NKC PROJECTS PVT LTD

CONSTRUCTION OF FOUR LANE RING ROAD/BYPASS AROUND SRINAGAR CITY FROM KM 0.000 to
Name of KM 42.100 (PHASE-I) ON ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) MODE UNDER
Project NHDP PHASE VII IN THE UNION TERRITORY OF JAMMU AND KASHMIR UNDER BHARATMALA
PARIYOJANA
Name of
Construction of Structure (PRW Rate)
Work
Structure Rates
Construction of four lane Ring road /bypass around Srinagar city from Km 0+000 to km 42+100 (Phase-I) under NHDP phase VII in the union
territory of Jammu and Kashmir under Bharatmala Pariyojana on EPC Mode

Revised Rates
BOQ Item
Description Unit wef
No.
01-04-2022
1 Item Description
Box Culvert

Labour charges for fixing and removing of formwork and pouring of concrete & Curing up to required
1.1
duration as per relevant drawing and specification for PCC in levelling course for foundation etc.

a) Shuttering/staging Work including deshuttering. Sqm 180


b) Pouring of Concrete by chute or by manually. Cum 190
C) Pouring of Concrete by Boom Placer Cum 150

Labour charges for fixing and removing of formwork and staging, making arrangements and pouring of
1.2 concrete & Curing up to required duration as per relevant drawing and specification for RCC
Foundation/Raft.

a) Shuttering/staging Work including deshuttering. Sqm 190


b) Pouring of Concrete by chute or by manually. Cum 200
C) Pouring of Concrete by Boom Placer Cum 150

Labour charges for fixing and removing of formwork and staging for Sub structure, making arrangements
1.3 and pouring of concrete & Curing up to required duration as per relevant drawing and specification for RCC
Wall including Haunch/Parapet Wall/Wing Wall/Return wall etc.

a) Shuttering Work including deshuttering. (Height 0 to 6 m) Sqm 250


b) Shuttering Work including deshuttering. (Height 6 to 12 m) Sqm 290
c) Pouring of Concrete by chute or by manually. Cum 215
d) Pouring of Concrete by Boom Placer Cum 150

Labour charges for fixing and removing of formwork and staging for Super structure, making arrangements
1.4 and pouring of concrete & Curing up to required duration as per relevant drawing and specification for RCC
Solid/Flat Slab

a) Shuttering Work including deshuttering. Sqm 250


b) Fixing and removing of staging. Cum 54
c) Pouring of Concrete by chute or by manually. Cum 225
d) Pouring of Concrete by Boom Placer Cum 150
Labour charges for loading, transporting, unloading, cutting, bending, lifting and fixing of Reinforcement
Steel (Raw reinforcement steel shall be issued free of cost at our store/Camp subject to reconciliation
with allowable wastage of 0.5% in invisible wastage and 0.5% in scrap) as required as per relevant drawings
1.5 MT 6,300
and specifications for all the RCC works (Including binding wire), lap & Chair are not be payable but shall be
considered for reconciliation.
(Binding wire will be issued from store on debitable basis.)
1.6 Labour charges for fixing of Weep Holes as per drawing and specifications Nos 33
Providing Reinforced cement concrete crash barrier constructed with RCC including fixing of Shuttering
1.7 Rmt. 715
conforming to IRC:21

Reinforced cement concrete for in approach slabs complete as per Drawing and Technical specification
1.8 Cum
section 1500, 1600, 1700, 2700 and as per the direction of Engineer.

a) Shuttering Work including deshuttering. Sqm 190

1/6
Revised Rates
BOQ Item
Description Unit wef
No.
01-04-2022

Labour charge of applying 2 coats of Enamal paint(asian, nerolac) of over cement primer to unplastered
1.9 Sqm 30
concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence.

