Office of the Engineer-in-Chief (R&B)

Memo. No. /PRP/DCE(R)/EE-R/DEE-1/ AEE 1/2017 Dt: .10.2017

Sub: - R&B Regional office Nalgonda– (R&B) District - Nalgonda –


Periodical Renewals to Nalgonda-Mushampally road from Km 2/8 to 6/6 in
Nalgonda District – Administrative Sanction accorded under Periodic Renewals
Programme (Non-Plan) for the year 2017-18 - Regarding.

Ref: - SE/R&B/Nalgonda Lr.No. TS/T4/2017-18/1451 dtd: 13.10.2017


*****
Under the circumstances explained by the Superintending Engineer (R&B)

Nalgonda in the reference cited, Administrative sanction is hereby accorded under

Periodic Renewals Programme (Non Plan) for the year 2017-18 for the following work:

Amount in
Sl. No Name of work Head of Account
Rs. Lakhs

1 Periodical Renewals to 110.00 lakhs 3054 – Roads and Bridges


Nalgonda- (Rupees one 04 – District and other Roads
Mushampally road hundred and ten MH-800 - Other Expenditure
from Km 2/8 to 6/6 in lakhs only) SH(07) – District and other Roads,
Nalgonda District. 270 – Minor works,
272 – Maintenance

The Superintending Engineer (R&B) Nalgonda should ensure that there will not be
any overlap of the sanctioned work reaches in any other schemes.

The Superintending Engineer (R&B) Nalgonda is requested to take further necessary


action in the matter.

Engineer-in-Chief (R&B) SR & CRN


To
The Superintending Engineer (R&B) Nalgonda
ROADS & BUILDINGS DEPARTMENT
TELANGANA

DETAILED ESTIMATE

Name of Work:-
Construction of CC roads at 2BHK Rural Houses (nos) of Alagadapa Village
of Miryalaguda mandal, Miryalaguda Constituency in Nalgonda District.

Rs 18.00 Lakhs
Amount of Estimate:-

(R&B) Circle :: NALGONDA


(R&B) Division :: NALGONDA
R&B) Sub-Division :: MIRYALAGUDA
(R&B) Section :: MIRYALAGUDA-I
SPECIFICATION REPORT

Specification report accompanying the Estimate for the work of " Construction of CC roads at 2BHK
Rural Houses (nos) in Alagadapa Village of Miryalaguda mandal, Miryalaguda Constituency in Nalgonda
District"
Amount of Estimate : Rs. 1800000.00

Govt of Telangana have allocated 4800 houses at 400 houses to each constituency for taking up of
2BHK Housing programme in the district, vide GO No.8,Housing (RH&CA.1) Dept 26.9.2015. Administative
sanction was accoorded to take up the contruction of 400 houses (240 Houses under rural housing and 160 urban
under miryalguda muncipality area) in miryalguda assembly constituency vide Proc.No.B6/AME/639/2015
DATED:20.02.2015 by the disctrict collector/ED/Nalgonda

In this regard it is to submited that 20 two BHK houses were sanctioned in Alagadapa village and
work is in progress, there is no provision for cement concrete roads in original sanctioned estimate. As per
instuctions of District Collector Nalgonda in the meeting held on 26/7/2018 and vide memo
EE/R&B/NLG/DB/D5/2018-19 dt: 26.7.2018 a detailed estimate is prepared for construction of CC Roads along
with cross drinage(CD) works with following provisions which are not covered in original estimate

Construction of granular sub-base by providing well graded material / Close graded material,
1 spreading in uniform layers with motor grader on prepared surface mixing by mixing place method
2 with rotavator
Providing at OMC
Vibrated and compacting
Cement with vibratory
Concrete (1:4:8) mix usingroller
40mm tosize
achieve
HBG thecrushed
desiredstone
3 Vibrated cement concrete M35 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
4 aggregate conformingfor
Forming embakment to shoulders
table 1000-1 and fine aggregate conforming to table 1000-2) including cost,
5 Providing of contarction joints and saperate membrane
6 Supplying and placing of water tank on top of the houses
S&F premium make CPVC Pipes -SDR 13.5 in ground or on wall including cost of tees, elbows,
7 bends, reducers, couplings, running joints, union flanges, unions etc

The estimate is prepared based on common SSR 2017-18. The work will be carried out as per
specifications and codal guide lines and relevant circular instructions.

Early approval to the estimate is solicited.

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer


R&B Section, Mlg-I R&B Sub-Division, Miryalguda (R&B)Division, Nalgonda
DETAILED CUM ABSTRACT
Name of Work ::- Construction of CC roads at 2BHK Rural Houses (nos) in Alagadapa Village of
Miryalaguda mandal, Miryalaguda Constituency in Nalgonda District.

MEASUREMENTS
Sno Description Quantity Rate Per Amount
No LENT BRDT DPT
1 2 3 4 5 6 7 8 9 10
1 Construction of Granular sub-base by providing HBG/HBT material confirming to Grading - III of
MoRT&H Table 400-2 including cost, (excluding seigniorage) charges and conveyance of all materials to
work site and spreading in uniform layers with motor grader or by approved means, on prepared surface
mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory
roller to achieve the desired density etc., complete for finished item of work as per MoRT&H
Specification 401 (5th revision) and as directed by the Engineer-in-charge. ( Payment will be made based
on levels for finished item of work ).

Internal roads 1 x 1 200 4.00 0.150 120.00


SAY 120.00 1387.00 CUM 166440

2 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine
aggregate conforming to table 1000-2 of MoRT&H including cost, (excluding seigniorage) conveyance of
all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc.,
including all other incidental and operational charges of all T&P etc., complete for finished item of work
as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-
Charge for below CC Pavement

Internal roads 1 x 1 200 3.90 0.100 78.00


Below culverts 1 x 5 7.5 0.80 0.100 3.00
SAY 81.00 3453.00 CUM 279693
3 Supplying & Providing Polythene sheet of specified gauge for cement concrete pavement including cost
and conveyance to site and all labour charges for laying the sheet, all incidental charges etc.,complete for
finished item of work as directed by the Engineer-in-charge.

Internal roads 1 X 1 200.00 4.00 800.00


SAY 800.00 18.00 sqm 14400

4 Providing contraction joints in CC pavement using bitumen sealant filler material as per IRC: 58:1988 &
IRC 15: 2002 inclding cost and conveyance of all materials and all labour charges complete for finished
item of work as directed by the Engineer-in-charge.

Internal roads 1 x 33 3.8 125.40


SAY 125.40 56.00 R-Mt 7022

5 Vibrated cement concrete M 35 grade using 20mm & 10mm HBG/HBT crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) and using fly ash
(replacing cement by fly ash to the extent of 15% and sand by 10%) including cost, (excluding
seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying,
vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for
finished item of work as per MoRT&H specification 1500, 1700, 2100 & 2702 (5th Revision) and as
directed by the Engineer-in-Charge for C.C Pavement.

Internal roads 1 x 1 200 3.80 0.200 152.00


1 2 3 4 5 6 7 8 9 10
SAY 152.00 5114.00 CUM 777328

6 Supplying and placing of water tank on top of the houses.

200 liters / house 1 x 1 4000 4000.00


SAY 4000.00 6.00 lit 24,000

7 S&F premium make CPVC Pipes -SDR 13.5 in ground or on wall including cost of tees, elbows, bends,
reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of
soils except rock requiring blasting, refilling, chiselling masonry walls and making good the walls &
floors to the original surface and fixing MS clamps on TW blocks on walls including cost and conveyance
of all materials and labour charges , overheads & contractors profit complete for finished item of work at
all floor levels for following diameters
1 2 3 4 5 6 7 8 9 10

Inlet to Water tank 22.20


mm dia 1 x 20 10.00 200.00 182.00 R-mt 36400

Inlet to Water tank 15.90


mm dia 1 x 20 20.00 400.00 160.00 R-mt 64000

8 Construction of embankment with borrowed useful earth from outside road boundary by mechanical
means up to SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil,
excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading
soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @
OMC to meet requirement of table 300-1 of MoRT&H, including all hire and operational charges of T&P
and (excluding seigniorage) charges, complete for finished item of work as per MoRT&H specification
305

Shoulder 1 x 2 200.00 1.00 0.35 140.00


SAY 140.00 231.00 CUM 32340

9 Providing, laying Reinforced cement concrete Hume pipes of 450 mm Dia., NP-3 class for pipe culverts
including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 450 mm
dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing
and as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC Special Publication No:
13 and as directed by the Engineer-in-Charge for finished item of work.

for culverts 5 x 1 7.50 37.50


37.50 1945.00 CUM 72938
1474561

Assistant Executive Engineer Dy. Executive Engineer Executive Engineer


(R&B) Section: Miryalaguda-I (R&B) Sub-Division:Miryalaguda (R&B) Division: Nalgonda

Superintending Engineer
(R&B) Circle: Nalgonda
GOVERNMENT OF TELANGANA STATE
ROADS AND BUILDINGS DEPARTMENT

Technical Sanction Memo. No. /PRP-2017-18/EE-R/ DEE 1/AEE-1/ 2017,


dt. .10.2017

1 Major Head of Account 3054 -Roads and Bridges

2 Mionor Head of Account 04 - District and other Roads

3 Sub-Head of Account MH 800 - Other Expenditure


4 Detailed Head of Account SH(07) - District and other Roads
270 - Minor works
272- Maintenance

Construction of CC roads at 2BHK Rural Houses (nos)


5 Name of the Work of Alagadapa Village of Miryalaguda mandal,
Miryalaguda Constituency in Nalgonda District.

6 Amount of Estimate Rs. 110.00 Lakhs

Administrative sanction accorded for Rs. 110.00 Lakhs


7 Administative sanction vide T.O. Memo. No. PRP/DCE-R/EE-
R/DEE1/AEE1/2017 dtd: .10.2017

Technical Sanction accorded for Rs.110.00 Lakhs


8 Technical Sanction (Rupees One hundred and ten lakhs only) based on
S.S.R 2017-18

AEE(1) DEE-1 EE( R) DCE( R) E-in-C(R&B)


SR &CRN
To
The Superintending Engineer, (R&B) Circle, Nalgonda
NAME OF WORK :- Construction of CC roads at 2BHK Rural Houses (nos) of
Alagadapa Village of Miryalaguda mandal, Miryalaguda
Constituency in Nalgonda District.

