You are on page 1of 104

SASEC Mugling - Pokhara Highway Improvement Phase I Project (SMPHIP)

Mugling – Anbhukhaireni - Pokhara Road (Section -1)


Contract No.: SMPHIP/OCB/MAP/01 (From 8+250km to 49+700 km)
SCHEDULE OF CROSS DRAINAGE

List of Cross Drainage Structure


Existing type, dimension (m)
S.N. Design Chainage Type
1 8+635.4 SC
2 8+943 HPC
3 9+105.4 SC
4 9+205.4 HPC
5 9+351.3 SC
6 9+424.5 HPC
7 9+596.7 SC
8 9+863.3 HPC
9 9+970.5 HPC
10 10+074.3 SC
11 10+486.4 HPC
12 10+492.6 SC
13 10+839 SC
14 11+301 SC
15 11+521.7 HPC
16 11+607.7 SC
17 11+833.4 SC
18 11+850 Double cell HPC
19 11+901.7 SC
20 12+129.15 SC
21 13+577 SC
22 13+988.22 SC
23 14+264 SC
24 14+511 SC
25 14+698.7 SC
26 14+766.09 HPC
27 14+823.37 HPC
28 14+905 HPC
29 14+964 HPC
30 15+014 HPC
31 15+173.49 SC
32 15+300 SC
33 15365.97 HPC
34 15+433.2100 HPC
35 15558.07 SC
36 15792.6 SC
37 15+936.9 SC
38 16122.01 SC
39 16+844 SC
40 16+955 HPC
41 17+010 HPC
42 17041 HPC
43 17+921 SC
44 18+080 HPC
45 18+165 HPC
46 18+237 HPC
47 18+292.5 HPC
48 18+347 SC
49 19+0670 SC
50 19+440 HPC
51 19+600 SC
52 20+241 SC
53 20+342 SC
54 20+584 SC
55 21+272 SC
56 21+672 SC
57 21+865 HPC
58 23+237 SC
59 23+601 SC
60 24+126 SC
61 25+076 SC
62 25+208 SC
63 25+321 SC
64 25+387 SC
65 25+669 SC
66 25+712 SC
67 26+195 SC
68 26+498 SC
69 26+743 SC
70 26+978 SC
71 27+160 SC
72 27+245 SC
73 27+582 SC
74 27+601 HPC
75 27+866 SC
76 28+495.5 HPC
77 29+039.5 SC
78 29+302 SC
79 29+673 SC
80 29+995 HPC
81 30+077 HPC
82 30+209 SC
83 30+403 SC
84 30+779.5 SC
85 30+935 SC
86 31+090 SC
87 31+220 SC
88 31+363 SC
89 31+426 SC
90 31+547 SC
91 31+838 SC
92 32+140 SC
93 32+246 HPC
94 32+561 SC
95 32+667 SC
96 32+769 SC
97 32+875 SC
98 33+057 SC
99 33+172 SC
100 33+403 SC
101 33+614 SC
102 33+807 SC
103 33+978 SC
104 34+108 HPC
105 34+309 SC
106 34+458 SC
107 34+675 SC
108 34+807 SC
109 34+865 SC
110 35+063 SC
111 35+325 SC
112 35+470 SC
113 35+820 SC
114 35+949 SC
115 36+257 SC
116 36+662 SC
117 37+053 HPC
118 37+244 SC
119 37+577 SC
120 38+265 SC
121 38+534 HPC
122 38+884 SC
123 38+993 SC
124 39+530 SC
125 39+644 SC
126 39+955 HPC
127 40+158 HPC
128 41+550 SC
129 41+657 SC
130 42+264 SC
131 42+370 SC
132 42+675 SC
133 42+920 SC
134 43+120 HPC
135 43+260 SC
136 43+320 SC
137 43+510 SC
138 43+810 SC
139 44+075 SC
140 44+258 SC
141 44+376 SC
142 44+490 SC
143 44+730 SC
144 44+912 SC
145 45+173 SC
146 45+491 SC
147 45+710 SC
148 45+866 SC
149 46+099.129 SC
150 46+214 SC
151 46+337 SC
152 46+488 SC
153 46+710 SC
154 46+967 SC
155 47+156 SC
156 47+483 SC
157 47+725 SC
158 47+856 SC
159 47+945 SC
160 48+185 HPC
161 48+383 SC
162 48+573 SC
163 48+680 SC
164 48+959 SC
165 49+098 SC
166 49+205 SC
167 49+380 HPC
168 49+626 SC
ghway Improvement Phase I Project (SMPHIP)
haireni - Pokhara Road (Section -1)
CB/MAP/01 (From 8+250km to 49+700 km)
E OF CROSS DRAINAGE

