1 Provisional Sum
Procument Item Details

SL.
Item Description Unit Quantity Unit Rate(NPR) Amount(NPR)
No

1 Provisional Sum: Additional testing of materials as PS 1.0 5000000.0 5,000,000.00


instructed by the Engineer if required. (Test: within the
Country or outside of Country)
2 Dismantling & reconstruction of existing infra- PS 1.0 7.0E7 70,000,000.00
structures and its disposal to approved site as per
requirement. Construction & development of new civil
supplementary infrastructures as per required and as per
specification and instruction of Engineer
2 Construction work
2.1 Road Construction Work

Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Earth work: Site clearance including
removal of bushes, debris, rubbish,
1 garbage in and outside of highway and m2 89600.0
service road etc. as per specification
and instruction of Engineer
Earth work : Excavation in roadway,
drain, retaining structures foundation
and sub-structures of the expressway
in all types of soil including removal
and satisfactory disposal and stacking
2 or hauling (to sites of embankment m3 126093.05
construction) of suitable cut materials
as required and excavation for existing
all type of pavement as per
specification and instruction of
Engineer. Mechanical Means
Earth work : Excavation in roadway,
drain, retaining structures foundation
and sub-structures of the expressway
in all types of soil including removal
and satisfactory disposal and stacking
3 or hauling (to sites of embankment m3 900.2
construction) of suitable cut materials
as required and excavation for existing
all type of pavement as per
specification and instruction of
Engineer. Manual Means
Earthwork: Construction of roadway
and drain in embankment and
miscellaneous backfilling areas for
road, drain and structures with
approved material obtained from
roadway excavation and from outside
4 m3 24937.16
location including transportation,
spreading in layers, watering and
compaction by machine equipment /
manually as per specification and
instruction of Engineer. Earthwork in
Filling
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Earthwork: Construction of roadway
and drain in embankment and
miscellaneous backfilling areas for
road, drain and structures with
approved material obtained from
roadway excavation and from outside
5 m3 2461.15
location including transportation,
spreading in layers, watering and
compaction by machine equipment /
manually as per specification and
instruction of Engineer. Back filling
with Granular Material behind
Earthwork: Construction of roadway
and drain in embankment and
miscellaneous backfilling areas for
road, drain and structures with
approved material obtained from
roadway excavation and from outside
location including transportation,
6 m3 99594.94
spreading in layers, watering and
compaction by machine equipment /
manually as per specification and
instruction of Engineer.
Transportation of exceed material
within 3 km (for 1km no pay) as per
instruction of Engineer.
Structures and Drain & Drainage
Structures: Supplying, Placing and
compacting pitching / soling works of
7 stone, according to the design line and m3 5202.4
level, all complete as mention in
drawing, specification and directed by
Engineer.
Structures and Drain & Drainage
Structures: Providing and placing
different grades of concrete for
foundation, base, structures, cover
8 slab, drain, box culvert etc. including m3 2214.45
mixing, laying, compacting, form
work and curing all complete as
mentioned in drawing, specification
and directed by Engineer. M15 / 20
Structures and Drain & Drainage
Structures: Providing and placing
different grades of concrete for
foundation, base, structures, cover
9 slab, drain, box culvert etc. including m3 11602.87
mixing, laying, compacting, form
work and curing all complete as
mentioned in drawing, specification
and directed by Engineer. M20 / 20
Structures and Drain & Drainage
Structures: Providing and placing
different grades of concrete for
foundation, base, structures, cover
10 slab, drain, box culvert etc. including m3 3042.83
mixing, laying, compacting, form
work and curing all complete as
mentioned in drawing, specification
and directed by Engineer. M30 / 20
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Structures and Drain & Drainage
Structures: Providing and placing of
reinforcement bar of high yield (Fe
500) for structure, drain, drain cover,
box culvert, existing & proposed
11 MT 775.51
infrastructures including cutting,
placing, binding and fixing and all
complete as mentioned in drawing,
specification and directed by
Engineer.
Structures and Drain & Drainage
Structures: Providing and laying of
hand pack cobble/natural Stone
(approx. size 10cm x 9cm x 9cm )
12 with granular material bedding on m3 1561.64
prepared surface in line & level of
Dummy, drain and structures as per
drawing, technical specification and
directed by Engineer.
Structures and Drain & Drainage
Structures: Supplying and laying of
outer diameter 315mm perforated
HDPE(10 kg/cm2) Pipe, including
13 Rm 8626.0
proper bedding underneath with water
tight connections at the joints as per
design, drawings, specifications and
instructions all complete.
Structures and Drain & Drainage
Structures: Providing and laying
grating of different size (as per
14 kg 519.0
drawing) of steel material as per
specification and instruction of
Engineer.
Structures and Drain & Drainage
Structures: Providing and Laying
Reinforced cement concrete 300mm
15 NP3 internal diameter pipe including Rm 519.0
fixing with cement mortar 1:2 as per
Drawing, technical specification and
directed by Engineer.
Structures and Drain & Drainage
Structures: Providing and Laying
Reinforced cement concrete 600mm
16 NP3 internal diameter pipe including Rm 3086.0
fixing with cement mortar 1:2 as per
Drawing, technical specification and
directed by Engineer.
Structures and Drain & Drainage
Structures: Supplying and laying,
brick masonry for structural works in
17 1:4 cement sand mortar all complete m3 283.6
works as mention in drawing,
specification and directed by the
Engineer.
Structures and Drain & Drainage
Structures: Supplying and laying,
stone masonry for structural works in
18 1:4 cement sand mortar all complete m3 13315.89
works as mention in drawing,
specification and directed by the
Engineer.
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Structures and Drain & Drainage
Structures: Providing and laying of
gabion work including filling
stone/boulder in mechanically woven
double twisted crates / mattress
including rolling, cutting and with
lacing wire and binding wire including
19 m3 16903.01
dressing, bedding, bonding all
complete as per Drawing and
Technical Specifications. Heavy zinc
coated Hexagonal mesh type 100 mm
x 120 mm, mesh wire 3 mm, selvage
wire 3.9 mm, lacing wire 2.4mm
[2402]
Structures and Drain & Drainage
Structures: Supply, Providing and
20 fixing of steel manwhole cover in line No. 62.0
and level as per specification and
drawings.