GENERAL ABSTRACT
Amount
S.No Description
(Rs.)
PART-I

1 Road Work 1474561

Sub Total 1474561

PART-II

2 L.S Amount for GST on Part "I". 12.0% 176947

3 L.S. for Price adjustment 2.00% 29491

4 L.S. for QC Charges 1.00% 14746

5 Segniorage charges 51892

7 L.S Amount for NAC on Part "I". 0.10% 1475

8 L.S. for Avagahana sadassulu, 5000

9 L.S for Unforeseen and rounding off 45889

Total Amount Rs. 1800000

18.00 Lakhs
MASTER DATA FOR
ROADS FOR THE YEAR 2016-17
Name of Work :: Construction of CC roads at 2BHK Rural Houses (nos) of Alagadapa Village
(It is linked throughout of Miryalaguda mandal, Miryalaguda Constituency in Nalgonda District.
Estimate )
Hyper Link Rates Rates
CONVEYANCE & RATES OF MATERIALS S.No Specification in Brief to DATA Exact Rounded
06.01.2018 1 2 5 3 4
Date (mm/dd/yy)
of Preparation of Estimate 06.01.2018 V. VENKATA NARAYANA 9440818440, 07799139399, vvnhighways.blogspot.in
Details Amount Leads EARTH WORKS FOR ROADS
Embankment Earth 0.00 5.00 1 Forming embankment with Side Earth PAGE_70 98.86 99.00
HMP 244.25 20.00 2 Forming embankment with Borrowed Soils 1000 m Lead PAGE_68 231.47 231.00
Crusher 244.25 20.00 3 Forming embankment with Borrowed Soils 5 KM Lead PAGE_68 231.47 231.00
Metal/ Stone Qry 244.25 20.00 4 E/W for Trench cutting PAGE_50 41.56 42.00
Gravel 75.25 5.00 5 Removal of soils by Mechanical means & carting 1000 M PAGE_58 18.01 18.00
Sand 300.58 25.00 6 Removal of soils by Manual Means & carting 1000 M PAGE_48 181.19 181.00
Hume Pipes Varies with pipe dia. 24.00 GRANULAR BASES and SUB BASES
BITUMEN Rates 7 Granular Sub-base with Grade I (Table 400 -1) type material PAGE_94 1572.32 1572.00
LEAD 465.00 8 Granular Sub-base with Grade II (Table 400 -1) type material-NEW PAGE _94 1591.33 1591.00
VG-10 24270.00 9 Granular Sub-base with Grade III (Table 400 -1) type material PAGE_95 1390.28 1390.00
VG-30 24470.00 10 Granular Sub-base with Grade I (Table 400-2) type material PAGE_95 1591.46 1591.00
RS1 20570.00 11 Granular Sub-base with Grade II (Table 400-2) type material PAGE_96 1615.35 1615.00
Emulsion (SS1) 33790.00 12 Granular Sub-base with Grade III (Table 400-2) type material PAGE_96 1387.30 1387.00
CEMENT / STEEL Rates 13 Scarifying the existing granular surface PAGE_67 21.65 22.00
CEMENT 4750.00 14 Scarifying the existing BT surface PAGE_67 7.93 8.00
HYSD Steel 43000.00 15 WBM Gr II with MC metal 22.4 mm & below and PRR PAGE_104 1774.14 1774.00
6 mm Mild Steel 41500.00 16 WBM Gr III with MC metal 22.4 mm & below and PRR PAGE_104 1943.87 1944.00
MS STEEL 39000.00 17 WBM Gr II with MC metal 45 mm & below and PRR PAGE_104 1850.48 1850.00
ALLOWANCES 18 WBM Gr III with MC metal 45 mm & below and PRR PAGE_104 2079.96 2080.00
Place ITEM Name Value 19 WBM Gr II with MC metal 22.4 mm & below and VRR PAGR_104 1761.57 1762.00
DATA Labour Municipal Area Allowance % 20 WBM Gr III with MC metal 22.4 mm & below and VRR PAGE_104 1931.30 1931.00
RMR Metal % 21 WBM Gr II with MC metal 45 mm & below and VRR PAGE_104 1837.91 1838.00
RMR Gravel % 22 WBM Gr III with MC metal 45 mm & below and VRR PAGE_104 2067.39 2067.00
RMR Sand % 23 Wet Mix Macadam PAGE_110 1796.92 1797.00
Overhead Charges ( R) 5.00 % BITUMINOUS SUB BASES, BASES and SURFACING
Overhead Charges ( B) 20.00 % 24 Single coat surface dressing with VG 10 grade Bitumen PAGE_141 50.07 50.00
Contractors Profit 10.00 % 25 Single coat surface dressing with VG 30 grade Bitumen PAGE_141 34.40 34.00
VAT 0.00 % 26 Prime Coat with BT Emulsion (MS) PAGE_123 30.31 30.00
Centering Charges Local Entry % 27 Tack Coat with BT Emulsion (MS) PAGE_124 6.73 7.00
28 Tack Coat with BT VG 10 Grade APRDC 8.00 8.00
29 Mix seal 20 mm with BT VG 30 Grade PAGE_146 116.95 117.00
30 Mix seal 25 mm with BT VG 30 Grade NABARD 116.95 117.00
31 Mix seal 25 mm with BT CRMB NABARD 117.00 117.00
32 Macadam 50 mm with BT VG 30 Grade PAGE_125 5512.49 5512.00
33 Macadam 50 mm with BT VG 30 Grade (NEW- Batch Mix Plant) PAGE_125 5100.73 5101.00
34 Macadam 50 mm with BT VG 10 Grade PAGE_125 5560.83 5561.00
35 Dense Graded Bituminous Macadam with BT VG 30 Grade PAGE_132 6042.81 6043.00
36 Dense Graded Bituminous Macadam with BT VG 30 Grade (NEW) PAGE_132 5899.80 5900.00
37 SDBC 25 mm with BT VG 30 Grade PAGE_135 6749.24 6749.00
38 Bituminous Concrete with BT CRMB 55 Grade PAGE_138 8033.02 8033.00
39 Bituminous Concrete with BT VG 30 Grade PAGE_138 6764.94 6765.00
40 Bituminous Concrete with BT VG 30 Grade (NEW-Batch Mix) PAGE_138 6613.95 6614.00
41 Gravel Shoulders PAGE_95 340.65 341.00
C.C. BASE COURSE and WEARING COARSE
42 VCC(1:4:8) Base course below CC Pavement PAGE_331 3452.70 3453.00
43 VCC(1:3:6) Base course below CC Pavement PAGE_331 3825.76 3826.00
44 VCC M35 for C.C. Pavement PAGE_345 5751.80 5752.00
45 VCC(1:3:6) Base course with FLY ASH & Sand PAGE_331 3600.28 3600.00
46 VCC M35 for C.C. Pavement with FLY ASH & Sand PAGE_345 5114.40 5114.00
CULVERTS, BRIDGES Foundations, Substructures & Superstructure
47 EW for Foundation of Structures by Mechanical Means PAGE_323 97.53 98.00
48 EW for Foundation of Structures by Manual Means PAGE_321 168.57 169.00
49 Granular Bedding Below Pipes PAGE_462 594.73 595.00
50 VCC (1:3:6) for Foundations PAGE_331 3825.76 3826.00
51 VCC(1:3:6) for Body Walls PAGE_455 4208.34 4208.00
52 Cost and Conveyance of 600 mm Dia Hume pipes to Site SSR600 1566.07 1566.00
53 Cost, conveyance and Laying of 600 Dia Hume Pipes PAGE_272 1945.45 1945.00
54 Cost and Conveyance of 800 mm Dia Hume pipes to Site SSR800 5007.35 5007.00
55 Cost, conveyance and Laying of 800 Dia Hume Pipes PAGE_272 5958.66 5959.00
56 Cost and Conveyance of 1000 mm Dia Hume pipes to Site SSR1000 8680.78 8681.00
57 Cost, conveyance and Laying of 1000 Dia Hume Pipes PAGE_272 10201.47 10201.00
58 Cost and Conveyance of 1200 mm Dia Hume pipes to Site SSR1200 11447.48 11447.00
59 Cost, conveyance and Laying of 1200 Dia Hume Pipes PAGE_272 13495.00 13495.00
60 Filling between Body walls with Gravel PAGE_462 436.38 436.00
61 Rough Stone Revetment with 300 mm HBG Stone PAGE_522 1149.43 1149.00
62 Filter Material with Gravel underneath Pitching PAGE_523 853.29 853.00
63 VCC M15 Grade CC with 40 mm metal for Raft Foundation PAGE_335 5238.06 5238.00
64 VCC M15 Grade CC with 40 mm metal for Sub Structure PAGE_335 5428.96 5429.00
65 VCC M20 Grade CC with 40 mm metal for Raft Foundation PAGE_336 5660.44 5660.00
66 VCC M20Grade CC with 40 mm metal for Sub Structure PAGE_336 5987.01 5987.00
67 VRCC M20 Grade CC for Bed blocks & Backing walls PAGE_472 6137.52 6138.00
68 VRCC M20 Grade CC with 20 mm metal for Deck Slab PAGE_472 6695.47 6695.00
69 VRCC M30 Grade CC with 20 mm metal for Wearing Coat PAGE_477 6105.10 6105.00
70 VRCC M25 Grade CC with 20 mm metal for Approach Slab PAGE_501 6177.19 6177.00
71 VRCC M20 Grade CC with 12 mm metal for Railing PAGE_472 354.72 355.00
-- DO -- -- DO -- PAGE_472 328.19 328.00
72 VCC M15 Grade CC with 40 mm metal for leveling course PAGE_500 4318.49 4318.00
73 Grouted Revetment with 300 mm HBG stone + CC(1:4:8) PAGE_522 1773.62 1774.00
74 Back filling behind Abutments with gravel PAGE_462 594.73 595.00
75 Providing and laying of filter media using 150 mm IRC stone PAGE_463 1217.02 1217.00
76 Providing HYSD ( Fe-415 ) for Super structure of R.C.C items. PAGE_489 44557.02 44557.00
77 Providing HYSD ( Fe-415 ) for Sub structure of R.C.C items. PAGE_490 56585.19 56585.00
78 Providing HYSD ( Fe-415 ) for Foundation of R.C.C items. PAGE_448 56202.30 56202.00
79 Providing MS ( Fe-250 ) for all RCC Items PAGE_460 53778.54 53779.00
MISCELLANEOUS ITEMS
80 Sand filling in foundation PAGE_422 1350.14 1350.00
81 Providing 100 mm dia AC Weep holes in VCC Abutment PAGE_461 73.10 73.00
82 VCC M 15 Grade CC using 40 - 10 mm metal for Dividers PAGE_455 4491.23 4491.00
83 VRCC M 20 Grade for Cover Slabs over Side Drains PAGE_472 5077.40 5077.00
84 Plastering in CM(1:5) 12 mm thick ( Rate per 10 sqm ) PAGE_452 92.82 93.00
85 Painting two coats to new plastered surface PAGE_220 79.93 80.00
86 Built-up-spray grout layer 75 mm thick with BT 80/100 Grade PAGE_130 132.54 133.00
87 Providing BT Patch work using 40 mm metal & BT 80/100 EinC 3894.05 3894.00
88 Providing BT Patch work using 9.5 to11.2mm metal & BT 80/100 EinC 4886.00 4886.00
89 Patch work 50 - 70 mm depth using 40-10 mm metal & 80/100 BT EinC 239.50 239.00
90 Patch work 25 - 35 mm depth using 25-10 mm metal & 80/100 BT EinC 153.85 154.00
91 Patch work 15 - 25 mm depth using 12-10 mm metal & 80/100 BT EinC 98.27 98.00
92 RR Masonry in CM(1:3) for Foundation. PAGE_334 3746.23 3746.00
93 RR Masonry in CM(1:3) for Substructure PAGE_453 3651.32 3651.00
94 Dismantling culverts & bridges in CC M15- M20 PAGE_23 627.75 628.00
95 Dismantling culverts & bridges in Ruble Masonry in CM Temp 392.51 393.00
96 25.4 mm Mastic pad for Longitudinal & Transversal Expansion joints EinC 991.00 991.00
97 12.7 mm Mastic pad for Transversal Contraction joints. EinC 568.00 568.00
98 Penetration macadam 50 mm thick PAGE_128 170.76 171.00
99 Penetration macadam 75 mm thick PAGE_129 238.26 238.00
100 Open-graded premix carpet of 20 mm thick with 80/100 BT PAGE_5_23 151.83 152.00
101 Providing and laying type B seal coat simultaneously with 80/100 BT PAGE_5_39 56.94 57.00
102 Hot Applied Thermoplastic Compound Page_225 10.84 11.00

V. VENKATA NARAYANA 9440818440, 07799139399, vvnhighways.blogspot.in


PREPARED on 10-12-2014
473802.00
###
Construction of CC roads at 2BHK Rural Houses (nos) of Alagadapa Village of Miryalaguda mandal,
Miryalaguda Constituency in Nalgonda District.
DETAILED CUM ABSTRACT ESTIMATE
Sl. Descripti Measurements Amount
Nos Quantity Rate/per
No. on L B D in Rs.

I Road Work
1 Scarifying the existing B.T surface to a depth of 50 mm by Mechanical
means and disposal of scarified material with all leads and lifts up to 1000
m as per MoRT&H (5th Revision) Specn. No.305.4.3

337.50 7.90 2666


Sqm
2 Providing, Laying, Spreading and compacting graded HBG crushed stone
aggregate to Wet Mix macadam specification including cost, (excluding
seigniorage) of all materials and including premixing the material with
water at OMC in Mechanical mix plant carriage of mixed material by tipper
to site , laying in uniform layers with paver in base courses on well
prepared surface and compacting with Vibratory roller to achieve the
desired density etc., as directed by the Engineer-in-Charge and as per
MoRT&H specification.406 (5th revision) for finished item of work.
(Payment will be made based on levels for finished item of work)

67.00 1797.00 120399


Cum
3 Providing and applying Prime Coat with bitumen emulsion (slow Setting)
bulk using emulsion pressure distributor on prepared surface of Granular
base including cleaning of road surface and spraying emulsion at the rate
of 0.70 Kg/sqm using emulsion pressure distributor for finished item of
work etc., complete for finished item of work as per MoRT&H Specification
502 (5th Revision) and as directed by the Engineer-in-charge.

337.50 30.30 10226


Sqm Sqm
4 Providing and applying tack coat with bitumen VG 10 Grade using Bitumen
pressure distributor at the rate of 0.20 Kgs per sqm on the prepared
bituminous/granular surface cleaned with mechanical broom for finished
item of work as per MoRT&H Specification 503 (5th revision) and as
directed by the Engineer-in-Charge.

14250.00 8.00 114000


Sqm Sqm
5 Providing compacted Bituminous Concrete with 100-120 TPH Batch Mix
type hot mix plant/40-60 TPH Hot Mix Plant using HBG crushed aggregates
of Grading-2 as per table 500-17 of specification 507 of MoRT&H (5th
revision), premixed with Bitumen binder VG 30 Grade @ 5.4 % of mix and
filler, transporting the hot mix to work site, laying with Paver finisher to the
required grade, level and alignment, rolling with smooth wheeled, vibratory
and tandem rollers to achieve the desired compaction as per MoRT&H
Specification 507 (5th revision) complete for finished item of work in all
respects as directed by Engineer-in-Charge (Payment will be made based
on levels for finished item of work) (Excluding VAT Charges)

427.50 6614.00 2827485


Cum Cum
6 Construction of earthen shoulders with borrowed earth,with MDD not less
than 17.5KN/Cum from approved sources,grading and consoilidation with 8
to 10 Tonnes Vibratory Road Roller @OMC to meet requirement of
MoRT&H ,including all hire and operational charges of T&P and seiniorage
charges ,complete for finished item of work as per MoRT&H specification
305 (5th revision)

440.00 194.00 85360


Cum
7 Construction of earthen shoulders with earth obtained from side earth with
MDD not less than 17.5KN/Cum from approved sources,grading and
consoilidation with 8 to 10 Tonnes Vibratory Road Roller @OMC to meet
requirement of MoRT&H ,including all hire and operational charges of T&P
and seiniorage charges ,complete for finished item of work as per MoRT&H
specification 305 (5th revision)

320.00 133.00 42560


Cum
Sub Total 3202696
Sl. Descripti Measurements Amount
Nos Quantity Rate/per
No. on L B D in Rs.

