Periodic Renewals Programme (Non Plan) for the year 2017-18 for the following work:
Amount in
Sl. No Name of work Head of Account
Rs. Lakhs
The Superintending Engineer (R&B) Nalgonda should ensure that there will not be
any overlap of the sanctioned work reaches in any other schemes.
DETAILED ESTIMATE
Name of Work:-
Construction of CC roads at 2BHK Rural Houses (nos) of Alagadapa Village
of Miryalaguda mandal, Miryalaguda Constituency in Nalgonda District.
Rs 18.00 Lakhs
Amount of Estimate:-
Specification report accompanying the Estimate for the work of " Construction of CC roads at 2BHK
Rural Houses (nos) in Alagadapa Village of Miryalaguda mandal, Miryalaguda Constituency in Nalgonda
District"
Amount of Estimate : Rs. 1800000.00
Govt of Telangana have allocated 4800 houses at 400 houses to each constituency for taking up of
2BHK Housing programme in the district, vide GO No.8,Housing (RH&CA.1) Dept 26.9.2015. Administative
sanction was accoorded to take up the contruction of 400 houses (240 Houses under rural housing and 160 urban
under miryalguda muncipality area) in miryalguda assembly constituency vide Proc.No.B6/AME/639/2015
DATED:20.02.2015 by the disctrict collector/ED/Nalgonda
In this regard it is to submited that 20 two BHK houses were sanctioned in Alagadapa village and
work is in progress, there is no provision for cement concrete roads in original sanctioned estimate. As per
instuctions of District Collector Nalgonda in the meeting held on 26/7/2018 and vide memo
EE/R&B/NLG/DB/D5/2018-19 dt: 26.7.2018 a detailed estimate is prepared for construction of CC Roads along
with cross drinage(CD) works with following provisions which are not covered in original estimate
Construction of granular sub-base by providing well graded material / Close graded material,
1 spreading in uniform layers with motor grader on prepared surface mixing by mixing place method
2 with rotavator
Providing at OMC
Vibrated and compacting
Cement with vibratory
Concrete (1:4:8) mix usingroller
40mm tosize
achieve
HBG thecrushed
desiredstone
3 Vibrated cement concrete M35 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
4 aggregate conformingfor
Forming embakment to shoulders
table 1000-1 and fine aggregate conforming to table 1000-2) including cost,
5 Providing of contarction joints and saperate membrane
6 Supplying and placing of water tank on top of the houses
S&F premium make CPVC Pipes -SDR 13.5 in ground or on wall including cost of tees, elbows,
7 bends, reducers, couplings, running joints, union flanges, unions etc
The estimate is prepared based on common SSR 2017-18. The work will be carried out as per
specifications and codal guide lines and relevant circular instructions.
MEASUREMENTS
Sno Description Quantity Rate Per Amount
No LENT BRDT DPT
1 2 3 4 5 6 7 8 9 10
1 Construction of Granular sub-base by providing HBG/HBT material confirming to Grading - III of
MoRT&H Table 400-2 including cost, (excluding seigniorage) charges and conveyance of all materials to
work site and spreading in uniform layers with motor grader or by approved means, on prepared surface
mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory
roller to achieve the desired density etc., complete for finished item of work as per MoRT&H
Specification 401 (5th revision) and as directed by the Engineer-in-charge. ( Payment will be made based
on levels for finished item of work ).
2 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine
aggregate conforming to table 1000-2 of MoRT&H including cost, (excluding seigniorage) conveyance of
all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc.,
including all other incidental and operational charges of all T&P etc., complete for finished item of work
as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-
Charge for below CC Pavement
4 Providing contraction joints in CC pavement using bitumen sealant filler material as per IRC: 58:1988 &
IRC 15: 2002 inclding cost and conveyance of all materials and all labour charges complete for finished
item of work as directed by the Engineer-in-charge.
5 Vibrated cement concrete M 35 grade using 20mm & 10mm HBG/HBT crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) and using fly ash
(replacing cement by fly ash to the extent of 15% and sand by 10%) including cost, (excluding
seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying,
vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for
finished item of work as per MoRT&H specification 1500, 1700, 2100 & 2702 (5th Revision) and as
directed by the Engineer-in-Charge for C.C Pavement.
