaction of Engineer. [SS/SP
1800/2000]

Left Abutment 1 3.50 8.20 0.30 8.61


Right Abutment 1 3.50 8.20 0.30 8.61
Total 17.22 Cum

8 Providing and placing machine mixed


Cement Concrete M30/20 for Pedestal
including compaction, curing, testing and
necessary lead, including necessary form
works [F3 Finish] all complete as per design
drawings, technical specification and to the
satisfaction of Engineer. [SS/SP 1800/2000]

Left Abutment 4 0.52 0.60 0.20 0.25

SOOSUNG/ERMC/TSE Cost Estimate/Bridge_Overpass8


SHIP-PPC East - West Highway Kakarbhitta - Laukahi Section

Bridge Overpass

Quantity Calculation of Foundation & Sub-structure


Right Abutment 4 0.52 0.60 0.20 0.25
Total 0.50 Cum

9 Providing and placing machine mixed


Cement Concrete M30/20 for Stopper
including compaction, curing, testing and
necessary lead, including necessary form
works [F3 Finish] all complete as per design
drawings, technical specification and to the
satisfaction of Engineer. [SS/SP 1800/2000]

Left Abutment 2 0.40 0.4 0.60 0.19


Right Abutment 2 0.40 0.4 0.60 0.19
Total 0.38 Cum

10 Providing and filling with graded Pervious


Filter Material behind abutment in layer with
necessary watering and compaction, all
complete as per design drawings, technical
specification and to the satisfaction of
Engineer. [SS/SP 900]

Left Abutment 1 8.20 0.60 6.81 33.51


Right Abutment 1 8.20 0.60 6.81 33.51
Total 67.02 Cum

11 Providing, laying and fixing of Geotextile


(filter fabric) all complete as per design
drawings, technical specification and to the
satisfaction of Engineer. [SS/SP 2400]

Left Abutment 1 8.20 6.81 55.84


Right Abutment 1 8.20 6.81 55.84
Total 111.68 Sqm

SOOSUNG/ERMC/TSE Cost Estimate/Bridge_Overpass9


SHIP-PPC East - West Highway Kakarbhitta - Laukahi Section

Length 15.2

Bridge Overpass

Quantity Calculation of Super-structure

Type :- RCC Length :- 15.2 m Width:- 11.75 m Span :- 1

9.00
0.4 8.20 0.4

0.155 0.08
1.0 0.23 0.48
0.33
0.15 0.15
0.15 0.23
0.3

2.2 2.2 2.2

1.000 7.00 1.000

Number of Girder : 4 L = 15.20 m


Main Girder Section
0.4 0.4 0.4

0.77
0.77 0.47

At Center At End End Cross Girder


Numbers 2
Total Length of Girder = 15.20

Sn Particulars No Length Breadth Height Area Volume Unit


Providing and placing machine mixed
Cement Concrete M30/20 for Deck
Slab, including compaction, curing, testing
and necessary lead, including necessary
form works [F3 Finish] all complete as per
1 design drawings, technical specification
and to the satisfaction of Engineer.
[SS/SP 1800 and 2000]

Central Part 1 15.20 7.00 0.23 24.47


Left End Tapering Part 1 15.20 1.00 0.27 4.03

SOOSUNG/ERMC/TSE Cost Estimate/Bridge_Overpass10


SHIP-PPC East - West Highway Kakarbhitta - Laukahi Section

Length 15.2

Bridge Overpass

Quantity Calculation of Super-structure


Right End Tapering Part 1 15.20 1.00 0.27 4.03
Hunches to Main Girders 6 15.20 0.30 0.15 2.05
Deduction
End Cross Girder 12 0.40 0.30 0.15 -0.11
Total 34.47 Cum
Total for 1 Span 1 34.47 Cum

Tack coat with Bitumen By Mechanical


Means Providing and applying tack coat
with hot Bitumen (VG-30) at specified
rate on the prepared
2 non-bituminous/bituminous surfaces
including cleaning all complete as per
design drawings, technical specification
and to the satisfaction of Engineer.
[SS/SP 1300]

On Carriageway 1 15.20 8.20 124.64


On Footpath 1 15.20 0.00 0.00
Total 124.64 Sqm
Total for 1 Span 1 124.64 Sqm

Bituminous Concrete / Asphalt


Concrete Providing and laying
Bituminous concrete/ Asphalt concrete
using crushed aggregates of specified
grading, premixed with bituminous binder
3 (VG-30) and filler all complete as per
design drawings, technical specification
and to the satisfaction of Engineer.
[SS/SP 1300]