II Side Drains

1 Earthwork excavation in soils up to SDR by mechanical means for


foundations of structures as per drawing and technical specification
including setting out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing sides of bottom, back filling
the excavation earth to the extent required etc., complete including
(excluding seigniorage) charges for finished item of work as per MoRT&H
specification 304(5th Revision) and as directed by the Engineer-in-Charge

1485.00 98.00 145530


Cum Cum
2 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG
crushed stone aggregate and fine aggregate conforming to table 1000-2 of
MoRT&H including cost, (excluding seigniorage) conveyance of all
materials to site and labour charges, centering, machine mixing, laying,
Vibrating, curing etc., including all other incidental and operational charges
of all T&P etc., complete for finished item of work as per MoRT&H
specification 1500,1700, 2100 (5th Revision) and as directed by the
Engineer-in-Charge for base course.

202.50 3826.00 774765


Cum Cum
3 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and
10mm size HBG crushed stone aggregate (Coarse aggregate conforming to
table 1000-1 and fine aggregate conforming to table 1000-2) including
cost, (excluding seigniorage) and conveyance of all materials to site and
all labour charges , centering, machine mixing, laying in position,
Compacting, Vibrating and curing including all other incidental and all other
operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2200 (5th Revision) for side walls of drains.

680.00 5429.00 3691720


Cum Cum
4 Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and
10mm size HBG crushed stone aggregate (Coarse aggregate conforming to
table 1000-1 and fine aggregate conforming to table 1000-2) including
cost, (excluding seigniorage) and conveyance of all materials to site and
all labour charges ,centering, machine mixing, laying in position,
Compacting , Vibrating and curing including all other incidental and all
other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2100 (5th Revision) for cover slabs

46.00 5660.00 260360


Cum Cum
5 Providing HYSD bars ( Fe-500) of different diameters, wrought and put up
bars of all diameters including cost and conveyance of steel to site and all
labour charges for fabrication of reinforcement including cutting, bending,
binding rods, tying grills, placing them in position etc., complete including
cost and conveyance of binding wire and all handling charges and
operational charges etc., and including over lapping welding if required
etc., complete for all R.C.C items for finished item of work as per standard
drawings, as per the directions of the Engineer-in-Charge and as per
MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of
1985 for cover slabs over drains

2.76 56604.00 156227


MT Cum
5028602

III CC Pavement

6 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG
crushed stone aggregate and fine aggregate conforming to table 1000-2 of
MoRT&H including cost, (excluding seigniorage) conveyance of all
materials to site and labour charges, centering, machine mixing, laying,
Vibrating, curing etc., including all other incidental and operational charges
of all T&P etc., complete for finished item of work as per MoRT&H
specification 1500,1700, 2100 (5th Revision) and as directed by the
Engineer-in-Charge for base course of CC pavement

66.00 3826.00 252516


Cum Cum
Sl. Descripti Measurements Amount
Nos Quantity Rate/per
No. on L B D in Rs.
7 Vibrated cement concrete M 40 grade using 20mm & 10mm HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
aggregate (natural sand) conforming to table 1000-2) including cost,
(excluding seigniorage) conveyance of all materials to site and labour
charges, centering, machine mixing, laying, vibrating, curing etc., including
all other incidental and operational charges of all T&P as per approved
drawings and as directed during execution but excluding cost of steel and
its fabrication charges for finished item as per MoRTH specification 602 and
as directed by the Engineer-in-Charge for C.C Pavement.

151.8 152.00 5752.00 874304


Cum Cum

Sub Total Rs. 1126820


Part-I (B) Routine MAINTENANCE WORK within the Defects liability period
i.e. 2 Years

Routine Maintenance for Jungle Clearance /tree and shrub trimming and
culvert repairs / vents maintenance / parapet wall repairs / retaining wall
repairs etc within DLP i.e., 2 years.

2 X 3.8 3600.00 27360


years per Km
III Part-I (C) Routine MAINTENANCE WORK after completion of DLP for 3 years

Routine Maintenance comprising of B.T. Pot Hole filling, BT edge repairs


(and other items on B.T. carriageway such as crack sealing, minor surface
repair etc., and unpaved shoulder repair (Berms)/Surface drains
maintenance/ including gravelling berms and jungle clearance/tree and
shrub trimming and culvert repairs/Vent maintenance/parapet wall repairs /
retaining wall repairs etc., Ordinary repairs to bridges and sign
maintenance/guard stones maintenance / painting Km/Hm stones and
others for 3 years from the end of DLP.

3 X 3.8 30000.00 342000


years per Km
IV The data for the Routine Maintenance items to be covered will be prepared
with SSR with which the subject work estimate is sanctioned and the items
of Rouine Maintenance will be carried out at these rates duly operating the
quoted percentage. Payment shall be made for the items to be recorded in
M. book. The overall amount shall be for Routine Maintenance for 3 years
after DLP and for Routine Maintenance of culverts and jungle clearance for
2 years after completion of subject work shall be limited maximum to
amounts indicated at Part I(B) and Part I(C)

Total Amount 9727478


Name of Work ::- Construction of CC roads at 2BHK Rural Houses (nos) of Alagadapa Village of
Miryalaguda mandal, Miryalaguda Constituency in Nalgonda District.

DATA
SSR :: 2014-15 Date :: 06.01.2018 Municipal Area Allowance :: 0.0%
SNo Quantity Unit Description of Item Rate per Amount
1 2 3 4 5 6 7

1 Construction of Granular sub-base by providing HBG/HBT material confirming to Grading - III


of MoRT&H Table 400-2 including cost, (excluding seigniorage) charges and conveyance of all
materials to work site and spreading in uniform layers with motor grader or by approved means, on
prepared surface mixing by mix in place method with Rotavator / approved means at OMC and
compacting with vibratory roller to achieve the desired density etc., complete for finished item of work
as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.
( Payment will be made based on levels for finished item of work ).

1 Page 95 of MoRT&H SDB


1 Unit = cum
1 Taking output = 300 cum
1 (A) Labour
1 0.40 day Mate 425.00 1.00 170.00
1 2.00 day Mazdoor skilled 438.50 1.00 877.00
1 8.00 day Mazdoor unskilled 400.00 1.00 3200.00
1 4247.00
1 0.0 % Municipal Area Allowance 4247.00 0.00
1 TOTAL A= 4247.00
1 (B) Machinery
1 6.00 hour Motor grader 3.35M Blade @50 cum/Hr. 3216.00 1.00 19296.00
1 12.00 hour Tractor - Rotavator (223+11=234) 422.00 1.00
1 6.00 hour Vibratory roller 8T 2638.90 1.00 15833.40
1 3.00 hour Water tanker 6 KL 624.00 1.00 1872.00
1 TOTAL B= 37001.40
1
1 (C) Material
1 Coarse graded Granular sub-base material as per
1 Table 400-2 of MORT&H
1 9.5-4.75mm IRC & MORT&H HBG/HBT Chips @ 66%
1 255.00 cum Average rate of (9.5-11.2),( 5-7)&(2.36-5) 897.08 1.00 228756.25
1 2.36mm and below @34%
1 129.00 cum Rate of 2.36mm & below HBG/HBT metal 700.25 1.00 90332.25
1 TOTAL C= 319088.50
1 (A + B +C) 360336.90
1
1 5.00 % (D) Over Head Charges on (A+B+C) 360336.90 18016.85
1
1 10.00 % (E) Contractors Profit on (A+B+C+D) 378353.75 37835.38
1
1 (F ) Seigniorage charges
1 384.00 cum Metal 0.00 1.00 0.00
1
1 300.00 cum TOTAL Cost for 300 cum = (A+B+C+D+E+F) 416189.13
1 2 3 4 5 6 7
1 Rate per 1 cum 1387.30
1 Rate per 1 cum 1387.00
1
2 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and
fine aggregate conforming to table 1000-2 of MoRT&H including cost, (excluding seigniorage)
conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating,
curing etc., including all other incidental and operational charges of all T&P etc., complete for
finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed
by the Engineer-in-Charge for below CC Pavement

2 Page 331 of MoRT&H SDB


2 Unit = cum
2 Taking output = 15 cum
2 (A) Labour
2 0.64 no Mate 425.00 1.00 272.00
2 1.00 no Mason 438.50 1.00 438.50
2 15.00 no Mazdoor 400.00 1.00 6000.00
2 6710.50
2 0.0 % Municipal Area Allowance 6710.50 0.00
2 TOTAL A= 6710.50
2 (B) Material
2 13.50 cum Cost of 40mm HBG M/C metal 942.50 1.00 12723.75
2 6.75 cum Sand at site 700.25 1.00 4726.69
2 2.43 MT Cement at site 4750.00 1.00 11542.50
2 TOTAL B= 28992.94
2 ( C) Machinery
2 6.00 hour Concrete mixer 0.4/0.28 cum 472.60 1.00 2835.60
2 6.00 hour Generator set 35 KVA 842.20 1.00 5053.20
2 2.00 hour Water tanker 6 KL 624.00 1.00 1248.00
2 TOTAL C= 9136.80
2 (A + B +C) 44840.24
2
2 5.00 % (D) Over Head Charges on (A+B+C) 44840.24 2242.01
2
2 10.00 % (E) Contractors Profit on (A+B+C+D) 47082.25 4708.23
2
2 (F ) Seigniorage charges
2 13.50 cum METAL 0.00 1.00 0.00
2 6.75 cum SAND 0.00 1.00 0.00
2
2 15.00 cum TOTAL Cost for 15 cum = (A+B+C+D+E+F) 51790.48
2 Rate per 1 cum 3452.70
2 Rate per 1 cum 3453.00
2
3 Vibrated cement concrete M 35 grade using 20mm & 10mm HBG/HBT crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) and
using fly ash (replacing cement by fly ash to the extent of 15% and sand by 10%) including cost,
(excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine
mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P
etc., complete for finished item of work as per MoRT&H specification 1500, 1700, 2100 & 2702
(5th Revision) and as directed by the Engineer-in-Charge for C.C Pavement.
1 2 3 4 5 6 7
3 Page 345,346 of MoRT&H SDB
3 Unit = cum
3 Taking output = 15 cum
3 (A) Labour
3 0.86 no Mate 425.00 1.00 365.50
3 1.50 no Mason 438.50 1.00 657.75
3 20.00 no Mazdoor 400.00 1.00 8000.00
3 9023.25
3 0.0 % Municipal Area Allowance 9023.25 0.00
3 TOTAL A= 9023.25
3 (B) Material
3 8.10 cum Cost of 20mm HBG/HBT M/C metal 1398.75 1.00 11329.88
3 5.40 cum Cost of 10mm HBG/HBT M/C metal 1132.50 1.00 6115.5
3 6.08 cum Sand at site 700.25 1.00 4257.52
3 5.381 MT Cement at site 4750.00 1.00 25559.75
3 1.576 MT Fly ash
3 1.576 MT Conveyance charges of fly ash 1.00
3
3 Fly Ash 15% of Cement = 0.15X6.33 =0.95 MT
3 Quantity of Fly Ash = 0.95 X 2.25/3.15= 0.678 MT
3 10% of Sand to replaced by Fly ash
10% Sand to be replaced by Fly ash =
3 (6.75 - 6.08)X1.60 = 1.072 MT
3 Quantity of Fly Ash = 1.072 X Sp Gr. Of
3 Fly ash/Sp Gr. Of Sand 1.072 X 2.25/2.687 = 0.898 MT
3
3 TOTAL B= 47262.65
3 (C ) Machinery
3 6.00 hour Concrete mixer 0.4/0.28 cum 472.60 1.00 2835.60
3 6.00 hour Generator set 33 KVA 842.20 1.00 5053.20
3 TOTAL C= 7888.80
3 (A + B +C) 64174.70
3
3 3.50 % (D) Form Work on (A+B+C) 64174.70 2246.11
3
3 5.00 % (E) Over Head Charges on (A+B+C) 66420.81 3321.04
3
3 10.00 % (F) Contractors Profit on (A+B+C+D) 69741.85 6974.19
3
3 (G ) Seigniorage charges
3 13.50 cum METAL 0.00 1.00 0.00
3 6.080 cum SAND 0.00 1.00 0.00
3
3 15.00 cum TOTAL Cost for 15 cum = (A+B+C+D+E+F+G) 76716.04
3 Rate per 1 cum 5114.40
3 Rate per 1 cum 5114.00
3
1 2 3 4 5 6 7
4 Construction of embankment with borrowed useful earth from outside road boundary by mechanical
means up to SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top
soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment,
spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory
Road Roller @ OMC to meet requirement of table 300-1 of MoRT&H, including all hire and
operational charges of T&P and (excluding seigniorage) charges, complete for finished item of work
as per MoRT&H specification 305

4
(5th revision) With a lead of 5KM (Payment will be made based on levels for finished item of work).