7 S&F premium make CPVC Pipes -SDR 13.5 in ground or on wall including cost of tees, elbows, bends,
reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of
soils except rock requiring blasting, refilling, chiselling masonry walls and making good the walls &
floors to the original surface and fixing MS clamps on TW blocks on walls including cost and conveyance
of all materials and labour charges , overheads & contractors profit complete for finished item of work at
all floor levels for following diameters
1 2 3 4 5 6 7 8 9 10
8 Construction of embankment with borrowed useful earth from outside road boundary by mechanical
means up to SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil,
excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading
soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @
OMC to meet requirement of table 300-1 of MoRT&H, including all hire and operational charges of T&P
and (excluding seigniorage) charges, complete for finished item of work as per MoRT&H specification
305
9 Providing, laying Reinforced cement concrete Hume pipes of 450 mm Dia., NP-3 class for pipe culverts
including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 450 mm
dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing
and as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC Special Publication No:
13 and as directed by the Engineer-in-Charge for finished item of work.
Superintending Engineer
(R&B) Circle: Nalgonda
GOVERNMENT OF TELANGANA STATE
ROADS AND BUILDINGS DEPARTMENT
GENERAL ABSTRACT
Amount
S.No Description
(Rs.)
PART-I
PART-II
18.00 Lakhs
MASTER DATA FOR
ROADS FOR THE YEAR 2016-17
Name of Work :: Construction of CC roads at 2BHK Rural Houses (nos) of Alagadapa Village
(It is linked throughout of Miryalaguda mandal, Miryalaguda Constituency in Nalgonda District.
Estimate )
Hyper Link Rates Rates
CONVEYANCE & RATES OF MATERIALS S.No Specification in Brief to DATA Exact Rounded
06.01.2018 1 2 5 3 4
Date (mm/dd/yy)
of Preparation of Estimate 06.01.2018 V. VENKATA NARAYANA 9440818440, 07799139399, vvnhighways.blogspot.in
Details Amount Leads EARTH WORKS FOR ROADS
Embankment Earth 0.00 5.00 1 Forming embankment with Side Earth PAGE_70 98.86 99.00
HMP 244.25 20.00 2 Forming embankment with Borrowed Soils 1000 m Lead PAGE_68 231.47 231.00
Crusher 244.25 20.00 3 Forming embankment with Borrowed Soils 5 KM Lead PAGE_68 231.47 231.00
Metal/ Stone Qry 244.25 20.00 4 E/W for Trench cutting PAGE_50 41.56 42.00
Gravel 75.25 5.00 5 Removal of soils by Mechanical means & carting 1000 M PAGE_58 18.01 18.00
Sand 300.58 25.00 6 Removal of soils by Manual Means & carting 1000 M PAGE_48 181.19 181.00
Hume Pipes Varies with pipe dia. 24.00 GRANULAR BASES and SUB BASES
BITUMEN Rates 7 Granular Sub-base with Grade I (Table 400 -1) type material PAGE_94 1572.32 1572.00
LEAD 465.00 8 Granular Sub-base with Grade II (Table 400 -1) type material-NEW PAGE _94 1591.33 1591.00
VG-10 24270.00 9 Granular Sub-base with Grade III (Table 400 -1) type material PAGE_95 1390.28 1390.00