Date : 11-Jul-22
ross Drainage Structure
Proposed type and dimenstions in meters
Type Span (m) Heght (m) Width (m)
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 4 3 18
RC Slab Culvert 4 3 18
RC Slab Culvert 6 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
Missed in DPR (slab culvert) 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert (Extension proposed in DPR)
4 4 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Box Culvert 1.2 1.2 18
RC Box Culvert 1.2 1.2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 5 3 18
RC Slab Culvert 6 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 42.5
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
2 2
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC slab culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Box Culvert 1.2 1.2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18

total culverts 168


total box culverts 41
slab culverts 112 109
cancelled 15
total culverts
total box culverts+ pipe
site construction slab clvt
cancelled
slab culverts
Finished
Unfinished

SIZE CHANGE Design by


site construction
cancel
site construction
Box culvert (1.2X1.2)
anjan
Box culvert (1.2X1.2)
skew type
Box culvert (1.2X1.2)
Box culvert (1.2X1.2)
cancel
cancel
preety
2X2/ consultant proposed 1.2X1.2 box anjan(2X2)
cancel

site construction
cancel by gupta/may not be cancellled(ARE)
cancel

3X3 slab culvert preety


3X3 slab culvert preety
anjan
Box culvert (1.2X1.2)
Box culvert (1.2X1.2) site construction
Box culvert (1.2X1.2)
Box culvert (1.2X1.2)
Box culvert (1.2X1.2)

Box culvert (1.2X1.2)

Box culvert (1.2X1.2)


2X2 Slab culvert
Box culvert (1.2X1.2)
Box culvert (1.2X1.2)
Pipe culvert
Pipe culvert
4X4 slab culvert
box culvert (1.2X1.2)/by consultant
cancel
Box culvert (1.2X1.2)
Box culvert (1.2X1.2)
Box culvert (1.2X1.2)
anjan

sudip

Box culvert (1.2X1.2)

2X2 slab culvert

preety
4X3 slab culvert
2X2 slab culvert
Box culvert (1.2X1.2)
Site construction
Site construction
3X3 slab culvert
Box culvert (1.2X1.2) (but 2X2 slab culvert done) site construction

site construction
anjan
anjan
Box culvert (1.2X1.2)
Sudip

cancel
preety
Box culvert (1.2X1.2)
3X3 slab culvert
2X2 slab culvert
Box culvert (1.2X1.2)
PREETY
anjan
sakshat
not visible (may be cancelled) (need to clear site)
Sudip
sakshat
sakshat
sakshat
PREETY
PREETY
sakshat

anjan
Sudip

Sudip
Box culvert (1.2X1.2)
2X2 slab culvert

3X3 slab culvert

2X2 slab culvert


2X2 slab culvert

2X2 slab culvert


anjan

Sudip
cancel
Box culvert (1.2X1.2)
Box culvert (1.2X1.2)

Box culvert (1.2X1.2)


Sudip

3X4 (redesign)
cancel
cancel
cancel
sakshat

cancel

sakshat

anjan
sudip

3X3 slab culvert


Box culvert (1.2X1.2)

Pipe culvert (cancelled by gupta)

cancel
Box culvert (1.2X1.2)

cancel

3X2 slab culvert

total culverts 168


total box culverts+ pipe 41+3 = 44
site construction slab clvt 7
cancelled 15
slab culverts 102
168
41+3 = 44 finished
7
15
102 filter (no fill) for slab culverts progress
27
75

status (working/finished) SUBMISSION DATE TO CONSULTANT


site construction

site construction
box culvert approved
finished 17-Jul-22
box culvert approved

box culvert approved


box culvert approved

finished 17-Jul-22
finished

box culvert approved


site construction

finished 17-Jul-22
finished 17-Jul-22
finished/need to reedit
box culvert approved
site construction
box culvert approved
box culvert approved
box culvert approved
box culvert approved
box culvert approved
box culvert approved
box culvert approved
box culvert approved
box culvert approved
pipe culvert approved
pipe culvert approved