4 Page 68,69 of MoRT&H SDB


4 Unit : Cum
4 Taking out put = 100 Cum
4 (A) Labour
4 0.04 day Mate 425.00 1.00 17.00
4 1.00 day Mazdoor unskilled 400.00 1.00 400.00
4 417.00
4 0.0 % Municipal Area Allowance 417.00 0.00
4 TOTAL A= 417.00
4
4 (B) Machinery
4 1.67 hour Hydraulic Excavator 1 Cum bucket capacity @ 60 cum/hr 2821.50 1.00 4711.91
4 800.00 t.km Tipper ( for 5 Km = 160 x 5 = 800) t.km 6.00 t.km 4800.00
4 Add 10% of cost of carriage to cover
4 cost of loading and unloading 480.00
4 0.50 hour Dozer 80 HP for spreading @ 200 cum per hour 2561.80 1.00 1280.90
4 1.00 hour Motor Graders for Grading @ 100 cum per hour 3216.00 1.00 3216.00
4 4.00 hour Water tanker 6 KL 624.00 1.00 2496.00
4 1.00 hour Vibratory roller 8T 2638.90 1.00 2638.90
4 TOTAL B= 19623.71
4 (A + B ) 20040.71
4
4 5.00 % (C) Over Head Charges on (A+B) 20040.71 1002.04
4
4 10.00 % (D) Contractors Profit on (A+B+C) 21042.75 2104.28
4
4 (E ) Seigniorage charges
4 100.00 cum Earth 0.00 1.00 0.00
4
4 100.00 cum TOTAL Cost for 100 cum = (A+B+C+D+E) 23147.03
4
4 Rate per 1 cum 231.47
4 Rate per 1 cum 231.00
4
4 Cost of NP3 class Hume pipes of 450 mm dia. including cost and conveyance to site including loading
unloading transportation and taxes etc. complete .

4 Cost of 450mm dia NP3 class Hume Pipes


4 1.00 RM Initial Cost of Pipes as per SSR 1434.00 1.00 1434.00
4
4 1.00 RM S1 = Basic Cost of M.S. Rods a per SSR 32636.00
4 S2 = Cost of M.S. rods
4 1.00 RM at the time of preparation of Estimate 41500.00
1 2 3 4 5 6 7
4 Ws= Weight of M.S. Rods required
4 per meter of pipe as per IS:458/2003 (kg)
4 As per TABLE 3/5 of IS:458-2003 & Note 5
4 1.00 RM Ws = (1.18+2.20*140/125) 3.6440
4 R1= Variation (increase/ decrease) in cost
4 (Rs. Per meter) due to change in cost of M.S. Rods
4 R1 = ( S2- S1)/1000 X Ws
4 1.00 RM R1 = ( 41500 - 32636 )/ 1000 X 3.644 32.30
4
4 1.00 RM C1 = Basic Cost of Cement a per SSR 4806.00
4 C2 = Cost of Cement
4 1.00 RM at the time of preparation of Estimate 4750.00
4 IS:458-2003
4 From TABLE 3 Barrel wall Thickness ( mm ) 85.00
4 Concrete Qty=π/4(0.77*0.77-0.60*0.60) (cum) 0.1829
4 From CLAUSE 5.5 Cement Content( kg/cum) 340.00
4 Wc= Weight of Cement required per meter of pipe
4 1.00 RM ( as per IS:458/2003 (kg) 0.1829*340) 62.186
4 R1= Variation (increase/ decrease) in cost
4 (Rs. Per meter) due to change in cost of Cement
4 R2 = ( C2- C1)/1000 X Wc
4 1.00 RM R2 = ( 4750 - 4806 )/ 1000 X 62.186 -3.48
4
4 Revised cost = Initial cost as per Table+R1+R2
4 =1434+32.3 -3.482416 1462.82
4
4 Lead Charges For 24 KM
4 Lead 24.00 KM
4 5.00 km Lead charges for First 5 KM Distance 62.40 5.00 62.40
4 19.00 km Lead charges for balance Distance 2.15 1.00 40.85
4 Total Rate: 1566.07
4 Rate per RM 1566.07
4
5 Providing, laying Reinforced cement concrete Hume pipes of 450 mm Dia., NP-3 class for pipe
culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing
of 450 mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc.,
as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC
Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work.

5 Page 272,273 of MoRT&H SDB


5 Unit = meter
5 Taking output = 12.5 meter
5 450 mm Dia.,
5 (A) Labour
5 0.14 no Mate 425.00 1.00 59.50
5 0.50 no Mason 438.50 1.00 219.25
5 3.00 no Mazdoor 400.00 1.00 1200.00
5 1478.75
5 0.0 % Municipal Area Allowance 1478.75 0.00
5 TOTAL A= 1478.75
5 (B) Material
5 12.50 RM Cost of 450 mm Dia pipes 1566.07 1.00 19575.88
1 2 3 4 5 6 7
5 TOTAL B= 19575.88
5 (A + B) 21054.63
5
5 5.00 % (D) Over Head Charges on (A+B) 21054.63 1052.73
5
5 10.00 % (E) Contractors Profit on (A+B+C) 22107.36 2210.74
5
5 12.50 RM TOTAL Cost for 12.5 RM = (A+B+C+D) 24318.10
5 Rate per 1 RM 1945.45
5 Rate per 1 RM 1945.00
5
Name of Work :- Construction of CC roads at 2BHK Rural Houses (nos) of Alagadapa Village of Miryalaguda mandal, Miryalaguda
Constituency in Nalgonda District.
Earth/ Gravel Metal/ Stone Sand
S.No Specification in Brief Unit Quantity cum cum cum
Factor Quantity Factor Quantity Factor Quantity
1 2 3 4 5 6 7 8 9 10

1 E/W for Trench cutting/Embankment 1 cum 140.00 1.000 140.000


2 Granular Sub-base 1 cum 120.00 1.280 153.60
10 BC-40 mm with BT 60/70 1 cum 1.486 0.00
11 DBM 50 mm with BT 80/100 1 cum 1.469 0.00
12 Gravel Shoulders 1 cum 1.280 0.000
13 VCC(1:4:8) 1 cum 0.900 0.00 0.450 0.00
14 VCC(1:3:6) 1 cum 81.00 0.900 72.90 0.450 36.45
15 VCC M15 Grade CC 1 cum 0.900 0.00 0.450 0.00
16 VRCC M20 Grade CC 1 cum 0.900 0.00 0.450 0.00
17 VRCC M25 Grade CC 1 cum 0.900 0.00 0.450 0.00
18 VRCC M30 Grade CC 1 cum 0.900 0.00 0.450 0.00
19 VCC M35 Grade CC 1 cum 152.00 0.900 136.80 0.450 68.40
20 VRCC M20 Grade CC for Railing 1 cum
21 Granular Bedding Below Pipes 1 cum 1.200 0.000
22 Filling between Body walls 1 cum 1.200 0.000
23 Rough Stone Revetment 1 cum 1.200 0.00
24 Filter Material with Gravel 1 cum 1.200 0.000
25 Grouted Revetment with CC(1:4:8) 1 cum 1.180 0.00 0.090 0.00
26 Back filling with gravel 1 cum 1.200 0.000
27 Filter media using 150 mm stone 1 cum 1.200 0.000
28 Sand filling in foundation 1 cum 1.200 0.000
29 100 mm dia AC Weep holes 1 m 0.002 0.000
30 Plastering in CM(1:5) 12 mm 1 sqm 0.151 0.000
31 Plotting Stones 1 sqm 0.0169 0.00
31 BUSG 75 mm thick with BT 80/100 1 sqm 0.113 0.00
32 BT Patch work using 40 mm metal 1 cum 1.330 0.00
33 Patch work 50 - 70 mm depth 1 sqm 0.078 0.00
34 Patch work 25 - 35 mm depth 1 sqm 0.040 0.00
35 Patch work 15 - 25 mm depth 1 sqm 0.030 0.00
36 RR Masonry in CM(1:3) foundation 1 cum 1.258 0.00 0.326 0.00
37 RR Masonry in CM(1:3) substructure 1 cum 1.158 0.00 0.347 0.00

Total Quantity 140.00 363.30 104.85


Rate 30.00 75.00 75.00
Amount Rs 4200.00 27248.00 7864.00
Total Amount Rs 39312.00
As per instructions of Industries& Commere (Mines-I) Department, No DM Fund 30% 11793.6
3573/MI(1)/2015 dtd: 13.05.2016 37.5
SM Fund 2%
786.24
51891.84
51892.00
Name of Work:- IMPROVEMENTS TO MAHABUBNAGAR-NALGONDA ROAD FROM KM. 114/4 TO
137/1 . ( WORK IN KM.

(A) .WEIGHTED AVERAGE LEAD FOR CRUSHER

(i) Reach km 45/0- 48/ 100

a) Cart Track 1.10 x 2.50 = 2.75 km


b) Miryalaguda - Kodad road km 21.90 to km 5.30 = 16.60 km
c) Alagadapa - Subbareddygudem road km 0.00 to km 0.50 = 0.50 km
km
d) Site Spreads in km 0.00 to km 0.20
e) Site average Lead (0.2 - 0) /2 = 0.10 km
Total Lead = 19.95 km
.WEIGHTED AVERAGE LEAD SAY = 20.00 km

(B). WEIGHTED AVERAGE LEAD FOR sand ( Quarry at )

(i) Reach km 45/0- 48/ 100


a) = 555.00 km
b) road km 0.00 to km 45.00 = 45.00 km
b) road km 0.00 to km 45.00 = 45.00 km
b) road km 0.00 to km 45.00 = 45.00 km
b) road km 0.00 to km 45.00 = 45.00 km

c) Site Spreads in km 45.00 to km 48.10


d) Site average Lead (48.1 - 45) /2 = 1.55 km
Total Lead = 736.55 km
.WEIGHTED AVERAGE LEAD SAY = 737.00 km

0
0
Asst. Executive Engineer Dy. Executive Engineer Executive Engineer (R&B)
R&B Section, Miryalaguda R&B Sub-Division: Miryalaguda Division,NALGONDA
Name of Work:- Construction of CC roads at 2BHK Rural Houses (nos) of Alagadapa Village of
Miryalaguda mandal, Miryalaguda Constituency in Nalgonda District.

BITUMEN LEADS & RATES

STRAIGHT LEAD :: Bitumen Lead 465.00 km Vizag


Lead Conveyance Rates
Lead for Emulsion ( round the trip ):: 930.00 km 1.50
Lead for Bulk Bitumen ( round the trip ) :: 930.00 km 1.50
BT as on 16-06-2017 Emulsionj as on 16-09-2017

Bulk Bulk Emulsion Emulsion


TYPE OF BITUMEN
(VG-10) (VG-30) (S.S) (R.S)

Initial cost (Ex. Chennai) 24270.00 24470.00 33790.00 20570.00


Lead charges for Bulk BT 1.5 x 930 1395.00 1395.00
Lead charges for Emulsion 1.5 x 930 1395.00 1395.00
Total 25665.00 25865.00 35185.00 21965.00
OR SAY 25665.00 25865.00 35185.00 21965.00
Name of Work :: Construction of CC roads at 2BHK Rural Houses (nos) of Alagadapa Village of Miryalaguda mandal, Miryalaguda
Constituency in Nalgonda District.

RMR.
Date :: 22.09.2017 SSR :: 2017-18

Machine Crushing
(-) Stacking Charges
Conveyance rate (-)
unloading charges

Stacking Charges

Blasting Charges
Initial Rate of
Average Lead

Initial Rate
Conveyance

Charges

Seigniorage
Loading &

of Material
Charging

Charges
Weighted

Stacking
TOTAL RATE

Material

0
rate
S.No Nature of Metal

25% On (6+9) SUM of


(4-5) (7-5) on (9) % Value ( 8 to12&14 )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
IRC and MORT&H HBG/HBT METALS ( CRUSHER LEADS )
10 50 mm to 55 mm Metal 20.00 244.25 0.00 105.71 433.00 244.25 433.00 67.00 108.25 0.00 0.0 0.00 852.50
11 40 mm to 45 mm M.C Metal 20.00 244.25 0.00 105.71 475.00 244.25 475.00 67.00 118.75 0.00 0.0 0.00 905.00
12 25 mm to 27 mm M.C Metal 20.00 244.25 0.00 105.71 783.00 244.25 783.00 67.00 195.75 0.00 0.0 0.00 1290.00
13 19 mm to 22 mm M.C Metal 20.00 244.25 0.00 105.71 821.00 244.25 821.00 67.00 205.25 0.00 0.0 0.00 1337.50
14 12 mm to 14 mm M.C chips 20.00 244.25 0.00 105.71 681.00 244.25 681.00 67.00 170.25 0.00 0.0 0.00 1162.50
15 9.5 mm to 11.2 mm M.C chips 20.00 244.25 0.00 105.71 623.00 244.25 623.00 67.00 155.75 0.00 0.0 0.00 1090.00
16 5 mm to 7 mm M.C chips 20.00 244.25 0.00 105.71 479.00 244.25 479.00 67.00 119.75 0.00 0.0 0.00 910.00
17 2.36 mm to 5 mm 20.00 244.25 0.00 105.71 304.00 244.25 304.00 67.00 76.00 0.00 0.0 0.00 691.25
18 Below 2.36 mm (Dust) 20.00 244.25 0.00 105.71 456.00 244.25 456.00 -- -- 0.00 0.0 0.00 700.25