Structures and Drain & Drainage
Structures: Supply, Providing and
fixing of Steel Galvanized Angle for
21 kg 291664.8
the proposed work as per drawings,
specification and instruction of
Engineer.
Structures and Drain & Drainage
Structures: Supply, Providing and
fixing of Galvanized steel wire net of
22 following size for the proposed work Rm 18004.0
as per drawings, specification and
instruction of Engineer. having size
2.1m width
Structures and Drain & Drainage
Structures: Supply, Providing and
fixing of Galvanized steel wire net of
23 following size for the proposed work Rm 18004.0
as per drawings, specification and
instruction of Engineer. having size
0.3m width
Structures and Drain & Drainage
Structures: Providing, laying and
24 fixing of Geo membrane (Geo-textile) m2 13529.57
all complete as per specification
[2403]
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Slope Protection Work: Surface
protection works for excavated slope
using Hot-dip Galvanized
Prefabricated Welded Steel Mesh:
Supply and installation of
prefabricated flexible galvanized steel
mesh of 100mm x 100mm aperture
size, made from minimum 6mm dia.
bars having minimum galvanization of
500 grams/sqm, welded in such a way
that the welding joints of the mesh
25 shall have minimum interpenetration sqm 3874.0
of 8% of the total diameter of the
welded bar and having 200mm
overlap on vertical joints and
horizontal panels jointed using the
spiral ring of 4mm dia. including
appropriate machine, manpower,
tools, tackles, fuel, erosion control
blakent, local seed with humus for
vegetation/ hydroseeding all complete
as per the drawing and detailed
technical specification.
Pavement work: Preparation of
subgrade as mentioned in the drawing,
26 m2 176116.62
specification and directed by the
Engineer.
Pavement work: Supplying, providing,
laying, spreading, watering, leveling,
compacting and all complete for
gravel sub-base over prepared
27 subgrade according to the designed m3 49904.32
camber including transportation all
complete as mentioned in the drawing,
specification and directed by
Engineer.
Pavement work: Supplying, providing,
laying, spreading, watering, leveling,
compacting and all complete for
crusher run base material grading of
28 m3 29464.49
standard specification including
transportation from source as
mentioned in drawing, specification
and directed by the Engineer.
Pavement work: Providing, laying,
transporting and all complete of
29 primer coat as mentioned in drawing, Lit. 153956.62
technical specification and directed by
the Engineer.
Pavement work: Providing, laying,
transporting and all complete of tack
30 coat as mentioned in drawing, Lit. 204398.31
technical specification and directed by
the Engineer.
Pavement work: Providing, mixing,
laying, compacting, transport and all
complete Dense Bituminous Macadam
31 m3 19113.0
(DBM) pavement surface as
mentioned in drawing, specification
and directed by Engineer.
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Pavement work: Providing, mixing,
laying, compacting, transport and all
complete of asphalt concrete
32 m3 7697.83
pavement as mentioned in drawing,
specification and directed by
Engineer.
Bio-Engineering: Providing and
planting of permanent hedges of
ornamental plants not greater than 2m
(center of median) and not greater
than 1m (edge of median (both side)
including digging of trenches, 60cm
wide and 45cm deep, refilling the
33 excavated earth mixed with farmyard Rm 16620.0
manure, supplied at the rate of 4.65
cum per 100m and supplying and
planting hedge plants at 30 cm apart
all complete and maintenance of
hedge for 5 years including all
materials required as per instruction of
Engineer & technical specification.
Bio-Engineering: Providing and
planting flowering plants and shrubs
in central verge and providing &
34 maintenance of flowering plants and Rm 22160.0
shrubs in central verge for five years
as per drawing, specification and
directed by Engineer.
Bio-Engineering: Providing and
planting rooted grass slips on the
slopes <45o including preparation of
slips on site, a max of 5 cm depth with
35 metal rod or operation includes m2 79215.84
digging planting hole to hard-wood
peg, depending on the nature of the
soil and as per directed by Engineer
and drawing and specification.
Bio-Engineering: Planting
containerized tree and shrub seedlings,
including pitting, transplanting,
composting and mulching, on slopes <
36 30o with pit size 30 cm diameter x No. 88576.59
depth mix Compost with soil and back
fill into pit to 1/4 of the pit volume as
per drawing, specification and directed
by Engineer.
Bio-Engineering: Providing and
Planting of trees by the road side in
0.60 m diameter holes, 1 m deep dug
in the ground, mixing the soil with
decayed farm yard/sludge manure,
37 No. 1650.0
planting the saplings, backfilling the
trench, watering, fixing the tree guard
and maintaining the plants for five
year as per drawing, specification and
directed by the Engineer.
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
Nepal Telecom all Complete as per
instruction of Engineer, NEA
specification, drawings. Supply of
180W +/- 10 % Top Maintainable
LED Street Light luminaire with
System efficacy of 110 lm/W. LED
Street Light shall be made up of Die
Cast aluminium housing suitable to
mounted on 55-68 mm OD bracket
arm. Luminaire shall have two
separate compartments for LEDs and
driver and both compartments should
be hermitically sealed to achieve IP 66
ingress protection. Optical
compartment shall be provided to
withstand IK 07 impact rating, while
control gear shall be provided with die
cast aluminium cover for safety. LM
80-08 compliant, LEDs from reputed
makes such as Nichia, Japan / Cree,
USA / Lumiled USA / Citizen Japan /
Osram Germany / Seoul Korea /
Bridgelux USA should be provided.
LEDs used in the product shall
comply with EN 62471 for Photo-
biological safety and certificate for the
same from manufacturer shall be
provided for Risk Group 2 maximum.