Labour charge for Painting of Structure No. and span arrangement as per drawing, IRC:7-1971 and Technical
1.10 Nos. 55
Specifications Section 800
2 Pipe Culvert

Labour charges for fixing and removing of formwork and pouring of concrete & Curing up to required
2.10 duration including all lifts and leads, loading and unloading, transportation etc as per relevant drawing and
specification for PCC in levelling course and cradle concrete for foundation etc.

a) Shuttering/staging Work including deshuttering. Sqm 180


b) Pouring of Concrete by chute or by pump including pipeline fixing. Cum 180

Labour charges for fixing and removing of formwork, making arrangements and pouring of concrete &
2.2
Curing up to required duration as per relevant drawing and specification for Cradle etc.
a) Shuttering/staging Work including deshuttering. Sqm 200
c) Pouring of Concrete by chute or by manually. Cum 190

Labour charges for fixing and removing of formwork and staging for Sub structure, making arrangements
2.3 and pouring of concrete & Curing up to required duration including all lifts and leads, loading and
unloading, transportation etc as per relevant drawing and specification for PCC Head Wall etc.

a) Shuttering Work including deshuttering. Sqm 250


b) Pouring of Concrete by chute or by pump including pipeline fixing. Cum 180

Labour charges for shifting, laying and jointing of reinforced cement concrete NP 4 (IS:458) RCC Pipes for
2.4 Culverts, complete as per relevant drawings and Technical Specification for Section 2900. Equipment and
consumables shall be provided by NKCPPL

a) 600 mm Dia Rmt. 275


b) 1200 mm Dia Rmt. 300
3 Box Type Structures ( LVUP/Minor Bridge)

Labour charges for fixing and removing of formwork and pouring of concrete & Curing up to required
3.1
duration as per relevant drawing and specification for PCC in levelling course for foundation etc.

a) Shuttering/staging Work including deshuttering. Sqm 180


b) Pouring of Concrete by chute or by manually. Cum 190
C) Pouring of Concrete by Boom Placer Cum 150
Labour charges for fixing and removing of formwork and staging, making arrangements and pouring of
3.2 concrete & Curing up to required duration as per relevant drawing and specification for RCC
Foundation/Raft.
a) Shuttering/staging Work including deshuttering. Sqm 190
b) Pouring of Concrete by chute or by manually. Cum 190
C) Pouring of Concrete by Boom Placer Cum 130

Labour charges for fixing and removing of formwork and staging for Sub structure, making arrangements
3.3 and pouring of concrete & Curing up to required duration as per relevant drawing and specification for RCC
Wall including Haunch/Parapet Wall/Wing Wall/Return wall etc.

a) Shuttering Work including deshuttering. (Height 0 to 6 m) Sqm 250


a1) Shuttering/staging Work including deshuttering. (Beyond 5 m) Sqm 290
b) Pouring of Concrete by chute or by manually. Cum 215
d) Pouring of Concrete by Boom Placer Cum 150
e) Staging beyond height 3 m Cum 40

2/6
Revised Rates
BOQ Item
Description Unit wef
No.
01-04-2022
Labour charges for fixing and removing of formwork and staging for Super structure, making arrangements
3.4 and pouring of concrete & Curing up to required duration as per relevant drawing and specification for RCC
Solid/ Flat Slab/I-Girder.

a) Shuttering Work including deshuttering. Sqm 250


b) Fixing and removing of staging. Cum 54
c) Pouring of Concrete by chute or by manually. Cum 225
e) Pouring of Concrete by Boom Placer Cum 150

Labour charges for loading, transporting, unloading, cutting, bending, lifting and fixing of Reinforcement
Steel (Raw reinforcement steel shall be issued free of cost at our store/Camp subject to reconciliation
with allowable wastage of 0.5% in invisible wastage and 0.5% in scrap) as required as per relevant drawings
3.5 and specifications for all the RCC works (Including binding wire), lap & Chair are not be payable but shall be MT 6,300
considered for reconciliation.
Weightage of Cutting & bending / placing & fixing 40% and 60% for partially payment.
Binding wire will be issued from store on debitable basis

3.6 Labour Charege fixing of drainage spouts as per drawings and Technical Specifications Clause 2705. Nos 220
3.7 Labour charges for fixing of Weep Holes as per drawing and specifications Nos 33
Providing Reinforced cement concrete crash barrier constructed with RCC including fixing of Shuttering
3.8 Rmt. 715
conforming to IRC:21.
Labour Charge fixing of Filler Type expansion joints complete as per drawings and Technical Specifications
3.9 Rmt. 17
Section 2600.

Reinforced cement concrete for in approach slabs complete as per Drawing and Technical specification
3.10
section 1500, 1600, 1700, 2700 and as per the direction of Engineer.

a) Shuttering Work including deshuttering. Sqm 190

b) Pouring of Concrete by chute/Pump including pipeline fixing or by manually. Cum 200

Labour charge of applying 2 coats of Enamal paint(asian, nerolac) of over cement primer to unplastered
3.11 Sqm 28
concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence.