HBG/HBT SS 5 METALS ( CRUSHER LEADS )


1 6 mm size M.C. Chips 20.00 244.25 0.00 105.71 505.00 244.25 505.00 67.00 126.25 0.00 0.0 0.00 942.50
2 10 mm size M.C. Chips 20.00 244.25 0.00 105.71 657.00 244.25 657.00 67.00 164.25 0.00 0.0 0.00 1132.50
3 12 mm size M.C. Chips 20.00 244.25 0.00 105.71 781.00 244.25 781.00 67.00 195.25 0.00 0.0 0.00 1287.50
4 20 mm size M.C. Metal 20.00 244.25 0.00 105.71 870.00 244.25 870.00 67.00 217.50 0.00 0.0 0.00 1398.75
5 25 mm size M.C. Metal 20.00 244.25 0.00 105.71 830.00 244.25 830.00 67.00 207.50 0.00 0.0 0.00 1348.75
6 40 mm size M.C. Metal 20.00 244.25 0.00 105.71 505.00 244.25 505.00 67.00 126.25 0.00 0.0 0.00 942.50

1 Gravel 5.00 75.25 0.00 60.12 98.00 75.25 98.00 -- -- 0.00 0.0 0.00 173.25

2 Sand for Mortar 25.00 300.58 0.00 60.12 760.00 300.58 760.00 -- -- 0.00 0.0 0.00 1060.58
3 Stone dust below 2.36mm 25.00 300.58 0.00 60.12 570.00 300.58 570.00 -- -- 0.00 0.0 0.00 700.25
3 Sand for Concrete 24.00 300.58 0.00 60.12 570.00 300.58 570.00 -- -- 0.00 0.0 0.00 870.58
4 Sand for Filling 25.00 300.58 0.00 60.12 570.00 300.58 570.00 -- -- 0.00 0.0 0.00 870.58
5 Cement 4750.00 4750.00
OTHER MATERIALS SS5 HBG METAL IRC HBG METAL
LABOUR 2017-18
2017-18 (Excluding blasting 2017-18 BUILDINGS SSR-2014-15
Charges)
DETAILS RATE SIZES RATE SIZES RATE
2017-18
GRAVEL 98.00 SS6 505.00 IRC2.36 304.00
MSAND 760.00 SS10 657.00 IRC5 479.00
MASTIC PADS
DETAILS RATE
CSAND 570.00 SS12 781.00 IRC9 623.00 25.4 mm
MASONI 470.00 FSAND 570.00 SS20 870.00 IRC12 681.00 12.7 mm
MASONII 425.00 CRS 249.00 SS25 830.00 IRC19 821.00 PAINTS
Mate 425.00 ROUGH 252.00 SS40 505.00 IRC25 783.00
Mazdoor skilled 438.50 BOND600 29.00 SS50 433.00 IRC40 475.00
Mazdoor unskilled 400.00 SS150 90.00 SS60 398.00 IRC50 433.00
SS225 152.00 SS65 360.00 IRC60 398.00
SS300 156.00 SS75 289.00 IRC65 360.00
QS25 40.00 Metals BLAST 67.00 IRC75 289.00
141 QS40 46.00 CRS BLAST3 67.00 DUST 456.00
297.5 RR BLAST2 67.00
438.5

BITUMEN LEADS & RATES


2008-09
RATE SEIGNIORAGES-RMR SEIGNIORAGES-DATA WORKS
MATERIAL
km/ MT
PACKED BITUMEN 1.75 Preamble 7
2016-17 2014-15
BULK BITUMEN 1.50

MATERIAL RATE MATERIAL RATE WORKS RATE

SGMETAL 0.00 METAL_D 0.00 EWBULK


SGSTONE 0.00 STONE_D 0.00 EW20A
SGSAND 0.00 SAND_D 0.00 ES20B
ADDITIONS SGEARTH 0.00 EARTH_D 0.00
OH 5.00 SGGRAVEL 0.00 GRAVEL_D 0.00
OH1 20.00
CP 10.00
VAT 0.00
LALI 13.00
NP4 CLASS PIPES
IS:458-1988 CEMENT & STEEL
2017-18
Dia of Pipes Shell Quantity of Cement
Outer Dia Cement Content BASIC PRICE CURRENT
S.No NP3 class Thick ness Concrete Content rate MATERIAL
(mm) ( kg) FOR PIPES PRICE
( mm ) (mm) ( cum ) ( kg/ cum) DETAILS First 5 km Next 1 km
RATE
Lead Lead
1 2 3 4 5 6 7 CEMENT 4806.00 4750.00
1 600 85 770 0.1829 340 62.186 450 mm 1434.00 62.400 2.15 HYSD 43000.00
2 800 95 990 0.2671 340 90.814 800 mm 4678.00 137.400 5.54 MS6 32636.00 41500.00
3 1000 115 1230 0.4028 340 136.952 1000 mm 7954.00 217.100 10.46 MS 39000.00
4 1200 120 1440 0.4976 340 169.184 1200 mm 10735.00 263.300 11.38 BWIRE 55.00

MACHINERY 2016-17 RATE 2007-08 2008-09 2014-15


AT PLANT
Dozer 80 HP for spreading @ 200 cum per hour 2561.80 2400.00 2760.00
Motor Graders for Grading @ 100 cum per hour 3216.00 2260.00 2600.00
Hydraulic Excavator 2821.50 1950.00 2250.00
Front end loader 1 Cum. bucket capacity 1646.00 1150.00 1320.00
Tippers 5.50 cum capacity 924.10 500.00 575.00
Vibratory roller 8 Tones for GSB, EARTH/ WMM rolling 2638.90 1350.00 1550.00
Finish rolling with 6-8 Tones smooth wheeled tandem roller. 1131.00 1150.00 1320.00
Water tanker 6 KL 624.00 300.00 345.00
Tractor with Rotavator 422.00 300.00 345.00
Air Compressor 250 cfm 521.20 320.00 370.00
Wet mix plant of 60 tonne hr. capacity 1646.00 1150.00 1320.00
Mechanical broom @ 1250 Sqm./Hour 357.00 250.00 290.00
Bitumen pressure distributor @1750 sqm/hr 1498.00 820.00 940.00
Emulsion pressure distributor @ 1750 Sqm./Hour 860.00 600.00 690.00
Hot Mix Plant 120 TPH 28175.00
Hot Mix Plant 100 TPH 24171.00
Hot Mix Plant 60 TPH 21668.00
Hot Mix Plant 40 to 60 TPH 19120.00 13500.00 15525.00
Sensor Paver finisher @ 100 TPH 3059.51
Mechanical Paver finisher @ 100 TPH 2249.00 950.00 1090.00
Smooth wheeled roller 8-10 Tones for initial break down rolling 1646.00 470.00 540.00
Vibratory roller 8 Tones for intermediate rolling 2638.90 1350.00 1320.00

Pneumatic road Roller 1283.00 900.00 1035.00


Hire charges of bitumen boiler 40mm metal 209.00
GSB Plant 50 cum 1143.00 800.00 920.00
Generator 250 KVA 1850.00 1350.00 1550.00
Electric generating set 125 KVA 1320.00 950.00 1090.00
Generator 100 KVA 1126.00 800.00 920.00 To be Checked
Tipper 5 cum capacity for Soil, GSB, WMM, Hot mix. 924.10 7.22 Derived from previous data and 3.90 4.50
Tipper 5.50 cum capacity per 10 Tonnes per t.km 6.00 0.05 present rate 3.90 4.50
Plate compactor/Power rammer/road roller 48.00 32.00 40.00
Hydraulic self propelled chip spreader @ 1500 sqm/hr. 2567.00 1800.00 2070.00
Mini hot mix plant (SDB of MOST 1994-95 page 131 ) 1268.00 1268.00 1268.00
Hire charges of bitumen boiler 10-12mm metal 209.00 150.00 170.00 Rate as per local
Road Marking Machine@ 80sqm per hour 111.00 1268.00 90.00 competitive
quotations
Hot Applide Thermoplastic Compound( Item no. 353)( per Liter) 200.00
Reflectorising glass beads (Per kg) 65.00
Concrete mixer 0.4/0.28 cum 472.60 300.00 345.00
Tractor 415.00 300.00 345.00
Tractor with ripper attachment @ 60 cum per hour 507.50 300.00 345.00

Generator set 30 KVA 842.20 540.00 620.00


Batch Mix Plant (Hot mix Plant – 100 TPH capacity) 24171.00
From To Data From To Data
data Entry Entry data Entry Entry
HMP 20.00 244.24592 E/W 5.00 75.2541478

BUILDINGS SSR-2014-15 Crusher 20.00 244.24592 Gravel 5.00 75.2541478

Metal/
20.00 244.24592 Sand 25.00 300.576508
Stone Qry

MASTIC PADS METAL LEADS & RATES SAND/ EARTH LEADS & RATES
991.00 BMS-W.20 2017-18 2017-18
From From
568.00 BMS-W.21 LEAD NOTATION RATE
SSR
LEAD NOTATION RATE
SSR
240.00 MLOAD 91.45 SLOAD 45.86
MUNLOAD 14.26 SUNLOAD 14.26
MSTACK SSTACK

SCRAP from SCARIFYING


2015-16 0.00 0 0.00 0.00 0 0.00
From
LEAD NOTATION RATE
SSR 1 MT1 27.20 30.90 1 SD1 28.25 32.10
MLOAD 32.00 2 MT2 38.02 43.20 2 SD2 39.52 44.90
MUNLOAD 16.00 3 MT3 52.72 59.90 3 SD3 52.72 59.90
4 MT4 63.99 72.70 4 SD4 63.99 72.70
5 MT5 75.25 85.50 5 SD5 75.25 85.50
6 MT6 86.52 12.80 6-30 6 SD6 86.52 12.80 6-30
7 MT7 97.79 10.70 >30 7 SD7 97.79 10.70 >30
8 MT8 109.05 8 SD8 109.05
9 MT9 120.32 9 SD9 120.32
10 MT10 131.58 10 SD10 131.58
11 MT11 142.85 11 SD11 142.85
12 MT12 154.12 12 SD12 154.12
13 MT13 165.38 13 SD13 165.38
14 MT14 176.65 14 SD14 176.65
15 MT15 187.92 15 SD15 187.92
16 MT16 199.18 16 SD16 199.18
17 MT17 210.45 17 SD17 210.45
18 MT18 221.71 18 SD18 221.71
19 MT19 232.98 19 SD19 232.98
20 MT20 244.25 20 SD20 244.25
21 MT21 255.51 21 SD21 255.51
22 MT22 266.78 22 SD22 266.78
23 MT23 278.04 23 SD23 278.04
24 MT24 289.31 24 SD24 289.31
25 MT25 300.58 25 SD25 300.58
26 MT26 311.84 26 SD26 311.84
27 MT27 323.11 27 SD27 323.11
28 MT28 334.37 28 SD28 334.37
29 MT29 345.64 29 SD29 345.64
30 MT30 356.91 30 SD30 356.91
31 MT31 366.32 31 SD31 366.32
32 MT32 375.74 32 SD32 375.74
33 MT33 385.16 33 SD33 385.16
34 MT34 394.58 34 SD34 394.58
35 MT35 404.00 35 SD35 404.00
36 MT36 413.41 36 SD36 413.41
37 MT37 422.83 37 SD37 422.83
38 MT38 432.25 38 SD38 432.25
39 MT39 441.67 39 SD39 441.67
40 MT40 451.08 40 SD40 451.08
41 MT41 460.50 41 SD41 460.50
42 MT42 469.92 42 SD42 469.92
43 MT43 479.34 43 SD43 479.34
44 MT44 488.76 44 SD44 488.76
45 MT45 498.17 45 SD45 498.17
46 MT46 507.59 46 SD46 507.59
47 MT47 517.01 47 SD47 517.01
48 MT48 526.43 48 SD48 526.43
49 MT49 535.84 49 SD49 535.84
50 MT50 545.26 50 SD50 545.26
51 MT51 554.68 51 SD51 554.68
52 MT52 564.10 52 SD52 564.10
53 MT53 573.52 53 SD53 573.52
54 MT54 582.93 54 SD54 582.93
55 MT55 592.35 55 SD55 592.35
56 MT56 601.77 56 SD56 601.77
57 MT57 611.19 57 SD57 611.19
58 MT58 620.60 58 SD58 620.60
59 MT59 630.02 59 SD59 630.02
60 MT60 639.44 60 SD60 639.44
61 MT61 648.86 61 SD61 648.86
62 MT62 658.28 62 SD62 658.28
63 MT63 667.69 63 SD63 667.69
64 MT64 677.11 64 SD64 677.11
65 MT65 686.53 65 SD65 686.53
66 MT66 695.95 66 SD66 695.95
67 MT67 705.36 67 SD67 705.36
68 MT68 714.78 68 SD68 714.78
69 MT69 724.20 69 SD69 724.20
70 MT70 733.62 70 SD70 733.62
71 MT71 743.04 71 SD71 743.04
72 MT72 752.45 72 SD72 752.45
73 MT73 761.87 73 SD73 761.87
74 MT74 771.29 74 SD74 771.29
75 MT75 780.71 75 SD75 780.71
76 MT76 790.12 76 SD76 790.12
77 MT77 799.54 77 SD77 799.54
78 MT78 808.96 78 SD78 808.96
79 MT79 818.38 79 SD79 818.38
80 MT80 827.80 80 SD80 827.80
81 MT81 837.21 81 SD81 837.21
82 MT82 846.63 82 SD82 846.63
83 MT83 856.05 83 SD83 856.05
84 MT84 865.47 84 SD84 865.47
85 MT85 874.88 85 SD85 874.88