VG-30 24470.00 10 Granular Sub-base with Grade I (Table 400-2) type material PAGE_95 1591.46 1591.00
RS1 20570.00 11 Granular Sub-base with Grade II (Table 400-2) type material PAGE_96 1615.35 1615.00
Emulsion (SS1) 33790.00 12 Granular Sub-base with Grade III (Table 400-2) type material PAGE_96 1387.30 1387.00
CEMENT / STEEL Rates 13 Scarifying the existing granular surface PAGE_67 21.65 22.00
CEMENT 4750.00 14 Scarifying the existing BT surface PAGE_67 7.93 8.00
HYSD Steel 43000.00 15 WBM Gr II with MC metal 22.4 mm & below and PRR PAGE_104 1774.14 1774.00
6 mm Mild Steel 41500.00 16 WBM Gr III with MC metal 22.4 mm & below and PRR PAGE_104 1943.87 1944.00
MS STEEL 39000.00 17 WBM Gr II with MC metal 45 mm & below and PRR PAGE_104 1850.48 1850.00
ALLOWANCES 18 WBM Gr III with MC metal 45 mm & below and PRR PAGE_104 2079.96 2080.00
Place ITEM Name Value 19 WBM Gr II with MC metal 22.4 mm & below and VRR PAGR_104 1761.57 1762.00
DATA Labour Municipal Area Allowance % 20 WBM Gr III with MC metal 22.4 mm & below and VRR PAGE_104 1931.30 1931.00
RMR Metal % 21 WBM Gr II with MC metal 45 mm & below and VRR PAGE_104 1837.91 1838.00
RMR Gravel % 22 WBM Gr III with MC metal 45 mm & below and VRR PAGE_104 2067.39 2067.00
RMR Sand % 23 Wet Mix Macadam PAGE_110 1796.92 1797.00
Overhead Charges ( R) 5.00 % BITUMINOUS SUB BASES, BASES and SURFACING
Overhead Charges ( B) 20.00 % 24 Single coat surface dressing with VG 10 grade Bitumen PAGE_141 50.07 50.00
Contractors Profit 10.00 % 25 Single coat surface dressing with VG 30 grade Bitumen PAGE_141 34.40 34.00
VAT 0.00 % 26 Prime Coat with BT Emulsion (MS) PAGE_123 30.31 30.00
Centering Charges Local Entry % 27 Tack Coat with BT Emulsion (MS) PAGE_124 6.73 7.00
28 Tack Coat with BT VG 10 Grade APRDC 8.00 8.00
29 Mix seal 20 mm with BT VG 30 Grade PAGE_146 116.95 117.00
30 Mix seal 25 mm with BT VG 30 Grade NABARD 116.95 117.00
31 Mix seal 25 mm with BT CRMB NABARD 117.00 117.00
32 Macadam 50 mm with BT VG 30 Grade PAGE_125 5512.49 5512.00
33 Macadam 50 mm with BT VG 30 Grade (NEW- Batch Mix Plant) PAGE_125 5100.73 5101.00
34 Macadam 50 mm with BT VG 10 Grade PAGE_125 5560.83 5561.00
35 Dense Graded Bituminous Macadam with BT VG 30 Grade PAGE_132 6042.81 6043.00
36 Dense Graded Bituminous Macadam with BT VG 30 Grade (NEW) PAGE_132 5899.80 5900.00
37 SDBC 25 mm with BT VG 30 Grade PAGE_135 6749.24 6749.00
38 Bituminous Concrete with BT CRMB 55 Grade PAGE_138 8033.02 8033.00
39 Bituminous Concrete with BT VG 30 Grade PAGE_138 6764.94 6765.00
40 Bituminous Concrete with BT VG 30 Grade (NEW-Batch Mix) PAGE_138 6613.95 6614.00
41 Gravel Shoulders PAGE_95 340.65 341.00
C.C. BASE COURSE and WEARING COARSE
42 VCC(1:4:8) Base course below CC Pavement PAGE_331 3452.70 3453.00
43 VCC(1:3:6) Base course below CC Pavement PAGE_331 3825.76 3826.00
44 VCC M35 for C.C. Pavement PAGE_345 5751.80 5752.00
45 VCC(1:3:6) Base course with FLY ASH & Sand PAGE_331 3600.28 3600.00
