BOQ ID BOQ Name BOQ Description Unit BOQ Quantity Base Rate BOQ Amount Item Name Item Unit Co-efficient Estimated Rate
Factor Qty (Master)
Siddha Galaxia Phase-II ,OPHELIA,Civil,
40198 Labour and Hire charges of Earth work in excavation in required profile in all type of soils in CUM 2500.000 180.0000 450,000.00
equipment for the construction of dry or wet condition for pile cap, raft or any other foundation of 0 0.000 0.0000
civil work in substructure & the proposed structure as per drawings and direction of E.I.C/
superstruc \ 1.1 consultant including all lift within the lead of 75.0 mtr.
40195 Labour and Hire charges of Earth work in excavation in required profile in all type of soils in CUM 1250.000 180.0000 225,000.00
equipment for the construction of dry or wet condition for pile cap, raft or any other foundation of 0 0.000 0.0000
civil work in substructure & the proposed structure as per drawings and direction of E.I.C/
superstruc \ 1.1 Depth up to 1.5m consultant including all lift within the lead of 75.0 mtr.
40195 Labour and Hire charges of Earth work in excavation in required profile in all type of soils in CUM 75.000 201.0000 15,075.00
equipment for the construction of dry or wet condition for pile cap, raft or any other foundation of 0 0.000 0.0000
civil work in substructure & the proposed structure as per drawings and direction of E.I.C/
superstruc \ 1.2 Depth above 1.5m consultant including all lift within the lead of 75.0 mtr.
40195 Labour and Hire charges of Earth work in filling with earth obtained from excavation in layer CUM 1700.000 135.0000 229,500.00
equipment for the construction of not exceeding 250 mm. in including watering, ramming etc. 0 0.000 0.0000
civil work in substructure & complete in all respect as per direction of E.I.C/consultant
superstruc \ 2 Earth work in filling (payment to be made on the basis of pre work and post work
40195 Labour andobtained
with earth Hire charges of
from excavation All charges
level for dismantling
measurement concrete
of finished in pile
quantity head projecting
of work. RMT 365.000 600.0000 219,000.00
equipment
in layer notfor the construction
exceeding 250 mm. of
in.. above cut-off level or as fixed by EIC & exposing the 0 0.000 0.0000
civil work in substructure & reinforcement bars, cleaning & straitening the same as per pile
superstruc \ 3.1 500 mm dia pile cap drawing and removing of the debris at designated dump
40195 Labour and Hire charges of Labour
yard as charges for constructing
per direction 230/250 mm thick masonry
of E.I.C/consultant. CUM 50.000 750.0000 37,500.00
equipment for the construction of work with standard clay brick or fly ash brick size PSC CEMENT (MINI BAGS 3 150.000 0.0000
civil work in substructure & 230x110x73mm in cement mortar 1:6 adequately soaked in PLANT)
superstruc \ 4 Labour charges for water before use etc. for side shuttering of pile cap, foundation
constructing 230/250 mm thick beam and raft slab. FLYASH - CONCRETE MT 0.2 10.000 0.0000
masonry work with standard clay FLY ASH BRICKS. NOS 431 21550.000 0.0000
brick or fly ash FULL COARSE SAND MT 0.466 23.300 0.0000
CEMENT BAGS 1.58 79.000 0.0000
CEMENT BAGS 4 200.000 0.0000
FINE SAND. MT 0 0.000 0.0000
40195 Labour and Hire charges of Labour charges for constructing 125/110mm thick brick SQM 880.000 145.0000 127,600.00
equipment for the construction of masonry with standard clay brick or fly ash brick size FULL COARSE SAND MT 0.062 54.560 0.0000
civil work in substructure & 230x110x73mm in cement mortar 1:4 adequately soaked in
FLY ASH BRICKS. NOS 52 45760.000 0.0000
superstruc \ 5 Labour charges for water before use etc. for side shuttering of pile cap, foundation
constructing 125/110mm thick brick beam and raft slab. FINE SAND. MT 0.0013 1.144 0.0000
masonry with standard clay brick or CEMENT BAGS 0.23 202.400 0.0000
fly ash
40195 Labour and Hire charges of Labour charges for mixing and laying 1:3:6 plain cement CUM 80.000 680.0000 54,400.00
equipment for the construction of concrete (P.C.C) of required thickness below footing, raft or any 5/8" STONE CHIPS. MT 0.0111 0.888 0.0000
civil work in substructure & other location as specified in the drawing till plinth level using
superstruc \ 6 Labour charges for stone chips with compacting, as required establishing FINE SAND. MT 0.791 63.280 0.0000
mixing and laying 1:3:6 plain dewatering system by pumping / bailing out water, cleaning, STONE CHIPS - 1/2" MT 0.465 37.200 0.0000
cement concrete (P.C.C) of required preparing surfaces, junctions etc. including shuttering, curing CEMENT BAGS 4.62 369.600 0.0000
thickness bel complete to the entire satisfaction of E.I.C/consultant. FULL COARSE SAND MT 0.929 74.320 0.0000
40195 Labour and Hire charges of Labour charges for laying brick soling with brick below SQM 1.000 45.0000 45.00
equipment for the construction of foundation floor, pile cap, tie beam etc. or any other location till 0 0.000 0.0000
civil work in substructure & plinth level including preparation of bed as necessary with
superstruc \ 7.1 Labour charges for joints properly filled in & packed with powdered earth or silver
40195 Labour and Hire
laying brick solingcharges of below
with brick Labour chargesas
sand complete forper
laying polythene
drawing, sheet (150gr/Sqm.)
specification below
and direction of SQM 2000.000 25.0000 50,000.00
equipment
foundation for thepile
floor, construction
cap, tie.. of flooring in foundation or in foundation trenches. (Item includes
E.I.C/consultant. 0 0.000 0.0000
civil work in substructure & the cost of polythene sheet).
superstruc \ 8 Labour charges for
40195 Labour and Hire charges
laying polythene of
sheet (150gr/Sqm.) Hire & labour charges for shuttering & centering with 12 mm. SQM 280.000 371.2500 103,950.00
equipment for the
below flooring construction
in foundation of ...
or in thick good quality ply board shuttering with required bracing for 0 0.000 0.0000
civil work in substructure & curved or straight including fitting, fixing & striking out after
superstruc \ 9 Hire & labour charges completion of works up to plinth complete as per drawing,
40195 Labour and Hire
for shuttering charges ofwith 12
& centering Hire & labour and
specification charges for shuttering
direction & centering with 12 mm.
of E.I.C/consultant. SQM 300.000 45.7500 13,725.00
equipment for the
mm. thick good construction
quality of
ply board.. thick good quality ply board shuttering with required bracing for
civil work in substructure & curved or straight including fitting, fixing & striking out after
superstruc \ 9.1 Extra labour and completion of works up to plinth complete as per drawing,
hire charges for providing approved specification and direction of E.I.C/consultant.
props for shuttering. Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
40195 Labour and Hire charges of Hire & labour charges for shuttering & centering with 12 mm. SQM 300.000 45.7500 13,725.00
equipment for the construction of thick good quality ply board shuttering with required bracing for 0 0.000 0.0000
civil work in substructure & curved or straight including fitting, fixing & striking out after
superstruc \ 9.1 Extra labour and completion of works up to plinth complete as per drawing,
40195 Labour and Hire
hire charges charges ofapproved
for providing Hire & labour and
specification charges for shuttering
direction & centering with 12 mm.
of E.I.C/consultant. SQM 1.000 210.0000 210.00
equipment for the construction of
props for shuttering. thick good quality ply board shuttering with required bracing for 0 0.000 0.0000
civil work in substructure & curved or straight including fitting, fixing & striking out after
superstruc \ 9.2 Hire & labour completion of works up to plinth complete as per drawing,
40195 Labour
chargesand for Hire charges
shuttering of
where Hire & labour and
specification charges for shuttering
direction & centering with 12 mm.
of E.I.C/consultant. SQM 1.000 84.5000 84.50
equipment for the construction
shuttering material like plywoodof thick good quality ply board shuttering with required bracing for 0 0.000 0.0000
civil work
battens in provi
etc. substructure & curved or straight including fitting, fixing & striking out after
superstruc \ 9.3 Labour charges for completion of works up to plinth complete as per drawing,
40195 Labour and Hire
initial board charges
making of tie
for beam, Labour charges
specification andfor mixing and
direction laying M25/M-30/M-35/M-40
of E.I.C/consultant. CUM 900.000 850.0000 765,000.00
equipment for the construction
beam (measurement of
of actual board grade reinforced cement concrete (excluding cost of shuttering FULL COARSE SAND MT 0.8558 770.220 0.0000
civil
makingwork
a in substructure & & reinforcement) for all items e.g. columns, beams, slabs,
ADMIXTURE - SIKAMENT KGS 0.6061 545.490 0.0000
superstruc \ 10 Labour charges for lintels, staircase, retaining wall, pockets etc. of all profile using
2003 NS
mixing and laying M25/M-30/M-35/M- aggregate (stone chips & course sand) as per design mix
40 grade reinforced cement approved by E.I.C/consultant including vibrating/compacting, CEMENT BAGS 8.3636 7527.240 0.0000
concrete (excludi curing, as required, cleaning, preparing surfaces, junctions etc. 5/8" STONE CHIPS. MT 0.001 0.900 0.0000
complete as per drawing, specification and to the entire
STONE CHIPS - 1/2" MT 0.4246 382.140 0.0000
satisfaction of E.I.C/Consultant. Cement concrete should have
an ultimate crushing strength of not less than desired strength FINE SAND. MT 0.7049 634.410 0.0000
on 15cm x 15cm x 15cm, cube at 28 days and mixing of
40195 Labour and Hire charges of concrete shall befor
Labour charges done with weigh
Bending, bindingbatcher/Batching
and laying of plant.(cost MT 80.000 5,600.0000 448,000.00
equipment for the construction of of using concrete pump in the rates).
reinforcement for reinforced cement concrete work in all sorts 25MM DIA TMT BAR MT 0.1346 10.768 0.0000
civil work in substructure & of structures including distribution bars, stirrups, binders etc.
superstruc \ 11.1 For reinforcement including costs of binding materials, initial straightening and 12MM DIA TMT BAR MT 0.1846 14.768 0.0000
steel of dia meter above 10 mm tor. removal of loose rust (if necessary) cutting to requisite length, 20MM DIA TMT BAR MT 0.5615 44.920 0.0000
hooking & bending to correct shape, placing in proper position 16MM DIA TMT BAR MT 0.4308 34.464 0.0000
& binding with 16 gauge black annealed wire / welding as per FLYASH - CONCRETE MT 0.125 10.000 0.0000
relevant I.S. code in every inspection complete as per drawing,
specification for work in foundation, basement slab, wall, pile 32MM DIA TMT BAR MT 0.0885 7.080 0.0000
cap, tie beam, column, deck slab, roof beam, floor beam, lintel
40195 Labour and Hire charges of chajja,
Labourfins,
chargesfaciaforetc. as per drawing
Bending, binding andand direction
laying of of MT 12.000 6,000.0000 72,000.00
equipment for the construction of E.I.C/consultant.
reinforcement for(Reinforcement
reinforced cement bar concrete
will be provided
work inby all sorts 10MM DIA TMT BAR MT 1 12.000 0.0000
civil work in substructure & developer
of structures at free of cost).
including distribution bars, stirrups, binders etc.
08MM DIA TMT BAR MT 1.1892 14.270 0.0000
superstruc \ 11.2 For reinforcement including costs of binding materials, initial straightening and
steel of dia meter 10mm tor or removal of loose rust (if necessary) cutting to requisite length,
below. and Hire charges of
40195 Labour hookingcharges
Labour & bending for to correct shape,
rebuilding pile diaplacing
500mminwith proper
C.C position
grade M- RMT 27.000 1,200.0000 32,400.00
equipment for the construction of & binding
25 with 16 gauge
round shuttering black annealedafter
and reinforcement wirepile
/ welding as per
head breaking 5/8" STONE CHIPS. MT 0.904 24.408 0.0000
civil work in substructure & relevant
etc. I.S. code
complete in every
as per drawing,inspection
directioncomplete as per drawing,
of E.I.C complete (rate
specification for work in foundation, FULL COARSE SAND MT 0.73 19.710 0.0000
superstruc \ 12 Labour charges for includes all labour, tools & tackles). basement slab, wall, pile
rebuilding pile dia 500mm with C.C cap, tie beam, column, deck slab, roof beam, floor beam, lintel STONE CHIPS - 1/2" MT 0.46 12.420 0.0000
grade M-25 round shuttering and chajja, fins, facia etc. as per drawing and direction of CEMENT BAGS 8.57 231.390 0.0000
reinforceme E.I.C/consultant. (Reinforcement bar will be provided by
developer at free of cost).
40195 Labour and Hire charges of Hire and labour charges for shuttering with centering , CUM 2100.000 417.0000 875,700.00
equipment for the construction of fabricating, erecting and fixing in position steel plate or 12mm 0 0.000 0.0000
civil work in substructure & thick good quality ply board shuttering with required bracing for
superstruc \ 1.1 At Ground floor. curved and straight, true to line and level, including making
40195 Labour and Hire charges of Hire and labour
provision for cutcharges
out withfor shuttering
approved with
stout centering
steel propping,, across CUM 100.000 141.0000 14,100.00
equipment for the construction of fabricating,
span, shutteringerecting and fixing
removal, in position
applying steeloil,
shuttering plate or 12mm
chamfering 0 0.000 0.0000
civil work in substructure & thick
cornersgood
(of quality
exposeply board
edges) ofshuttering withcolumns,
slabs, beams, required bracing
walls, for
superstruc \ 1.2 Extra cost for hire & curved
mullionandpoststraight, true complete
(if any) etc. to line and aslevel, including
per drawing & making
direction of
40195 Labour and Hireover
labour charges charges of
rate of Hire and labour
provision charges
for cutRate
EIC/consultant. out with
shallfor shuttering
approved
include with
stout
removal centering
steel
and propping,, across
dismantling the CUM 1300.000 274.0000 356,200.00
equipment
shuttering inforitem
the no
construction
1.1 , when of
use fabricating,
span, erecting
shuttering
aforesaid assembly and fixing
removal,
after in position
applying
specified steeloil,
shuttering
period complete.plate or 12mm
chamfering 0 0.000 0.0000
civil work in substructure &
of plywoo thick
cornersgood
(of quality
exposeply board
edges) ofshuttering withcolumns,
slabs, beams, required bracing
walls, for
superstruc \ 1.3 When ply wood and curved
mullionandpoststraight, true complete
(if any) etc. to line and aslevel, including
per drawing & making
direction of
40195 Labour
battens and
will Hire chargesby
be supplied of Labour
provisioncharges for
outmixing
for cutRate
EIC/consultant. with & layingremoval
shallapproved
include M25 /M30/M-35
stout steel grade across
and propping,
dismantling the CUM 462.000 900.0000 415,800.00
equipment
developer or forinstead
the construction
of ply woodof reinforced
span, cement
shuttering concrete
removal, (excluding
applying cost
shuttering
aforesaid assembly after specified period complete. of shuttering
oil, chamfering& FINE SAND. MT 0.7418 342.712 0.0000
civil work in alumi
and battens substructure & reinforcement)
corners (of expose for all itemsofe.g.
edges) columns,
slabs, beams, liftcolumns,
wall, retaining
walls, wall, ADMIXTURE - SIKAMENT KGS 0.7143 330.007 0.0000
superstruc \ 2.1 At Ground floor. beam,
mullionslab
postetc. of alletc.