38 Luminaire manufacturer shall produce Nos. 469.0
certificate of association with LED
manufacturer for minimum 5 year.
LEDs used shall have maximum
allowed junction temperature of 125
Deg C with actual operating junction
temperature not more than 90 Deg C
at an ambient temperature of 35 Deg
C. The LENS used shall have optical
grade PMMA-HT / Polycarbonate to
provide street light distribution for
Uniform lighting. LED optical lens
should be properly fixed to MCPCB
and should not be only fixed by glue.
LED optical lens shall have
temperature withstand capacity of
greater than 85 Deg C and
Transmissivity of more than 90%.The
LED shall be compliant with LM80-
08 standard with Useful L70 life of
50000 Hrs. tested at maximum current
and at 105 Deg C case temperature
(Complete LM 80 test report for LED
should be submitted for 10000 hrs. of
testing). The LEDs used in Street
Light should be MacAdam Step 5
standard Rated LED with CCT of
5700 K and CRI of Minimum 70.
Maximum permissible driving current
of LEDs are from 0.15A to 2A. Actual
Driving Current of LEDs shall be less
than 1000mA for life long reliability.
LED Driver should be BIS Registered.
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
LED Driver shall be Isolated type,
Constant Current topology driver in
metal enclosure with proper heat sink
for heat dissipation suitable to operate
in input voltage range of 150V to
270V (nominal rated voltage – 240V)
with 4KV internal surge protection in
both Common Mode and Differential
Mode. LED Driver shall be potted
type. Power factor greater than 0.95
and total harmonic distortion (THD)
of less than 10% should be integral to
the luminaire. LED driver shall have
output short circuit & over voltage
withstanding protection inbuilt.
Luminaire shall be external SPD of
10KV with minimum one TMOV
mounted inside luminaire. Bidder shall
submit necessary test reports as
mentioned in the description Make:
Wipro: LR06-102 series or equivalent
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
Nepal Telecom all Complete as per
instruction of Engineer, NEA
specification, drawings. CCMS
System Details:(Same make as light
fixture WIPRO or equivalent); Smart
Feeder Panel made up of single /
double door CRCA Sheet Steel with
Grey Powder Coating / Painting of
minimum 22 SWG and with IP54
Protection with A) Switching Point
Controller: This hardware consists of
MCBs, Contactors and Fuses which
protects system and operators in case
of electrical malfunction, Switching
point controller VA rating is designed
for twice the lighting load
requirement, SPC uses Class 1.0
Single or Three Phase energy meter, It
should allow Manual override of the
system with Isolator during
maintenance and system faults. It
should have single phase/ three phase
energy meter, Street light Feeder pillar
with CCMS Controller and Switching
components, web based application
and cloud server. System capabilities
including Scheduling, Individual lamp
dimming, fault notifications and report
39 generation in command CVS format. Nos. 15.0
B) Energy Meter: It compliance with
the standard IS: 13779/1999 or IEC:
1036. CBIP Report-325 Complied.
Voltage Rating should be 10- 60A,
Class 1.0, Rated frequency 50Hz,
Power factor 0.25 lag - Unity 0.5 lead,
as per IS13779. The system monitors
energy parameters and communicate it
with CCMS unit to transmit it to
server, Voltages each phase, Current
each phase, PF each phase, Metering
KWH cumulative, Metering KVAH,
Number of operational light, Number
of non-operational lights, Failure of
contactor, Status of the incoming
supply (power failure), High /low
voltage, Overload on the phases. C)
CCMS Controller: Power supply -
230VAC, Communication through
GSM/GPRS or Wi-Fi. It Should
supports Phase wise on /off switching
by Schedule or by built in
astronomical clock for
ON/OFF/Dimming luminaires based
on individual selection and Manual
ON/OFF/Dimming of lights of a
particular switching point or
networked switching points from
Central Control Station. Battery
Backed RTC in built in side CCMS
Controller. CCMS supports wireless
Low Power RF 2.4 ZigBee
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
communication with maximum 100
nos. of individual node/Luminaire
controller which can dim up/down the
led lamp up to 500W. Network Fault
Tolerance: self-forming and self-
healing RF mesh network having
Open Field Range: 200 m. internal
storage Memory 256MB X NAND
Flash. Optional - Ethernet. Inbuilt
Micro SD card for data storage
(Capacity up to 16GB). Alert message
in pre-defined abnormal system
conditions through SMS (5 numbers)
and web based application through
GSM/GPRS for: i) Phase-wise
currents on crossing threshold values
ii) Phase-wise voltages on crossing
threshold values. iii) MCB trips, iv)
Theft alerts, v) No output supply vi)
Group failure of lights vii) No
input/output supply. Serial
Communication: RS485/RS232,
CCMS Controller can be remotely
configurable through server.
Communication Protocol - Street
Light Gateway supports RS485
MODBUS communication and
HTTPS support for Wireless
communication with server using SIM
based GPRS Connection.
