PROPOSE CONSTRUCTION AND COMPLETION OF FLEXIBLE ROAD PAVEMENT AND OTHER RELATED WORKS AT KM7 ROUTE 8 TELEMIN

JAYA- BEREMBANG ROAD

ITEM Code. No DESCRIPTION UNIT QTY RATE RM

A110 CONTRACTUAL REQUIREMENTS


BOND

A111 Performance Bond sum

Insurance

A121 insurance of the works sum

A122 Public liability insurance sum

A123 SOCSO/workmen compensation insurance sum

A200 ENGINEER/SO/PD/ER REQUIREMENT


Facilities

A211.1 Establishment of (transportable type cabin) office (with a sum


floor area of 70 m2)

A211.2 Removal of (transportable type cabin) office(with a floor sum


area of 70 m2)

A300 PROJECT REQUIREMENT

A310 Survey and setting out by licensed surveyor sum

A331 Operation and maintenance manual as per specification sum

Maintenance of road; existing road

A351 Routine Maintenance sum

A352 Periodic maintenance sum

Clearance os site upon completion

A360 sum
Clearance of site upon completion as per specification

Access to site

A381 Restriction on working hours sum

A382 Restriction on working methods sum

A400 AUTHORITIES REQUIREMENTS

A411 Occupational health and safety plan sum

A417 Safety signage as per specification sum

Carried to Collection Page


PROPOSE CONSTRUCTION AND COMPLETION OF FLEXIBLE ROAD PAVEMENT AND OTHER RELATED WORKS AT KM7 ROUTE 8 TELEMIN
JAYA- BEREMBANG ROAD

ITEM Code. No DESCRIPTION UNIT QTY RATE RM

G440 Surface protection; 250mm thick stone pitching as per M2 126


specification

F131 Excavation; cut and dispose; earth material M3 209

F133 Excavation; cut and dispose; rock M3 15

Carried to Collection Page


PROPOSE CONSTRUCTION AND COMPLETION OF FLEXIBLE ROAD PAVEMENT AND OTHER RELATED WORKS AT KM7 ROUTE 8 TELEMIN
JAYA- BEREMBANG ROAD

ITEM Code. No DESCRIPTION UNIT QTY RATE RM

F100 EXCAVATION

F111.1 Topsoil average epth of 150mm and sisposed to the M2


contractor's dumpsite as approved by
Engineer/S.O/P.D/E.R

CUT TO FILL

F121.1 Earth material from original ground level to form M3 87


embankment; max depth 2.00m

F123.1 Rock by open blasting to form embankment commencin M3 9


from

F300 FILLING

F312.1 Imported material from contractor's own source with M3 982


grading limits as per specification

Carried to Collection Page


PROPOSE CONSTRUCTION AND COMPLETION OF FLEXIBLE ROAD PAVEMENT AND OTHER RELATED WORKS AT KM7 ROUTE 8 TELEMIN
JAYA- BEREMBANG ROAD

ITEM Code. No DESCRIPTION UNIT QTY RATE RM

R100 SUBGRADE PREPARATION

R110 Earth material to receive road pavement 200mm thick M2 178

Sub base course

R222.1
Granular material with a (CBR value of more than 30,
complying with Type C) of specification (clause no ) in M2 178
200 mm thick

R221.2
Granular material with a (CBR value of more than 30,
complying with Type C) of specification (clause no ) in M2 386
50 mm thick

R300 ROADBASE

R320.1 Crushed aggregates with a (CBR value of more than 80, M2 178
type II in 200 m thick

R320.2 Crushed aggregates with a (CBR value of more than 80, M2 386
type II in 300 m thick

R320.3 Crushed aggregates with a (CBR value of more than 80, M2 68


type II in 7mm thick

R400 ROAD SHOULDER

R410 Earth shoulder 200 mm thick M2 59

R430 Paved shoulder M2 93

R500 BITUMINOUS PAVEMENT COURSES

R520 Prime coat to be applied at a rate of 0.35 litre per M2 68


square metre

R530 Tack coat to be applied at a rate of 0.35 litre per square M2 68


metre

R541 Binder course 200mm nominal thickness polymeer M2 68


modified asphalt in 3 layer

Wearing course

R551 Asphaltic concrete as per specification M2 68

R832 Delineator post as shown on drawing No, NR 8

Carried to Collection Page


PROPOSE CONSTRUCTION AND COMPLETION OF FLEXIBLE ROAD PAVEMENT AND OTHER RELATED WORKS AT KM7 ROUTE 8 TELEMIN
JAYA- BEREMBANG ROAD