(if any) profile using good
complete as perquality
drawing aggregate
& direction of 2003 NS
(stone chips & course
EIC/consultant. Rate shallsand) as perremoval
include design mixand approved
dismantling by the
E.I.C/consultant
aforesaid assembly including vibrating/compacting,
after specified period complete. curing, as MEDIUM COARSE SAND MT 0.62 286.440 0.0000
required cleaning, preparing surface, etc. complete as per FULL COARSE SAND MT 0.8558 395.380 0.0000
drawing, specification and direction of E.I.C/consultant. Cement
CEMENT BAGS 8.3333 3849.985 0.0000
concrete should have an ultimate crushing strength of not less
than 250/ 300kg/350/ sq.cm on 15cm x 15 cm x 15 cm, cube at 28
days and mixing of concrete shall be done with weigh
batcher/batching plant at site. (Cost of using of concrete pump
included in the rates). Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
40195 Labour and Hire charges of Labour charges for mixing & laying M25 /M30/M-35 grade SIDDHA SPHERE
CUM 462.000 LLP900.0000 415,800.00
equipment for the construction of reinforced cement concrete (excluding cost of shuttering &
civil work in substructure & reinforcement) for all items e.g. columns, lift wall, retaining wall,
superstruc \ 2.1 At Ground floor. beam, slab etc. of all profile using good quality aggregate
(stone chips & course sand) as per design mix approved by
BOQ Estimation Report
E.I.C/consultant including vibrating/compacting, curing, as
required cleaning, preparing surface, etc. complete as per
drawing, specification and direction of E.I.C/consultant. Cement
concrete should have an ultimate crushing strength of not less
than 250/ 300kg/350/ sq.cm on 15cm x 15 cm x 15 cm, cube at 28 5/8" STONE CHIPS. MT 0.0024 1.109 0.0000
days and mixing of concrete shall be done with weigh STONE CHIPS - 1/2" MT 0.4444 205.313 0.0000
batcher/batching plant at site. (Cost of using of concrete pump
included in the rates).
40195 Labour and Hire charges of Labour charges for mixing & laying M25 /M30/M-35 grade CUM 220.000 127.0000 27,940.00
equipment for the construction of reinforced cement concrete (excluding cost of shuttering & 0 0.000 0.0000
civil work in substructure & reinforcement) for all items e.g. columns, lift wall, retaining wall,
superstruc \ 2.1 Extra labour for beam, slab etc. of all profile using good quality aggregate
40195 Labour
pouringand Hire charges
concrete of lift wall
in R.C.C. Labour charges
(stone chips for bending,
& course sand) as fixing with binding
per design steel
mix approved by MT 86.000 5,600.0000 481,600.00
equipment
and columnfor at the
anyconstruction
floor of reinforcement
E.I.C/consultant(Tor steel asvibrating/compacting,
including per IS - 1786) Fe 415/500) for as
curing, RCC 10MM DIA TMT BAR MT 0.0486 4.180 0.0000
civil work in substructure & work including
required transporting,
cleaning, de coiling,
preparing surface, etc.straightening,
complete as per
superstruc \ 3.1 a At Ground floor. removing loose rust, cutting, bending 25MM DIA TMT BAR MT 0.1171 10.071 0.0000
drawing, specification and direction ofand placing for allCement
E.I.C/consultant. profile
and binding
concrete with have
should 18 gauge annealed
an ultimate wire asstrength
crushing per drawing & less
of not to 16MM DIA TMT BAR MT 0.2343 20.150 0.0000
the
thanentire satisfactionsq.cm
250/ 300kg/350/ of E.I.C/consultant.
on 15cm x 15 cm Payment of steel
x 15 cm, cube shall
at 28 08MM DIA TMT BAR MT 0.2914 25.060 0.0000
be
daysmade
andas per drawing
mixing and approved
of concrete bar bending
shall be done schedule
with weigh 32MM DIA TMT BAR MT 0.0771 6.631 0.0000
with permissible laps
batcher/batching plantand as per
at site. mode
(Cost of measurement.
of using of concrete The
pump
rate shallin
include all labour and materials excluding the cost of 20MM DIA TMT BAR MT 0.3029 26.049 0.0000
included the rates).
reinforcement at ground floor. 12MM DIA TMT BAR MT 0.0971 8.351 0.0000
40195 Labour and Hire charges of Labour charges for bending, fixing with binding steel MT 7.000 2,927.0000 20,489.00
equipment for the construction of reinforcement (Tor steel as per IS - 1786) Fe 415/500) for RCC 0 0.000 0.0000
civil work in substructure & work including transporting, de coiling, straightening,
superstruc \ 3.1 b At 1st floor. (for removing loose rust, cutting, bending and placing for all profile
40195 Labour
keepingand Hire
dowel charges
bar above of1st floor). Labour charges
and binding withfor
18 making holes andwire
gauge annealed fixing
as M.S. sleeves &ofto
per drawing RMT 1.000 301.0000 301.00
equipment for the construction of various diasatisfaction
the entire in RCC beams, columns etc forPayment
of E.I.C/consultant. servicesoforsteel
any shall 0 0.000 0.0000
civil work in substructure & other purpose
be made as peras per design/
drawing drawing/ instruction
and approved bar bendingofschedule
superstruc \ 4.1 65 mm dia. light E.I.C/Consultant
with permissible at anyand
laps location
as perand
mode complete in all respect
of measurement. Theto
40195 Labour
duty and Hire charges of Labour
the charges
rateentire
shall forallmaking
satisfaction
include holes and fixing
of E.I.C/Consultant.
labour and materials M.S.
The sleeves
rate
excluding shall of of
include
the cost RMT 1.000 301.0000 301.00
equipment for the construction of various
the cost dia
of in RCC
fitting & beams,
fixing
reinforcement at ground floor. columns
complete. etc
(450 for
to services
600 mm or any
long). 0 0.000 0.0000
civil work in substructure & other purpose as per design/ drawing/ instruction of
superstruc \ 4.2 100 mm dia light E.I.C/Consultant at any location and complete in all respect to
40195 Labour
duty and Hire charges of Labour charges
the entire for making
satisfaction holes and fixing
of E.I.C/Consultant. M.S.
The sleeves
rate of
shall include RMT 1.000 301.0000 301.00
equipment for the construction of various
the costdia in RCC
of fitting & beams, columns (450
fixing complete. etc for
to services or any
600 mm long). 0 0.000 0.0000
civil work in substructure & other purpose as per design/ drawing/ instruction of
superstruc \ 4.3 150 mm dia light E.I.C/Consultant at any location and complete in all respect to
40195 Labour
duty and Hire charges of Labour charges
the entire for making
satisfaction holes and fixing
of E.I.C/Consultant. M.S.
The sleeves
rate of
shall include RMT 1.000 301.0000 301.00
equipment for the construction of various
the costdia in RCC
of fitting & beams, columns (450
fixing complete. etc for
to services or any
600 mm long). 0 0.000 0.0000
civil work in substructure & other purpose as per design/ drawing/ instruction of
superstruc \ 4.4 80mm dia light duty E.I.C/Consultant at any location and complete in all respect to
40195 Labour and Hire charges of Labour charges
the entire for 250ofmm/230mm
satisfaction thick brick
E.I.C/Consultant. workshall
The rate in cement
include CUM 100.000 750.0000 75,000.00
equipment for the construction of mortar
the cost(1:6) with 1st
of fitting classcomplete.
& fixing brick or fly(450
ashtobricks
600 mmof sizes
long).230 CEMENT BAGS 1.58 158.000 0.0000
civil work in substructure & mmx110 mmx73mm of approved quality including cut brick
FLY ASH BRICKS. NOS 0 0.000 0.0000
superstruc \ 5.1 a At Ground floor. works in beads either plain or cur-ved batters etc. including
making, complete as per drawing, direction & specification FLY ASH BRICKS (230 X NOS 431 43100.000 0.0000
including the cost of all material, labour ,tools, scaffolding, 110 X 70)
curing etc. complete as per direction of E.I.C./Consultant and FULL COARSE SAND MT 0.5592 55.920 0.0000
technical specification at ground floor.
FINE SAND. MT 0 0.000 0.0000
40195 Labour and Hire charges of Labour charges for 125 mm/110 mm thick brick work with SQM 300.000 145.0000 43,500.00
equipment for the construction of 1st class clay bricks of sizes 250×125×75 mm or fly Ash FULL COARSE SAND MT 0.0527 15.810 0.0000
civil work in substructure & composite meter brick of sizes 230×110×73mm of approved
FINE SAND. MT 0 0.000 0.0000
superstruc \ 6.1 a At Ground floor quality in cement mortar 1:4 with H.B. wire netting (20 gauge) at
every third layer complete as per direction & specification, at CEMENT BAGS 0.23 69.000 0.0000
ground floor including the cost of all material labour, tools, FLY ASH BRICKS (230 X NOS 51 15300.000 0.0000
tackles, scaffolding, curing etc. complete as per direction of 110 X 70)
E.IC/Consultant and technical specification.
FLY ASH BRICKS. NOS 0 0.000 0.0000
40195 Labour and Hire charges of Labour charges for 200mm thick brick work in cement morter CUM 60.000 850.0000 51,000.00
equipment for the construction of (1:6) with fly ash composite mortar brick of approved quality (of CEMENT BAGS 1.58 94.800 0.0000
civil work in substructure & size 230mm x 110mm x 73mm Av) or with traditional clay brick
FINE SAND. MT 0 0.000 0.0000
superstruc \ 7.1 a At Ground floor of sizes 250mm x 125mm x 75mm including cut brick works in
beads either plain or batter or curved etc as per drawing, FLY ASH BRICKS (230 X NOS 431 25860.000 0.0000
direction & specification complete. The rate includes all labour 110 X 70)
and material complete as per drawing, specification and
direction of E.I.C/consultant at ground floor.
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
40195 Labour and Hire charges of Labour charges for 200mm thick brick work in cement morter CUM 60.000 850.0000 51,000.00
equipment for the construction of (1:6) with fly ash composite mortar brick of approved quality (of BOQ Estimation Report
civil work in substructure & size 230mm x 110mm x 73mm Av) or with traditional clay brick
superstruc \ 7.1 a At Ground floor of sizes 250mm x 125mm x 75mm including cut brick works in
beads either plain or batter or curved etc as per drawing,
direction & specification complete. The rate includes all labour
and material complete as per drawing, specification and FLY ASH BRICKS. NOS 0 0.000 0.0000
direction of E.I.C/consultant at ground floor.
FULL COARSE SAND MT 0.4944 29.664 0.0000
40195 Labour and Hire charges of Labour charges for Plaster (to wall, ceiling etc.) with sand & SQM 1210.000 102.0000 123,420.00
equipment for the construction of cement mortar including rounding of or chamfering corners as CEMENT BAGS 0.124 150.040 0.0000
civil work in substructure & directed & racking out joints, chipping where necessary,
superstruc \ 8.1 a At Ground floor. including throating, nosing and drip course, scaffolding CEMENT BAGS 0.0884 106.964 0.0000
/staging where necessary as per specification drawing and FINE SAND. MT 0.0203 24.563 0.0000
direction of E.I.C/consultant.10mm thick plaster with (1:4)
40195 Labour and Hire charges of mortar
Labour in ceilingfor
charges at ground
Plaster floor.
(to wall, ceiling etc.) with sand & SQM 2750.000 95.0000 261,250.00
equipment for the construction of cement mortar including rounding of or chamfering corners as CEMENT BAGS 0.0884 243.100 0.0000
civil work in substructure & directed & racking out joints, chipping where necessary,
FULL COARSE SAND MT 0.0425 116.875 0.0000
superstruc \ 8.2 a At Ground floor. including throating, nosing and drip course, scaffolding
/staging where necessary as per specification drawing and FINE SAND. MT 0.0004 1.100 0.0000
direction of E.I.C/consultant.
40195 Labour and Hire charges of Labour charges for Plaster (to wall, ceiling etc.) with sand & SQM 1.000 127.0000 127.00
equipment for the construction of cement mortar including rounding of or chamfering corners as MEDIUM COARSE SAND MT 0.01 0.010 0.0000
civil work in substructure & directed & racking out joints, chipping where necessary,
FINE SAND. MT 0.0014 0.001 0.0000
superstruc \ 8.3 a For Ground floor. including throating, nosing and drip course, scaffolding
/staging where necessary as per specification drawing and FULL COARSE SAND MT 0.0343 0.034 0.0000
direction of E.I.C/consultant. CEMENT BAGS 0.1143 0.114 0.0000
40195 Labour and Hire charges of Neat cement finish over plastered surface (cement not move SQM 25.000 23.0000 575.00
equipment for the construction of than 2.75 kg/sqm) in all floors. CEMENT BAGS 0.055 1.375 0.0000
civil work in substructure &
superstruc \ 9 Neat cement finish
40195 Labour and Hire
over plastered charges
surface of
(cement not Labour charges of Fitting, fixing door frame in position EACH 30.000 110.0000 3,300.00
equipment
move than 2.75for the construction
kg/sqm) of
in all floors. complete includes a protective coat of a painting at the contract 0 0.000 0.0000
civil work in substructure & surface of the frame including fixing MS clamp (6 nos.) with
superstruc \ 10 Labour charges of concrete in all floors.