box culvert approved


box culvert approved
box culvert approved
finished 17-Jul-22
box culvert approved
box culvert approved
box culvert approved
box culvert approved
finished/need to reedit

box culvert approved

box culvert approved

box culvert approved


site construction
site construction

site construction

site construction
finished
finished 17-Jul-22
box culvert approved
FINISHED 17-Jul-22

box culvert approved

finished
box culvert approved

box culvert approved


finished
finished
finished 17-Jul-22

FINISHED 17-Jul-22
finished
finished 17-Jul-22
finished

finished
finished
box culvert approved

finished
FINISHED 17-Jul-22

finished
box culvert approved
finished

box culvert approved


finished

box culvert approved


box culvert approved

box culvert approved


finished

box culvert approved


box culvert approved

finished 17-Jul-22

finished 17-Jul-22
box culvert approved

pipe culvert approved

box culvert approved

box culvert approved


APPROVED DATE COMMENTS FROM CONSULTANT
1

3
4

5
6

8
9

10

11

12
13

14
15

16
17
18

19

20
SASEC Mugling - Pokhara Highway Improvement Phase I Project (SMPHIP)
Mugling – Anbhukhaireni - Pokhara Road (Section -1)
Contract No.: SMPHIP/OCB/MAP/01 (From 8+250km to 49+700 km)
SCHEDULE OF CROSS DRAINAGE

List of Cross Drainage Structure


Existing type, dimension (m)
S.N. Design Chainage Type
5 9+351.3 SC
7 9+596.7 SC
12 10+492.6 SC
13 10+839 SC
19 11+901.7 SC
20 12+129.15 SC
21 13+577 SC
22 13+988.22 SC
32 15+300 SC
37 15+936.9 SC
38 16122.01 SC
43 17+921 SC
48 18+347 SC
49 19+0670 SC
51 19+600 SC
52 20+241 SC
53 20+342 SC
54 20+584 SC
55 21+272 SC
56 21+672 SC
58 23+237 SC
59 23+601 SC
60 24+126 SC
64 25+387 SC
66 25+712 SC
68 26+498 SC
69 26+743 SC
71 27+160 SC
72 27+245 SC
73 27+582 SC
75 27+866 SC
77 29+039.5 SC
79 29+673 SC
80 29+995 HPC
82 30+209 SC
83 30+403 SC
84 30+779.5 SC
85 30+935 SC
86 31+090 SC
87 31+220 SC
88 31+363 SC
89 31+426 SC
90 31+547 SC
91 31+838 SC
92 32+140 SC
94 32+561 SC
95 32+667 SC
96 32+769 SC
97 32+875 SC
98 33+057 SC
99 33+172 SC
100 33+403 SC
101 33+614 SC
102 33+807 SC
103 33+978 SC
105 34+309 SC
106 34+458 SC
107 34+675 SC
108 34+807 SC
109 34+865 SC
110 35+063 SC
111 35+325 SC
112 35+470 SC
113 35+820 SC
114 35+949 SC
115 36+257 SC
116 36+662 SC
118 37+244 SC
122 38+884 SC
124 39+530 SC
125 39+644 SC
128 41+550 SC
132 42+675 SC
133 42+920 SC
135 43+260 SC
136 43+320 SC
137 43+510 SC
138 43+810 SC
139 44+075 SC
140 44+258 SC
141 44+376 SC
142 44+490 SC
143 44+730 SC
144 44+912 SC
145 45+173 SC
146 45+491 SC
147 45+710 SC
148 45+866 SC
149 46+099.129 SC
150 46+214 SC
152 46+488 SC
154 46+967 SC
155 47+156 SC
158 47+856 SC
159 47+945 SC
161 48+383 SC
162 48+573 SC
163 48+680 SC
164 48+959 SC
165 49+098 SC
166 49+205 SC
168 49+626 SC
ghway Improvement Phase I Project (SMPHIP)
haireni - Pokhara Road (Section -1)
CB/MAP/01 (From 8+250km to 49+700 km)
E OF CROSS DRAINAGE