46 VCC M35 for C.C. Pavement with FLY ASH & Sand PAGE_345 5114.40 5114.00
CULVERTS, BRIDGES Foundations, Substructures & Superstructure
47 EW for Foundation of Structures by Mechanical Means PAGE_323 97.53 98.00
48 EW for Foundation of Structures by Manual Means PAGE_321 168.57 169.00
49 Granular Bedding Below Pipes PAGE_462 594.73 595.00
50 VCC (1:3:6) for Foundations PAGE_331 3825.76 3826.00
51 VCC(1:3:6) for Body Walls PAGE_455 4208.34 4208.00
52 Cost and Conveyance of 600 mm Dia Hume pipes to Site SSR600 1566.07 1566.00
53 Cost, conveyance and Laying of 600 Dia Hume Pipes PAGE_272 1945.45 1945.00
54 Cost and Conveyance of 800 mm Dia Hume pipes to Site SSR800 5007.35 5007.00
55 Cost, conveyance and Laying of 800 Dia Hume Pipes PAGE_272 5958.66 5959.00
56 Cost and Conveyance of 1000 mm Dia Hume pipes to Site SSR1000 8680.78 8681.00
57 Cost, conveyance and Laying of 1000 Dia Hume Pipes PAGE_272 10201.47 10201.00
58 Cost and Conveyance of 1200 mm Dia Hume pipes to Site SSR1200 11447.48 11447.00
59 Cost, conveyance and Laying of 1200 Dia Hume Pipes PAGE_272 13495.00 13495.00
60 Filling between Body walls with Gravel PAGE_462 436.38 436.00
61 Rough Stone Revetment with 300 mm HBG Stone PAGE_522 1149.43 1149.00
62 Filter Material with Gravel underneath Pitching PAGE_523 853.29 853.00
63 VCC M15 Grade CC with 40 mm metal for Raft Foundation PAGE_335 5238.06 5238.00
64 VCC M15 Grade CC with 40 mm metal for Sub Structure PAGE_335 5428.96 5429.00
65 VCC M20 Grade CC with 40 mm metal for Raft Foundation PAGE_336 5660.44 5660.00
66 VCC M20Grade CC with 40 mm metal for Sub Structure PAGE_336 5987.01 5987.00
67 VRCC M20 Grade CC for Bed blocks & Backing walls PAGE_472 6137.52 6138.00
68 VRCC M20 Grade CC with 20 mm metal for Deck Slab PAGE_472 6695.47 6695.00
69 VRCC M30 Grade CC with 20 mm metal for Wearing Coat PAGE_477 6105.10 6105.00
70 VRCC M25 Grade CC with 20 mm metal for Approach Slab PAGE_501 6177.19 6177.00
71 VRCC M20 Grade CC with 12 mm metal for Railing PAGE_472 354.72 355.00
-- DO -- -- DO -- PAGE_472 328.19 328.00
72 VCC M15 Grade CC with 40 mm metal for leveling course PAGE_500 4318.49 4318.00
73 Grouted Revetment with 300 mm HBG stone + CC(1:4:8) PAGE_522 1773.62 1774.00
74 Back filling behind Abutments with gravel PAGE_462 594.73 595.00
75 Providing and laying of filter media using 150 mm IRC stone PAGE_463 1217.02 1217.00
76 Providing HYSD ( Fe-415 ) for Super structure of R.C.C items. PAGE_489 44557.02 44557.00
77 Providing HYSD ( Fe-415 ) for Sub structure of R.C.C items. PAGE_490 56585.19 56585.00
78 Providing HYSD ( Fe-415 ) for Foundation of R.C.C items. PAGE_448 56202.30 56202.00
79 Providing MS ( Fe-250 ) for all RCC Items PAGE_460 53778.54 53779.00
MISCELLANEOUS ITEMS
80 Sand filling in foundation PAGE_422 1350.14 1350.00
81 Providing 100 mm dia AC Weep holes in VCC Abutment PAGE_461 73.10 73.00
82 VCC M 15 Grade CC using 40 - 10 mm metal for Dividers PAGE_455 4491.23 4491.00
83 VRCC M 20 Grade for Cover Slabs over Side Drains PAGE_472 5077.40 5077.00