40195 Labour and Hire
Fitting, fixing doorcharges
frame in of position Supplying and fixing thermo cool in position at expansion joint SQM 1.000 127.0000 127.00
equipment for the construction
complete includes of
a protective coat up to 50mm thick as per drawing and direction of 0 0.000 0.0000
civil
of a work in substructure & E.I.C/consultant.
superstruc \ 11 Supplying and fixing
40195 Labour
thermo and
coolHire chargesatof
in position Labour charges for laying polythene sheet (150 gm/sqm) below SQM 1.000 25.0000 25.00
equipment for the
expansion joint upconstruction
to 50mm thick of as flooring, in foundation .(rate includes the cost of polythene 0 0.000 0.0000
civil work in a
per drawing substructure & sheet)
superstruc \ 12 Labour charges for
40195 Labour and Hire charges
laying polythene sheet (150 of Labour charges for mixing and laying 1:2:4 cement concrete of CUM 50.000 680.0000 34,000.00
equipment
gm/sqm) below for the construction
flooring, in of required thickness with or without reinforcement with stone 0 0.000 0.0000
civil work in.(rate
foundation substructure
inclu & chips including vibrating compacting complete.
superstruc \ 13 Labour charges for
40195 Labour and laying
mixing and Hire charges of
1:2:4 cement Extra labour for doing the work above 3.65 meter to 6.0 meter CUM 100.000 56.0000 5,600.00
equipment
concrete offor the construction
required of
thickness with height within the floor standing on stagaing or scaffolding as 0 0.000 0.0000
civil work in substructure &
or without per requirement.
superstruc \ 14.a Brick work 200
40195 Labour
mm/250mm and Hire
thick.charges of Extra labour for doing the work above 3.65 meter to 6.0 meter SQM 150.000 12.0000 1,800.00
equipment for the construction of height within the floor standing on stagaing or scaffolding as 0 0.000 0.0000
civil work in substructure & per requirement.
superstruc \ 14.b Brick work
40195 Labour and Hirethick.
125mm/110mm charges of Extra labour for doing the work above 3.65 meter to 6.0 meter SQM 250.000 4.8000 1,200.00
equipment for the construction of height within the floor standing on stagaing or scaffolding as 0 0.000 0.0000
civil work in substructure & per requirement.
superstruc \ 14.c 10 mm thick
40195 Labour andwork
plastering Hireincharges
ceiling.of Extra labour for doing the work above 3.65 meter to 6.0 meter SQM 550.000 4.8000 2,640.00
equipment for the construction of height within the floor standing on stagaing or scaffolding as 0 0.000 0.0000
civil work in substructure & per requirement.
superstruc \ 14.d 15 mm thick
40195 Labour andwork
plastering Hireincharges
wall. of Extra for staging by props/M.S pipes with necessary bracing CUM 354.000 66.0000 23,364.00
equipment for the construction of beyond 4.0m height (mode of measurement where staging 0 0.000 0.0000
civil work in substructure & beyond 4.0m is practically unavoidable mean height of above
superstruc \ 15 Extra for staging by initial 4.0m)- Area in plan x mean height of staging up to soffit of
48168 Chemical
props/M.SGrouting
pipes with of necessary All chargesinitial
shuttering for fixing 20mm diameter tor steel for concrete
4.0 meter. NOS 12.000 550.0000 6,600.00
Reinforcement
bracing beyondBar 4.0m forheight
rebaring \ All
(mode column
(The extraby staging
chemical grouting
shall after drilling
be allowed during hole to requisite
the work stage 0 0.000 0.0000
charges for fixing 20mm diameter
of measureme depth on pile
shuttering, cap (M-30
bending, graderod
binding, concrete). As per
concreting manufacturer
beyond 4.0 meter
tor steel for concrete column by specification
and also during forwork
diameter
stagehole 25mm
Brick work&,Lintel
depth work
400mm with
plastering
chemical grouting after drilli minimum
above 4.0 pull
metertest
in value 13.0toton.
addition lift. (Rate includes the cost of
3(three) nos. pull test & shall be arranged by contractor with
their all necessary equipment’s Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
48168 Chemical Grouting of All charges for fixing 20mm diameter tor steel for concrete NOS 12.000 550.0000 6,600.00
Reinforcement Bar for rebaring \ All column by chemical grouting after drilling hole to requisite
charges for fixing 20mm diameter depth on pile cap (M-30 grade concrete). As per manufacturer
tor steel for concrete column by specification for diameter hole 25mm & depth 400mm with
51592 Labour
chemical & grouting
Hire Charges
after of
drilli Labour
minimum charges with
pull test all tools
value & tackles,
13.0 ton. includingthe
(Rate includes handling
cost of of CUM 9.000 300.0000 2,700.00
Equipment for CIVIL WORK from concrete placing
3(three) nos. pull hose
test &pipe
shall(for
beplacing
arrangedconcrete at different
by contractor with 0 0.000 0.0000
1st floor to above Roof of 14th places) for laying cement
their all necessary concrete in all type of RCC structure
equipment’s
floor... \ 1. Labour charges with all like beams, columns, slabs (floor slabs, suspended floor slab,
51592 Labour & Hire Charges
tools & tackles, includingof handling 1.b) CONCRETE GRADE-M35
cantilever/canopy slab, sloping slab), walls, stair cases, lintel, CUM 9.000 300.0000 2,700.00
Equipment
of concrete for CIVILhose
placing WORK pipefrom
(for pl chajjas, overhead tank, parapet wall, fascia, drop walls, fins, pile 0 0.000 0.0000
1st floor to above Roof of 14th cap, tie beam, transfer beam etc. having any depth & heights,
floor... \ 1.b) CONCRETE GRADE- required shapes/profiles/inclination as per drawing
51592 M35
Labour & Hire Charges of 1.c) CONCRETE
specification GRADE-M30
& direction of E.I.C. including vibrating CUM 1962.000 300.0000 588,600.00
Equipment for CIVIL WORK from compacting, curing as required, cleaning, preparation of CHRYSO OPTIMA K916 KGS 4.6891 9200.014 0.0000
1st floor to above Roof of 14th surface etc. to get the desired strength of concrete, keeping
floor... \ 1.c) CONCRETE GRADE- SIKATOP-77 KGS 0.051 100.062 0.0000
construction joint, protecting the freshly laid concrete from rain FOSROC - STRUCTURO KGS 0.6014 1179.947 0.0000
M30 or heat as & when necessary with P.V.C. sheets marking date of
203
concrete etc. complete. The rate shall include all labours, tools
& tackles for placing/ pouring including handling of concrete FAIRMATE - FAIRCURE KGS 0.0051 10.006 0.0000
placing hose pipe, laying & compacting of the concrete of WC
various grades in position in all levels, depths & heights as SIKAREP MICROCRETE-4 KGS 0.051 100.062 0.0000
required with shapes/profiles/ inclination as per drawing &
specification /I. S. Code or as directed by the E.I.C. The rate
shall also include supplying fixing & laying pipe line network for 10MM STONE CHIPS MT 0.89 1746.180 0.0000
water, pumps for pumping water & cleaning the concrete MEDIUM COARSE SAND MT 0.86 1687.320 0.0000
surfaces etc. (SSLLP will provide source of water at one point RMC - M30 (FREE FLOW CUM 0.186 364.932 0.0000
at ground floor, vertical water line from source of water with one GRADE)
delivery point in each floor ), making the surface good to
receive the finishes, dewatering & keeping the area dry, CEMENT BAGS 1.2793 2509.987 0.0000
removing laitance from surface, providing the construction FLYASH - CONCRETE MT 0.0306 60.037 0.0000
joints, keeping ducts, opening as per drawing arranging stand ADO AT - NANO PUMP PACK 0.0127 24.917 0.0000
by vibrators & needles, making the date of concreting, grinding 200GM.
of uneven surfaces of concrete at shuttering joints, testing of
concrete etc. complete as per direction of Eng.-in- charge
51592 Labour & Hire Charges of 1.d) CONCRETE
(Concrete will beGRADE-M25
supplied by SSLLP at single point in each CUM 2610.000 300.0000 783,000.00
Equipment for CIVIL WORK from floor). RMC-M25 (FREE FLOW CUM 1 2610.000 0.0000
1st floor to above Roof of 14th 1.a) CONCRETE GRADE-M40 GRADE)
floor... \ 1.d) CONCRETE GRADE-
M25 CEMENT BAGS 6.0077 15680.097 0.0000
MEDIUM COARSE SAND MT 1 2610.000 0.0000
FOSROC - STRUCTURO KGS 0.6 1566.000 0.0000
203
STONE CHIPS - 1/2" MT 0.05 130.500 0.0000
OPC CEMENT (GRADE- MT 0.0383 99.963 0.0000
53)
FAIRMATE - FAIRCURE KGS 0.0054 14.094 0.0000
WC
OPC CEMENT (GRADE- MT 0.05 130.500 0.0000
43)
SIKAREP MICROCRETE-4 KGS 0.0517 134.937 0.0000
51592 Labour & Hire Charges of Labour charges for un-packing, shifting, fixing, centering, SQM 39570.000 244.0000 9,655,080.00
Equipment for CIVIL WORK from shuttering & removal of Aluminum formwork for vertical, 0 0.000 0.0000
1st floor to above Roof of 14th horizontal or sloping for all RCC works above ground level at all
floor... \ 2. Labour charges for un- heights including all leads with necessary supporting
51592 Labour
packing,&shifting,
Hire Charges
fixing,ofcentering, -do- above forapplying
arrangement, mockupapproved
work in 1st floor to start
shuttering the work.
oil (REBOL or (this SQM 2880.000 366.0000 1,054,080.00
Equipment
shuttering &for CIVIL WORK
removal from
of Aluminum item of work
FOSROC applicable
or BASF for 1st floor
or equivalent mock up by
as approved work only)on the
client)
1st
formfloor to above Roof of 14th form work, properly greasing the PVC sleeves for wall ties,
floor... \ 2.i) -do- above for mockup keeping the form work in position after concreting for a period
work in 1st floor to start the work. as specified in the relevant IS Code or as per instruction of
(this item of work applicable for 1 E.I.C. & removing the from work along with PVC cone & brown Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
tape (if required) after expiry of the specified period, complete
Aug 19,2019 5:03 PM
with all labour, tools & tackles etc. as per drawing &
specification. The form work shall be water tight & shall be free
SIDDHA SPHERE LLP
BOQ Estimation Report
51592 Labour & Hire Charges of -do- above for mockup work in 1st floor to start the work. (this SQM 2880.000 366.0000 1,054,080.00
Equipment for CIVIL WORK from item of work applicable for 1st floor mock up work only) 0 0.000 0.0000
1st floor to above Roof of 14th
floor... \ 2.i) -do- above for mockup
51592 Labour
work in & Hire
1st Charges
floor to startofthe work. Labour & Hire charges for shuttering with centering, SQM 750.000 507.0000 380,250.00
Equipment
(this item offor CIVIL
work WORK from
applicable for 1 fabricating, erecting & fixing in position steel plate or 12mm 5/8" STONE CHIPS. MT 0.0067 5.025 0.0000
1st floor to above Roof of 14th thick good quality ply board shuttering with required bracing for
STONE CHIPS - 1/2" MT 0.0267 20.025 0.0000
floor... \ 3. Labour & Hire charges curved & straight, true to line & level, including making
for shuttering with centering, provision for cut out with approved stout steel propping, across PVC ECO-DRAIN PIPE PCS 0.008 6.000 0.0000
fabricating, erecting & fixing in span, shuttering removal, applying shuttering oil, chamfering 315MM DIA X 6MTR.
position corners (of expose edges) of slabs, beams, columns, walls, LENGTH (SN-4
mullion post (if any) etc. complete as per drawing & direction of FAIRMATE - FAIRADD S KGS 0.0667 50.025 0.0000
E.I.C./consultant. Rate shall include all labour tools & tackles (PLASTICISED
hire charges of shuttering, shuttering oil, all consumable EXPANDING GROUT
materials removal & dismantling the aforesaid assembly after ADMIXTURE)
specified period complete.
3.i) For work above 14th. Floor roof. 315MM SUPREME NOS 0.0773 57.975 0.0000
ECODRAIN PIPE
CBEX 100 KGS 0.0067 5.025 0.0000
MEDIUM COARSE SAND MT 0.0187 14.025 0.0000
CEMENT BAGS 0.1933 144.975 0.0000
FULL COARSE SAND MT 0.0187 14.025 0.0000
51592 Labour & Hire Charges of Hire & labour charges for centering, shuttering, fabricating & SQM 30.000 525.0000 15,750.00
Equipment for CIVIL WORK from fixing of formwork for all RCC works for Fire refuge Platform at 0 0.000 0.0000
1st floor to above Roof of 14th necessary height including all leads with necessary M.S.
floor... \ 4. Hire & labour charges for supporting arrangement. Applying shuttering oil
51592 Labour
centering,& Hire Chargesfabricating
shuttering, of & Labour
(Like REBOL charges fromforFOSROC
straightening,
or BASF Cutting,
or anybending & fixing of
other approved oil) MT 410.000 9,886.0000 4,053,260.00
Equipment for CIVIL
fixing of formwork forWORK from
all RCC wor reinforcement
on the form work, in position
keepingwith PVC cover
the form work in blocks for RCC
position after work 16MM DIA TMT BAR MT 0.0571 23.411 0.0000
1st floor to above Roof of 14th at all levels for
concreting in all sorts of
a period asstructures
specified in including MainIS
the relevant bar,
Code or 08MM DIA TMT BAR MT 0.5888 241.408 0.0000
floor... \ 5. Labour charges for Distribution
as per instruction bars, Stirrups,
of E.I.C. &Binders
removing etc.theincluding
formwork costs
afterofexpiry
straightening, Cutting, bending & binding materials,
of the specified initialcomplete
period, straightening
with all& removal
materials,of labour,
loose rust
tools 10MM DIA TMT BAR MT 0.122 50.020 0.0000
fixing of reinforcement in position (if necessary)
& tackles cutting
etc. all as per todrawing
requisite&length, hookingThe
specification. & bending
formwork, to 32MM DIA TMT BAR MT 0.0282 11.562 0.0000
with PVC correct
shall beshape,
made out placing in proper
of approved position of
thickness & binding
plywoodwith 12mm 18 25MM DIA TMT BAR MT 0.0177 7.257 0.0000
gauge black annealed
thick plastic coated marine wire/ resistant
welding as plyper relevant
board, shallISbeCode
waterin
every 12MM DIA TMT BAR MT 0.1756 71.996 0.0000
tight ( intersection
by sealing the complete as per
joints with heavydrawing, specification
duty brown for
self-adhesive
work
tape) in Shearbe
& shall wall,
freeStair
from, warping,
Slabs, Parapet
denting wall, LMR, OHT, The
& unevenness. 20MM DIA TMT BAR MT 0.0106 4.346 0.0000
Chajjas,
rates shall fins as percost
include drawing
of all&labour,
directiontoolsof &
E.I.C./consultant.
tackles, hire
Steel reconciliation
by shall
charges be submitted with each R/A material,
& Final
51592 Labour & Hire Charges of Extra forof shuttering,
staging shuttering
props/M.S. oil, all
pipes consumable
with necessary bracing CUM 460.000 66.0000 30,360.00
Equipment for CIVIL WORK from Bills
cost ,lifting
of formingof the reinforcement
champers, coping, at all
drip levels,
beyond 4.0 meter height (mode of measurement where stagingmoulds, placing of
roundings,
necessary spacer, chair etc.corbels,
as unavoidable
& where necessary &shown
such MS PIPE 40MM KGS 2.5109 1155.014 0.0000
1st floor to above Roof of 14th grooves,4.0
beyond cut outs,isopening,
meter practically arches etc. asheight
mean ofother
in
floor... \ 6. Extra for staging by works
the that
drawings are required
[Measurement to make
shallit complete
be as per
above initial 4.0 meter). Area in plan X mean height of staging as per
drawing drawing.
& SWIVEL CLAMP NOS 0.3 138.000 0.0000
props/M.S. pipes with necessary [Measurement
specification].
up shall be asabove
to soffit of shuttering per drawing].
initial 4.0The rates
meter. shall
Rate include
includes,
bracing &beyond 4.0 meter all labour tools & tackles, PVC cover block of approved make,
51592 Labour Hire Charges of height all labour,
Labour tools &
charges fortackles,
fixing &the cost of hire
removing of PVCcharges of materials
pipe SLEEVE (dia. RMT 70.000 135.0000 9,450.00
(mode of mea binding
& wire etc. &
transportation, hire charges
removal of of one
staging Builders
after Hoist.
completion.