Date : 11-Jul-22
ross Drainage Structure
Proposed type and dimenstions in meters
Type Span (m) Heght (m) Width (m)
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 4 3 18
RC Slab Culvert 4 3 18
RC Slab Culvert 6 3 18
Missed in DPR (slab culvert) 2 2 18
RC Slab Culvert (Extension proposed in DPR)4 4 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 5 3 18
RC Slab Culvert 6 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 42.5
RC Slab Culvert 3 3 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 3 3 18
2 2
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18

total culverts 168


total box culverts 41
slab culverts 112 109
cancelled 15
SIZE CHANGE Design by
anjan
skew type
preety
2X2/ consultant proposed 1.2X1.2 box anjan(2X2)

3X3 slab culvert preety


3X3 slab culvert preety
anjan
2X2 Slab culvert
4X4 slab culvert
box culvert (1.2X1.2)/by consultant
anjan
sudip

2X2 slab culvert

preety
4X3 slab culvert
2X2 slab culvert
3X3 slab culvert

anjan
anjan

Sudip
preety
3X3 slab culvert
2X2 slab culvert
PREETY
anjan
sakshat
not visible (may be cancelled) (need to clear site)
Sudip
sakshat
sakshat
sakshat

PREETY
sakshat

anjan

anjan
Sudip

Sudip
2X2 slab culvert
anjan
3X3 slab culvert

2X2 slab culvert anjan


2X2 slab culvert

2X2 slab culvert


anjan
anjan

Sudip
Sudip

3X4 (redesign)
sakshat

anjan

anjan
sudip

3X3 slab culvert

3X2 slab culvert

total culverts 168


total box culverts+ pipe 41+3 = 44
site construction 7
cancelled 15
slab culverts 102
status (working/finished) SUBMISSION DATE TO CONSULTANT
finished 17-Jul-22

finished 17-Jul-22

finished 17-Jul-22
finished 17-Jul-22
finished/ NEED TO REEDIT

finished 17-Jul-22
finished/ NEED TO REEDIT

finished
finished 17-Jul-22

FINISHED 17-Jul-22
finished

finished

finished 17-Jul-22

FINISHED 17-Jul-22
finished
finished 17-Jul-22
finished

finished
FINISHED 17-Jul-22

finished

finished

finished
finished 17-Jul-22

finished 17-Jul-22
APPROVED DATE COMMENTS FROM CONSULTANT
1

2
3

5
6

7
8

10
11

12
13
14
15

16
17

18

19

20
SASEC Mugling - Pokhara Highway Improvement Phase I Project (SMPHIP)
Mugling – Anbhukhaireni - Pokhara Road (Section -1)
Contract No.: SMPHIP/OCB/MAP/01 (From 8+250km to 49+700 km)
SCHEDULE OF CROSS DRAINAGE

List of Cross Drainage Structure


Existing type, dimension (m)
S.N. Design Chainage Type
1 8+635.4 SC
2 8+943 HPC
3 9+105.4 SC
4 9+351.3 SC
5 9+596.7 SC
6 10+074.3 SC
7 10+486.4 HPC
8 10+492.6 SC
9 10+839 SC
10 11+301 SC
11 11+607.7 SC
12 11+833.4 SC
13 11+850 Double cell HPC
14 11+901.7 SC
15 12+129.15 SC
16 13+577 SC
17 13+988.22 SC
18 15+300 SC
19 15+936.9 SC
20 16122.01 SC
21 16+844 SC
22 17+921 SC
23 18+347 SC
24 19+0670 SC
25 19+600 SC
26 20+241 SC
27 20+342 SC
28 20+584 SC
29 21+272 SC
30 21+672 SC
31 23+237 SC
32 23+601 SC
33 24+126 SC
34 25+208 SC
35 25+321 SC
36 25+387 SC
37 25+669 SC
38 25+712 SC
39 26+195 SC
40 26+498 SC
41 26+743 SC
42 27+160 SC
43 27+245 SC
44 27+582 SC
45 27+866 SC
46 28+495.5 HPC
47 29+039.5 SC
48 29+673 SC
49 29+995 HPC
50 30+209 SC
51 30+403 SC
52 30+779.5 SC
53 30+935 SC
54 31+090 SC
55 31+220 SC
56 31+363 SC
57 31+426 SC
58 31+547 SC
59 31+838 SC
60 32+140 SC
61 32+561 SC
62 32+667 SC
63 32+769 SC
64 32+875 SC
65 33+057 SC
66 33+172 SC
67 33+403 SC
68 33+614 SC
69 33+807 SC
70 33+978 SC
71 34+309 SC
72 34+458 SC
73 34+675 SC
74 34+807 SC
75 34+865 SC
76 35+063 SC
77 35+325 SC
78 35+470 SC
79 35+820 SC
80 35+949 SC
81 36+257 SC
82 36+662 SC
83 37+244 SC
84 37+577 SC
85 38+884 SC
86 39+530 SC
87 39+644 SC
88 41+550 SC
89 41+657 SC
90 42+264 SC
91 42+370 SC
92 42+675 SC
93 42+920 SC
94 43+120 HPC
95 43+260 SC
96 43+320 SC
97 43+510 SC
98 43+810 SC
99 44+075 SC
100 44+258 SC
101 44+376 SC
102 44+490 SC
103 44+730 SC
104 44+912 SC
105 45+173 SC
106 45+491 SC
107 45+710 SC
108 45+866 SC
109 46+099.129 SC
110 46+214 SC
111 46+488 SC
112 46+967 SC
113 47+156 SC
114 47+483 SC
115 47+856 SC
116 47+945 SC
117 48+185 HPC
118 48+383 SC
119 48+573 SC
120 48+680 SC
121 48+959 SC
122 49+098 SC
123 49+205 SC
124 49+626 SC
ghway Improvement Phase I Project (SMPHIP)
haireni - Pokhara Road (Section -1)
CB/MAP/01 (From 8+250km to 49+700 km)
E OF CROSS DRAINAGE