Lobour charge for Painting of Structure No. and span arrangement as per drawing, IRC:7-1971 and Technical
3.12 Nos. 55
Specifications Section 800
4 Girder Slab Type Structure( VUP/Minor Bridge)
A. Open Foundation

Labour charges for fixing and removing of formwork and pouring of concrete & Curing up to required
4.1
duration as per relevant drawing and specification for PCC in levelling course for foundation etc

a) Shuttering/staging Work including deshuttering. Sqm 200


b) Pouring of Concrete by chute or by manually. Cum 220
Labour charges for fixing and removing of formwork and staging, making arrangements and pouring of
4.2 concrete & Curing up to required duration as per relevant drawing and specification for RCC
Foundation/Raft.

a) Shuttering Work including deshuttering. Sqm 220


b) Pouring of Concrete by chute or by manually. Cum 245
B. Cast in Situ RCC Pile

Labour Charges for all activities included Fixing of temporary liner, Bentonite Mixing & Circulation, Boring,
4.3 flushing, Fixing of permanent liner, welding of liner, Lowering of Tremie pipe & Hopper, Concreting etc. in
boring of RCC Pile also includes loading & Unloading and other relvent works etc.

a)1200mm Dia RMT 170

3/6
Revised Rates
BOQ Item
Description Unit wef
No.
01-04-2022
b)1500mm Dia RMT 250

Labour Charges for loading, transporting, unloading, cutting, bending, lifting and fixing of Reinforcement
Steel as per relevant drawings and specifications for all the RCC piling works (including binding wire,
4.4 welding rods, cutting & binding sets and other consumable material). Laps and Chairs will not be measured
for payment but will be measured/recorded only for reconciliation purpose.

a)Reinforcement Cage cutting & Binding for RCC Pile (Including Binding wire and weldeing rods etc) MT 2,300
b)Reinforcement Cage Lowering for RCC Pile including Welding of laps etc. MT 1,000
c)Chipping of pile upto cut-off level Per Pile 2,250
Labour Charges for all activities included in Dynamic Pile test such as Bentonite Mixing, cage & liner fixing,
pocket cutting, dial gauge locking arangement, concrete pouring, labour with test machine & crane, curing
4.5 Per Pile 10,000
and pile head prepartion, boring, Pile head helical reinforcement including loading & Unloading and other
relvent works etc.

C. Foundation/Pile Cap

Labour charges for fixing and removing of formwork and pouring of concrete & Curing up to required
4.6 duration including dressing upto 150 mm which also includes disposal of such material with all lifts and lead
as per relevant drawing and specification for PCC in levelling course for foundation/Pile Cap etc.

a) Shuttering/staging Work including deshuttering. Sqm 180


b) Pouring of Concrete by chute or by manually. Cum 165
Labour charges for fixing and removing of formwork and staging, making arrangements and pouring of
4.7 concrete & Curing up to required duration as per relevant drawing and specification for RCC Sqm
Foundation/Pile Cap.
a)Shuttering/ staging work including deshuttering( Including Dewatering) Sqm 200
b)Pouring of Concrete With Chute/Manually Cum 165
Labour charges for loading, transporting, unloading, cutting, bending, lifting and fixing of Reinforcement
Steel (Raw reinforcement steel shall be issued free of cost at our store/Camp subject to reconciliation
with allowable wastage of 0.5% in invisible wastage and 0.5% in scrap) as required as per relevant drawings
4.8 and specifications for all the RCC works (Including binding wire), lap & Chair will not be measured for MT 6,300
payment but shall be considered for reconciliation.
Weightage of Cutting & bending / placing & fixing 40% and 60% for partially payment.
( Binding Wire will be issued from store on debitable basis)
B. Sub-Structure

Labour charges for fixing and removing of formwork and staging for Sub structure, making arrangements
4.9 and pouring of concrete & Curing up to required duration as per relevant drawing and specification for
RCC Wall including Haunch/Parapet Wall/Wing Wall/Return walll/ Abutment/Pier/Pier Cap/Pedestal etc.