86 MT86 884.30 86 SD86 884.30


87 MT87 893.72 87 SD87 893.72
88 MT88 903.14 88 SD88 903.14
89 MT89 912.56 89 SD89 912.56
90 MT90 921.97 90 SD90 921.97

91 MT91 931.39 91 SD91 931.39

92 MT92 940.81 92 SD92 940.81

93 MT93 950.23 93 SD93 950.23

94 MT94 959.64 94 SD94 959.64

95 MT95 969.06 95 SD95 969.06

96 MT96 978.48 96 SD96 978.48


97 MT97 987.90 97 SD97 987.90
98 MT98 997.32 98 SD98 997.32
Rates changes up to 100th Km as per SSR 99 MT99 1006.73 99 SD99 1006.73
2017-18 100 MT100 1016.15 100 SD100 1016.15
101 MT101 1025.39 101 SD101 1025.39
102 MT102 1034.63 102 SD102 1034.63
103 MT103 1043.88 103 SD103 1043.88
104 MT104 1053.12 104 SD104 1053.12
105 MT105 1062.36 105 SD105 1062.36
106 MT106 1071.60 106 SD106 1071.60
107 MT107 1080.84 107 SD107 1080.84
108 MT108 1090.08 108 SD108 1090.08
109 MT109 1099.33 109 SD109 1099.33
110 MT110 1108.57 110 SD110 1108.57
111 MT111 1117.81 111 SD111 1117.81
112 MT112 1127.05 112 SD112 1127.05
113 MT113 1136.29 113 SD113 1136.29
114 MT114 1145.54 114 SD114 1145.54
115 MT115 1154.78 115 SD115 1154.78
116 MT116 1164.02 116 SD116 1164.02
117 MT117 1173.26 117 SD117 1173.26
118 MT118 1182.50 118 SD118 1182.50
119 MT119 1191.74 119 SD119 1191.74
120 MT120 1200.99 120 SD120 1200.99
121 MT121 1210.23 121 SD121 1210.23
122 MT122 1219.47 122 SD122 1219.47
123 MT123 1228.71 123 SD123 1228.71
124 MT124 1237.95 124 SD124 1237.95
125 MT125 1247.19 125 SD125 1247.19
126 MT126 1256.44 126 SD126 1256.44
127 MT127 1265.68 127 SD127 1265.68
128 MT128 1274.92 128 SD128 1274.92
129 MT129 1284.16 129 SD129 1284.16
130 MT130 1293.40 130 SD130 1293.40
131 MT131 1302.64 131 SD131 1302.64
132 MT132 1311.89 132 SD132 1311.89
133 MT133 1321.13 133 SD133 1321.13
134 MT134 1330.37 134 SD134 1330.37
135 MT135 1339.61 135 SD135 1339.61
136 MT136 1348.85 136 SD136 1348.85
137 MT137 1358.10 137 SD137 1358.10
138 MT138 1367.34 138 SD138 1367.34
139 MT139 1376.58 139 SD139 1376.58
140 MT140 1385.82 140 SD140 1385.82
141 MT141 1395.06 141 SD141 1395.06
142 MT142 1404.30 142 SD142 1404.30
143 MT143 1413.55 143 SD143 1413.55
144 MT144 1422.79 144 SD144 1422.79
145 MT145 1432.03 145 SD145 1432.03
146 MT146 1441.27 146 SD146 1441.27
147 MT147 1450.51 147 SD147 1450.51
148 MT148 1459.75 148 SD148 1459.75
149 MT149 1469.00 149 SD149 1469.00
150 MT150 1478.24 150 SD150 1478.24
151 MT151 1487.48 151 SD151 1487.48
152 MT152 1496.72 152 SD152 1496.72
153 MT153 1505.96 153 SD153 1505.96
154 MT154 1515.20 154 SD154 1515.20
155 MT155 1524.45 155 SD155 1524.45
156 MT156 1533.69 156 SD156 1533.69
157 MT157 1542.93 157 SD157 1542.93
158 MT158 1552.17 158 SD158 1552.17
159 MT159 1561.41 159 SD159 1561.41
160 MT160 1570.66 160 SD160 1570.66
161 MT161 1579.90 161 SD161 1579.90
162 MT162 1589.14 162 SD162 1589.14
163 MT163 1598.38 163 SD163 1598.38
164 MT164 1607.62 164 SD164 1607.62
165 MT165 1616.86 165 SD165 1616.86
166 MT166 1626.11 166 SD166 1626.11
167 MT167 1635.35 167 SD167 1635.35
168 MT168 1644.59 168 SD168 1644.59
169 MT169 1653.83 169 SD169 1653.83
170 MT170 1663.07 170 SD170 1663.07
171 MT171 1672.31 171 SD171 1672.31
172 MT172 1681.56 172 SD172 1681.56
173 MT173 1690.80 173 SD173 1690.80
174 MT174 1700.04 174 SD174 1700.04
175 MT175 1709.28 175 SD175 1709.28
176 MT176 1718.52 176 SD176 1718.52
177 MT177 1727.76 177 SD177 1727.76
178 MT178 1737.01 178 SD178 1737.01
179 MT179 1746.25 179 SD179 1746.25
180 MT180 1755.49 180 SD180 1755.49
181 MT181 1764.73 181 SD181 1764.73
182 MT182 1773.97 182 SD182 1773.97
183 MT183 1783.22 183 SD183 1783.22
184 MT184 1792.46 184 SD184 1792.46
185 MT185 1801.70 185 SD185 1801.70
186 MT186 1810.94 186 SD186 1810.94
187 MT187 1820.18 187 SD187 1820.18
188 MT188 1829.42 188 SD188 1829.42
189 MT189 1838.67 189 SD189 1838.67
190 MT190 1847.91 190 SD190 1847.91
191 MT191 1857.15 191 SD191 1857.15
192 MT192 1866.39 192 SD192 1866.39
193 MT193 1875.63 193 SD193 1875.63
194 MT194 1884.87 194 SD194 1884.87
195 MT195 1894.12 195 SD195 1894.12
196 MT196 1903.36 196 SD196 1903.36
197 MT197 1912.60 197 SD197 1912.60
198 MT198 1921.84 198 SD198 1921.84
199 MT199 1931.08 199 SD199 1931.08
200 MT200 1940.32 200 SD200 1940.32
201 MT201 1949.57 201 SD201 1949.57
202 MT202 1958.81 202 SD202 1958.81
203 MT203 1968.05 203 SD203 1968.05
204 MT204 1977.29 204 SD204 1977.29
205 MT205 1986.53 205 SD205 1986.53
206 MT206 1995.78 206 SD206 1995.78
207 MT207 2005.02 207 SD207 2005.02
208 MT208 2014.26 208 SD208 2014.26
209 MT209 2023.50 209 SD209 2023.50
210 MT210 2032.74 210 SD210 2032.74
211 MT211 2041.98 211 SD211 2041.98
212 MT212 2051.23 212 SD212 2051.23
213 MT213 2060.47 213 SD213 2060.47
214 MT214 2069.71 214 SD214 2069.71
215 MT215 2078.95 215 SD215 2078.95
216 MT216 2088.19 216 SD216 2088.19
217 MT217 2097.43 217 SD217 2097.43
218 MT218 2106.68 218 SD218 2106.68
219 MT219 2115.92 219 SD219 2115.92
220 MT220 2125.16 220 SD220 2125.16
221 MT221 2134.40 221 SD221 2134.40
222 MT222 2143.64 222 SD222 2143.64
223 MT223 2152.88 223 SD223 2152.88
224 MT224 2162.13 224 SD224 2162.13
225 MT225 2171.37 225 SD225 2171.37
226 MT226 2180.61 226 SD226 2180.61
227 MT227 2189.85 227 SD227 2189.85
228 MT228 2199.09 228 SD228 2199.09
229 MT229 2208.34 229 SD229 2208.34
230 MT230 2217.58 230 SD230 2217.58
231 MT231 2226.82 231 SD231 2226.82
232 MT232 2236.06 232 SD232 2236.06
233 MT233 2245.30 233 SD233 2245.30
234 MT234 2254.54 234 SD234 2254.54
235 MT235 2263.79 235 SD235 2263.79
236 MT236 2273.03 236 SD236 2273.03
237 MT237 2282.27 237 SD237 2282.27
238 MT238 2291.51 238 SD238 2291.51
239 MT239 2300.75 239 SD239 2300.75
240 MT240 2309.99 240 SD240 2309.99
241 MT241 2319.24 241 SD241 2319.24
242 MT242 2328.48 242 SD242 2328.48
243 MT243 2337.72 243 SD243 2337.72
244 MT244 2346.96 244 SD244 2346.96
245 MT245 2356.20 245 SD245 2356.20
246 MT246 2365.44 246 SD246 2365.44
247 MT247 2374.69 247 SD247 2374.69
248 MT248 2383.93 248 SD248 2383.93
249 MT249 2393.17 249 SD249 2393.17
250 MT250 2402.41 250 SD250 2402.41
251 MT251 2411.65 251 SD251 2411.65
252 MT252 2420.90 252 SD252 2420.90
253 MT253 2430.14 253 SD253 2430.14
254 MT254 2439.38 254 SD254 2439.38
255 MT255 2448.62 255 SD255 2448.62
256 MT256 2457.86 256 SD256 2457.86
257 MT257 2467.10 257 SD257 2467.10
258 MT258 2476.35 258 SD258 2476.35
259 MT259 2485.59 259 SD259 2485.59
260 MT260 2494.83 260 SD260 2494.83
261 MT261 2504.07 261 SD261 2504.07
262 MT262 2513.31 262 SD262 2513.31
263 MT263 2522.55 263 SD263 2522.55
264 MT264 2531.80 264 SD264 2531.80
265 MT265 2541.04 265 SD265 2541.04
266 MT266 2550.28 266 SD266 2550.28
267 MT267 2559.52 267 SD267 2559.52
268 MT268 2568.76 268 SD268 2568.76
269 MT269 2578.00 269 SD269 2578.00
270 MT270 2587.25 270 SD270 2587.25
271 MT271 2596.49 271 SD271 2596.49
272 MT272 2605.73 272 SD272 2605.73
273 MT273 2614.97 273 SD273 2614.97
274 MT274 2624.21 274 SD274 2624.21
275 MT275 2633.46 275 SD275 2633.46
276 MT276 2642.70 276 SD276 2642.70
277 MT277 2651.94 277 SD277 2651.94
278 MT278 2661.18 278 SD278 2661.18
279 MT279 2670.42 279 SD279 2670.42
280 MT280 2679.66 280 SD280 2679.66
281 MT281 2688.91 281 SD281 2688.91
282 MT282 2698.15 282 SD282 2698.15
283 MT283 2707.39 283 SD283 2707.39
284 MT284 2716.63 284 SD284 2716.63
285 MT285 2725.87 285 SD285 2725.87
286 MT286 2735.11 286 SD286 2735.11
287 MT287 2744.36 287 SD287 2744.36
288 MT288 2753.60 288 SD288 2753.60
289 MT289 2762.84 289 SD289 2762.84
290 MT290 2772.08 290 SD290 2772.08
291 MT291 2781.32 291 SD291 2781.32
292 MT292 2790.56 292 SD292 2790.56
293 MT293 2799.81 293 SD293 2799.81
294 MT294 2809.05 294 SD294 2809.05
295 MT295 2818.29 295 SD295 2818.29
296 MT296 2827.53 296 SD296 2827.53
297 MT297 2836.77 297 SD297 2836.77
298 MT298 2846.02 298 SD298 2846.02
299 MT299 2855.26 299 SD299 2855.26
300 MT300 2864.50 300 SD300 2864.50
301 MT301 2873.74 301 SD301 2873.74
302 MT302 2882.98 302 SD302 2882.98
303 MT303 2892.22 303 SD303 2892.22
304 MT304 2901.47 304 SD304 2901.47
305 MT305 2910.71 305 SD305 2910.71
306 MT306 2919.95 306 SD306 2919.95
307 MT307 2929.19 307 SD307 2929.19
308 MT308 2938.43 308 SD308 2938.43
309 MT309 2947.67 309 SD309 2947.67
310 MT310 2956.92 310 SD310 2956.92
311 MT311 2966.16 311 SD311 2966.16
312 MT312 2975.40 312 SD312 2975.40
313 MT313 2984.64 313 SD313 2984.64
314 MT314 2993.88 314 SD314 2993.88
315 MT315 3003.12 315 SD315 3003.12
316 MT316 3012.37 316 SD316 3012.37
317 MT317 3021.61 317 SD317 3021.61
318 MT318 3030.85 318 SD318 3030.85
319 MT319 3040.09 319 SD319 3040.09
320 MT320 3049.33 320 SD320 3049.33
321 MT321 3058.58 321 SD321 3058.58
322 MT322 3067.82 322 SD322 3067.82
323 MT323 3077.06 323 SD323 3077.06
324 MT324 3086.30 324 SD324 3086.30
325 MT325 3095.54 325 SD325 3095.54
326 MT326 3104.78 326 SD326 3104.78
327 MT327 3114.03 327 SD327 3114.03
328 MT328 3123.27 328 SD328 3123.27
329 MT329 3132.51 329 SD329 3132.51
330 MT330 3141.75 330 SD330 3141.75
331 MT331 3150.99 331 SD331 3150.99
332 MT332 3160.23 332 SD332 3160.23
333 MT333 3169.48 333 SD333 3169.48
334 MT334 3178.72 334 SD334 3178.72
335 MT335 3187.96 335 SD335 3187.96
336 MT336 3197.20 336 SD336 3197.20
337 MT337 3206.44 337 SD337 3206.44
338 MT338 3215.68 338 SD338 3215.68
339 MT339 3224.93 339 SD339 3224.93
340 MT340 3234.17 340 SD340 3234.17
341 MT341 3243.41 341 SD341 3243.41
342 MT342 3252.65 342 SD342 3252.65
343 MT343 3261.89 343 SD343 3261.89
344 MT344 3271.13 344 SD344 3271.13
345 MT345 3280.38 345 SD345 3280.38
346 MT346 3289.62 346 SD346 3289.62
347 MT347 3298.86 347 SD347 3298.86
348 MT348 3308.10 348 SD348 3308.10
349 MT349 3317.34 349 SD349 3317.34
350 MT350 3326.59 350 SD350 3326.59
351 MT351 3335.83 351 SD351 3335.83
352 MT352 3345.07 352 SD352 3345.07
353 MT353 3354.31 353 SD353 3354.31
354 MT354 3363.55 354 SD354 3363.55
355 MT355 3372.79 355 SD355 3372.79
356 MT356 3382.04 356 SD356 3382.04
357 MT357 3391.28 357 SD357 3391.28
358 MT358 3400.52 358 SD358 3400.52
359 MT359 3409.76 359 SD359 3409.76
360 MT360 3419.00 360 SD360 3419.00
361 MT361 3428.24 361 SD361 3428.24
362 MT362 3437.49 362 SD362 3437.49
363 MT363 3446.73 363 SD363 3446.73
364 MT364 3455.97 364 SD364 3455.97
365 MT365 3465.21 365 SD365 3465.21
366 MT366 3474.45 366 SD366 3474.45
367 MT367 3483.69 367 SD367 3483.69
368 MT368 3492.94 368 SD368 3492.94
369 MT369 3502.18 369 SD369 3502.18
370 MT370 3511.42 370 SD370 3511.42
371 MT371 3520.66 371 SD371 3520.66
372 MT372 3529.90 372 SD372 3529.90
373 MT373 3539.15 373 SD373 3539.15
374 MT374 3548.39 374 SD374 3548.39
375 MT375 3557.63 375 SD375 3557.63
376 MT376 3566.87 376 SD376 3566.87
377 MT377 3576.11 377 SD377 3576.11
378 MT378 3585.35 378 SD378 3585.35
379 MT379 3594.60 379 SD379 3594.60
380 MT380 3603.84 380 SD380 3603.84
381 MT381 3613.08 381 SD381 3613.08
382 MT382 3622.32 382 SD382 3622.32
383 MT383 3631.56 383 SD383 3631.56
384 MT384 3640.80 384 SD384 3640.80
385 MT385 3650.05 385 SD385 3650.05
386 MT386 3659.29 386 SD386 3659.29
387 MT387 3668.53 387 SD387 3668.53
388 MT388 3677.77 388 SD388 3677.77
389 MT389 3687.01 389 SD389 3687.01
390 MT390 3696.25 390 SD390 3696.25
391 MT391 3705.50 391 SD391 3705.50
392 MT392 3714.74 392 SD392 3714.74
393 MT393 3723.98 393 SD393 3723.98
394 MT394 3733.22 394 SD394 3733.22
395 MT395 3742.46 395 SD395 3742.46
396 MT396 3751.71 396 SD396 3751.71
397 MT397 3760.95 397 SD397 3760.95
398 MT398 3770.19 398 SD398 3770.19
399 MT399 3779.43 399 SD399 3779.43
400 MT400 3788.67 400 SD400 3788.67
401 MT401 3797.91 401 SD401 3797.91
402 MT402 3807.16 402 SD402 3807.16
403 MT403 3816.40 403 SD403 3816.40
404 MT404 3825.64 404 SD404 3825.64
405 MT405 3834.88 405 SD405 3834.88
406 MT406 3844.12 406 SD406 3844.12
407 MT407 3853.36 407 SD407 3853.36
408 MT408 3862.61 408 SD408 3862.61
409 MT409 3871.85 409 SD409 3871.85
410 MT410 3881.09 410 SD410 3881.09
411 MT411 3890.33 411 SD411 3890.33
412 MT412 3899.57 412 SD412 3899.57
413 MT413 3908.81 413 SD413 3908.81
414 MT414 3918.06 414 SD414 3918.06
415 MT415 3927.30 415 SD415 3927.30
416 MT416 3936.54 416 SD416 3936.54
417 MT417 3945.78 417 SD417 3945.78
418 MT418 3955.02 418 SD418 3955.02
419 MT419 3964.27 419 SD419 3964.27
420 MT420 3973.51 420 SD420 3973.51
421 MT421 3982.75 421 SD421 3982.75
422 MT422 3991.99 422 SD422 3991.99
423 MT423 4001.23 423 SD423 4001.23
424 MT424 4010.47 424 SD424 4010.47
425 MT425 4019.72 425 SD425 4019.72
426 MT426 4028.96 426 SD426 4028.96
427 MT427 4038.20 427 SD427 4038.20
428 MT428 4047.44 428 SD428 4047.44
429 MT429 4056.68 429 SD429 4056.68
430 MT430 4065.92 430 SD430 4065.92
431 MT431 4075.17 431 SD431 4075.17
432 MT432 4084.41 432 SD432 4084.41
433 MT433 4093.65 433 SD433 4093.65
434 MT434 4102.89 434 SD434 4102.89
435 MT435 4112.13 435 SD435 4112.13
436 MT436 4121.37 436 SD436 4121.37
437 MT437 4130.62 437 SD437 4130.62
438 MT438 4139.86 438 SD438 4139.86
439 MT439 4149.10 439 SD439 4149.10
440 MT440 4158.34 440 SD440 4158.34
441 MT441 4167.58 441 SD441 4167.58
442 MT442 4176.83 442 SD442 4176.83
443 MT443 4186.07 443 SD443 4186.07
444 MT444 4195.31 444 SD444 4195.31
445 MT445 4204.55 445 SD445 4204.55
446 MT446 4213.79 446 SD446 4213.79
447 MT447 4223.03 447 SD447 4223.03
448 MT448 4232.28 448 SD448 4232.28
449 MT449 4241.52 449 SD449 4241.52
450 MT450 4250.76 450 SD450 4250.76
451 MT451 4260.00 451 SD451 4260.00
452 MT452 4269.24 452 SD452 4269.24
453 MT453 4278.48 453 SD453 4278.48
454 MT454 4287.73 454 SD454 4287.73
455 MT455 4296.97 455 SD455 4296.97
456 MT456 4306.21 456 SD456 4306.21
457 MT457 4315.45 457 SD457 4315.45
458 MT458 4324.69 458 SD458 4324.69
459 MT459 4333.93 459 SD459 4333.93
460 MT460 4343.18 460 SD460 4343.18
461 MT461 4352.42 461 SD461 4352.42
462 MT462 4361.66 462 SD462 4361.66
463 MT463 4370.90 463 SD463 4370.90
464 MT464 4380.14 464 SD464 4380.14
465 MT465 4389.39 465 SD465 4389.39
466 MT466 4398.63 466 SD466 4398.63
467 MT467 4407.87 467 SD467 4407.87
468 MT468 4417.11 468 SD468 4417.11
469 MT469 4426.35 469 SD469 4426.35
470 MT470 4435.59 470 SD470 4435.59
471 MT471 4444.84 471 SD471 4444.84
472 MT472 4454.08 472 SD472 4454.08
473 MT473 4463.32 473 SD473 4463.32
474 MT474 4472.56 474 SD474 4472.56
475 MT475 4481.80 475 SD475 4481.80
476 MT476 4491.04 476 SD476 4491.04
477 MT477 4500.29 477 SD477 4500.29
478 MT478 4509.53 478 SD478 4509.53
479 MT479 4518.77 479 SD479 4518.77
480 MT480 4528.01 480 SD480 4528.01
481 MT481 4537.25 481 SD481 4537.25
482 MT482 4546.49 482 SD482 4546.49
483 MT483 4555.74 483 SD483 4555.74
484 MT484 4564.98 484 SD484 4564.98
485 MT485 4574.22 485 SD485 4574.22
486 MT486 4583.46 486 SD486 4583.46
487 MT487 4592.70 487 SD487 4592.70
488 MT488 4601.95 488 SD488 4601.95
489 MT489 4611.19 489 SD489 4611.19
490 MT490 4620.43 490 SD490 4620.43
491 MT491 4629.67 491 SD491 4629.67
492 MT492 4638.91 492 SD492 4638.91
493 MT493 4648.15 493 SD493 4648.15
494 MT494 4657.40 494 SD494 4657.40
495 MT495 4666.64 495 SD495 4666.64
496 MT496 4675.88 496 SD496 4675.88
497 MT497 4685.12 497 SD497 4685.12
498 MT498 4694.36 498 SD498 4694.36
499 MT499 4703.60 499 SD499 4703.60
500 MT500 4712.85 500 SD500 4712.85
METAL LEADS & RATES SAND/ EARTH LEADS & RATES