84 Plastering in CM(1:5) 12 mm thick ( Rate per 10 sqm ) PAGE_452 92.82 93.00
85 Painting two coats to new plastered surface PAGE_220 79.93 80.00
86 Built-up-spray grout layer 75 mm thick with BT 80/100 Grade PAGE_130 132.54 133.00
87 Providing BT Patch work using 40 mm metal & BT 80/100 EinC 3894.05 3894.00
88 Providing BT Patch work using 9.5 to11.2mm metal & BT 80/100 EinC 4886.00 4886.00
89 Patch work 50 - 70 mm depth using 40-10 mm metal & 80/100 BT EinC 239.50 239.00
90 Patch work 25 - 35 mm depth using 25-10 mm metal & 80/100 BT EinC 153.85 154.00
91 Patch work 15 - 25 mm depth using 12-10 mm metal & 80/100 BT EinC 98.27 98.00
92 RR Masonry in CM(1:3) for Foundation. PAGE_334 3746.23 3746.00
93 RR Masonry in CM(1:3) for Substructure PAGE_453 3651.32 3651.00
94 Dismantling culverts & bridges in CC M15- M20 PAGE_23 627.75 628.00
95 Dismantling culverts & bridges in Ruble Masonry in CM Temp 392.51 393.00
96 25.4 mm Mastic pad for Longitudinal & Transversal Expansion joints EinC 991.00 991.00
97 12.7 mm Mastic pad for Transversal Contraction joints. EinC 568.00 568.00
98 Penetration macadam 50 mm thick PAGE_128 170.76 171.00
99 Penetration macadam 75 mm thick PAGE_129 238.26 238.00
100 Open-graded premix carpet of 20 mm thick with 80/100 BT PAGE_5_23 151.83 152.00
101 Providing and laying type B seal coat simultaneously with 80/100 BT PAGE_5_39 56.94 57.00
102 Hot Applied Thermoplastic Compound Page_225 10.84 11.00
I Road Work
1 Scarifying the existing B.T surface to a depth of 50 mm by Mechanical
means and disposal of scarified material with all leads and lifts up to 1000
m as per MoRT&H (5th Revision) Specn. No.305.4.3
II Side Drains
III CC Pavement
6 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG
crushed stone aggregate and fine aggregate conforming to table 1000-2 of
MoRT&H including cost, (excluding seigniorage) conveyance of all
materials to site and labour charges, centering, machine mixing, laying,
Vibrating, curing etc., including all other incidental and operational charges
of all T&P etc., complete for finished item of work as per MoRT&H
specification 1500,1700, 2100 (5th Revision) and as directed by the
Engineer-in-Charge for base course of CC pavement
Routine Maintenance for Jungle Clearance /tree and shrub trimming and
culvert repairs / vents maintenance / parapet wall repairs / retaining wall
repairs etc within DLP i.e., 2 years.
DATA
SSR :: 2014-15 Date :: 06.01.2018 Municipal Area Allowance :: 0.0%
SNo Quantity Unit Description of Item Rate per Amount
1 2 3 4 5 6 7
4
(5th revision) With a lead of 5KM (Payment will be made based on levels for finished item of work).
0
0
Asst. Executive Engineer Dy. Executive Engineer Executive Engineer (R&B)
R&B Section, Miryalaguda R&B Sub-Division: Miryalaguda Division,NALGONDA
Name of Work:- Construction of CC roads at 2BHK Rural Houses (nos) of Alagadapa Village of
Miryalaguda mandal, Miryalaguda Constituency in Nalgonda District.
RMR.