Equipment for CIVIL WORK from from 50mm to 250mm) in wall or slab as per drawing & 0 0.000 0.0000
1st floor to above Roof of 14th instruction of E.I.C. The PVC pipe shall be covered by layer of
floor... \ 7. Labour charges for fixing Grease, polythene sheet & thermo cool before fixing. Only
40195 Labour
& removingand Hire charges
of PVC of
pipe SLEEVE 16.
heavy Hireduty
andPVC labourpipecharges
will be of shuttering
provided work with 25mm thick
by developer. SQM 75.880 225.0000 17,073.00
equipment
(dia. from 50mmfor thetoconstruction of
250mm) in wall hard board or 12mm plywood without prop and board making 0 0.000 0.0000
civil work in substructure &
or slab etc. at side of foundation concrete.
superstruc \ 16. Hire and labour
40195 Labour
chargesand Hire charges
of shuttering workof with 17. labour charge of aluminium shuttering work at volumn & SQM 649.027 274.0000 177,833.40
equipment
25mm thickfor theboard
hard construction
or 12mmof S.W. of Sub-structure. where aluminium frame shuttering will be 0 0.000 0.0000
civil workwithout
plywood in substructure & provided by the developer.
superstruc \ 17. labour charge of
55566 Labour
aluminium andshuttering
Hire chargesworkof at Extra labour for lifting charges above 1st floor level for double CUM 35.000 58.0000 2,030.00
equipment
volumn & S.W. for the construction of
of Sub-structure. height portion. 0 0.000 0.0000
civil
where work in substructure and
aluminium 1.a) For mixing & laying M25/M30 grade reinforcement concrete.
superstr \ 1. Extra labour for lifting
55566 Labour
chargesand aboveHire1st
charges of for
floor level Bending binding & laying reinforcement MT 6.000 127.0000 762.00
equipment
double height for portion.
the construction of 0 0.000 0.0000
civil work in substructure and
superstr \ 1.b) Bending binding &
55566 Labour and Hire charges of
laying reinforcement Hire charges of centering & shuttering. SQM 350.000 6.0000 2,100.00
equipment for the construction of
civil work in substructure and
superstr \ 1.c) Hire charges of
centering & shuttering.
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
55566 Labour and Hire charges of Hire charges of centering & shuttering. SQM 350.000 6.0000 2,100.00
equipment for the construction of 0 0.000 0.0000
civil work in substructure and
superstr \ 1.c) Hire charges of
55566 Labour and
centering & Hire charges of
shuttering. Hire charges of Laying M25/M30 reinforcement concrete. Where CUM 12.000 300.0000 3,600.00
equipment for the construction of ready mix concrete was provided by developer. 0 0.000 0.0000
civil work in substructure and
superstr \ 1.d) Hire charges of
56083 quantity estimatereinforcement
Laying M25/M30 and quantity quantity estimate and quantity surveying for the Block - OPELIA SQFT 0.000 0.0000 0.00
surveying for theready
concrete. Where Blockmix
- OPELIA
concrete 0 0.000 0.0000
was provided by
56083 quantity estimate and quantity quantity estimate Report for pilling / shore - pilling RCC work SQFT 134276.000 0.5000 67,138.00
surveying for the Block - OPELIA \ 0 0.000 0.0000
RCC WORK
56083 quantity estimate and quantity quantity estimate Report for Finishing Work SQFT 134276.000 0.5000 67,138.00
surveying for the Block - OPELIA \ 0 0.000 0.0000
Finishing work
56083 quantity estimate and quantity quantity estimate Report for Details BBS SQFT 134276.000 0.2000 26,855.20
surveying for the Block - OPELIA \ 0 0.000 0.0000
BBS
56083 quantity estimate and quantity quantity estimate Report MEP SQFT 134276.000 0.3000 40,282.80
surveying for the Block - OPELIA \ 0 0.000 0.0000
MEP
58503 Labour charges for making Labour charges for single brick flat soling with fly ash brick of SQM 700.000 39.0000 27,300.00
temporary flooring for storing size 230mmX110mmX75mm are including ramming, chil-chaling FLY ASH BRICKS (230 X NOS 39 27300.000 0.0000
purpose with brick flat soling at & dressing properly including filling gaps the joints & leveling 110 X 70)
ground fl \ 1. Labour charges for the under bed with silver sand as per direction of E.I.C.
single brick flat soling with fly ash including the cost of all labour & carriage of brick within 45.0
51592 Labour
brick of &size
Hire Charges of
230mmX110mmX75mm do above for mockup work in 2nd floor to start the work. (this
meter. SQM 307.830 366.0000 112,665.78
Equipment
are inclu for CIVIL WORK from item of work
(Bricks applicable
& silver sand willfor
be2nd floor mock
supplied up work only)
by developer) 0 0.000 0.0000
1st floor to above Roof of 14th
floor... \ 2.ii) do above for mockup
58952 Labour
work in Charges
2nd floorfor Civil Work
to start in
the work. Labour charges for constructing 125/110mm thick brick SQM 1400.000 135.0000 189,000.00
Duct various
(this item area applicable
of work i.e. in Common,
for 2n masonry with standard clay brick or fly ash brick size RED BRICKS (1ST CLASS) NOS 51 71400.000 0.0000
Electrical, Lift Front Wall, Plum \ 1. 230X110X73mm in cement mortar 1:4 adequately soaked in
Labour charges for constructing water before use etc. (Rate includes all labour, tools,
125/110mm thick brick masonry scaffolding curing etc. complete as per direction of CHICKEN WIRE MESH ROLL 0.0357 49.980 0.0000
with standard clay brick or fly ash E.I.C./Consultant & technical specification at ground floor). FLY ASH BRICKS (230 X NOS 52 72800.000 0.0000
110 X 70)
MEDIUM COARSE SAND MT 0.4643 650.020 0.0000
CEMENT BAGS 0.0071 9.940 0.0000
CEMENT BAGS 1.5536 2175.040 0.0000
58952 Labour Charges for Civil Work in Labour charges for 250/230 mm thick brick masonry work with CUM 30.000 782.0000 23,460.00
Duct various area i.e. in Common, or fly as composite mortar brick in cement mortar 1:6 MEDIUM COARSE SAND MT 0.5 15.000 0.0000
Electrical, Lift Front Wall, Plum \ 2. adequately soaked in water before use etc. for side shuttering
Labour charges for 250/230 mm of pile cap, foundation beam & raft slab. RED BRICKS (1ST CLASS) NOS 435 13050.000 0.0000
thick brick masonry work with or fly
as composite mortar brick in c CEMENT BAGS 2.5 75.000 0.0000
FLY ASH BRICKS (230 X NOS 435 13050.000 0.0000
110 X 70)
CEMENT BAGS 0.3333 9.999 0.0000
58952 Labour Charges for Civil Work in Labour charges for plaster (to Wall, Ceiling etc.) with sand & SQM 1500.000 89.0000 133,500.00
Duct various area i.e. in Common, cement mortar including rounding of or chamfering corners as MEDIUM COARSE SAND MT 0.0267 40.050 0.0000
Electrical, Lift Front Wall, Plum \ 3. directed & racking out joints, chipping where necessary,
Labour charges for plaster (to Wall, including throating, nosing and drip course, scaffolding/staging CEMENT BAGS 0.09 135.000 0.0000
Ceiling etc.) with sand & cement where necessary as per specification drawing & direction of CEMENT BAGS 0.0067 10.050 0.0000
mortar including rounding o E.I.C./Consultant.
I) 15mm thick inside plastering with cement mortar (1:6) at
ground floor.
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
58952 Labour Charges for Civil Work in Labour charges for mixing & laying 1:2:4/1:1.5:3 grade CUM 15.000 809.0000 12,135.00
Duct various area i.e. in Common, reinforced cement concrete (excluding cost of shuttering & MEDIUM COARSE SAND MT 0.6667 10.000 0.0000
Electrical, Lift Front Wall, Plum \ 4. reinforcement) for all items e.g. columns, beams, slabs, lintels,
Labour charges for mixing & laying staircase, retaining wall, pockets etc. of all profile using good STONE CHIPS - 1/2" MT 0.8667 13.000 0.0000
1:2:4/1:1.5:3 grade reinforced quality aggregate (Stone Chips & Course Sand) as per design CEMENT BAGS 8.6667 130.000 0.0000
cement concrete (excluding cost mix approved by E.I.C./Consultant i/c. vibrating/compacting, 5/8" STONE CHIPS. MT 0.8667 13.000 0.0000
curing, as required, cleaning, preparing surfaces, junctions etc. 08MM DIA TMT BAR MT 0.0333 0.500 0.0000
complete as per drawing, specification & to the entire
satisfaction of E.I.C./Consultant.
58952 Labour Charges for Civil Work in Extra Labour for pouring concrete in R.C.C. lifts wall & column CUM 15.000 120.0000 1,800.00
Duct various area i.e. in Common, at any floor. (Over Item. No. 3) 0 0.000 0.0000
Electrical, Lift Front Wall, Plum \ 4.i)
Extra Labour for pouring concrete
64370 Labour
in R.C.C.Charges
lifts wallfor
& Civil
columnWork \
at any At 1st Floor CUM 2.310 915.0000 2,113.65
Labour Charges
floor. (Over Item.for
No.Civil
3 Work FLY ASH BRICKS (230 X NOS 476.1905 1100.000 0.0000
110 X 70)
CEMENT BAGS 0.4329 1.000 0.0000
CEMENT BAGS 1.2987 3.000 0.0000
PSC CEMENT (MINI BAGS 1082.2511 2500.000 0.0000
PLANT)
MEDIUM COARSE SAND MT 0.5411 1.250 0.0000
64370 Labour Charges for Civil Work \ At 2nd Floor CUM 2.310 980.0000 2,263.80
Labour Charges for Civil Work MEDIUM COARSE SAND MT 0.5411 1.250 0.0000
PSC CEMENT (MINI BAGS 519.4805 1200.000 0.0000
PLANT)
CEMENT BAGS 1.2987 3.000 0.0000
CEMENT BAGS 0.4329 1.000 0.0000
FLY ASH BRICKS (230 X NOS 476.1905 1100.000 0.0000
110 X 70)
64370 Labour Charges for Civil Work \ At 3rd Floor CUM 2.310 1,045.0000 2,413.95
Labour Charges for Civil Work MEDIUM COARSE SAND MT 0.5411 1.250 0.0000
CEMENT BAGS 1.2987 3.000 0.0000
FLY ASH BRICKS (230 X NOS 476.1905 1100.000 0.0000
110 X 70)
CEMENT BAGS 0.4329 1.000 0.0000
64370 Labour Charges for Civil Work \ At 4th Floor CUM 2.310 1,110.0000 2,564.10
Labour Charges for Civil Work CEMENT BAGS 0.4329 1.000 0.0000
FLY ASH BRICKS (230 X NOS 476.1905 1100.000 0.0000
110 X 70)
CEMENT BAGS 1.2987 3.000 0.0000
MEDIUM COARSE SAND MT 0.5411 1.250 0.0000
64370 Labour Charges for Civil Work \ At 5th Floor CUM 2.310 1,175.0000 2,714.25
Labour Charges for Civil Work FLY ASH BRICKS (230 X NOS 476.1905 1100.000 0.0000
110 X 70)
CEMENT BAGS 1.2987 3.000 0.0000
CEMENT BAGS 0.4329 1.000 0.0000
MEDIUM COARSE SAND MT 0.5411 1.250 0.0000
64370 Labour Charges for Civil Work \ At 6th Floor CUM 2.310 1,240.0000 2,864.40
Labour Charges for Civil Work CEMENT BAGS 1.2987 3.000 0.0000
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
64370 Labour Charges for Civil Work \ At 6th Floor CUM 2.310 1,240.0000 2,864.40
Labour Charges for Civil Work
FLY ASH BRICKS (230 X NOS 476.1905 1100.000 0.0000
110 X 70)
CEMENT BAGS 0.4329 1.000 0.0000
MEDIUM COARSE SAND MT 0.5411 1.250 0.0000
64370 Labour Charges for Civil Work \ At 7th Floor CUM 2.310 1,305.0000 3,014.55
Labour Charges for Civil Work FLY ASH BRICKS (230 X NOS 476.1905 1100.000 0.0000
110 X 70)
CEMENT BAGS 0.4329 1.000 0.0000
CEMENT BAGS 1.2987 3.000 0.0000
MEDIUM COARSE SAND MT 0.5411 1.250 0.0000
64370 Labour Charges for Civil Work \ At 8th Floor CUM 2.310 1,370.0000 3,164.70
Labour Charges for Civil Work MEDIUM COARSE SAND MT 0.5411 1.250 0.0000
CEMENT BAGS 0.4329 1.000 0.0000
CEMENT BAGS 1.2987 3.000 0.0000
FLY ASH BRICKS (230 X NOS 476.1905 1100.000 0.0000
110 X 70)
64370 Labour Charges for Civil Work \ At 9th Floor CUM 2.310 1,435.0000 3,314.85
Labour Charges for Civil Work CEMENT BAGS 1.2987 3.000 0.0000
CEMENT BAGS 0.4329 1.000 0.0000
MEDIUM COARSE SAND MT 0.5411 1.250 0.0000
FLY ASH BRICKS (230 X NOS 476.1905 1100.000 0.0000
110 X 70)
64370 Labour Charges for Civil Work \ At 10th Floor CUM 2.310 1,500.0000 3,465.00
Labour Charges for Civil Work MEDIUM COARSE SAND MT 0.5411 1.250 0.0000
CEMENT BAGS 0.4329 1.000 0.0000
CEMENT BAGS 1.2987 3.000 0.0000
FLY ASH BRICKS (230 X NOS 476.1905 1100.000 0.0000
110 X 70)
64370 Labour Charges for Civil Work \ At 11th Floor CUM 2.310 1,565.0000 3,615.15
Labour Charges for Civil Work MEDIUM COARSE SAND MT 0.5411 1.250 0.0000
FLY ASH BRICKS (230 X NOS 476.1905 1100.000 0.0000
110 X 70)
CEMENT BAGS 1.2987 3.000 0.0000
CEMENT BAGS 0.4329 1.000 0.0000
64370 Labour Charges for Civil Work \ At 12th Floor CUM 2.310 1,630.0000 3,765.30
Labour Charges for Civil Work FLY ASH BRICKS (230 X NOS 476.1905 1100.000 0.0000
110 X 70)
CEMENT BAGS 1.2987 3.000 0.0000
CEMENT BAGS 0.4329 1.000 0.0000
MEDIUM COARSE SAND MT 0.5411 1.250 0.0000
64370 Labour Charges for Civil Work \ At 13th Floor CUM 2.310 1,695.0000 3,915.45