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
40 Nos. 15.0
Nepal Telecom all Complete as per
instruction of Engineer, NEA
specification, drawings. SIM based
GPRS Connection ( On clients scope)
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
Nepal Telecom all Complete as per
instruction of Engineer, NEA
41 Nos. 469.0
specification, drawings. 11m
Octagonal Pole: Top Dia. 90mm,
Bottom Dia. 210mm Sheet, Thickness
4.5 mm, Base Plate Dimensions (L x
B x T) 350X350X30, PCD (275mm),
Foundation bolt M25mmX1000mmX4
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
42 Nos. 469.0
Nepal Telecom all Complete as per
instruction of Engineer, NEA
specification, drawings. single Arm
bracket 2000mm
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
43 Nos. 469.0
Nepal Telecom all Complete as per
instruction of Engineer, NEA
specification, drawings. RCC
Concrete foundation for pole
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
Nepal Telecom all Complete as per
44 Nos. 469.0
instruction of Engineer, NEA
specification, drawings. Junction box
of IP-65 Grade with 3 phase 100 A
copper busbar and two nos. 16 Amp
DP MCB of 15 KA( as an option)
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
Nepal Telecom all Complete as per
instruction of Engineer, NEA
specification, drawings. TWO POLE
STRUCTURE:Make:Hulas with C
Class Heavy Duty. Supply,
Installation, Testing &
Commissioning of 2 pole structure for
terminating 11 KV O.H. supply from
NEA as per specifications and
drawing. The two pole structure shall
comprise of:-steel tubular two pole
structure 11 mtrs high( 6" Dia) (as per
NEA approved), in cement concrete
foundation 1:1.5:3 (1 cement : 1.5
coarse sand : 3graded aggregate 40mm
nominal size) including excavation
and refilling etc. as required. The rate
shall be inclusive of painting with 2
coats of aluminium paint (on red
oxide). The portion of pole under the
ground shall be provided with 2 coats
of bituminous paint - 2 Nos.; Steel
sections, channels angles, flats,
clamps, GI nuts, bolts and required
45 hardware etc of different sizes for No. 3.0
cross arms( with 42 x 42 and 5 mm
thick, bracings, supports etc. for pole
GOD etc. including anticlimbing
barbed wires (conforming to IS:278)
having 4 points barbs spaced 75
±12mm apart. All steel structure shall
be given 2 coats of red oxide primer
and 2 finishing coats of aluminium
paint as required. - Lot; 11 KV class
disc/pin/support insulators complete
with clamps and fixing hard wares etc.
complete as required ; 11 KV station
class thyrite type lightening arrestors
complete with mounting arrangement
(on all phases) - 3 Nos.; Drop out -
lock out (DOLO) fuse, gang operating
device (Air Break Switch) with pad
locking arrangement (operating rod to
be supported properly), complete with
operating handle and locking
arrangement - 1 Set; GI stay set
complete with 20mm dia 1.8 M long
stay rod with 450 x 450 x 7.5 mm
anchor plate with thimbles, stay
clamps,8 mm dia GI stay wire, turn
buckle (20mm x 600mm) strain
insulator bow tightner in cement
concrete 1:3:6 foundation as
excavation and refilling - 2 Set
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
Nepal Telecom all Complete as per
46 RM 3556.0
instruction of Engineer, NEA
specification, drawings. H.T. Cabling:
Make: Havells india or equivalent 3
C x 35 Sq.mm XLPE HT 11 KV AL
cable
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
Nepal Telecom all Complete as per
instruction of Engineer, NEA
specification, drawings. H.T. Cabling:
Make: Havells india or equivalent.
Supply, installation of 11 mtrs
high( 6" Dia) steel pole for HT Cable
support including cable hanging
47 No. 178.0
support with all accessories (as per
NEA approved), in cement concrete
foundation 1:1.5:3 (1 cement : 1.5
coarse sand : 3graded aggregate 40mm
nominal size) including excavation
and refilling etc. as required. The rate
shall be inclusive of painting with 2
coats of aluminium paint (on red
oxide). The portion of pole under the
ground shall be provided with 2 coats
of bituminous paint - 2 Nos.
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
Nepal Telecom all Complete as per
instruction of Engineer, NEA
specification, drawings. End
48 set 3.0
Termination: Raychem or equivalent.
Heat shrinkable cable jointing of 3
core x 50 sq.mm 11 KV volts grade
XLPE insulated armoured cables with
suitable cable termination using
Raychem/ MECP kits including all
accessories.
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
Nepal Telecom all Complete as per
instruction of Engineer, NEA
specification, drawings. End
Termination: Raychem or equivalent.
Supply, installation, testing and
commissioning of Maintenance Free
49 No. 16.0
compound earthing stations by means
of 2 meter long, 50 mm dia
intergrated with 100x32x6 mm
terminals filled with earth enhancing
coumpound in required quantity all
complete with 300 x300 x450 mm
masonry enclosure with pre cast
cover. All earthing arrangements
must comply with IS–3043.The
resistivity should be below 3 ohm.
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
Nepal Telecom all Complete as per
instruction of Engineer, NEA
specification, drawings. End
Termination: Raychem or equivalent.
Supply and installation of distribution
transformer 100 KVA three phase
NEA approved ONAN type with no
load ratio of 11000/433 volts with
both low and high voltage windings of
high purity electrolytic copper. The
50 No. 3.0
transformer shall be complete with
rating and diagram plate, 2 Nos.
earthing terminals, and high winding
temperature indicator. The distribution
transformer shall be On load tap
changer with -15% and +5% tappings
in step of 2.5% each step on HV side,
3 phase 50 Hz with standard
accessories
(NEEK/TMC/SCHNEIDER).The
transformer is pad mounted type so
the cost must include 1.5 mtr. high
concrete foundation suitable for
transformer installation.
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
Nepal Telecom all Complete as per
51 instruction of Engineer, NEA RM 14117.0
specification, drawings. End
Termination: Raychem or equivalent
Supply, installation of 110 mm dia.
HDP Pipe of 6 kg pressure on both
side of road for laying of power cable.
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
Nepal Telecom all Complete as per
instruction of Engineer, NEA
specification, drawings. End
52 RM 14117.0
Termination: Raychem or equivalent
Trench for 110 mm HDP Pipe laying .
The cost must include HT wrapping
tape and cable marker upto height of
1000 mm at 5 mtr spacing.The pipe
must have 150 mm sand all around
and then filling of digged material.
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
Nepal Telecom all Complete as per
53 instruction of Engineer, NEA RM 2812.0
specification, drawings. End
Termination: Raychem or equivalent
Supply, installation of 32 mm dia.