Date :: 22.09.2017 SSR :: 2017-18
Machine Crushing
(-) Stacking Charges
Conveyance rate (-)
unloading charges
Stacking Charges
Blasting Charges
Initial Rate of
Average Lead
Initial Rate
Conveyance
Charges
Seigniorage
Loading &
of Material
Charging
Charges
Weighted
Stacking
TOTAL RATE
Material
0
rate
S.No Nature of Metal
1 Gravel 5.00 75.25 0.00 60.12 98.00 75.25 98.00 -- -- 0.00 0.0 0.00 173.25
2 Sand for Mortar 25.00 300.58 0.00 60.12 760.00 300.58 760.00 -- -- 0.00 0.0 0.00 1060.58
3 Stone dust below 2.36mm 25.00 300.58 0.00 60.12 570.00 300.58 570.00 -- -- 0.00 0.0 0.00 700.25
3 Sand for Concrete 24.00 300.58 0.00 60.12 570.00 300.58 570.00 -- -- 0.00 0.0 0.00 870.58
4 Sand for Filling 25.00 300.58 0.00 60.12 570.00 300.58 570.00 -- -- 0.00 0.0 0.00 870.58
5 Cement 4750.00 4750.00
OTHER MATERIALS SS5 HBG METAL IRC HBG METAL
LABOUR 2017-18
2017-18 (Excluding blasting 2017-18 BUILDINGS SSR-2014-15
Charges)
DETAILS RATE SIZES RATE SIZES RATE
2017-18
GRAVEL 98.00 SS6 505.00 IRC2.36 304.00
MSAND 760.00 SS10 657.00 IRC5 479.00
MASTIC PADS
DETAILS RATE
CSAND 570.00 SS12 781.00 IRC9 623.00 25.4 mm
MASONI 470.00 FSAND 570.00 SS20 870.00 IRC12 681.00 12.7 mm
MASONII 425.00 CRS 249.00 SS25 830.00 IRC19 821.00 PAINTS
Mate 425.00 ROUGH 252.00 SS40 505.00 IRC25 783.00
Mazdoor skilled 438.50 BOND600 29.00 SS50 433.00 IRC40 475.00
Mazdoor unskilled 400.00 SS150 90.00 SS60 398.00 IRC50 433.00
SS225 152.00 SS65 360.00 IRC60 398.00
SS300 156.00 SS75 289.00 IRC65 360.00
QS25 40.00 Metals BLAST 67.00 IRC75 289.00
141 QS40 46.00 CRS BLAST3 67.00 DUST 456.00
297.5 RR BLAST2 67.00
438.5
Metal/
20.00 244.24592 Sand 25.00 300.576508
Stone Qry
MASTIC PADS METAL LEADS & RATES SAND/ EARTH LEADS & RATES
991.00 BMS-W.20 2017-18 2017-18
From From
568.00 BMS-W.21 LEAD NOTATION RATE
SSR
LEAD NOTATION RATE
SSR
240.00 MLOAD 91.45 SLOAD 45.86
MUNLOAD 14.26 SUNLOAD 14.26
MSTACK SSTACK
2008-09 2008-09
From From
LEAD NOTATION RATE LEAD NOTATION RATE
SSR SSR
MLOAD 12.80 12.80 SLOAD 10.00 10.00
MUNLOAD 8.70 8.70 SUNLOAD 8.50 8.50
MSTACK 8.70 8.70 SSTACK 5.50 5.50
0.00 0.00 0 0.00
0.25 110.00 0.25 SD250 50.00 50.00
0.50 MT500 110.00 110.00 0.50 SD500 75.00 75.00
1 MT1 120.00 120.00 1 SD1 100.00 100.00
2 MT2 126.00 126.00 2 SD2 106.00 106.00
3 MT3 132.00 132.00 3 SD3 112.00 112.00
4 MT4 138.00 138.00 4 SD4 118.00 118.00
5 MT5 144.00 144.00 5 SD5 124.00 124.00
6 MT6 150.00 150.00 6 SD6 130.00 130.00
7 MT7 156.00 156.00 7 SD7 136.00 136.00
8 MT8 162.00 162.00 8 SD8 142.00 142.00
9 MT9 168.00 168.00 9 SD9 148.00 148.00
10 MT10 174.00 174.00 10 SD10 154.00 154.00
11 MT11 180.00 180.00 11 SD11 160.00 160.00