Date : 11-Jul-22
ross Drainage Structure
Proposed type and dimenstions in meters
Type Span (m) Heght (m) Width (m)
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 4 3 18
RC Slab Culvert 4 3 18
RC Slab Culvert 6 3 18
Missed in DPR (slab culvert) 2 2 18
RC Slab Culvert (Extension proposed in DPR)4 4 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 5 3 18
RC Slab Culvert 6 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 42.5
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 3 3 18
2 2
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18

total culverts 168


total box culverts 41
slab culverts 112 109
cancelled 15
SIZE CHANGE Design by
site construction
cancel
site construction
anjan
skew type
cancel
cancel
preety
2X2/ consultant proposed 1.2X1.2 box anjan(2X2)
cancel
site construction
may not be cancellled
cancel

3X3 slab culvert preety


3X3 slab culvert preety
anjan
2X2 Slab culvert
4X4 slab culvert
box culvert (1.2X1.2)/by consultant
cancel
anjan
sudip

2X2 slab culvert

preety
4X3 slab culvert
2X2 slab culvert
Site construction
Site construction
3X3 slab culvert
Box culvert (1.2X1.2) (but 2X2 slab culvert done)site construction

site construction
anjan
anjan

Sudip

cancel
preety
3X3 slab culvert
2X2 slab culvert
PREETY
anjan
sakshat
not visible (may be cancelled) (need to clear site)
Sudip
sakshat
sakshat
sakshat

PREETY
sakshat

anjan

anjan
Sudip

Sudip
2X2 slab culvert
anjan
3X3 slab culvert

2X2 slab culvert anjan


2X2 slab culvert

2X2 slab culvert


anjan
anjan

Sudip
cancel

Sudip

3X4 (redesign)
cancel
cancel
cancel
sakshat

cancel
anjan

anjan
sudip

3X3 slab culvert


cancel

cancel

3X2 slab culvert


status (working/finished) SUBMISSION DATE TO CONSULTANT
site construction

site construction
finished 17-Jul-22

completed 17-Jul-22

site construction

completed 17-Jul-22
completed 17-Jul-22
finished/ NEED TO REEDIT

completed 17-Jul-22
COMPLETED/NEED TO REEDIT
site construction
site construction

site construction

site construction
finished
finished 17-Jul-22

FINISHED 17-Jul-22

COMPLETED

COMPLETED

finished 17-Jul-22

FINISHED 17-Jul-22
finished
finished 17-Jul-22
finished

finished
FINISHED 17-Jul-22

finished
finished

finished

finished 17-Jul-22

finished 17-Jul-22
APPROVED DATE COMMENTS FROM CONSULTANT
1

5
6
7

10
11
12

13

14
15

16
17

18
19

20
SASEC Mugling - Pokhara Highway Improvement Phase I Project (SMPHIP)
Mugling – Anbhukhaireni - Pokhara Road (Section -1)
Contract No.: SMPHIP/OCB/MAP/01 (From 8+250km to 49+700 km)
SCHEDULE OF CROSS DRAINAGE