Labour Charges for Civil Work MEDIUM COARSE SAND MT 0.5411 1.250 0.0000
CEMENT BAGS 0.4329 1.000 0.0000
FLY ASH BRICKS (230 X NOS 476.1905 1100.000 0.0000
110 X 70)
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
64370 Labour Charges for Civil Work \ At 13th Floor CUM 2.310 1,695.0000 3,915.45
Labour Charges for Civil Work BOQ Estimation Report
64370 Labour Charges for Civil Work \ At 14th Floor CUM 0.000 0.0000 0.00
Labour Charges for Civil Work 0 0.000 0.0000
64370 Labour Charges for Civil Work \ At 15th Floor CUM 0.000 0.0000 0.00
Labour Charges for Civil Work 0 0.000 0.0000
64370 Labour Charges for Civil Work \ At 16th Floor CUM 0.000 0.0000 0.00
Labour Charges for Civil Work 0 0.000 0.0000
64370 Labour Charges for Civil Work \ At 17th Floor CUM 0.000 0.0000 0.00
Labour Charges for Civil Work 0 0.000 0.0000
64370 Labour Charges for Civil Work \ At 18th Floor CUM 0.000 0.0000 0.00
Labour Charges for Civil Work 0 0.000 0.0000
64370 Labour Charges for Civil Work \ At 19th Floor CUM 0.000 0.0000 0.00
Labour Charges for Civil Work 0 0.000 0.0000
64370 Labour Charges for Civil Work \ At 1st Floor SQM 108.000 145.0000 15,660.00
Labour charges for constructing GI BINDING WIRE 22 SWG KGS 0.0093 1.004 0.0000
125/110mm thick brick masonry
08MM DIA TMT BAR MT 0.0093 1.004 0.0000
SIKATOP - 122 HS - KGS 0.0093 1.004 0.0000
POLYMER MORTAR
MS BINDING WIRE 20 KGS 0.0093 1.004 0.0000
SWG
SIKATOP-77 KGS 0.0093 1.004 0.0000
CHICKEN WIRE MESH ROLL 0.0093 1.004 0.0000
12MM DIA TMT BAR MT 0.0093 1.004 0.0000
MEDIUM COARSE SAND MT 0.0579 6.253 0.0000
FLY ASH BRICKS (230 X NOS 52.7778 5700.002 0.0000
110 X 70)
CEMENT BAGS 0.2315 25.002 0.0000
SIKA FIBRE MESH METRE 0.0093 1.004 0.0000
CEMENT BAGS 0.0463 5.000 0.0000
10MM DIA TMT BAR MT 0.0093 1.004 0.0000
64370 Labour Charges for Civil Work \ At 2nd Floor SQM 108.000 155.0000 16,740.00
Labour charges for constructing FLY ASH BRICKS (230 X NOS 52.7778 5700.002 0.0000
125/110mm thick brick masonry 110 X 70)
MEDIUM COARSE SAND MT 0.0579 6.253 0.0000
CEMENT BAGS 0.0463 5.000 0.0000
CEMENT BAGS 0.2315 25.002 0.0000
64370 Labour Charges for Civil Work \ At 3rd Floor SQM 108.000 165.0000 17,820.00
Labour charges for constructing FLY ASH BRICKS (230 X NOS 52.7778 5700.002 0.0000
125/110mm thick brick masonry 110 X 70)
CEMENT BAGS 0.0463 5.000 0.0000
MEDIUM COARSE SAND MT 0.0579 6.253 0.0000
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
64370 Labour Charges for Civil Work \ At 3rd Floor SQM 108.000 165.0000 17,820.00
Labour charges for constructing BOQ Estimation Report
125/110mm thick brick masonry
64370 Labour Charges for Civil Work \ At 4th Floor SQM 108.000 175.0000 18,900.00
Labour charges for constructing MEDIUM COARSE SAND MT 0.0579 6.253 0.0000
125/110mm thick brick masonry
CEMENT BAGS 0.2315 25.002 0.0000
CEMENT BAGS 0.0463 5.000 0.0000
FLY ASH BRICKS (230 X NOS 52.7778 5700.002 0.0000
110 X 70)
64370 Labour Charges for Civil Work \ At 5th Floor SQM 108.000 185.0000 19,980.00
Labour charges for constructing CEMENT BAGS 0.2315 25.002 0.0000
125/110mm thick brick masonry
FLY ASH BRICKS (230 X NOS 52.7778 5700.002 0.0000
110 X 70)
MEDIUM COARSE SAND MT 0.0579 6.253 0.0000
CEMENT BAGS 0.0463 5.000 0.0000
64370 Labour Charges for Civil Work \ At 6th Floor SQM 108.000 195.0000 21,060.00
Labour charges for constructing CEMENT BAGS 0.2315 25.002 0.0000
125/110mm thick brick masonry
FLY ASH BRICKS (230 X NOS 52.7778 5700.002 0.0000
110 X 70)
CEMENT BAGS 0.0463 5.000 0.0000
MEDIUM COARSE SAND MT 0.0579 6.253 0.0000
64370 Labour Charges for Civil Work \ At 7th Floor SQM 108.000 205.0000 22,140.00
Labour charges for constructing CEMENT BAGS 0.0463 5.000 0.0000
125/110mm thick brick masonry
FLY ASH BRICKS (230 X NOS 52.7778 5700.002 0.0000
110 X 70)
CEMENT BAGS 0.2315 25.002 0.0000
MEDIUM COARSE SAND MT 0.0579 6.253 0.0000
64370 Labour Charges for Civil Work \ At 8th Floor SQM 108.000 215.0000 23,220.00
Labour charges for constructing CEMENT BAGS 0.0463 5.000 0.0000
125/110mm thick brick masonry
CEMENT BAGS 0.2315 25.002 0.0000
MEDIUM COARSE SAND MT 0.0579 6.253 0.0000
FLY ASH BRICKS (230 X NOS 52.7778 5700.002 0.0000
110 X 70)
64370 Labour Charges for Civil Work \ At 9th Floor SQM 108.000 225.0000 24,300.00
Labour charges for constructing CEMENT BAGS 0.0463 5.000 0.0000
125/110mm thick brick masonry
FLY ASH BRICKS (230 X NOS 52.7778 5700.002 0.0000
110 X 70)
CEMENT BAGS 0.2315 25.002 0.0000
MEDIUM COARSE SAND MT 0.0579 6.253 0.0000
64370 Labour Charges for Civil Work \ At 10th Floor SQM 108.000 235.0000 25,380.00
Labour charges for constructing FLY ASH BRICKS (230 X NOS 52.7778 5700.002 0.0000
125/110mm thick brick masonry 110 X 70)
CEMENT BAGS 0.0463 5.000 0.0000
MEDIUM COARSE SAND MT 0.0579 6.253 0.0000
CEMENT BAGS 0.2315 25.002 0.0000
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
64370 Labour Charges for Civil Work \ At 11th Floor SQM 108.000 245.0000 26,460.00
Labour charges for constructing CEMENT BAGS 0.0463 5.000 0.0000
125/110mm thick brick masonry
FLY ASH BRICKS (230 X NOS 52.7778 5700.002 0.0000
110 X 70)
MEDIUM COARSE SAND MT 0.0579 6.253 0.0000
CEMENT BAGS 0.2315 25.002 0.0000
64370 Labour Charges for Civil Work \ At 12th Floor SQM 108.000 255.0000 27,540.00
Labour charges for constructing CEMENT BAGS 0.2315 25.002 0.0000
125/110mm thick brick masonry
CEMENT BAGS 0.0463 5.000 0.0000
MEDIUM COARSE SAND MT 0.0579 6.253 0.0000
FLY ASH BRICKS (230 X NOS 52.7778 5700.002 0.0000
110 X 70)
64370 Labour Charges for Civil Work \ At 13th Floor SQM 108.000 265.0000 28,620.00
Labour charges for constructing CEMENT BAGS 0.0463 5.000 0.0000
125/110mm thick brick masonry
CEMENT BAGS 0.2315 25.002 0.0000
FLY ASH BRICKS (230 X NOS 52.7778 5700.002 0.0000
110 X 70)
MEDIUM COARSE SAND MT 0.0579 6.253 0.0000
64370 Labour Charges for Civil Work \ At 14th Floor SQM 0.000 0.0000 0.00
Labour charges for constructing 0 0.000 0.0000
125/110mm thick brick masonry
64370 Labour Charges for Civil Work \ At 15th Floor SQM 0.000 0.0000 0.00
Labour charges for constructing 0 0.000 0.0000
125/110mm thick brick masonry
64370 Labour Charges for Civil Work \ At 16th Floor SQM 0.000 0.0000 0.00
Labour charges for constructing 0 0.000 0.0000
125/110mm thick brick masonry
64370 Labour Charges for Civil Work \ At 17th Floor SQM 0.000 0.0000 0.00
Labour charges for constructing 0 0.000 0.0000
125/110mm thick brick masonry
64370 Labour Charges for Civil Work \ At 18th Floor SQM 0.000 0.0000 0.00
Labour charges for constructing 0 0.000 0.0000
125/110mm thick brick masonry
64370 Labour Charges for Civil Work \ At 19th Floor SQM 0.000 0.0000 0.00
Labour charges for constructing 0 0.000 0.0000
125/110mm thick brick masonry
64370 Labour Charges for Civil Work \ At 1st Floor SQM 116.000 116.5000 13,514.00
Labour charges for plaster with MEDIUM COARSE SAND MT 0.0302 3.503 0.0000
sand & cement mortar including
CEMENT BAGS 0.069 8.004 0.0000
rounding
CEMENT BAGS 0.0172 1.995 0.0000
64370 Labour Charges for Civil Work \ At 2nd Floor SQM 116.000 123.0000 14,268.00
Labour charges for plaster with CEMENT BAGS 0.069 8.004 0.0000
sand & cement mortar including
MEDIUM COARSE SAND MT 0.0302 3.503 0.0000
rounding
CEMENT BAGS 0.0172 1.995 0.0000
64370 Labour Charges for Civil Work \ At 3rd Floor SQM 116.000 129.5000 15,022.00
Labour charges for plaster with CEMENT BAGS 0.0172 1.995 0.0000
sand & cement mortar including
rounding
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
64370 Labour Charges for Civil Work \ At 3rd Floor SQM 116.000 129.5000 15,022.00
Labour charges for plaster with
sand & cement mortar including
CEMENT BAGS 0.069 8.004 0.0000
rounding
MEDIUM COARSE SAND MT 0.0302 3.503 0.0000
64370 Labour Charges for Civil Work \ At 4th Floor SQM 116.000 136.0000 15,776.00
Labour charges for plaster with MEDIUM COARSE SAND MT 0.0302 3.503 0.0000
sand & cement mortar including
rounding CEMENT BAGS 0.069 8.004 0.0000
CEMENT BAGS 0.0172 1.995 0.0000
64370 Labour Charges for Civil Work \ At 5th Floor SQM 116.000 142.5000 16,530.00
Labour charges for plaster with CEMENT BAGS 0.069 8.004 0.0000
sand & cement mortar including
CEMENT BAGS 0.0172 1.995 0.0000
rounding
MEDIUM COARSE SAND MT 0.0302 3.503 0.0000
64370 Labour Charges for Civil Work \ At 6th Floor SQM 116.000 149.0000 17,284.00
Labour charges for plaster with MEDIUM COARSE SAND MT 0.0302 3.503 0.0000
sand & cement mortar including
CEMENT BAGS 0.069 8.004 0.0000
rounding
CEMENT BAGS 0.0172 1.995 0.0000
64370 Labour Charges for Civil Work \ At 7th Floor SQM 116.000 155.5000 18,038.00
Labour charges for plaster with CEMENT BAGS 0.0172 1.995 0.0000
sand & cement mortar including
rounding CEMENT BAGS 0.069 8.004 0.0000
MEDIUM COARSE SAND MT 0.0302 3.503 0.0000
64370 Labour Charges for Civil Work \ At 8th Floor SQM 116.000 162.0000 18,792.00
Labour charges for plaster with CEMENT BAGS 0.069 8.004 0.0000
sand & cement mortar including
MEDIUM COARSE SAND MT 0.0302 3.503 0.0000
rounding
CEMENT BAGS 0.0172 1.995 0.0000
64370 Labour Charges for Civil Work \ At 9th Floor SQM 116.000 168.0000 19,488.00
Labour charges for plaster with CEMENT BAGS 0.0172 1.995 0.0000
sand & cement mortar including
rounding MEDIUM COARSE SAND MT 0.0302 3.503 0.0000
CEMENT BAGS 0.069 8.004 0.0000
64370 Labour Charges for Civil Work \ At 10th Floor SQM 116.000 175.0000 20,300.00
Labour charges for plaster with MEDIUM COARSE SAND MT 0.0302 3.503 0.0000
sand & cement mortar including
CEMENT BAGS 0.0172 1.995 0.0000
rounding
PSC CEMENT (MINI BAGS 4.3103 499.995 0.0000
PLANT)
CEMENT BAGS 0.069 8.004 0.0000
64370 Labour Charges for Civil Work \ At 11th Floor SQM 116.000 181.5000 21,054.00
Labour charges for plaster with CEMENT BAGS 0.069 8.004 0.0000
sand & cement mortar including
MEDIUM COARSE SAND MT 0.0302 3.503 0.0000
rounding
CEMENT BAGS 0.0172 1.995 0.0000
64370 Labour Charges for Civil Work \ At 12th Floor SQM 116.000 188.0000 21,808.00
Labour charges for plaster with PSC CEMENT (MINI BAGS 43.1034 4999.994 0.0000
sand & cement mortar including PLANT)
rounding
CEMENT BAGS 0.069 8.004 0.0000
CEMENT BAGS 0.0172 1.995 0.0000
MEDIUM COARSE SAND MT 0.0302 3.503 0.0000
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
64370 Labour Charges for Civil Work \ At 12th Floor SQM 116.000 188.0000 21,808.00
Labour charges for plaster with
sand & cement mortar including BOQ Estimation Report
rounding
64370 Labour Charges for Civil Work \ At 13th Floor SQM 116.000 194.5000 22,562.00
Labour charges for plaster with CEMENT BAGS 0.069 8.004 0.0000
sand & cement mortar including
CEMENT BAGS 0.0172 1.995 0.0000
rounding
MEDIUM COARSE SAND MT 0.0302 3.503 0.0000
64370 Labour Charges for Civil Work \ At 14th Floor SQM 0.000 0.0000 0.00
Labour charges for plaster with 0 0.000 0.0000
sand & cement mortar including
rounding
64370 Labour Charges for Civil Work \ At 15th Floor SQM 0.000 0.0000 0.00
Labour charges for plaster with 0 0.000 0.0000
sand & cement mortar including
rounding
64370 Labour Charges for Civil Work \ At 16th Floor SQM 0.000 0.0000 0.00
Labour charges for plaster with 0 0.000 0.0000
sand & cement mortar including
rounding
64370 Labour Charges for Civil Work \ At 17th Floor SQM 0.000 0.0000 0.00
Labour charges for plaster with 0 0.000 0.0000
sand & cement mortar including
rounding
64370 Labour Charges for Civil Work \ At 18th Floor SQM 0.000 0.0000 0.00
Labour charges for plaster with 0 0.000 0.0000
sand & cement mortar including
rounding
64370 Labour Charges for Civil Work \ At 19th Floor SQM 0.000 0.0000 0.00
Labour charges for plaster with 0 0.000 0.0000
sand & cement mortar including
rounding
64370 Labour Charges for Civil Work \ Labour charges for pipe slot filling at toilet after fixing pipe (by RMT 3200.000 40.0000 128,000.00
Labour charges for pipe slot filling Plumbing Agency) with concrete grade M-20 (1: 1.1/2 :3) 10MM STONE CHIPS MT 0.0141 45.120 0.0000
at toilet after fixing pipe (by including mending good damages & roughening the surface.