HDP Pipe of 6 kg pressure on both
side of road for laying of power cable
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
Nepal Telecom all Complete as per
instruction of Engineer, NEA
54 RM 432.0
specification, drawings. End
Termination: Raychem or equivalent
Supply, insta;llation of hot dip
galvanised ladder type cable tray of
size 450x 60 mm with all support and
accessories for cable laying in bridge
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
55 Nepal Telecom all Complete as per RM 6561.0
instruction of Engineer, NEA
specification, drawings. End
Termination: Raychem or equivalent
3C x 2.5 mm2 cu. unarmoured cable
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
56 Nepal Telecom all Complete as per RM 4805.0
instruction of Engineer, NEA
specification, drawings. End
Termination: Raychem or equivalent
4C x 10 mm2 cu. Armoured cable
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
57 Nepal Telecom all Complete as per RM 9312.0
instruction of Engineer, NEA
specification, drawings. End
Termination: Raychem or equivalent
4C x 16 mm2 cu. Armoured cable
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
58 Nepal Telecom all Complete as per RM 85.0
instruction of Engineer, NEA
specification, drawings. End
Termination: Raychem or equivalent
4C x 70 mm2 cu. Armoured cable
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
Nepal Telecom all Complete as per
instruction of Engineer, NEA
specification, drawings. Construction
59 of brick masonry chamber of internal No. 469.0
size 450x450mm with 250mm thick
brickwork in 1:4 cement mortar,
450x450mm concrete manhole cover
with frame (heavy duty), cement
plaster inside, height varies from 300
to 1000mm.The manhole must have
drain out provision.
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
Nepal Telecom all Complete as per
instruction of Engineer, NEA
specification, drawings. Construction
60 of brick masonry chamber of internal No. 5.0
size 600x600mm with 250mm thick
brickwork in 1:4 cement mortar,
450x450mm concrete manhole cover
with frame (heavy duty), cement
plaster inside, height varies from 300
to 1000mm.The manhole must have
drain out provision.
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
Nepal Telecom all Complete as per
instruction of Engineer, NEA
specification, drawings. Panel-IP 65
floor mounted as per following details
(SIEMENS/HAGER); Incomer:250 4
pole MCCB of 25 kA with complete
features of microprocessor release unit
, for short circuit, over current and
61 No. 3.0
earth fault protection with adjustable
setting with following accessories :
Under voltage protection; Over
voltage protection; Instantanous Over
Current protection; Auxiliary contacts
required for under voltage, over
voltage and necessary interlocking of
breakers.; Reverse Power relay.;
Busbar : (Heat shrinkable colored
sleeve) 200 A TPN Copper;
Outgoings:4 Nos 32 A 15 kA 2-P
MCB, 6 Nos 32 A 25 kA 4-P MCCB
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
Nepal Telecom all Complete as per
instruction of Engineer, NEA
62 specification, drawings. Provide, Job 1.0
supply and install, testing &
commissioning and approvel from
NTC/NEA as specified in Appendix-2
of Employer's Requirements to
perform complete work of Optical
Fiber.
Electric Work : Electric Work and
Optical Fiber Work: Providing,
installing, excavation, testing and
connecting, approved by NEA and
Nepal Telecom all Complete as per
instruction of Engineer, NEA
specification, drawings. Provide,
supply and install, testing &
commissioning and approvel from
NEA as specified in Appendix-2 of
63 Job 1.0
Employer's Requirements to perform
complete work of Rehabilitation and
Reconstruction of Electric work (i.e.
11kv crossing, 132 kv crossing,
electric tower etc and newly
construction of underground crossing
of proposed electric work as per NEA
specification, drawings and instruction
of Engineer and all complete with
closed co-ordination of NEA)
Road Furnitures: Providing and laying
of hot applied thermoplastic
compound on rough surface (similar to
Asphalt concrete and rigid pavement)
at least 2 mm thick including
64 m2 107655.0
reflectorizing glass beads as per DOR
Traffic sign manual/ Specifications .
The finished surface to be level,
uniform and free from streaks and
holes. [1504]
Road Furnitures: Providing and fixing
of retro- reflectorized warning,
Regulatory and informatory sign as
per specification clause 1501made of
high intensity grade sheeting, fixed
over aluminium sheeting, 1.5mm thick
supported on a 50 mm internal dia
65 steel tube or mild steel angle iron post No. 145.0
75 mm X 40 mm x 6mm firmly fixed
to the ground by means of properly
designed foundation with M 10/40
grade cement concrete 30cm x 30cm x
30cm below groung level or as per
drawings and Technical Specification.
80cm x 60cm rectangular [1501].
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Road Furnitures: Providing and fixing
of retro- reflectorized warning,
Regulatory and informatory sign as
per specification clause 1501made of
high intensity grade sheeting, fixed
over aluminium sheeting, 1.5mm thick
supported on a 50 mm internal dia
66 steel tube or mild steel angle iron post No. 42.0
75 mm X 40 mm x 6mm firmly fixed
to the ground by means of properly
designed foundation with M 10/40
grade cement concrete 30cm x 30cm x
30cm below groung level or as per
drawings and Technical Specification.
90cm equilateral triangle [1501].