On Carriageway 1 15.20 8.20 0.07 8.72


On Footpath 1 15.20 0.00 0.03 0.00
Total 8.72 Cum
Total for 1 Span 1 8.72 Cum

Providing and placing machine mixed


Cement Concrete M30/20 Main Girders,
including compaction, curing, testing and
necessary lead, including necessary form
works [F3 Finish] all complete as per
4 design drawings, technical specification
and to the satisfaction of Engineer.
[SS/SP 1800, 2000 and 2100]

Rectangular Section 1 15.20 0.40 0.77 4.68


Total for One Girder 4.68
For Total Number of Girder 4 18.72 Cum
Total for 1 Span 1 18.72 Cum

SOOSUNG/ERMC/TSE Cost Estimate/Bridge_Overpass11


SHIP-PPC East - West Highway Kakarbhitta - Laukahi Section

Length 15.2

Bridge Overpass

Quantity Calculation of Super-structure


Providing and placing machine mixed
Cement Concrete M30/20 Cross
Girders, including compaction, curing,
testing and necessary lead, including
necessary form works [F3 Finish] all
5 complete as per design drawings,
technical specification and to the
satisfaction of Engineer. [SS/SP 1800,
2000 and 2100]

End Cross Girder 2 6.60 0.40 0.47 2.48


Deduction 6 0.40 0.40 0.47 -0.45
Total 2.03 Cum
Total for 1 Span 1 2.03 Cum

Providing and placing machine mixed


Cement Concrete M30/20 for Crash
Barrier, including compaction, curing,
testing and necessary lead, including
necessary form works [F3 Finish] all
6 complete as per design drawings,
technical specification and to the
satisfaction of Engineer. [SS/SP 1800 and
2000]

Upper Trapezoidal Section 2 15.20 0.18 0.48 2.63


Lower Trapezoidal Section 2 15.20 0.30 0.26 2.33
Lower Rectangular Section 2 15.20 0.40 0.08 0.91
Total 5.87 Cum
Total for 1 Span 1 8.02 Cum
Tapered Crash Barrier 2 3.50 0.19 2.15

7 Providing and fixing of Expansion Joints


(Strip Seal Type) including necessary
assesories,all complete as per design
drawings, technical specification and to 1 10.95 10.95 Rm
the satisfaction of Engineer. [SS/SP 1900]

Total for 1 Span 1 21.90 Rm

8 Providing and fixing of Elastomeric


Bearing all complete as per design
drawings, technical specification and to
the satisfaction of Engineer. [1900]

Free Bearings 4 4.00


Partially Fixed Bearings 4 4.00
Total 8.00 No
Total for 1 Span 1 8.00 No

SOOSUNG/ERMC/TSE Cost Estimate/Bridge_Overpass12


SHIP-PPC East - West Highway Kakarbhitta - Laukahi Section

Length 15.2

Bridge Overpass

Quantity Calculation of Super-structure


9 Providing and fixing of Drainage Spouts
all complete as per design drawings,
technical specification and to the 12 12.00 No
satisfaction of Engineer. [3100]

Total for 1 Span 1 12.00 No

10 Providing and fixing of GI Ralling Pipe all


complete as per design drawings,
technical specification and to the
satisfaction of Engineer. [2200 and 3100]
GI Pipes Ø 75 mm
On top of Crash Barrier 2 15.20 10.10 307.04
GI Pipes Ø 50 mm
On top of Crash Barrier @ 2m c/c 16 0.32 6.17 31.59
Total 338.63 Kg
Total for 1 Span 1 338.63 Kg

11 Providing and fixing of Steel Plates and


other parts all complete as per design
drawings, technical specification and to
the satisfaction of Engineer. [SS/SP 2200]

Steel plates for Crash Barrier Rails


Base plate 150X100X16 16 1.88 30.08
Utility Hanger including plates, rods, nuts
12 4.50 54.00
and bolts
Total 84.08 Kg
Total for 1 Span 1 84.08 Kg

12 Providing and assembling in position


Falsework for construction of RCC
Superstructure, all complete as per
design drawings, technical specification 1 13.40 9.00 120.60 Sqm
and to the satisfaction of Engineer.
[SS/SP 1800]

Total for 1 Span 1 120.60 Sqm

SOOSUNG/ERMC/TSE Cost Estimate/Bridge_Overpass13


SHIP-PPC East - West Highway Kakarbhitta - Laukahi Section

Bridge Overpass

Summary of Reinforcement
Total
Sn Description of works No Quantity Units Remarks
Quantity