12 MT12 186.00 186.00 12 SD12 166.00 166.00
13 MT13 192.00 192.00 13 SD13 172.00 172.00
14 MT14 198.00 198.00 14 SD14 178.00 178.00
15 MT15 204.00 204.00 15 SD15 184.00 184.00
16 MT16 210.00 210.00 16 SD16 190.00 190.00
17 MT17 216.00 216.00 17 SD17 196.00 196.00
18 MT18 222.00 222.00 18 SD18 202.00 202.00
19 MT19 228.00 228.00 19 SD19 208.00 208.00
20 MT20 234.00 234.00 20 SD20 214.00 214.00
21 MT21 239.75 5.7500 21 SD21 219.00 5.0000
22 MT22 245.50 5.5000 22 SD22 224.00 4.8000
23 MT23 251.25 5.0000 23 SD23 229.00 4.6000
24 MT24 257.00 4.7500 24 SD24 234.00 4.4000
25 MT25 262.75 4.5000 25 SD25 239.00 4.2000
26 MT26 268.50 26 SD26 244.00
27 MT27 274.25 27 SD27 249.00
28 MT28 280.00 28 SD28 254.00
29 MT29 285.75 29 SD29 259.00
30 MT30 291.50 30 SD30 264.00
31 MT31 297.00 31 SD31 268.80
32 MT32 302.50 32 SD32 273.60
33 MT33 308.00 33 SD33 278.40
34 MT34 313.50 34 SD34 283.20
35 MT35 319.00 35 SD35 288.00
36 MT36 324.50 36 SD36 292.80
37 MT37 330.00 37 SD37 297.60
38 MT38 335.50 38 SD38 302.40
39 MT39 341.00 39 SD39 307.20
40 MT40 346.50 40 SD40 312.00
41 MT41 352.00 41 SD41 316.80
42 MT42 357.50 42 SD42 321.60
43 MT43 363.00 43 SD43 326.40
44 MT44 368.50 44 SD44 331.20
45 MT45 374.00 45 SD45 336.00
46 MT46 379.50 46 SD46 340.80
47 MT47 385.00 47 SD47 345.60
48 MT48 390.50 48 SD48 350.40
49 MT49 396.00 49 SD49 355.20
50 MT50 401.50 50 SD50 360.00
51 MT51 406.50 51 SD51 364.60
52 MT52 411.50 52 SD52 369.20
53 MT53 416.50 53 SD53 373.80
54 MT54 421.50 54 SD54 378.40
55 MT55 426.50 55 SD55 383.00
56 MT56 431.50 56 SD56 387.60
57 MT57 436.50 57 SD57 392.20
58 MT58 441.50 58 SD58 396.80
59 MT59 446.50 59 SD59 401.40
60 MT60 451.50 60 SD60 406.00
61 MT61 456.50 61 SD61 410.60
62 MT62 461.50 62 SD62 415.20
63 MT63 466.50 63 SD63 419.80
64 MT64 471.50 64 SD64 424.40
65 MT65 476.50 65 SD65 429.00
66 MT66 481.50 66 SD66 433.60
67 MT67 486.50 67 SD67 438.20
68 MT68 491.50 68 SD68 442.80
69 MT69 496.50 69 SD69 447.40
70 MT70 501.50 70 SD70 452.00
71 MT71 506.50 71 SD71 456.60
72 MT72 511.50 72 SD72 461.20
73 MT73 516.50 73 SD73 465.80
74 MT74 521.50 74 SD74 470.40
75 MT75 526.50 75 SD75 475.00
76 MT76 531.50 76 SD76 479.60
77 MT77 536.50 77 SD77 484.20
78 MT78 541.50 78 SD78 488.80
79 MT79 546.50 79 SD79 493.40
80 MT80 551.50 80 SD80 498.00
81 MT81 556.25 81 SD81 502.40
82 MT82 561.00 82 SD82 506.80
83 MT83 565.75 83 SD83 511.20
84 MT84 570.50 84 SD84 515.60
85 MT85 575.25 85 SD85 520.00
86 MT86 580.00 86 SD86 524.40
87 MT87 584.75 87 SD87 528.80
88 MT88 589.50 88 SD88 533.20
89 MT89 594.25 89 SD89 537.60
11
14
3.3
1
29.3
6330
25.32
25.8
533.8
7.34
5.73
546.87
13.08
13.5
26.58