CIVIL WORKS
SECTION 01 (EXCAVATION)
Excavation in all kinds of Soil upto desired level depths, in foundation and pipe trenches
including disposal of surplus/ rejected excavated material to designated places complete in
1 all respect as shown on the drawings and as directed by the Engineer.
Cft
Excavation in all kinds of Rocks upto desired level depths, in pipe trenches including
disposal of surplus/ rejected excavated material to designated places complete in all respect
2 as shown on the drawings and as directed by the Engineer.
Cft
Sand bedding including levelling, dressing, watering and compaction complete in all
3 respect as shown on the drawings and as directed by the Engineer.
Cft
Filling with approved selected A-3 material for around pipe including levelling, dressing,
watering and compaction complete in all respect as shown on the drawings and as directed
4 by the Engineer.
Cft
Backfill with excavated borrow material (as per Engineer's instructions) including
5 levelling, dressing, watering and compaction complete in all respect.
Cft
Backfill with Common materials obtained from required excavation including levelling,
6 dressing, watering and compaction, complete in all respect as shown on the drawings and
as directed by the Engineer. Cft
SUB TOTAL (SECT
b) Walls Cft
ELECTRICAL WORKS
Mtr
Hot Deep Galvonize Angle Bracket for Cable Nos
GRAND TOTAL AM
INITIAL
NOTE: Getting approval of Trench design from HESCO shall be the responsibility
Estimated
Rate (Rs.) Amount (Rs.)
Quantity
30,870.00
13,230.00
308.00
884.00
2,888.00
2,888.00
SUB TOTAL (SECTION 01)
Estimated
Rate (Rs.) Amount (Rs.)
Quantity
616.00
200
Estimated
Rate (Rs.) Amount (Rs.)
Quantity
3,247.00
4,937.00
3,247.00
4,059.00
62,870.00
12,791.00
4.00
SUB TOTAL (SECTION 04)
Estimated
Rate (Rs.) Amount (Rs.)
Quantity
3600
520
24
12
40
Estimated
Rate (Rs.) Amount (Rs.)
Quantity
SIGNATURE OF BIDDER