2008-09 2008-09

From From
LEAD NOTATION RATE LEAD NOTATION RATE
SSR SSR
MLOAD 12.80 12.80 SLOAD 10.00 10.00
MUNLOAD 8.70 8.70 SUNLOAD 8.50 8.50
MSTACK 8.70 8.70 SSTACK 5.50 5.50
0.00 0.00 0 0.00
0.25 110.00 0.25 SD250 50.00 50.00
0.50 MT500 110.00 110.00 0.50 SD500 75.00 75.00
1 MT1 120.00 120.00 1 SD1 100.00 100.00
2 MT2 126.00 126.00 2 SD2 106.00 106.00
3 MT3 132.00 132.00 3 SD3 112.00 112.00
4 MT4 138.00 138.00 4 SD4 118.00 118.00
5 MT5 144.00 144.00 5 SD5 124.00 124.00
6 MT6 150.00 150.00 6 SD6 130.00 130.00
7 MT7 156.00 156.00 7 SD7 136.00 136.00
8 MT8 162.00 162.00 8 SD8 142.00 142.00
9 MT9 168.00 168.00 9 SD9 148.00 148.00
10 MT10 174.00 174.00 10 SD10 154.00 154.00
11 MT11 180.00 180.00 11 SD11 160.00 160.00
12 MT12 186.00 186.00 12 SD12 166.00 166.00
13 MT13 192.00 192.00 13 SD13 172.00 172.00
14 MT14 198.00 198.00 14 SD14 178.00 178.00
15 MT15 204.00 204.00 15 SD15 184.00 184.00
16 MT16 210.00 210.00 16 SD16 190.00 190.00
17 MT17 216.00 216.00 17 SD17 196.00 196.00
18 MT18 222.00 222.00 18 SD18 202.00 202.00
19 MT19 228.00 228.00 19 SD19 208.00 208.00
20 MT20 234.00 234.00 20 SD20 214.00 214.00
21 MT21 239.75 5.7500 21 SD21 219.00 5.0000
22 MT22 245.50 5.5000 22 SD22 224.00 4.8000
23 MT23 251.25 5.0000 23 SD23 229.00 4.6000
24 MT24 257.00 4.7500 24 SD24 234.00 4.4000
25 MT25 262.75 4.5000 25 SD25 239.00 4.2000
26 MT26 268.50 26 SD26 244.00
27 MT27 274.25 27 SD27 249.00
28 MT28 280.00 28 SD28 254.00
29 MT29 285.75 29 SD29 259.00
30 MT30 291.50 30 SD30 264.00
31 MT31 297.00 31 SD31 268.80
32 MT32 302.50 32 SD32 273.60
33 MT33 308.00 33 SD33 278.40
34 MT34 313.50 34 SD34 283.20
35 MT35 319.00 35 SD35 288.00
36 MT36 324.50 36 SD36 292.80
37 MT37 330.00 37 SD37 297.60
38 MT38 335.50 38 SD38 302.40
39 MT39 341.00 39 SD39 307.20
40 MT40 346.50 40 SD40 312.00
41 MT41 352.00 41 SD41 316.80
42 MT42 357.50 42 SD42 321.60
43 MT43 363.00 43 SD43 326.40
44 MT44 368.50 44 SD44 331.20
45 MT45 374.00 45 SD45 336.00
46 MT46 379.50 46 SD46 340.80
47 MT47 385.00 47 SD47 345.60
48 MT48 390.50 48 SD48 350.40
49 MT49 396.00 49 SD49 355.20
50 MT50 401.50 50 SD50 360.00
51 MT51 406.50 51 SD51 364.60
52 MT52 411.50 52 SD52 369.20
53 MT53 416.50 53 SD53 373.80
54 MT54 421.50 54 SD54 378.40
55 MT55 426.50 55 SD55 383.00
56 MT56 431.50 56 SD56 387.60
57 MT57 436.50 57 SD57 392.20
58 MT58 441.50 58 SD58 396.80
59 MT59 446.50 59 SD59 401.40
60 MT60 451.50 60 SD60 406.00
61 MT61 456.50 61 SD61 410.60
62 MT62 461.50 62 SD62 415.20
63 MT63 466.50 63 SD63 419.80
64 MT64 471.50 64 SD64 424.40
65 MT65 476.50 65 SD65 429.00
66 MT66 481.50 66 SD66 433.60
67 MT67 486.50 67 SD67 438.20
68 MT68 491.50 68 SD68 442.80
69 MT69 496.50 69 SD69 447.40
70 MT70 501.50 70 SD70 452.00
71 MT71 506.50 71 SD71 456.60
72 MT72 511.50 72 SD72 461.20
73 MT73 516.50 73 SD73 465.80
74 MT74 521.50 74 SD74 470.40
75 MT75 526.50 75 SD75 475.00
76 MT76 531.50 76 SD76 479.60
77 MT77 536.50 77 SD77 484.20
78 MT78 541.50 78 SD78 488.80
79 MT79 546.50 79 SD79 493.40
80 MT80 551.50 80 SD80 498.00
81 MT81 556.25 81 SD81 502.40
82 MT82 561.00 82 SD82 506.80
83 MT83 565.75 83 SD83 511.20
84 MT84 570.50 84 SD84 515.60
85 MT85 575.25 85 SD85 520.00
86 MT86 580.00 86 SD86 524.40
87 MT87 584.75 87 SD87 528.80
88 MT88 589.50 88 SD88 533.20
89 MT89 594.25 89 SD89 537.60