List of Cross Drainage Structure


Existing type, dimension (m)
S.N. Design Chainage Type
1 8+635.4 SC
2 8+943 HPC
3 9+105.4 SC
4 9+205.4 HPC
5 9+351.3 SC
6 9+424.5 HPC
7 9+596.7 SC
8 9+863.3 HPC
9 9+970.5 HPC
10 10+074.3 SC
11 10+486.4 HPC
12 10+492.6 SC
13 10+839 SC
14 11+301 SC
15 11+521.7 HPC
16 11+607.7 SC
17 11+833.4 SC
18 11+850 Double cell HPC
19 11+901.7 SC
20 12+129.15 SC
21 13+577 SC
22 13+988.22 SC
23 14+264 SC
24 14+511 SC
25 14+698.7 SC
26 14+766.09 HPC
27 14+823.37 HPC
28 14+905 HPC
29 14+964 HPC
30 15+014 HPC
31 15+173.49 SC
32 15+300 SC
33 15365.97 HPC
34 15+433.2100 HPC
35 15558.07 SC
36 15792.6 SC
37 15+936.9 SC
38 16122.01 SC
39 16+844 SC
40 16+955 HPC
41 17+010 HPC
42 17041 HPC
43 17+921 SC
44 18+080 HPC
45 18+165 HPC
46 18+237 HPC
47 18+292.5 HPC
48 18+347 SC
49 19+0670 SC
50 19+440 HPC
51 19+600 SC
52 20+241 SC
53 20+342 SC
54 20+584 SC
55 21+272 SC
56 21+672 SC
57 21+865 HPC
58 23+237 SC
59 23+601 SC
60 24+126 SC
61 25+076 SC
62 25+208 SC
63 25+321 SC
64 25+387 SC
65 25+669 SC
66 25+712 SC
67 26+195 SC
68 26+498 SC
69 26+743 SC
70 26+978 SC
71 27+160 SC
72 27+245 SC
73 27+582 SC
74 27+601 HPC
75 27+866 SC
76 28+495.5 HPC
77 29+039.5 SC
78 29+302 SC
79 29+673 SC
80 29+995 HPC
81 30+077 HPC
82 30+209 SC
83 30+403 SC
84 30+779.5 SC
85 30+935 SC
86 31+090 SC
87 31+220 SC
88 31+363 SC
89 31+426 SC
90 31+547 SC
91 31+838 SC
92 32+140 SC
93 32+246 HPC
94 32+561 SC
95 32+667 SC
96 32+769 SC
97 32+875 SC
98 33+057 SC
99 33+172 SC
100 33+403 SC
101 33+614 SC
102 33+807 SC
103 33+978 SC
104 34+108 HPC
105 34+309 SC
106 34+458 SC
107 34+675 SC
108 34+807 SC
109 34+865 SC
110 35+063 SC
111 35+325 SC
112 35+470 SC
113 35+820 SC
114 35+949 SC
115 36+257 SC
116 36+662 SC
117 37+053 HPC
118 37+244 SC
119 37+577 SC
120 38+265 SC
121 38+534 HPC
122 38+884 SC
123 38+993 SC
124 39+530 SC
125 39+644 SC
126 39+955 HPC
127 40+158 HPC
128 41+550 SC
129 41+657 SC
130 42+264 SC
131 42+370 SC
132 42+675 SC
133 42+920 SC
134 43+120 HPC
135 43+260 SC
136 43+320 SC
137 43+510 SC
138 43+810 SC
139 44+075 SC
140 44+258 SC
141 44+376 SC
142 44+490 SC
143 44+730 SC
144 44+912 SC
145 45+173 SC
146 45+491 SC
147 45+710 SC
148 45+866 SC
149 46+099.129 SC
150 46+214 SC
151 46+337 SC
152 46+488 SC
153 46+710 SC
154 46+967 SC
155 47+156 SC
156 47+483 SC
157 47+725 SC
158 47+856 SC
159 47+945 SC
160 48+185 HPC
161 48+383 SC
162 48+573 SC
163 48+680 SC
164 48+959 SC
165 49+098 SC
166 49+205 SC
167 49+380 HPC
168 49+626 SC
ghway Improvement Phase I Project (SMPHIP)
haireni - Pokhara Road (Section -1)
CB/MAP/01 (From 8+250km to 49+700 km)
E OF CROSS DRAINAGE