1 Substructure Abutment &


Foundation
Foundation & footing
a) Foundation footing of Abutment
Left abutment 1 5.70 5.70
Right abutment 1 5.70 5.70
Total of (a) 11.40 Mt
Total of Foundation Reinfocement 11.40 Mt
Substructre
a) Abutment
Left Abutment 1 7.25 7.25
Right Abutment 1 7.25 7.25

Total of (a) 14.51 Mt


d) Pedestal Mesh
Bar for Pedestal Mesh 8 0.02 0.14
Total of ( d ) 0.14 Mt
e ) Stopper
Bar for Stoppers (For four stopper) 4 0.03 0.13
Total of ( e ) 0.13 Mt
Total of Substructure Reinfocement 14.79 Mt

2 Superstructure
2.1 Deck Slab 1 3.54 3.54
2.2 End Cross Girder 1 0.51 0.51
2.4 Main Girder 1 4.08 4.08
2.5 RCC Crash Barrier 1 1.87 1.87
Total Reinforcement in Superstructure 10.00 Mt

SOOSUNG/ERMC/TSE Cost Estimate/Bridge_Overpass14


SHIP-PPC East - West Highway Kakarbhitta - Laukahi Section

Bridge Overpass

Bar Bending Schedule of Deck Slab

Length Unit wt. Weight


SN Sketch Label Dia Nos Remarks
(m) (kg/m) (kg)

1 7600
100

S1 12 102 7.80 0.888 706.345


100

2 S2 12 102 9.11 0.888 824.793


100

100

8908

3 0 S2a 10 122 0.00 0.617 -


0

3 0 S2b 10 122 0.00 0.617 -


0

S3 10 52 15.42 0.617 494.364


15110
S3 10 9 15.42 0.617 85.563
155

155

3 S3 10 9 15.42 0.617 85.563

4 15110
155

S4 10 61 15.42 0.617 579.928


155
155

3 2000 S4a 10 61 2.16 0.617 81.047


155

3 2000 S4b 10 61 2.16 0.617 81.047

360
733 S6a 8 570 1.25 0.395 281.816
160
100

5 S5a 10 206 1.25 0.617 158.758


950
200

SOOSUNG/ERMC/TSE Cost Estimate/Bridge_Overpass15


SHIP-PPC East - West Highway Kakarbhitta - Laukahi Section

100
5 950 S5b 10 206 1.25 0.617 158.758

200
3,537.983
Total of Deck Slab 3.538 MT

Bar Bending Schedule of Main Girder

Length Unit wt. Weight


SN Sketch Label Dia Nos Remarks
(m) (kg/m) (kg)
400

400
3 MG1 32 4 15.89 6.313 401.150
15085
200

200

3 MG2 32 2 12.08 6.313 152.467


11675
200

200

3 MG3 32 2 10.23 6.313 129.171


9830
200

200

3 MG4 32 2 6.60 6.313 83.387


6204

4 15120 MG5 10 6 15.12 0.617 55.932

10 28 2.59 0.617 44.711


2*75
910

3 MG6

310 12 46 2.59 0.888 105.774

4 320 MG7 32 24 0.32 6.313 48.486

1,021.079
Total of One Main Girder 1.021 MT
Total of Four Main Girder 4.084 MT

Bar Bending Schedule of End Cross Girder

Length Unit wt. Weight


SN Sketch Label Dia Nos Remarks
(m) (kg/m) (kg)

6900
400

1 EC1 20 4 7.70 2.466 75.957


400

SOOSUNG/ERMC/TSE Cost Estimate/Bridge_Overpass16


SHIP-PPC East - West Highway Kakarbhitta - Laukahi Section

6900
400

400
2 EC2 25 4 7.70 3.853 118.683

2*60

3 EC3 10 36 1.96 0.617 43.503


610

310

4 6920 EC4 8 6 6.92 0.395 16.383

254.527
Total of One Cross Girder 0.255 MT
Total of Two End Cross Girder 0.509 MT

Bar Bending Schedule of Crash Barrier

Length Unit wt. Weight


SN Sketch Label Dia Nos Remarks
(m) (kg/m) (kg)

575
928

1 C1 16 81 2.03 1.578 259.782


225

304
915

2 C2 16 81 1.42 1.578 180.901

500

4 9960 C3 16 11 9.96 1.578 172.923

613.605
Total of 10 m 0.614 MT
Total of 1 m 0.061 MT

Bar Bending Schedule of Abutment Footing

Length Unit wt. Weight


SN Sketch Label Dia Nos 0
(m) (kg/m) (kg)