a) Shuttering Work including deshuttering. Sqm 280


b) Pouring of Concrete by chute/Pump including pipeline fixing or by manually. Cum 270
c) Fixing and removal of Staging Cum 75
Labour Charge for Pedestal, Including cutting, bending, lifting and fixing of reinforcement,
4.10 Shuttering/Deshuttring and pouring of concrete with Line & Level and all complete relevant to Pedestal Per No. 1,750
etc.
C. Super-Structure

Labour charges for fixing and removing of formwork and staging for Super structure (Girder & Slab),
4.11 making arrangements and pouring of concrete & Curing up to required duration as per relevant drawing
and specification for RCC Girder & Slab etc.

a) Shuttering Work including deshuttering. Sqm 275


b) Pouring of Concrete by chute/manually. Cum 250

4/6
Revised Rates
BOQ Item
Description Unit wef
No.
01-04-2022
c) Fixing and removal of Staging (staging shall be paid for pier cap/abutment cap only ) staging shall be
Cum 66
paid from ground level.
I-Girders
Labour charges for fixing and removing of formwork and pouring of concrete & Curing up to required
4.12 duration including dressing upto 150 mm which also includes disposal of such material with all lifts and lead
as per relevant drawing and specification for PCC in leveling bed for the casting of girder

a) Shuttering/staging Work including deshuttering. Sqm 180


b) Pouring of Concrete by chute or by manually. Cum 190
Labour charges for fixing and removing of formwork and staging, making arrangements and pouring of
4.13
concrete & Curing up to required duration as per relevant drawing and specification for I-Girder.

a)Shuttering/ staging work including deshuttering( Including Dewatering) Sqm 250


b)Pouring of Concrete by Concrete Pump including jointing and removing of Pipeline. Cum 200

Labour charges for loading, transporting, unloading, cutting, bending, lifting and fixing of Reinforcement
Steel (Raw reinforcement steel shall be issued free of cost at our store/Camp subject to reconciliation
with allowable wastage of 0.5% in invisible wastage and 0.5% in scrap) as required as per relevant drawings
and specifications for all the RCC works (Including binding wire), lap & Chair will not be measured for
4.14 MT 6,300
payment but shall be considered for reconciliation.
Weightage of Cutting & bending / placing & fixing 40% and 60% for partially payment.
Binding wire will be issued from store on debitable basis)

Labour charge for loading, transporting, unloading, lifting, cutting and fixing of High Tensile Steel strands
4.15 all accessories, stressing and jacking operations, fixing of Anchor block, fixing & profiling of Sheathing Pipe MT 8,000
and grouting etc. including couplers complete as per drawings.

Labour charges for fixing of Sleeves for lugs of bearings in I Girders including fixing of templates and
4.16 reinforcement mesh, including loading, unloading, lifting and other relevant works. (The rate is for each Set 2,000
bearing on one end of I Girder)

D. Miscellaneous
Labour charges for loading, transporting, unloading, cutting, bending, lifting and fixing of Reinforcement
Steel (Raw reinforcement steel shall be issued free of cost at our store/Camp subject to reconciliation
with allowable wastage of 0.5% in invisible wastage and 0.5% in scrap) as required as per relevant drawings
and specifications for all the RCC works (Including binding wire), lap & Chair are not be payable but shall be
4.17 MT 6,300
considered for reconciliation.
Weightage of Cutting & bending / placing & fixing 40% and 60% for partially payment.
Binding wire will be issued from store on debitable basis

Labour Charege fixing of drainage spouts as per drawings and Technical


4.18 Nos 231
Specifications Clause 2705.

4.19 Labour charges for fixing of Weep Holes as per drawing and specifications Nos 35
Labour charge for Reinforced cement concrete crash barrier including cutting, bending & tying of
4.20 Rmt. 866
reinforcement steel, fixing and removal of shuttering and prouring of concrete conforming to IRC:21.

Reinforced cement concrete for in approach slabs complete as per Drawing and Technical
4.21
specification section 1500, 1600, 1700, 2700 and as per the direction of Engineer.

a) Shuttering Work including deshuttering. Sqm 190


b) Pouring of Concrete by chute/manually. Cum 220

5/6
Revised Rates
BOQ Item
Description Unit wef
No.
01-04-2022
Labour charge of applying 2 coats of Enamal paint(asian, nerolac) of over cement primer to unplastered
4.22 Sqm 29
concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence.

Labour charge for Painting of Structure No. and span arrangement as per drawing, IRC:7-1971 and
4.23 Nos. 58
Technical Specifications Section 800

6/6