90 MT90 599.00 90 SD90 542.00


91 MT91 603.75 91 SD91 546.40
92 MT92 608.50 92 SD92 550.80
93 MT93 613.25 93 SD93 555.20
94 MT94 618.00 94 SD94 559.60

95 MT95 622.75 95 SD95 564.00

96 MT96 627.50 96 SD96 568.40

97 MT97 632.25 97 SD97 572.80

98 MT98 637.00 98 SD98 577.20

99 MT99 641.75 99 SD99 581.60

100 MT100 646.50 100 SD100 586.00


101 MT101 651.00 101 SD101 590.20
102 MT102 655.50 102 SD102 594.40
103 MT103 660.00 103 SD103 598.60
104 MT104 664.50 104 SD104 602.80
105 MT105 669.00 105 SD105 607.00
106 MT106 673.50 106 SD106 611.20
107 MT107 678.00 107 SD107 615.40
108 MT108 682.50 108 SD108 619.60
109 MT109 687.00 109 SD109 623.80
110 MT110 691.50 110 SD110 628.00
111 MT111 696.00 111 SD111 632.20
112 MT112 700.50 112 SD112 636.40
113 MT113 705.00 113 SD113 640.60
114 MT114 709.50 114 SD114 644.80
115 MT115 714.00 115 SD115 649.00
116 MT116 718.50 116 SD116 653.20
117 MT117 723.00 117 SD117 657.40
118 MT118 727.50 118 SD118 661.60
119 MT119 732.00 119 SD119 665.80
120 MT120 736.50 120 SD120 670.00
121 MT121 741.00 121 SD121 674.20
122 MT122 745.50 122 SD122 678.40
123 MT123 750.00 123 SD123 682.60
124 MT124 754.50 124 SD124 686.80
125 MT125 759.00 125 SD125 691.00
126 MT126 763.50 126 SD126 695.20
127 MT127 768.00 127 SD127 699.40
128 MT128 772.50 128 SD128 703.60
129 MT129 777.00 129 SD129 707.80
130 MT130 781.50 130 SD130 712.00
131 MT131 786.00 131 SD131 716.20
132 MT132 790.50 132 SD132 720.40
133 MT133 795.00 133 SD133 724.60
134 MT134 799.50 134 SD134 728.80
135 MT135 804.00 135 SD135 733.00
136 MT136 808.50 136 SD136 737.20
137 MT137 813.00 137 SD137 741.40
138 MT138 817.50 138 SD138 745.60
139 MT139 822.00 139 SD139 749.80
140 MT140 826.50 140 SD140 754.00
141 MT141 831.00 141 SD141 758.20
142 MT142 835.50 142 SD142 762.40
143 MT143 840.00 143 SD143 766.60
144 MT144 844.50 144 SD144 770.80
145 MT145 849.00 145 SD145 775.00
146 MT146 853.50 146 SD146 779.20
147 MT147 858.00 147 SD147 783.40
148 MT148 862.50 148 SD148 787.60
149 MT149 867.00 149 SD149 791.80
150 MT150 871.50 150 SD150 796.00
151 MT151 876.00 151 SD151 800.20
152 MT152 880.50 152 SD152 804.40
153 MT153 885.00 153 SD153 808.60
154 MT154 889.50 154 SD154 812.80
155 MT155 894.00 155 SD155 817.00
156 MT156 898.50 156 SD156 821.20
157 MT157 903.00 157 SD157 825.40
158 MT158 907.50 158 SD158 829.60
159 MT159 912.00 159 SD159 833.80
160 MT160 916.50 160 SD160 838.00
161 MT161 921.00 161 SD161 842.20
162 MT162 925.50 162 SD162 846.40
163 MT163 930.00 163 SD163 850.60
164 MT164 934.50 164 SD164 854.80
165 MT165 939.00 165 SD165 859.00
166 MT166 943.50 166 SD166 863.20
167 MT167 948.00 167 SD167 867.40
168 MT168 952.50 168 SD168 871.60
169 MT169 957.00 169 SD169 875.80
170 MT170 961.50 170 SD170 880.00
171 MT171 966.00 171 SD171 884.20
172 MT172 970.50 172 SD172 888.40
173 MT173 975.00 173 SD173 892.60
174 MT174 979.50 174 SD174 896.80
175 MT175 984.00 175 SD175 901.00
176 MT176 988.50 176 SD176 905.20
177 MT177 993.00 177 SD177 909.40
178 MT178 997.50 178 SD178 913.60
179 MT179 1002.00 179 SD179 917.80
180 MT180 1006.50 180 SD180 922.00
181 MT181 1011.00 181 SD181 926.20
182 MT182 1015.50 182 SD182 930.40
183 MT183 1020.00 183 SD183 934.60
184 MT184 1024.50 184 SD184 938.80
185 MT185 1029.00 185 SD185 943.00
186 MT186 1033.50 186 SD186 947.20
187 MT187 1038.00 187 SD187 951.40
188 MT188 1042.50 188 SD188 955.60
189 MT189 1047.00 189 SD189 959.80
190 MT190 1051.50 190 SD190 964.00
191 MT191 1056.00 191 SD191 968.20
192 MT192 1060.50 192 SD192 972.40
193 MT193 1065.00 193 SD193 976.60
194 MT194 1069.50 194 SD194 980.80
195 MT195 1074.00 195 SD195 985.00
196 MT196 1078.50 196 SD196 989.20
197 MT197 1083.00 197 SD197 993.40
198 MT198 1087.50 198 SD198 997.60
199 MT199 1092.00 199 SD199 1001.80
200 MT200 1096.50 200 SD200 1006.00
201 MT201 1101.00 201 SD201 1010.20
202 MT202 1105.50 202 SD202 1014.40
203 MT203 1110.00 203 SD203 1018.60
204 MT204 1114.50 204 SD204 1022.80
205 MT205 1119.00 205 SD205 1027.00
206 MT206 1123.50 206 SD206 1031.20
207 MT207 1128.00 207 SD207 1035.40
208 MT208 1132.50 208 SD208 1039.60
209 MT209 1137.00 209 SD209 1043.80
210 MT210 1141.50 210 SD210 1048.00
211 MT211 1146.00 211 SD211 1052.20
212 MT212 1150.50 212 SD212 1056.40
213 MT213 1155.00 213 SD213 1060.60
214 MT214 1159.50 214 SD214 1064.80
215 MT215 1164.00 215 SD215 1069.00
216 MT216 1168.50 216 SD216 1073.20
217 MT217 1173.00 217 SD217 1077.40
218 MT218 1177.50 218 SD218 1081.60
219 MT219 1182.00 219 SD219 1085.80
220 MT220 1186.50 220 SD220 1090.00
221 MT221 1191.00 221 SD221 1094.20
222 MT222 1195.50 222 SD222 1098.40
223 MT223 1200.00 223 SD223 1102.60
224 MT224 1204.50 224 SD224 1106.80
225 MT225 1209.00 225 SD225 1111.00
226 MT226 1213.50 226 SD226 1115.20
227 MT227 1218.00 227 SD227 1119.40
228 MT228 1222.50 228 SD228 1123.60
229 MT229 1227.00 229 SD229 1127.80
230 MT230 1231.50 230 SD230 1132.00
231 MT231 1236.00 231 SD231 1136.20
232 MT232 1240.50 232 SD232 1140.40
233 MT233 1245.00 233 SD233 1144.60
234 MT234 1249.50 234 SD234 1148.80
235 MT235 1254.00 235 SD235 1153.00
236 MT236 1258.50 236 SD236 1157.20
237 MT237 1263.00 237 SD237 1161.40
238 MT238 1267.50 238 SD238 1165.60
239 MT239 1272.00 239 SD239 1169.80
240 MT240 1276.50 240 SD240 1174.00
241 MT241 1281.00 241 SD241 1178.20
242 MT242 1285.50 242 SD242 1182.40
243 MT243 1290.00 243 SD243 1186.60
244 MT244 1294.50 244 SD244 1190.80
245 MT245 1299.00 245 SD245 1195.00
246 MT246 1303.50 246 SD246 1199.20
247 MT247 1308.00 247 SD247 1203.40
248 MT248 1312.50 248 SD248 1207.60
249 MT249 1317.00 249 SD249 1211.80
250 MT250 1321.50 250 SD250 1216.00
251 MT251 1326.00 251 SD251 1220.20
252 MT252 1330.50 252 SD252 1224.40
253 MT253 1335.00 253 SD253 1228.60
254 MT254 1339.50 254 SD254 1232.80
255 MT255 1344.00 255 SD255 1237.00
256 MT256 1348.50 256 SD256 1241.20
257 MT257 1353.00 257 SD257 1245.40
258 MT258 1357.50 258 SD258 1249.60
259 MT259 1362.00 259 SD259 1253.80
260 MT260 1366.50 260 SD260 1258.00
261 MT261 1371.00 261 SD261 1262.20
262 MT262 1375.50 262 SD262 1266.40
263 MT263 1380.00 263 SD263 1270.60
264 MT264 1384.50 264 SD264 1274.80
265 MT265 1389.00 265 SD265 1279.00
266 MT266 1393.50 266 SD266 1283.20
267 MT267 1398.00 267 SD267 1287.40
268 MT268 1402.50 268 SD268 1291.60
269 MT269 1407.00 269 SD269 1295.80
270 MT270 1411.50 270 SD270 1300.00
271 MT271 1416.00 271 SD271 1304.20
272 MT272 1420.50 272 SD272 1308.40
273 MT273 1425.00 273 SD273 1312.60
274 MT274 1429.50 274 SD274 1316.80
275 MT275 1434.00 275 SD275 1321.00
276 MT276 1438.50 276 SD276 1325.20
277 MT277 1443.00 277 SD277 1329.40
278 MT278 1447.50 278 SD278 1333.60
279 MT279 1452.00 279 SD279 1337.80
280 MT280 1456.50 280 SD280 1342.00
281 MT281 1461.00 281 SD281 1346.20
282 MT282 1465.50 282 SD282 1350.40
283 MT283 1470.00 283 SD283 1354.60
284 MT284 1474.50 284 SD284 1358.80
285 MT285 1479.00 285 SD285 1363.00
286 MT286 1483.50 286 SD286 1367.20
287 MT287 1488.00 287 SD287 1371.40
288 MT288 1492.50 288 SD288 1375.60
289 MT289 1497.00 289 SD289 1379.80
290 MT290 1501.50 290 SD290 1384.00
291 MT291 1506.00 291 SD291 1388.20
292 MT292 1510.50 292 SD292 1392.40
293 MT293 1515.00 293 SD293 1396.60
294 MT294 1519.50 294 SD294 1400.80
295 MT295 1524.00 295 SD295 1405.00
296 MT296 1528.50 296 SD296 1409.20
297 MT297 1533.00 297 SD297 1413.40
298 MT298 1537.50 298 SD298 1417.60
299 MT299 1542.00 299 SD299 1421.80
300 MT300 1546.50 300 SD300 1426.00
11.46
5.73
0.14
5.87

11
14
3.3
1
29.3

1 70 3.75 0.15 39.375


1 20 3.75 0.15 11.25
16.5
67.125
0.6
450
680
46
16100

6330
25.32
25.8
533.8
7.34
5.73
546.87

13.08
13.5
26.58

3.8 10.2 12 502


1.9 0.6 2.1 1.2
0.8 0.8 0.8
2.8 2.8 2.8
1.9 1.9 1.9
16.3 19.6 508.7
=25931-24451
1480