5/8" STONE CHIPS. MT 0.0019 6.080 0.0000
Plumbing Agency) with concrete Before concreting chipping to be done & cement slurry to be
laid as per instruction of E.I.C. CEMENT BAGS 0.0703 224.960 0.0000
MEDIUM COARSE SAND MT 0.0078 24.960 0.0000
CEMENT BAGS 0.0131 41.920 0.0000
OPC CEMENT (GRADE- MT 0.0005 1.600 0.0000
53)
OPC CEMENT (GRADE- MT 0.0005 1.600 0.0000
43)
64370 Labour Charges for Civil Work \ Labour charges for making window beat to inside of window to RMT 3000.000 39.0000 117,000.00
Labour charges for making window protect rainwaters at any floor as per instruction of E.I.C. CEMENT BAGS 0.0057 17.100 0.0000
beat to inside of window to protect
CEMENT BAGS 0.001 3.000 0.0000
rainwaters at any floor as per
FLYASH - CONCRETE. BAGS 0.0467 140.100 0.0000
FULL COARSE SAND MT 0.001 3.000 0.0000
MEDIUM COARSE SAND MT 0.0012 3.600 0.0000
65276 Civil \ 6.i Providing scaffolding Providing scaffolding including working platforms at various CUM 1000.000 100.0000 100,000.00
including working platforms at levels beyond 4.0 meter height as reqired from time to time, 0 0.000 0.0000
various levels beyond 4.0 meter erecting & removing the scaffolding, staging as directed
height as r including the cost of all materials, cost of labour, cost of
66088 Ground Floor Civil work \ 1.Labour 1.Labour
equipment charges for Earth
& machinary, work
work at in
all excavation in &
leads, levels required
lifts, loading CUM 30.000 180.0000 5,400.00
charges for Earth work in profile in all type
& unloading, of soils in dry
transportation & other
& all wet condition for,
incidental raft or etc.
charges any 0 0.000 0.0000
excavation in required profile.Depth other foundation
The work shall beofcaried
the proposed
out as perstructure as per of
the directions drawings
the E.I.C&
up to 1.5 meter.. direction of E.I.C./Consultant including all lift within the lead of
66088 Ground Floor Civil work \ 2.Labour 2.Labour charges for Earth
75.0 meter...1a.Depth work
up to 1.5 in filling with earth obtained
meter. CUM 28.000 135.0000 3,780.00
charges for Earth work in filling from excavation in layer not exceeding 250 mm as per direction 0 0.000 0.0000
with earth obtained from excavation of E.I.C./Consultant (payment to be made on the basis of pre
in layer not exceedin work & post work level measurement of finished quantity of
work
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
66088 Ground Floor Civil work \ 3.Providing Mixing & laying polythene sheet (150gr/Sqm.) below SQM 60.000 25.0000 1,500.00
3.Providing Mixing & laying flooring in foundation or in foundation trenches. 0 0.000 0.0000
polythene sheet (150gr/Sqm.) below
flooring in foundation or in foundati
66088 Ground Floor Civil work \ 4.Labour 4.Labour charges for mixing & laying 1:3:6/1:4:8 Plain Cement CUM 6.000 680.0000 4,080.00
charges for mixing & laying Concrete (P.C.C) of required thickness below footing, raft or any 12MM DIA TMT BAR MT 0.0833 0.500 0.0000
1:3:6/1:4:8 Plain Cement Concrete other location as specified in the drawing till plinth level using
(P.C.C) of required thickness stone chips with compacting, as required establishing SILVER SAND. MT 16.6667 100.000 0.0000
dewatering system by pumping / bailing out water, cleaning, CEMENT BAGS 8.3333 50.000 0.0000
preparing surfaces, junctions etc. including curing complete to MEDIUM COURSE SAND MT 0.8333 5.000 0.0000
be the entire satisfaction of E.I.C/Consultant... (ZONE -III)
5/8" STONE CHIPS. MT 0.5 3.000 0.0000
PPC Cement BAGS 8.3333 50.000 0.0000
08MM DIA TMT BAR MT 0.0833 0.500 0.0000
10MM DIA TMT BAR MT 0.0833 0.500 0.0000
SILVER SAND MT 16.6667 100.000 0.0000
MEDIUM COURSE SAND - MT 0.8333 5.000 0.0000
(ZONE -II)
10MM STONE CHIPS MT 0.8333 5.000 0.0000
16MM DIA TMT BAR MT 0.0833 0.500 0.0000
MEDIUM COARSE SAND MT 0.8333 5.000 0.0000
66088 Ground Floor Civil work \ 5.Labour 5.Labour charges for single brick soling with picked jhama brick SQM 130.000 39.0000 5,070.00
charges for single brick soling with below foundation floor, pile cap, tie beam etc. or any other 0 0.000 0.0000
picked jhama brick below 5.aBrick location till plinth level including preparation of bed as
on flat soling (75m. necessary with joints properly filled in & packed with powdered
66088 Ground Floor Civil work \ 6.Hire and 6.Hire
earth orand labour
silver sand charges
complete for shuttering
as per drawing,with centering,
specification SQM 30.000 417.0000 12,510.00
labour charges for shuttering with fabricating, erecting
....Brick on flat solingand(75mmfixing in position steel plate or 12mm
thick). 0 0.000 0.0000
centering, fabricating, erecting and thick good quality ply board shuttering with required bracing for
fixing in positio curved and straight, true to line and level, including making
66088 Ground Floor Civil work \ 7.Labour 7.Labour
provisioncharges
for cut out for with
mixing & laying
approved 1:2:4/1:1.5:3
stout grade across
steel propping, CUM 6.000 850.0000 5,100.00
charges for mixing & laying reinforced cementremoval,
span, shuttering concreteapplying
(excluding cost of shuttering
shuttering oil, chamfering& 0 0.000 0.0000
1:2:4/1:1.5:3 grade reinforced reinforcement)
corners (of expose for all itemsofe.g.
edges) columns,
slabs, beams, beams,
columns,slabs, lintels,
walls,
cement concrete (excluding cost staircase,
mullion post retaining
(if any)wall, pockets etc.
etc. complete of all
as per profile &
drawing using goodof
direction
66088 Ground Floor Civil work \ 8.Labour 8.Labour
quality charges Rate
aggregate
E.I.C./Consultant. for bending,
(stone chips
shall binding
& course
include &sand)
laying
removal as
and ofdismantling
per design MT 1.000 5,600.0000 5,600.00
charges for bending, binding & reinforcement
mix forE.I.C/Consultant
approvedassembly
the aforesaid by reinforced
after cement concrete
including
specified work in all sorts
period complete. 0 0.000 0.0000
laying of reinforcement for of structures includingcuring,
vibrating/compacting, distribution bars, stirrups,
as required, cleaning, binders
preparingetc.
reinforced cement concrete work including costs of binding
surfaces, junctions materials,
etc. complete initial
as per straightening
drawing, &
specification
66088 Ground Floor Civil work \ 9.Labour 9.Labour
removal charges
of
& to the entireloose for constructing
rust (if necessary)
satisfaction 230/250
cuttingmm
of E.I.C/Consultant. thick masonry
to requisite length, CUM 18.000 782.0000 14,076.00
charges for constructing 230/250 work
hookingwith&standard
bending to clay brickshape,
correct or fly ash brickinsize
placing proper position MEDIUM COARSE SAND MT 0.2778 5.000 0.0000
mm thick masonry work with 230x110x73mm
& binding with 16 in gauge
cement mortar
black 1:6 adequately
annealed soaked
wire / welding asinper GI BINDING WIRE 26 SWG KGS 0.5556 10.001 0.0000
standard clay brick or fly ash water
relevantbefore use etc.
I.S. code (Rateinspection
in every includes all labour, tools,
complete as per drawing,
scaffolding
specification curing
for worketc.incomlete as perbasement
foundation, directionslab,
of wall, pile
E.I.C/Consultant
cap, tie beam, column, & technical specification
deck slab, roof beam, at ground floor).
floor beam, lintel FLY ASH BRICKS (230 X NOS 500 9000.000 0.0000
chajja, fins, fascia etc. as per drawing & direction of 110 X 70)
E.I.C/Consultant. PPC Cement BAGS 5.5556 100.001 0.0000
GI BINDING WIRE 22 SWG KGS 0.5556 10.001 0.0000
66088 Ground Floor Civil work \ 10.Labour 10.Labour charges for constructing 125/110mm thick brick SQM 80.000 135.0000 10,800.00
charges for constructing masonry with standard clay brick or fly ash brick size 0 0.000 0.0000
125/110mm thick brick masonry 230X110X73mm in cement mortar 1:4....(Rate includes all
with standard clay brick or fly ash labour, tools, scaffolding curing etc. complete as per direction
of E.I.C./Consultant & technical specification at ground floor).
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
66088 Ground Floor Civil work \ 10.Labour 10.Labour charges for constructing 125/110mm thick brick SQM 80.000 135.0000 10,800.00
charges for constructing masonry with standard clay brick or fly ash brick size
125/110mm thick brick masonry 230X110X73mm in cement mortar 1:4....(Rate includes all
with standard clay brick or fly ash labour, tools, scaffolding curing etc. complete as per direction
66088 Ground Floor Civil work \ 11.Labour 11.Labour charges for
of E.I.C./Consultant plaster (to
& technical wall, ceilingat
specification etc.) with floor).
ground sand & SQM 180.000 110.0000 19,800.00
charges for plaster (to wall, ceiling cement mortar including rounding of or chamfering corners as 0 0.000 0.0000
etc.) with...20mm thick outside directed & racking out joints, chipping where necessary,
plastering with ceme including throating, nosing and drip course, scaffolding/staging
72179 Ground Floor Civil work \ 1.Earth 1.Earth work in excavation
where necessary in requireddrawing
as per specification profile in& all type of of
direction soils CUM 10.000 180.0000 1,800.00
work in excavation in required in dry or wet condition for thick
E.I.C./Consultant.....20mm pile cap, raft or
outside any otherwith
plastering foundation
cement 0 0.000 0.0000
profile in all type of soils in dry or of the proposed
mortar structure
(1:4) at ground flooras per drawings and direction of
wet condition for pile E.I.C/ consultant including all lift within the lead of 75.0 mtr
72179 Ground Floor Civil work \ 2.Earth 2.Earth work in filling with earth obtained from excavation in CUM 100.000 135.0000 13,500.00
work in filling with earth obtained layer not exceeding 250 mm. in including watering, ramming 0 0.000 0.0000
from excavation in layer not etc. complete in all respect as per direction of E.I.C/consultant
exceeding 250 mm. in includ (payment to be made on the basis of pre work and post work
72179 Ground Floor Civil work \ 3.Labour 3.Labour charges for
level measurement ofconstructing 230/250
finished quantity mm thick masonry
of work. CUM 10.000 850.0000 8,500.00
charges for constructing 230/250 work with standard clay brick or fly ash brick size FLY ASH BRICKS (230 X NOS 432 4320.000 0.0000
mm thick masonry work with 230x110x73mm in cement mortar 1:6 adequately soaked in 110 X 70)
standard clay brick or fly ash water before use etc.
MEDIUM COURSE SAND MT 0.2 2.000 0.0000
(ZONE -III)
CEMENT BAGS 2 20.000 0.0000
PPC CEMENT BAGS 2 20.000 0.0000
PSC CEMENT (MINI BAGS 2 20.000 0.0000
PLANT)
FLY ASH BRICKS (230 X NOS 430 4300.000 0.0000
110 X 70)
FULL COARSE SAND MT 0.2 2.000 0.0000
OPC CEMENT BAGS 2 20.000 0.0000
SAND - ZONE II MT 0.2 2.000 0.0000
SAND - ZONE III MT 0.5 5.000 0.0000
72179 Ground Floor Civil work \ 4.Labour 4.Labour charges for constructing 125/110mm thick brick SQM 30.000 145.0000 4,350.00
charges for constructing masonry with standard clay brick or fly ash brick size FLY ASH BRICKS (230 X NOS 51 1530.000 0.0000
125/110mm thick brick masonry 230x110x73mm in cement mortar 1:4 adequately soaked in 110 X 70)
with standard clay brick or fly ash water before use etc.
PSC CEMENT (MINI BAGS 0.25 7.500 0.0000
PLANT)
SAND - ZONE III MT 0.1 3.000 0.0000
PARTITION NET BUNDLE 1 30.000 0.0000
PARTITION NET BUNDLE 0.2 6.000 0.0000
72179 Ground Floor Civil work \ 5.Labour 5.Labour charges for plaster (to wall, ceiling etc.) with sand & SQM 80.000 115.0000 9,200.00
charges for plaster (to wall, ceiling
cement mortar including rounding of or chamfering corners as SAND - ZONE III MT 0.05 4.000 0.0000
etc.) with sand & cement mortar directed & racking out joints, chipping where necessary,
PSC CEMENT (MINI BAGS 0.25 20.000 0.0000
including rounding of including throating, nosing and drip course, scaffolding/staging
PLANT)
where necessary as per specification drawing & direction of
E.I.C./Consultant.....20mm thick outside plastering with cement
mortar (1:4)
72179 Ground Floor Civil work \ 6.Labour 6.Labour at ground
charges floor and laying 1:3:6 plain cement
for mixing CUM 20.000 750.0000 15,000.00
charges for mixing and laying 1:3:6 concrete (P.C.C) of required thickness below footing, raft or any 10MM STONE CHIPS MT 1 20.000 0.0000
plain cement concrete (P.C.C) of other location as specified in the drawing till plinth level using
CEMENT BAGS 10 200.000 0.0000
required thickness bel stone chips with compacting, as required including shuttering,
curing complete to the entire satisfaction of E.I.C/consultant 5/8" STONE CHIPS MT 0.9 18.000 0.0000
10MM STONE CHIPS MT 0.6 12.000 0.0000
PSC CEMENT (MINI BAGS 4.5 90.000 0.0000
PLANT)
SAND - ZONE III MT 0.71 14.200 0.0000
PSC CEMENT (MINI BAGS 10 200.000 0.0000
PLANT)
5/8" STONE CHIPS. MT 1 20.000 0.0000
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
72179 Ground Floor Civil work \ 7.Labour 7.Labour charges for laying polythene sheet (150gr/Sqm.) below SQM 200.000 25.0000 5,000.00
charges for laying polythene sheet flooring in foundation or in foundation trenches. (Item includes 0 0.000 0.0000
(150gr/Sqm.) below flooring in the cost of polythene sheet)
foundation or in foundati
72179 Ground Floor Civil work \ 8.Hire & 8.Hire & labour charges for shuttering & centering with 12 mm. SQM 10.000 417.0000 4,170.00
labour charges for shuttering & thick good quality ply board shuttering with required bracing for 0 0.000 0.0000
centering with 12 mm. thick good curved or straight including fitting, fixing & striking out after
quality ply board shutteri completion of works up to plinth complete as per drawing,
72179 Ground Floor Civil work \ 9.Labour 9.Labour charges
specification for mixing
and direction ofand laying M25 grade reinforced
E.I.C/consultant CUM 2.000 905.0000 1,810.00
charges for mixing and laying M25 cement concrete using aggregate (stone chips & course sand) FLY ASH - BAGS MT 0.1 0.200 0.0000
grade reinforced cement concrete as per design mix approved by E.I.C/consultant including
using aggregate (stone c vibrating/compacting, curing, as required, cleaning, preparing OPC CEMENT BAGS 9 18.000 0.0000
surfaces, junctions etc. complete as per drawing, specification
and to the entire
72179 Ground Floor Civil work \ 10.Labour 10.Labour satisfaction
charges for Bending, of E.I.C/Consultant.
binding and laying of MT 1.500 7,150.0000 10,725.00
charges for Bending, binding and reinforcement (8mm to 10mm) for reinforced cement concrete 08MM DIA TMT BAR MT 1 1.500 0.0000
laying of reinforcement (8mm to work in all sorts of structures including distribution bars,
10MM DIA TMT BAR MT 0.5 0.750 0.0000
10mm) for reinforced ceme stirrups, binders etc. including costs of binding materials, as
per direction of E.I.C/consultant. (Reinforcement bar will be
provided by
72179 Ground Floor Civil work \ 11.Labour 11.Labour developer
charges withatallfree of cost).
tools & tackles, including handling of CUM 50.000 350.0000 17,500.00
charges with all tools & tackles, concrete placing hose pipe for laying cement concrete at 0 0.000 0.0000
including handling of concrete Ground Floor slab, as per drawing specification & direction of
placing hose pipe for lay E.I.C. including vibrating compacting, curing as required,
72179 Ground Floor Civil work \ 12.Labour cleaning,
12.Labourpreparation
charges forofremoval
surfaceofetc.single brick soling SQM 130.000 25.0000 3,250.00
charges for removal of single brick 1.a) CONCRETE GRADE-M25 0 0.000 0.0000
soling
72179 Ground Floor Civil work \ 13.Labour 13.Labour charges for scafolding with bamboo & Coconut CUM 50.000 100.0000 5,000.00
charges for scafolding with bamboo Rope. 0 0.000 0.0000
& Coconut Rope.