Road Furnitures: Providing and
Fixing Reinforced cement concrete M
15 grade kilometer Post including
67 painting and printing as per Standard No. 10.0
Drawing-2070 and Technical
Specifications. One kilometer post
(precast) [1506]
Road Furnitures: Providing and
Fixing Reinforced cement concrete M
15 grade kilometer Post including
68 painting and printing as per Standard No. 4.0
Drawing-2070 and Technical
Specifications. Five kilometer Post
(precast) [1506]
Road Furnitures: 200 m Marker
Stone: Providing and fixing of rosad
stud100x100, die-cast in aluminium,
resistant to corrosive effct of salt and
grit, fitted with lenses reflectors,
69 installed in concrete or asphaltic No. 276.0
surface by drilling hole 30mm upto a
depth of 60mm and bedded in a
suitable bituminous grout or epoxy
mortar, all complete as per drawing
and Technical Specifications. [1505]
Road Furnitures: Bridge Name Plate
Sign (C29): Providing, fixing and
erecting 50 mm dia steel pipe railing
in 3 rows duly painted on medium
70 weight steel channels(ISMC series) No. 30.0
100 mm x 50 mm, 1.2 metres high
aboveground, 2 m center to center,
complete as per Drawing
andTechnical specifications. [3105]
Road Furnitures: Guard Rail:
Providing and erecting "W" metal
beam crashbarrier comprising of 3 mm
thick corrugated sheet metal beam rail,
70cm above road/ground level, fixed
on ISMC series channel vertical post,
71 150x75x5mm spaced 2m c/c, 1.8m rm 1635.0
high, 1.1m below ground/road level,
metal beam rail to be fixed on the
vertical post with a spacer of channel
section 150x75x5mm, 330mm long
complete as per drawing and technical
specifications. [1509]
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Road Furnitures: Road Delineators
Post
Providing and installation of 150 mm
* 150 mm 1. 5 m long delineators
(road way indicators, hazard
72 markers, object markers), 80-100 cm No. 420.0
high above ground level, painted black
and white in 20 cm wide strips, buried
or pressed into the ground and
conforming to the drawings and
Technical Specifications. [1507]
Providing Insurance of Works, Plants,
Equipments, Employers, Labors,
Personal Injuries for the Employer's
Design Work and Contractor's Design
Work as per the conditions of contract,
instruction of Engineer and all
complete.The insurance shall cover all
the works, goods, liability for breach
of professional duty, injury to persons
and damage to property, injury to
73 Job 1.0
employees, other insurance required
by laws and by local practice and
other requirement stipulated in the bid
document complying with Beema
Samiti's (Insurance Regulatery
Authority of Nepal) guidelines,
regulations, directives and other
related document issued. The
insurance premium shall not exeed
2.5% of the bid amount.
Provide, supply and install Laboratory
building including services, essential
supplies like water, electricity,
sanitary services and their
maintenance and cost of all
equipment, tools, materials, labour and
74 Month 27.0
incidentals as specified in Appendix-1
of Employer's Requirements to
perform tests and other operations of
quality control according to the
specification and directed by
Engineer.
Providing and maintaining site office
/ Engineer’s site office including water
supply, electricity, drainage,
communication, security,
75 Month 27.0
accomodation and kitchen utilities
and all the facilities as per employer’s
requirement and conditions of
contract.
Prepare and submit monthly /
Quarterly / Yearly / update of existing
Environment Management Plan /
76 Month 27.0
progress report 6Nos. of copies each
with soft copy and color prints in A4
size paper with color photo.
Prepare and provide as built drawings
in GIS base maps including report in
77 Set 1.0
4hard copies and 2CDs all complete
set as per instruction of Engineer
3 Construction work
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Contractors Design Works: Conduct
detailed survey, geological, geo-
physical and geo-technical
investigation, hydrological
investigation and preparation of
detailed design and construction
drawings for the Contractor’s Design
1 Works comprising 37 Nos. of Major LS 1.0
and Minor PSC Girder Bridges,
Special PSC Box Bridges and
associated works including design of
expressway structures and slope
stabilization work within bridge
section as per the Employer’s
Requirement.
Contractors Design Works: Conduct
detailed survey, geological, geo-
physical and geo-technical
investigation, hydrological
investigation and preparation of
detailed design and construction
drawings for the Contractor’s Design
2 Works for Expressway, slope LS 1.0
stabilization works, service road
(Dharan-Chatara Highway crossing at
CH 47+110 of Main Lane of
Expressway), retaining walls
including RE wall and associated
works as per the Employer’s
Requirement.
Contractors Design Works: Conduct
detailed survey, geological, geo-
physical and geo-technical
investigation, hydrological
investigation and preparation of
detailed design and construction
drawings for the Contractor’s Design
3 Works for Interchange at Budune, Toll LS 1.0
Plaza, service road & intersection at
Dharan Chatara Highway connection
(Phurkechaur) works and all complete
as described in Employer's
Requirement and associated works as
per the Employer’s Requirement.From
CH 43+800 to CH 44+800
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Contractors Design Works:
Construction of foundations, sub-
structures (Pier and Abutments),
superstructures, protection works
including slope stabilization work
within bridge section; approach slab,
approach road, river training works as
specified in Employer’s Requirement,
wing/return walls, Asphalt overlay,
including utility works e.g. electrical
and lighting works, optical fiber
works, ; ancillary. for double lane twin
bridges all complete as per the
Employer’s Requirement and
condition of contract for the Bridges
and associated works as outlined
below; (a) CH 41+054 to CH 41+144,
90 m length (Terai) (b) CH 41+046 to
CH 41+106, 60m length (Kathmandu)
(a) CH 41+229 to CH 41+539, 310m
length (Terai)(b) CH 41+211 to CH
41+521, 310m length (Kathmandu)(a)
CH 41+804 to CH 42+074, 270 m
length (Terai)(b) CH 41+796 to CH
42+066, 270m length (Kathmandu).(a)
CH 42+726 to CH 42+926, 200m
length (Terai).(b) CH 42+734 to CH
42+934, 200 m length (Kathmandu).
(a) CH 43+105 to CH 43+285, 180m
length (Terai).(b) CH 43+115 to CH
43+295, 180 m length (Kathmandu).
