Bridge Overpass SP-2
Bridge Overpass SP-2
Bridge Overpass
Summary of Quantity
Sn Description of Works No Quantity Total Quantity Unit Remarks
1 FOUNDAATION / SUBSTRUCTURE / ABUTEMENT / PIER
FOUNDATION
1.1 Earthwork in Excavation for foundation of structure
in all type of soil including shoring, struting, bracing,
dewatering and disposal with necessary haulage and
lift, removal of stumps and other deleterious matter
and backfilling with approved Material all complete as 6.00 253.08 1,518.48 Cum
per design drawings, technical specification and to
the satisfaction of Engineer. [SS/SP 900]
Bridge Overpass
Summary of Quantity
Sn Description of Works No Quantity Total Quantity Unit Remarks
Bridge Overpass
Summary of Quantity
Sn Description of Works No Quantity Total Quantity Unit Remarks
SUBSTRUCTURE
1.7 Providing and placing machine mixed Cement
Concrete M30/20 for Abutment Stem, Cap,
Approach Slab, Pedestal and Stopper including
compaction, curing, testing and necessary lead,
including necessary form works [F3 Finish] all 6.00 133.48 800.88 Cum
complete as per design drawings, technical
specification and to the satisfaction of Engineer.
[SS/SP 1800/2000]
2 SUPERSTRUCTURE
Providing and placing machine mixed Cement
Concrete M30/20 for Deck Slab, including
compaction, curing, testing and necessary lead,
including necessary form works [F3 Finish] all
2.1 6.00 34.47 206.82 Cum
complete as per design drawings, technical
specification and to the satisfaction of Engineer.
[SS/SP 1800 and 2000]
Bridge Overpass
Summary of Quantity
Sn Description of Works No Quantity Total Quantity Unit Remarks
Bridge Overpass
Summary of Quantity
Sn Description of Works No Quantity Total Quantity Unit Remarks
Providing and fixing of GI Ralling Pipe all complete
2.11 as per design drawings, technical specification and to 6.00 338.63 2,031.78 Kg
the satisfaction of Engineer. [2200 and 3100]
Bridge Overpass
3.5
0.25 0.40 0.90 0.25
0.25 Width of Abutment = 9.00 m
0.3
Panel Thickness = 0.40 m
1.36 Width of Pedestal = 0.60 m
0.20 Number of Pedestal = 4.00 No
0.60 Avg. Depth of Excavation = 1.85 m
0.52 Depth of PCC = 0.10 m
1.00
1.0
0.30 4.85
7.60
Bridge Overpass
Bridge Overpass
Left Abutment
Stem 1 1.00 9.00 4.85 43.65
Abutment Cap 1 1.30 9.00 0.60 7.02
Ballast Wall 1 0.40 9.00 1.36 4.90
Heel side hunch 1 0.30 9.00 1.00 1.35
Corbel rectangular portion 1 0.25 8.20 0.25 0.51
Corbel traingular portion 1 0.25 8.20 0.25 0.26
Right Abutment
Stem 1 1.00 9.00 4.85 43.65
Abutment Cap 1 1.30 9.00 0.60 7.02
Ballast Wall 1 0.40 9.00 1.36 4.90
Heel side hunch 1 0.30 9.00 1.00 1.35
Corbel rectangular portion 1 0.25 8.20 0.25 0.51
Corbel traingular portion 1 0.25 8.20 0.25 0.26
Total 115.38 Cum
Bridge Overpass
Length 15.2
Bridge Overpass
9.00
0.4 8.20 0.4
0.155 0.08
1.0 0.23 0.48
0.33
0.15 0.15
0.15 0.23
0.3
0.77
0.77 0.47
Length 15.2
Bridge Overpass
Length 15.2
Bridge Overpass
Length 15.2
Bridge Overpass
Bridge Overpass
Summary of Reinforcement
Total
Sn Description of works No Quantity Units Remarks
Quantity
2 Superstructure
2.1 Deck Slab 1 3.54 3.54
2.2 End Cross Girder 1 0.51 0.51
2.4 Main Girder 1 4.08 4.08
2.5 RCC Crash Barrier 1 1.87 1.87
Total Reinforcement in Superstructure 10.00 Mt
Bridge Overpass
1 7600
100
100
8908
155
4 15110
155
360
733 S6a 8 570 1.25 0.395 281.816
160
100
100
5 950 S5b 10 206 1.25 0.617 158.758
200
3,537.983
Total of Deck Slab 3.538 MT
400
3 MG1 32 4 15.89 6.313 401.150
15085
200
200
200
200
3 MG6
1,021.079
Total of One Main Girder 1.021 MT
Total of Four Main Girder 4.084 MT
6900
400
6900
400
400
2 EC2 25 4 7.70 3.853 118.683
2*60
310
254.527
Total of One Cross Girder 0.255 MT
Total of Two End Cross Girder 0.509 MT
575
928
304
915
500
613.605
Total of 10 m 0.614 MT
Total of 1 m 0.061 MT
500
300
3 3380 AF1a 32 24 4.18 6.313 633.355
500
740
200
0
5 5425 AF3 25 46 6.17 3.853 1,092.774
0740
3 8830
600
600
600
8830
4 AF8 20 24 10.03 2.466 593.652
600
600
L varies 870
Curve Length-130
5 Curve Radius-40 AF9 16 133 1.12 1.578 234.059
to 520
Hook Length-80
7450
8850
5,700.932
Total of One Abutment Foundation 5.701 MT
300
6324
1 AB1 20 60 7.12 2.466 1,054.131
500
500
6324
500
6320
8835
2*100
515
1140
8850
4 AB5 12 23 8.85 0.888 180.715
870
5 AB6 16 132 1.19 1.578 247.925
Hook Length-100
260
1960
300
260
1890
8850
10 AB8a 10 7 8.85 0.617 38.195
8850
510
300
110
7 655
AB10 16 41 1.78 1.578 114.863
200
510
5 Hook Length-200 AB11 12 82 0.91 0.888 66.249
255
5 AB11a 12 82 0.66 0.888 47.684
Hook Length-200
8860
8 AB12 20 1 8.86 2.466 21.850
8860
8 AB13 16 2 8.86 1.578 27.968
400
7,254.775
Total in One Abutment 7.255 MT
3400
1 AS1 12 110 3.40 0.888 332.042
8100
2 AS2 12 48 8.10 0.888 345.182
500
1 460 PED1 10 6 1.82 0.617 6.733
200
420
488
300
1260
600
2*100
400