74167 CIVIL WORK \ 1.LABOUR CHARGES 1.LABOUR CHARGES FOR MAKING RCC HOLE IN FRONT OF NO 1.000 1.0000 1.00
FOR MAKING RCC HOLE IN FRONT LIFT FACIA FOR FIXING LIFT CALL BUTTON AT EACH FLOOR 0 0.000 0.0000
OF LIFT FACIA FOR FIXING LIFT
CALL BUTTON AT EACH FLO
74167 CIVIL WORK \ 2.LABOUR CHARGES 2.LABOUR CHARGES FOR CHIPPING AND REMOVING NO 1.000 1.0000 1.00
FOR CHIPPING AND REMOVING CONCRETE AT INSERT PLATE FOR FIXING JOIST AT OUTSIDE 0 0.000 0.0000
CONCRETE AT INSERT PLATE FOR OF PROJECTION SLAB WORK.
FIXING JOIST AT OUTSIDE OF P
74167 CIVIL WORK \ 3.LABOUR CHARGES 3.LABOUR CHARGES FOR DISMANTALLING RCC CUM 1.000 1.0000 1.00
FOR DISMANTALLING RCC SLAB,BEAM,FDN ETC AS PER INSTRUCTION OF E.I.C. 0 0.000 0.0000
SLAB,BEAM,FDN ETC AS PER
INSTRUCTION OF E.I.C.
74167 CIVIL WORK \ 4.LABOUR CHARGES 4.LABOUR CHARGES FOR CUTTING RCC HOLE 200 mm X NO 1.000 1.0000 1.00
FOR CUTTING RCC HOLE 200 mm 200mm X 150mm THICK.SLAB, BEAM FOR FIXING PIPES. 0 0.000 0.0000
X 200mm X 150mm THICK.SLAB,
BEAM FOR FIXING PIPES.
74167 CIVIL WORK \ 5.LABOUR CHARGES 5.LABOUR CHARGES FOR MAKING CONCRETE BASE NO 1.000 1.0000 1.00
FOR MAKING CONCRETE BASE (150X150X250) AT BALCONY FOR FIXING SERA BOARD FOR 0 0.000 0.0000
(150X150X250) AT BALCONY FOR PIPE COVERING.
FIXING SERA BOARD FOR PIPE CO
74167 CIVIL WORK \ 6.LABOUR CHARGES 6.LABOUR CHARGES OF REMOVING TINA FENCING AT FIRST SQM 1.000 1.0000 1.00
OF REMOVING TINA FENCING AT FLOOR AT SIDDHA TEMPORARY STORE 0 0.000 0.0000
FIRST FLOOR AT SIDDHA
TEMPORARY STORE
74167 CIVIL WORK \ 7.LABOUR CHARGES 7.LABOUR CHARGES FOR REMOVING M.S BARICATE AT EACH 1.000 1.0000 1.00
FOR REMOVING M.S BARICATE AT EACH FLOOR FOR FIXED SAFETY PURPOSE 0 0.000 0.0000
EACH FLOOR FOR FIXED SAFETY
PURPOSE
74167 CIVIL WORK \ 8.LABOUR CHARGES LABOUR CHARGES FOR MAKING AND FIXING PRECAST NO 1.000 1.0000 1.00
FOR MAKING AND FIXING LINTEL 110X110MM, LENGTH 1.4M TO 1.8M FOR LIFT FRONT FULL COARSE SAND MT 0.2 0.200 0.0000
PRECAST LINTEL 110X110MM, AS PER INSTRUCTION OF EIC.
5/8" STONE CHIPS. MT 0.2 0.200 0.0000
LENGTH 1.4M TO 1.8M FOR LIFT
FRONT MEDIUM COURSE SAND MT 0.02 0.020 0.0000
(ZONE -III)
10MM DIA TMT BAR MT 0.02 0.020 0.0000
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
74167 CIVIL WORK \ 8.LABOUR CHARGES LABOUR CHARGES FOR MAKING AND FIXING PRECAST NO 1.000 1.0000 1.00
FOR MAKING AND FIXING LINTEL 110X110MM, LENGTH 1.4M TO 1.8M FOR LIFT FRONT
PRECAST LINTEL 110X110MM, AS PER INSTRUCTION OF EIC. BOQ Estimation Report
LENGTH 1.4M TO 1.8M FOR LIFT
FRONT
74167 CIVIL WORK \ 9.LABOUR CHARGES 9.LABOUR CHARGES FOR FIXING DOOR FRAME WITH NO 1.000 1.0000 1.00
FOR FIXING DOOR FRAME WITH FASTENER(10X120MM-6 NOS EACH FRAME) AS PER DOOR FRAME WOODEN - NOS 1 1.000 0.0000
FASTENER(10X120MM-6 NOS INSTRUCTION OF EIC. 1095MM X 2140MM
EACH FRAME) AS PER
INSTRUCTION O
DOOR FRAME WOODEN - NOS 1 1.000 0.0000
1195MM X 2145MM
74167 CIVIL WORK \ 10.LABOUR 10.LABOUR CHARGES FOR SHUTTERING AND CASTING NO 1.000 1.0000 1.00
CHARGES FOR SHUTTERING AND DUCT OPENING AT ROOF LEVEL AFTER PLUMBING WORK 0 0.000 0.0000
CASTING DUCT OPENING AT ROOF COMPLETED.
LEVEL AFTER PLUMBING WORK
74167 CIVIL WORK \ 11.Labour charges
COMPLET 11.Labour charges for 250/230 m.m. thick brick masonry work CUM 1.000 1.0000 1.00
for 250/230 m.m. thick brick with or fly as composite mortar brick in cement mortar 1:6 PSC CEMENT (MINI BAGS 5 5.000 0.0000
masonry work with or fly as adequately soaked in water before use etc. at any floors PLANT)
composite mortar brick in complete as per direction of complete as per direction of E.I.C.
& B.O.Q -Above roof work MEDIUM COURSE SAND MT 0.3 0.300 0.0000
(ZONE -III)
FLY ASH BRICKS (230 X NOS 450 450.000 0.0000
110 X 70)
74167 CIVIL WORK \ 12.Labour charges 12.Labour charges for constructing 125/110m.m. thick brick SQM 1.000 1.0000 1.00
for constructing 125/110m.m. thick masonry with standard clay brick or fly ash brick size PSC CEMENT (MINI BAGS 0.05 0.050 0.0000
brick masonry with standard clay 230X110X73 mm in cement mortar 1:4 adequately soaked in PLANT)
brick or fly a water before use etc. at any floors (Rate includes all labour,
tools, scaffolding curing (etc.) complete as per direction of E.I.C CEMENT BAGS 0.05 0.050 0.0000
& B.O.Q-Above roof work FLY ASH BRICKS (230 X NOS 52 52.000 0.0000
110 X 70)
MEDIUM COURSE SAND MT 0.05 0.050 0.0000
(ZONE -III)
74167 CIVIL WORK \ 13.Labour charges 13.Labour charges for plaster with sand & cement mortar SQM 1.000 1.0000 1.00
for plaster with sand & cement including rounding of or chamfering corners as directed &
mortar including rounding of or racking out joints, chipping where necessary, including
chamfering corners throating, nosing & drip course, scaffolding/staging where
necessary at any floors as per specification drawing & direction
of E.I.C./Consultant..i.12/15m.m. thick inside plastering with Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
cement mortar (1:6)-Above roof work Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
74167 CIVIL WORK \ 13.Labour charges 13.Labour charges for plaster with sand & cement mortar SQM 1.000 1.0000 1.00
for plaster with sand & cement including rounding of or chamfering corners as directed & MEDIUM COURSE SAND MT 0.03 0.030 0.0000
mortar including rounding of or racking out joints, chipping where necessary, including (ZONE -III)
chamfering corners throating, nosing & drip course, scaffolding/staging where
necessary at any floors as per specification drawing & direction PSC CEMENT (MINI BAGS 0.02 0.020 0.0000
of E.I.C./Consultant..i.12/15m.m. thick inside plastering with PLANT)
cement mortar (1:6)-Above roof work
74422 civil work-Supplymentary items \ 1.Hire & labour charges for centering, shuttering, fabricating & SQM 410.000 600.0000 246,000.00
1.Hire & labour charges for fixing of formwork for all RCC works for Plantar & Parapet Wall 0 0.000 0.0000
centering, shuttering, fabricating & etc. at necessary height including all leads with necessary M.S.
fixing of formwork for all RCC work supporting arrangement. Applying shuttering oil (Like ‘REBOL’
74422 civil work-Supplymentary items \ 2.Hire & labour charges
from ‘FOSROC’ or ‘BASF’ fororcentering,
any othershuttering,
approved oil) fabricating &
on the form SQM 200.000 675.0000 135,000.00
2.Hire & labour charges for fixing of formwork
work, keeping for allwork
the form RCCinworks
positionfor after
Parapet Wall on for a
concreting 0 0.000 0.0000
centering, shuttering, fabricating & Projection Slab & Sky
period as specified bridge
in the etc. atISnecessary
relevant Code or asheight including
per instruction
fixing of formwork for all RCC work all leads &with
of E.I.C. necessary
removing overhang after
the formwork M.S. supporting
expiry of the specified
75964 CORE CUTTING ON A RCC Labour charges
arrangement.
period, complete for
Applying
withcore cutting
allshuttering
materials,onoila RCC
(Like Structure
labour, ‘REBOL’ up to aetc.
from
tools & tackles EACH 1.000 900.0000 900.00
STRUCTURE WITH A DEPTH UP TO depth
‘FOSROC’of 250mm.
all as per or ‘BASF’
drawing I.&250or Xany
250other
mm Dia.
specification. approved
The formwork,oil) onshall
the form
be made 0 0.000 0.0000
250MM INITIAL FOUR RESIDENTIAL work,
out of keeping
approved the form work
thickness of in position
plywood after thick
12mm concreting
plasticfor a
COMPLEX \ Core cutting on a RCC period
coated as specified
marine in theply
resistant relevant
board, IS Code
shall be or as per
water tightinstruction
(by
75964 CORE
StructureCUTTING ON A RCC
with a depth up to 250mm 200
of X 250
E.I.C. & mm Dia. the formwork after expiry of the specified
removing EACH 1.000 850.0000 850.00
sealing the joints with heavy duty brown self-adhesive tape) &
STRUCTURE WITH A DEPTH
Initial Four Residential ComplexUP TO period, 0 0.000 0.0000
250MM INITIAL FOUR RESIDENTIAL shall becomplete
free fromwith all materials,
warping, denting & labour, tools & tackles
unevenness. The rates etc.
(G+13) (i. all as include
shall per drawingcost of& specification.
all labour, tools The & formwork,
tackles, hire shall be made
charges of
COMPLEX \ Core cutting on a RCC out
100 of
approved
shuttering, thickness
shuttering of consumable
oil, all plywood 12mm thick plastic
material, cost of
75964 CORE
StructureCUTTING ON A RCC
with a depth up to 250mm X 200 mm Dia. EACH 3.000 500.0000 1,500.00
coated
formingmarine
champers,resistant
coping,ply drip
board, shall be
moulds, water tight
rounding’s, ( by
grooves,
STRUCTURE WITH A DEPTH
Initial Four Residential ComplexUP TO 0 0.000 0.0000
250MM INITIAL FOUR RESIDENTIAL sealing
cut outs,the joints with
opening, heavy
corbels, duty brown
arches etc. asself-adhesive
shown in thetape) &
(G+13) (i. shall be free from warping, denting
COMPLEX \ Core cutting on a RCC drawings [Measurement shall be as &per unevenness.
drawing & The rates
87006 Labour
Structure Charges Miscellaneous
with a depth up to 250mm shall include
specification].
Lifting, removing cost&ofshifting
all labour, tools & tackles,
construction rubbish, hire charges of
debris, CUM 350.000 110.0000 38,500.00
Work shuttering, shuttering oil, alletc.
consumable material, cost asof
Initial at Initial
Four Four Blocks
Residential (i.e.
Complex unusable broken materials from one place to other 0 0.000 0.0000
Ophelia,
(G+13) (i.Bianca, Orion & Cygnus) at forming champers,
directed by our engineercoping, or drip moulds, rounding’s,
supervisor-in-charge withingrooves,
a lead
S \ 1. Lifting, removing & shifting cut outs,
of 50m opening,
inside corbels,
the S.G.-II workarches etc. as shown in the
premises.
87006 Labour Charges
construction Miscellaneous
rubbish, debris, drawings [Measurement
Earthwork in excavation in shall be as of
all kinds per drawing
soil up to a&depth of 1.5 CUM 0.000 127.0000 0.00
Work
unusableat Initial
brokenFour Blocks (i.e.
materials etc. from specification].
m. 0 0.000 0.0000
Ophelia,
on Bianca, Orion & Cygnus) at
S \ 2. Earthwork in excavation in all
87006 Labour
kinds ofCharges
soil up to Miscellaneous
a depth of 1.5 m. Earth work in filling layer by layer of 150 mm thickness with CUM 0.000 85.0000 0.00
Work at Initial Four Blocks (i.e. excavated earth. 0 0.000 0.0000
Ophelia, Bianca, Orion & Cygnus) at
S \ 3. Earth work in filling layer by
87006 Labour
layer of Charges Miscellaneous
150 mm thickness with Earth filling in different points including lifting the CUM 0.000 85.0000 0.00
Work at Initial
excavated Four Blocks (i.e.
earth. loose/compacted/heaped earth & carrying within a lead of 50 0 0.000 0.0000
Ophelia, Bianca, Orion & Cygnus) at meter & filling in layer as directed by the E.I.C. including
S \ 4. Earth filling in different points watering for compaction.
87006 Labour
including Charges Miscellaneous
lifting the Shifting of earth & disposing the same in different points CUM 0.000 120.0000 0.00
Work at Initial Four Blocksearth
loose/compacted/heaped (i.e. & including lifting the loose/compacted/heaped earth & carrying 0 0.000 0.0000
Ophelia,
carrying Bianca,
w Orion & Cygnus) at within a lead of 50 meter & filling in layer as directed by the
S \ 5. Shifting of earth & disposing E.I.C.