(a) CH 43+350 to CH 43+525, 175m
4 length (Terai).(b) CH 43+350 to CH LS 1.0
43+525, 175m length (Kathmandu).(a)
CH 43+901 to CH 44+006, 105m
length (Terai).(b) CH 43+899 to CH
44+004, 105m length (Kathmandu).(a)
CH 44+410 to CH 44+445, 35m
length (Terai).(b) CH 44+420 to CH
44+455, 35m length (Kathmandu).(a)
CH 44+715 to CH 44+785, 70m
length (Terai).(b) CH 44+735 to CH
44+805, 70m length (Kathmandu).(a)
CH 45+544 to CH 45+694, 150m
length (Terai).(b) CH 45+536 to CH
45+686, 150m length (Kathmandu).(a)
CH 45+739 to CH 45+844, 105m
length (Terai).(b) CH 45+756 to CH
45+816, 60m length (Kathmandu).(a)
CH 46+124 to CH 46+229, 105m
length (Terai).(b) CH 46+117 to CH
46+222, 105m length (Kathmandu).(a)
CH 46+309 to CH 46+414, 105m
length (Terai).(b) CH 46+311 to CH
46+391, 80m length (Kathmandu).(a)
CH 46+574 to CH 46+774, 200m
length (Terai).(b) CH 46+556 to CH
46+756, 200m length (Kathmandu).(a)
CH 47+230 to CH 47+470, 240m
length (Terai).(b) CH 47+228 to CH
47+468, 240m length (Kathmandu).(a)
CH 47+841 to CH 48+021, 180m
length (Terai).(b) CH 47+823 to CH
48+003, 180m length (Kathmandu).(a)
CH 48+384 to CH 48+924, 540m
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
length (Terai).(b) CH 48+403 to CH
48+943, 540m length (Kathmandu).(a)
CH 49+426 to CH 49+696, 270m
length (Terai).(b) CH 49+431 to CH
49+701, 270m length (Kathmandu).(a)
CH 00+288 to CH 00+328, 40m
length. Note:*Width of each bridge is
11.8 m as per standard and as per the
indicative drawings. The Bridge width
may increase at the curved sections for
extra widening as per road geometry.
* Approach road means 20m extra
road on each side of the longest twin
bridge from the given chainage
included in Contract’s Design Work
Contractors Design Works:
Construction of Expressway which
includes earthwork works, slope
stabilization works and /or valley side
structures on one or both side of
expressway (hill side and valley side)
where ever required including slope
preparation, reinforcement works
horizontal drain, etc with facing
5 works, erosion control blanket with LS 1.0
hydro seeding as mentioned in
specification and bio-engineering
including retaining structures with
proper water management and other
associated works and all complete as
per the Employer’s Requirement and
instruction of Engineer as outlined
below;From CH 41+164 to CH
41+191;
Contractors Design Works:
Construction of Expressway which
includes earthwork works, slope
stabilization works and /or valley side
structures on one or both side of
expressway (hill side and valley side)
where ever required including slope
preparation, reinforcement works
horizontal drain, etc with facing
6 works, erosion control blanket with LS 1.0
hydro seeding as mentioned in
specification and bio-engineering
including retaining structures with
proper water management and other
associated works and all complete as
per the Employer’s Requirement and
instruction of Engineer as outlined
below;From CH 41+560 to CH
41+760;
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Contractors Design Works:
Construction of Expressway which
includes earthwork works, slope
stabilization works and /or valley side
structures on one or both side of
expressway (hill side and valley side)
where ever required including slope
preparation, reinforcement works
horizontal drain, etc with facing
7 works, erosion control blanket with LS 1.0
hydro seeding as mentioned in
specification and bio-engineering
including retaining structures with
proper water management and other
associated works and all complete as
per the Employer’s Requirement and
instruction of Engineer as outlined
below;From CH 42+094 to CH
42+500;
Contractors Design Works:
Construction of Expressway which
includes earthwork works, slope
stabilization works and /or valley side
structures on one or both side of
expressway (hill side and valley side)
where ever required including slope
preparation, reinforcement works
horizontal drain, etc with facing
8 works, erosion control blanket with LS 1.0
hydro seeding as mentioned in
specification and bio-engineering
including retaining structures with
proper water management and other
associated works and all complete as
per the Employer’s Requirement and
instruction of Engineer as outlined
below;From CH 42+500 to CH
46+706
Contractors Design Works:
Construction of Expressway which
includes earthwork works, slope
stabilization works and /or valley side
structures on one or both side of
expressway (hill side and valley side)
where ever required including slope
preparation, reinforcement works
horizontal drain, etc with facing
9 works, erosion control blanket with LS 1.0
hydro seeding as mentioned in
specification and bio-engineering
including retaining structures with
proper water management and other
associated works and all complete as
per the Employer’s Requirement and
instruction of Engineer as outlined
below;From CH 44+825 to CH
45+010;
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Contractors Design Works:
Contractors Design Works:
Construction of Expressway which
includes earthwork works, slope
stabilization works and /or valley side
structures on one or both side of
expressway (hill side and valley side)
where ever required including slope
preparation, reinforcement works
horizontal drain, etc with facing
10 LS 1.0
works, erosion control blanket with
hydro seeding as mentioned in
specification and bio-engineering
including retaining structures with
proper water management and other
associated works and all complete as
per the Employer’s Requirement and
instruction of Engineer as outlined
below;From CH 45+030 to CH
45+380;
Contractors Design Works:
Construction of Expressway which
includes earthwork works, slope
stabilization works and /or valley side
structures on one or both side of
expressway (hill side and valley side)
where ever required including slope
preparation, reinforcement works
horizontal drain, etc with facing
11 works, erosion control blanket with LS 1.0
hydro seeding as mentioned in
specification and bio-engineering
including retaining structures with
proper water management and other
associated works and all complete as
per the Employer’s Requirement and
instruction of Engineer as outlined
below;From CH 45+380 to CH
45+516;
Contractors Design Works:
Contractors Design Works:
Construction of Expressway which
includes earthwork works, slope
stabilization works and /or valley side
structures on one or both side of
expressway (hill side and valley side)
where ever required including slope
preparation, reinforcement works
horizontal drain, etc with facing
12 LS 1.0
works, erosion control blanket with
hydro seeding as mentioned in
specification and bio-engineering
including retaining structures with
proper water management and other
associated works and all complete as
per the Employer’s Requirement and
instruction of Engineer as outlined
below;From CH 45+706 to CH
45+736;
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Contractors Design Works:
Construction of Expressway which
includes earthwork works, slope
stabilization works and /or valley side
structures on one or both side of
expressway (hill side and valley side)
where ever required including slope
preparation, reinforcement works
horizontal drain, etc with facing
13 works, erosion control blanket with LS 1.0
hydro seeding as mentioned in
specification and bio-engineering