1 7418 AF1 32 24 8.66 6.313 1,311.863


740

500

SOOSUNG/ERMC/TSE Cost Estimate/Bridge_Overpass17


SHIP-PPC East - West Highway Kakarbhitta - Laukahi Section

300
3 3380 AF1a 32 24 4.18 6.313 633.355

500
740

3 5500 AF2 20 24 6.44 2.466 381.168

200
0
5 5425 AF3 25 46 6.17 3.853 1,092.774
0740

5 AF4 20 46 3.56 2.466 403.290


3055
500
600

3 8830
600

AF5 20 14 10.03 2.466 346.297

2 8830 AF6 16 12 10.03 1.578 189.969


600

600
600

3 8830 AF7 16 26 10.03 1.578 411.599


600

8830
4 AF8 20 24 10.03 2.466 593.652
600

600
L varies 870

Curve Length-130
5 Curve Radius-40 AF9 16 133 1.12 1.578 234.059
to 520

Hook Length-80

7450
8850

7 AF10 16 2 32.60 1.578 102.908

5,700.932
Total of One Abutment Foundation 5.701 MT

Bar Bending Schedule of One Abutment

SOOSUNG/ERMC/TSE Cost Estimate/Bridge_Overpass18


SHIP-PPC East - West Highway Kakarbhitta - Laukahi Section

Length Unit wt. Weight


SN Sketch Label Dia Nos Remarks
(m) (kg/m) (kg)

300

6324
1 AB1 20 60 7.12 2.466 1,054.131
500

500
6324

2 AB2 25 120 7.32 3.853 3,386.641

500
6320

2 AB2c 16 8 6.82 1.578 86.114


500

8835

3 AB3 16 34 19.87 1.578 1,066.292


1100

2*100
515

7 AB4 12 61 3.51 0.888 190.090

1140

8850
4 AB5 12 23 8.85 0.888 180.715

870
5 AB6 16 132 1.19 1.578 247.925
Hook Length-100

260
1960

1 AB7 16 60 2.52 1.578 238.644

300

260
1890

6 AB8 16 60 3.49 1.578 330.882


1044
300

SOOSUNG/ERMC/TSE Cost Estimate/Bridge_Overpass19


SHIP-PPC East - West Highway Kakarbhitta - Laukahi Section

8850
10 AB8a 10 7 8.85 0.617 38.195

8850

3 268 AB9 10 8 18.24 0.617 89.945

510
300
110

7 655
AB10 16 41 1.78 1.578 114.863

200

510
5 Hook Length-200 AB11 12 82 0.91 0.888 66.249

255
5 AB11a 12 82 0.66 0.888 47.684
Hook Length-200

8860
8 AB12 20 1 8.86 2.466 21.850

8860
8 AB13 16 2 8.86 1.578 27.968
400

9 AB14 20 30 0.90 2.466 66.586


500

7,254.775
Total in One Abutment 7.255 MT

Bar Bending Schedule of Approach Slab (For ONE )

Length Unit wt. Weight


SN Sketch Label Dia Nos Remarks
(m) (kg/m) (kg)

3400
1 AS1 12 110 3.40 0.888 332.042

8100
2 AS2 12 48 8.10 0.888 345.182

Total of One Approach Slab 677.225


0.677
Total of Two Approach Slabs 1.354 MT

SOOSUNG/ERMC/TSE Cost Estimate/Bridge_Overpass20


SHIP-PPC East - West Highway Kakarbhitta - Laukahi Section

Bar Bending Schedule of Pedestal Mesh (For One)

Length Unit wt. Weight


SN Sketch Label Dia Nos Remarks
(m) (kg/m) (kg)

500
1 460 PED1 10 6 1.82 0.617 6.733
200

420

1 460 PED2 10 6 1.74 0.617 6.437


200
408

1 PED3 12 1 5.30 0.888 4.705

488

Total of One Pedestal Mesh 17.875


0.018 MT

Bar Bending Schedule of Stopper (For One)

Length Unit wt. Weight


SN Sketch Label Dia Nos Remarks
(m) (kg/m) (kg)

300
1260
600

2 ST1 16 6 2.76 1.578 26.137


300
300

2*100
400

3 ST2 10 6 1.64 0.617 6.067


320

1 400 ST3 10 4 0.40 0.617 0.986

Total of one stopper 33.190


0.033 MT