Date : 11-Jul-22
ross Drainage Structure
Proposed type and dimenstions in meters
Type Span (m) Heght (m) Width (m)
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 4 3 18
RC Slab Culvert 4 3 18
RC Slab Culvert 6 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
Missed in DPR (slab culvert) 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert (Extension proposed in DPR)
4 4 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Box Culvert 1.2 1.2 18
RC Box Culvert 1.2 1.2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 5 3 18
RC Slab Culvert 6 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 42.5
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
2 2
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC slab culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Box Culvert 1.2 1.2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 4 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 3 3 18
RC Slab Culvert 2 2 18
RC Slab Culvert 2 2 18
RC Box Culvert 1.2 1.2 18
RC Slab Culvert 2 2 18

total culverts 168


total box culverts 41
slab culverts 112 109
cancelled 15
SIZE CHANGE Design by
site construction
cancel
site construction
Box culvert (1.2X1.2)
anjan
Box culvert (1.2X1.2)
skew type
Box culvert (1.2X1.2)
Box culvert (1.2X1.2)
cancel
cancel
preety
2X2/ consultant proposed 1.2X1.2 box anjan(2X2)
cancel

site construction
may not be cancellled
cancel

3X3 slab culvert preety


3X3 slab culvert preety
anjan
Box culvert (1.2X1.2)
Box culvert (1.2X1.2) site construction
Box culvert (1.2X1.2)
Box culvert (1.2X1.2)
Box culvert (1.2X1.2)

Box culvert (1.2X1.2)

Box culvert (1.2X1.2)


2X2 Slab culvert
Box culvert (1.2X1.2)
Box culvert (1.2X1.2)
Pipe culvert
Pipe culvert
4X4 slab culvert
box culvert (1.2X1.2)/by consultant
cancel
Box culvert (1.2X1.2)
Box culvert (1.2X1.2)
Box culvert (1.2X1.2)
anjan

sudip

Box culvert (1.2X1.2)

2X2 slab culvert

preety
4X3 slab culvert
2X2 slab culvert
Box culvert (1.2X1.2)
Site construction
Site construction
3X3 slab culvert
Box culvert (1.2X1.2) (but 2X2 slab culvert done) site construction

site construction
anjan
anjan
Box culvert (1.2X1.2)
Sudip

cancel
preety
Box culvert (1.2X1.2)
3X3 slab culvert
2X2 slab culvert
Box culvert (1.2X1.2)
PREETY
anjan
sakshat
not visible (may be cancelled) (need to clear site)
Sudip
sakshat
sakshat
sakshat
PREETY
PREETY
sakshat

anjan

anjan
Sudip

Sudip
Box culvert (1.2X1.2)
2X2 slab culvert
anjan
3X3 slab culvert

2X2 slab culvert anjan


2X2 slab culvert

2X2 slab culvert


anjan
anjan

Sudip
cancel
Box culvert (1.2X1.2)
Box culvert (1.2X1.2)

Box culvert (1.2X1.2)


Sudip

3X4 (redesign)
cancel
cancel
cancel
sakshat

cancel
anjan
sakshat

anjan
sudip

3X3 slab culvert


Box culvert (1.2X1.2)
anjan
Pipe culvert (cancelled by gupta)

cancel
Box culvert (1.2X1.2)

cancel

3X2 slab culvert

total culverts 168


total box culverts+ pipe 41+3 = 44
site construction 7
cancelled 15
slab culverts 102
status (working/finished) SUBMISSION DATE TO CONSULTANT
site construction

site construction

finished 17-Jul-22

completed 17-Jul-22

site construction

completed 17-Jul-22
completed 17-Jul-22
finished/ NEED TO REEDIT

site construction
pipe culvert approved
pipe culvert approved

completed 17-Jul-22

COMPLETED/NEED TO REEDIT

site construction
site construction

site construction

site construction
finished
finished 17-Jul-22
FINISHED 17-Jul-22

COMPLETED

COMPLETED

finished 17-Jul-22

FINISHED 17-Jul-22
finished
finished 17-Jul-22
finished

COMPLETED
finished

finished
FINISHED 17-Jul-22

finished
finished

finished

finished 17-Jul-22

finished 17-Jul-22
pipe culvert approved
APPROVED DATE COMMENTS FROM CONSULTANT
1

3
4

5
6

8
9

10

11

12
13

14
15

16
17
18

19

20

You might also like