including retaining structures with
proper water management and other
associated works and all complete as
per the Employer’s Requirement and
instruction of Engineer as outlined
below;From CH 45+850 to CH
46+097;
Contractors Design Works:
Construction of Expressway which
includes earthwork works, slope
stabilization works and /or valley side
structures on one or both side of
expressway (hill side and valley side)
where ever required including slope
preparation, reinforcement works
horizontal drain, etc with facing
14 works, erosion control blanket with LS 1.0
hydro seeding as mentioned in
specification and bio-engineering
including retaining structures with
proper water management and other
associated works and all complete as
per the Employer’s Requirement and
instruction of Engineer as outlined
below;From CH 46+249 to CH
46+289;
Contractors Design Works:
Construction of Expressway which
includes earthwork works, slope
stabilization works and /or valley side
structures on one or both side of
expressway (hill side and valley side)
where ever required including slope
preparation, reinforcement works
horizontal drain, etc with facing
15 works, erosion control blanket with LS 1.0
hydro seeding as mentioned in
specification and bio-engineering
including retaining structures with
proper water management and other
associated works and all complete as
per the Employer’s Requirement and
instruction of Engineer as outlined
below;From CH 46+434 to CH
46+536;
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Contractors Design Works:
Construction of Expressway which
includes earthwork works, slope
stabilization works and /or valley side
structures on one or both side of
expressway (hill side and valley side)
where ever required including slope
preparation, reinforcement works
horizontal drain, etc with facing
16 works, erosion control blanket with LS 1.0
hydro seeding as mentioned in
specification and bio-engineering
including retaining structures with
proper water management and other
associated works and all complete as
per the Employer’s Requirement and
instruction of Engineer as outlined
below;From CH 46+794 to CH
46+900;
Contractors Design Works:
Construction of Expressway which
includes earthwork works, slope
stabilization works and /or valley side
structures on one or both side of
expressway (hill side and valley side)
where ever required including slope
preparation, reinforcement works
horizontal drain, etc with facing
17 works, erosion control blanket with LS 1.0
hydro seeding as mentioned in
specification and bio-engineering
including retaining structures with
proper water management and other
associated works and all complete as
per the Employer’s Requirement and
instruction of Engineer as outlined
below;From CH 46+900 to CH
47+208;
Contractors Design Works:
Construction of Expressway which
includes earthwork works, slope
stabilization works and /or valley side
structures on one or both side of
expressway (hill side and valley side)
where ever required including slope
preparation, reinforcement works
horizontal drain, etc with facing
18 works, erosion control blanket with LS 1.0
hydro seeding as mentioned in
specification and bio-engineering
including retaining structures with
proper water management and other
associated works and all complete as
per the Employer’s Requirement and
instruction of Engineer as outlined
below;From CH 47+490 to CH
47+803;
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Contractors Design Works:
Construction of Expressway which
includes earthwork works, slope
stabilization works and /or valley side
structures on one or both side of
expressway (hill side and valley side)
where ever required including slope
preparation, reinforcement works
horizontal drain, etc with facing
19 works, erosion control blanket with LS 1.0
hydro seeding as mentioned in
specification and bio-engineering
including retaining structures with
proper water management and other
associated works and all complete as
per the Employer’s Requirement and
instruction of Engineer as outlined
below;From CH 48+041 to CH
48+090;
Contractors Design Works:
Construction of Expressway which
includes earthwork works, slope
stabilization works and /or valley side
structures on one or both side of
expressway (hill side and valley side)
where ever required including slope
preparation, reinforcement works
horizontal drain, etc with facing
20 works, erosion control blanket with LS 1.0
hydro seeding as mentioned in
specification and bio-engineering
including retaining structures with
proper water management and other
associated works and all complete as
per the Employer’s Requirement and
instruction of Engineer as outlined
below;From CH 48+090 to CH
48+290;
Contractors Design Works:
Construction of Expressway which
includes earthwork works, slope
stabilization works and /or valley side
structures on one or both side of
expressway (hill side and valley side)
where ever required including slope
preparation, reinforcement works
horizontal drain, etc with facing
21 works, erosion control blanket with LS 1.0
hydro seeding as mentioned in
specification and bio-engineering
including retaining structures with
proper water management and other
associated works and all complete as
per the Employer’s Requirement and
instruction of Engineer as outlined
below;From CH 49+020 to CH
49+380;
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Contractors Design Works:
Construction of Expressway which
includes earthwork works, slope
stabilization works and /or valley side
structures on one or both side of
expressway (hill side and valley side)
where ever required including slope
preparation, reinforcement works
horizontal drain, etc with facing
22 works, erosion control blanket with LS 1.0
hydro seeding as mentioned in
specification and bio-engineering
including retaining structures with
proper water management and other
associated works and all complete as
per the Employer’s Requirement and
instruction of Engineer as outlined
below;From CH 49+721 to CH
49+818.82;
Contractors Design Works:
Construction of Interchange at
Budhane, Toll Plaza, connection road
from Toll Plaza to Dharan – Chatara
Highway connection at Phurkechaur,
intersection at Phurkechaur including
cutting, filling, retaining walls, slope
23 LS 1.0
protection stabilization, cross drainage
works, bio-engineering works and
other associated works all complete as
per the Employer’s Requirement and
instruction of Engineer as outlined
below; From CH 43+800 to CH
44+800
Contractors Design Works:
Contractors Design Works:
Construction of Expressway within
CH 41+000 to CH 49+818.82
excluding slope, Bridge & Interchange
works chainage as mentioned in item
24 number 4, 5 & 6 including slope LS 1.0
cutting, filling, slope preparation, bio-
engineering, retaining structures with
proper water management and other
associated works all complete as per
the Employer’s Requirement and
instruction of Engineer.
Contractors Design Works:
Construction of Dharan – Chatara
Highway crossing at CH 47+110 of
Main Lane of Expressway which
includes slope cutting, filling, slope
25 preparation, bio-engineering, cross LS 1.0
drainage, retaining structures with
proper water management and other
associated works and all complete as
per the Employer’s Requirement and
instruction of Engineer.
Total of Procument Items
Total Item Price

VAT

Grand Total