ITEM Code. No DESCRIPTION UNIT QTY RATE RM

Q131 Excavation; for outlet and inlet structure from platform M3 85


level size 4129mm x 2257mm

Q121 Exacavation; extra over;rock M3 8

Q151 Excavation; culvert; earth commencing from platform M3 231


level

Q121.2 Exacavation; extra over;rock M3 23

Q230 Surface drain; roadside drain M3 120

Q622 Culvert; precast box culvert; 1200mm x 1200mm twin M3 22


precast box culvert with dry weather flow

I131 In-situ prescribed mix; 1:3:6 M3 85

Carried to Collection Page


PROPOSE CONSTRUCTION AND COMPLETION OF FLEXIBLE ROAD PAVEMENT AND OTHER RELATED WORKS AT KM7 ROUTE 8 TELEMIN
JAYA- BEREMBANG ROAD

ITEM Code. No DESCRIPTION UNIT QTY RATE RM

Q131 Excavation; for outlet and inlet structure from platform M3 85


level size 4129mm x 2257mm
PROPOSE CONSTRUCTION AND COMPLETION OF FLEXIBLE ROAD PAVEMENT AND OTHER RELATED WORKS AT KM7 ROUTE 8 TELEMIN
JAYA- BEREMBANG ROAD

ITEM Code. No DESCRIPTION UNIT QTY RATE RM

Collection page of Class F : Earthwork

Page BQ F1

Carried to Grand Summary


PROPOSE CONSTRUCTION AND COMPLETION OF FLEXIBLE ROAD PAVEMENT AND OTHER RELATED WORKS AT KM7 ROUTE 8 TELEMIN
JAYA- BEREMBANG ROAD

ITEM Code. No DESCRIPTION UNIT QTY RATE RM

Collection page of Class A : General Item

Page BQ A1

Carried to Grand Summary


PROPOSE CONSTRUCTION AND COMPLETION OF FLEXIBLE ROAD PAVEMENT AND OTHER RELATED WORKS AT KM7 ROUTE 8 TELEMIN
JAYA- BEREMBANG ROAD

ITEM Code. No DESCRIPTION UNIT QTY RATE RM

Collection page of Class A : General Item


PROPOSE CONSTRUCTION AND COMPLETION OF FLEXIBLE ROAD PAVEMENT AND OTHER RELATED WORKS AT KM7 ROUTE 8 TELEMIN
JAYA- BEREMBANG ROAD

ITEM Code. No DESCRIPTION UNIT QTY RATE RM

Collection page of Class G : Geotechnical works

Page BQ G1

Carried to Grand Summary


PROPOSE CONSTRUCTION AND COMPLETION OF FLEXIBLE ROAD PAVEMENT AND OTHER RELATED WORKS AT KM7 ROUTE 8 TELEMIN
JAYA- BEREMBANG ROAD

ITEM Code. No DESCRIPTION UNIT QTY RATE RM

Collection page of Class G : Geotechnical works


PROPOSE CONSTRUCTION AND COMPLETION OF FLEXIBLE ROAD PAVEMENT AND OTHER RELATED WORKS AT KM7 ROUTE 8 TELEMIN
JAYA- BEREMBANG ROAD

ITEM Code. No DESCRIPTION UNIT QTY RATE RM

Collection page of Class R : Roads and paving

Page BQ R1

Carried to Grand Summary


PROPOSE CONSTRUCTION AND COMPLETION OF FLEXIBLE ROAD PAVEMENT AND OTHER RELATED WORKS AT KM7 ROUTE 8 TELEMIN
JAYA- BEREMBANG ROAD

ITEM Code. No DESCRIPTION UNIT QTY RATE RM

Collection page of Class Q: Drainange works

Page BQ Q1

Carried to Grand Summary


PROPOSE CONSTRUCTION AND COMPLETION OF FLEXIBLE ROAD PAVEMENT AND OTHER RELATED WORKS AT KM7 ROUTE 8 TELEMIN
JAYA- BEREMBANG ROAD

ITEM Code. No DESCRIPTION UNIT QTY RATE RM

Collection page of Class Q: Drainange works