87006 Labour
the same Charges Miscellaneous
in different points Filling with yellow/silver sand layer by layer of 150 mm CUM 300.000 80.0000 24,000.00
Work at Initial
including Four
lifting the Blocks (i.e. thickness by carrying sand from a lead of 50 m. 0 0.000 0.0000
Ophelia, Bianca, Orion & Cygnus) at
loose/compacted/
S \ 6. Filling with yellow/silver sand
87006 Labour
layer byCharges
layer of 150Miscellaneous
mm thickness Lifting, removing, shifting & stacking of sand within a lead of 50 CUM 625.000 60.0000 37,500.00
Work at Initial
by carrying Four
sand Blocks
from (i.e.
a lead o m. 0 0.000 0.0000
Ophelia, Bianca, Orion & Cygnus) at
S \ 7. Lifting, removing, shifting &
87006 Labour
stackingCharges
of sand Miscellaneous
within a lead of 50 Filling good earth in the pockets of the Grass Paver Blocks laid CUM 0.000 12.0000 0.00
Work
m. at Initial Four Blocks (i.e. over the ground up to the height leaving 25 mm from the top 0 0.000 0.0000
Ophelia, Bianca, Orion & Cygnus) at face level & watering for compaction.
S \ 8. Filling good earth in the
87006 Labour
pocketsCharges
of the GrassMiscellaneous
Paver Blocks Haulage path repairing. CUM 0.000 40.0000 0.00
Work at Initial
laid over Four Blocks
the ground (i.e.
up to the 0 0.000 0.0000
Ophelia,
height Bianca, Orion & Cygnus) at
S \ 9. Haulage path repairing.
Category 24,728,182.83 Category
Total: Total:
Siddha Galaxia Phase-II ,OPHELIA,ALUMINIUM GLAZING -D&W,
58694 Aluminium door & window \ W1 34 SERIES FIXED WITH OPENABLEWINDOW: SQFT 6794.890 97.2000 660,463.31
Providing,fitting and fixing including transportation of 55 to 60
Micron powder coated from Alom(Grey RAL 7006 ( SP 10 AN)
from Interpon Shade card), Aluminium 34 series(Type-1)
Casement series: Openable/Openable cum Fixed window of
Alom make with section details as follows: Page 1 of 1
*Amount in INR Outer 34 series 1.5mm thick,H5966/B2082A Report Generated By : Sounak Nandi
Mullion details:1.5mm thick,H5964/B9139A, Aug 19,2019 5:03 PM
Shutter details: 1.5mm thick,H5965/B4124A
SIDDHA SPHERE LLP
BOQ Estimation Report
58694 Aluminium door & window \ W1 34 SERIES FIXED WITH OPENABLEWINDOW: SQFT 6794.890 97.2000 660,463.31
Providing,fitting and fixing including transportation of 55 to 60 0 0.000 0.0000
Micron powder coated from Alom(Grey RAL 7006 ( SP 10 AN)
from Interpon Shade card), Aluminium 34 series(Type-1)
58694 Aluminium door & window \ W2 34 SERIESseries:
Casement FIXED WITH OPENABLEWINDOW:
Openable/Openable cum Fixed window of SQFT 3906.040 106.4000 415,602.66
Providing,fitting
Alom make with section and fixing including
details transportation of 55 to 60
as follows: 0 0.000 0.0000
Micron
Outer 34 powder
series coated
1.5mm from Alom(Grey RAL 7006 ( SP 10 AN)
thick,H5966/B2082A
from Interpon
Mullion Shade card),
details:1.5mm Aluminium 34 series(Type-1)
thick,H5964/B9139A,
58694 Aluminium door & window \ W3 34 SERIES
Casement
Shutter FIXED
series:
details: WITH OPENABLEWINDOW:
Openable/Openable
1.5mm thick,H5965/B4124A cum Fixed window of SQFT 581.260 94.4000 54,870.94
Providing,fitting
Alom make with and
section
Cleat Angle details: 4.9mm fixing including
details transportation of 55 to 60
as follows:
thick,H5976/B2081A, 0 0.000 0.0000
Micron
Outer 34powder
series
Clip details: coated
1.5mm
1.0mm from Alom(Grey RAL
thick,H5966/B2082A
thick,H5967/B4125A with 7006 ( SP 10 AN)
necessary
from Interpon
Mullion Shade
details:1.5mm card), Aluminium
thick,H5964/B9139A, 34
standard accessories like Gasket Oscaka make,friction hinges series(Type-1)
58694 Aluminium door & window \ W4 34 SERIES
Casement
Shutter FIXED
series:
details: WITH OPENABLEWINDOW:
Openable/Openable
1.5mm thick,H5965/B4124A cum Fixed window of SQFT 1350.460 110.4000 149,090.78
Mccoy make,handle
Providing,fitting Mccoy/Insta/Ebco
and4.9mm
fixing including make,Fisher
transportation screw
of 55 to 60
Alom
Cleat
Fisher make
Angle
make with section
details:
N6x80,weather details as follows:
thick,H5976/B2081A,
sealent etc.with protective tape all 0 0.000 0.0000
Micron
Outer
Clip 34powder
series
details: coated
1.5mm
1.0mm from Alom(Grey
thick,H5966/B2082A
thick,H5967/B4125A RAL
with 7006 ( SP 10
necessary AN)
complete with 5mm thick clear float Glass of Saint Gobain make
from Interpon
Mullion
standard Shade
details:1.5mm
accessories card), Aluminium
thick,H5964/B9139A,
like Gasket 34
Oscaka In series(Type-1)
make,friction hinges
58694 Aluminium door & window \ W4' as
34 per drawing
SERIES
Casement FIXED
series:and direction
WITH of Engineer
OPENABLEWINDOW:
Openable/Openable cum charge
Fixed at any
window floor.
of SQFT 148.220 94.4000 13,991.97
Shutter
Mccoy details:
make,handle 1.5mm thick,H5965/B4124A
Mccoy/Insta/Ebco make,Fisher screw
Providing,fitting
Alom make
Cleat Angle with and
section
details: fixing including
details as transportation
follows:
4.9mm thick,H5976/B2081A, of 55 to 60 0 0.000 0.0000
Fisher
Micron make
powder N6x80,weather
coated from sealent etc.with
Alom(Grey RAL protective
7006 ( SP 10tapeAN)all
Outer
Clip
complete34 series
details: 1.5mm
1.0mm
with Shade thick,H5966/B2082A
thick,H5967/B4125A
5mm thick clear float Glass with necessary
of Saint Gobain make
from Interpon
Mullion
standard details:1.5mm
accessories card), Aluminium
thick,H5964/B9139A,
like Gasket Oscaka 34 series(Type-1)
make,friction hinges
58694 Aluminium door & window \ W5 as
34 per
Casement drawing
SERIES FIXED
series:and direction
WITH of Engineer
OPENABLEWINDOW:
Openable/Openable cum In charge
Fixed at any
window floor.
of SQFT 46.500 109.6000 5,096.40
Shutter
Mccoy details: 1.5mm
make,handle thick,H5965/B4124A
Mccoy/Insta/Ebco make,Fisher screw
Providing,fitting
Alom
Cleat make
Angle with and4.9mm
section
details: fixing including
details transportation of 55 to 60
as follows:
thick,H5976/B2081A, 0 0.000 0.0000
Fisher
Micron make
powder N6x80,weather
coated from sealent
Alom(Grey etc.with
RAL protective
7006 ( SP 10tapeAN)all
Outer
Clip
complete34 series
details:with 1.5mm
1.0mm
5mm thickthick,H5966/B2082A
thick,H5967/B4125A
clear float Glasswithof necessary
Saint Gobain make
from Interpon
Mullion
standard Shade card),
details:1.5mm
accessories like Aluminium
thick,H5964/B9139A,
Gasket Oscaka 34 series(Type-1)
make,friction hinges
58694 Aluminium door & window \ W6 as
34 per drawing
SERIES
Casement FIXED
series:and direction
WITH of Engineer
OPENABLEWINDOW:
Openable/Openable cum In charge
Fixed at any
window floor. SQFT 542.510 102.0000 55,336.02
Shutter
Mccoy details:
make,handle 1.5mm thick,H5965/B4124A
Mccoy/Insta/Ebco make,Fisher screwof
Providing,fitting
Alom Angle
Cleat make with and
section
details: fixing
4.9mm including
details transportation
as follows:
thick,H5976/B2081A, of 55 to 60 0 0.000 0.0000
Fisher make N6x80,weather sealent etc.with protective tape all
Micron
Outer
Clip 34powder
series
details: coated
1.5mm
1.0mm from Alom(Grey
thick,H5966/B2082A
thick,H5967/B4125A RAL
with 7006 ( SP 10
necessary AN)
complete
from with Shade
Interpon 5mm thick card), clear float Glass
Aluminium of Saint Gobain make
34 series(Type-1)
Mullion
standard
as per details:1.5mm
accessories
drawing and thick,H5964/B9139A,
like
direction Gasket Oscaka
of Engineer make,friction
In charge at any hinges
floor.
58694 Aluminium door & window \ W7 34 SERIES
Casement
Shutter FIXED
series:
details: WITH OPENABLEWINDOW:
Openable/Openable
1.5mm thick,H5965/B4124A cum Fixed window of SQFT 1044.330 124.0000 129,496.92
Mccoy make,handle
Providing,fitting Mccoy/Insta/Ebco
and4.9mm
fixing including make,Fisher screw
transportation of 55 to 60
Alom
Cleat
Fisher make
Angle
make with section
details:
N6x80,weather details as follows:
thick,H5976/B2081A,
sealent etc.with protective tape all 0 0.000 0.0000
Micron
Outer
Clip 34powder
series
details: coated
1.5mm
1.0mm from Alom(Grey
thick,H5966/B2082A
thick,H5967/B4125A RAL
with 7006 ( SP 10
necessary AN)
complete with 5mm thick clear float Glass of Saint Gobain make
from Interpon
Mullion
standard Shade card),
details:1.5mm
accessories Aluminium
thick,H5964/B9139A,
like Gasket Oscaka 34 series(Type-1)
make,friction hinges
58694 Aluminium door & window \ W8 as
34 per drawing
SERIES FIXED and direction
WITH of Engineer
OPENABLEWINDOW: In charge at any floor. SQFT 440.790 136.0000 59,947.44
Casement
Shutter
Mccoy series:
details:
make,handle Openable/Openable
1.5mm thick,H5965/B4124A
Mccoy/Insta/Ebco cum Fixed
make,Fisher window
screw of
Providing,fitting
Alom make and fixing including transportation of 55 to 60
Cleat makewith
FisherAngle section
details: 4.9mm
N6x80,weather details as follows:
thick,H5976/B2081A,
sealent etc.with protective tape all 0 0.000 0.0000
Micron
Outer 34powder
series
Clip details: coated
1.5mm
1.0mm from Alom(Grey
thick,H5966/B2082A RAL 7006 ( SP 10 AN)
complete with 5mm thick,H5967/B4125A
thick clear float Glass with necessary
of Saint Gobain make
from Interpon
Mullion
standard Shade
details:1.5mm
accessories card), Aluminium
thick,H5964/B9139A,
like Gasket Oscaka 34 series(Type-1)
make,friction hinges
58694 Aluminium door & window \ W10' as
34 per drawing
SERIES
Casement FIXED
series:and direction
WITH of Engineer
OPENABLEWINDOW:
Openable/Openable cum In charge at any
Fixed window floor.
of SQFT 298.380 86.4000 25,780.03
Shutter
Mccoy details:
make,handle 1.5mm thick,H5965/B4124A
Mccoy/Insta/Ebco make,Fisher screw
Providing,fitting
Alom make
Cleat Angle with and
section
details: fixing including
details as transportation
follows:
4.9mm thick,H5976/B2081A, of 55 to 60 0 0.000 0.0000
Fisher
Micron make
powder N6x80,weather
coated from sealent etc.with
Alom(Grey RAL protective
7006 ( SP 10tapeAN)all
Outer
Clip 34 series
details: 1.5mm
1.0mm thick,H5966/B2082A
thick,H5967/B4125A with
complete with 5mm thick clear float Glass of Saint Gobain make necessary
from Interpon
Mullion
standard Shade card),
details:1.5mm
accessories Aluminium
thick,H5964/B9139A,
like Gasket Oscaka 34 series(Type-1)
make,friction hinges
58694 Aluminium door & window \ WS as
34 per drawing
SERIES FIXED and direction
WITH of Engineer
OPENABLEWINDOW: In charge at any floor. SQFT 434.000 109.6000 47,566.40
Casement
Shutter
Mccoy series:
details:
make,handle Openable/Openable
1.5mm thick,H5965/B4124A
Mccoy/Insta/Ebco cum Fixed
make,Fisher window
screw of
Providing,fitting
Alom
Cleat make
Angle with and
section
details: fixing
4.9mm including
details transportation
as follows:
thick,H5976/B2081A, of 55 to 60 0 0.000 0.0000
Fisher
Micron make
powder N6x80,weather
coated from sealent
Alom(Grey etc.with
RAL protective
7006 ( SP tape
10 AN)all
Outer
Clip
complete34 series
details:with 1.5mm
1.0mm thickthick,H5966/B2082A
5mm thick,H5967/B4125A
clear float Glass with necessary
of Saint Gobain make
from Interpon
Mullion
standard Shade
details:1.5mm
accessories card), Aluminium
thick,H5964/B9139A,
like Gasket Oscaka 34 series(Type-1)
make,friction hinges
58694 Aluminium door & window \ SD1 as
25 per drawing
SERIES
Casement and
ALUMINIUM
series: direction
SLIDING
Openable/Openable of Engineer
DOOR: cum In charge at any
Fixed window floor.
of SQFT 1444.100 97.6000 140,944.16
Shutter
Mccoy details:
make,handle 1.5mm thick,H5965/B4124A
Mccoy/Insta/Ebco make,Fisher screw
Providing,fitting
Alom make
Cleat Angle with and
sectionfixing including
details as transportation
follows: of 55 to 60 0 0.000 0.0000
Fisher makedetails: 4.9mm thick,H5976/B2081A,
N6x80,weather sealent etc.with protective tape all
Micron
Outer
Clip 34powder
series
details: coated
1.5mm
1.0mm from Alom(Grey RAL
thick,H5966/B2082A
thick,H5967/B4125A with 7006 ( SP 10 AN)
necessary
complete
from with Shade
Interpon 5mm thick card), clear float Glass
Aluminium of Saintsection
25 series: Gobain make
Mullion
standard
as per details:1.5mm
accessories
drawing thick,H5964/B9139A,
like
and direction Gasket Oscaka
of Engineer make,friction
In charge at any hinges
floor.
58694 Aluminium door & window \ SD2 25 SERIES
details:
Shutter ALUMINIUM
details: 1.5mm SLIDING DOOR:
thick,H5965/B4124A SQFT 1895.380 103.6000 196,361.37
Mccoy make,handle Mccoy/Insta/Ebco make,Fisher screw
Providing,fitting
3 Track
Cleat Top details:
Angle and and
Side: fixing
4.9mmB3964, including transportation
1.5mmetc.with of 55
thick, protective tape all
thick,H5976/B2081A, to 60 0 0.000 0.0000
Fisher
Micron make
powder N6x80,weather
coated from sealent
Alom(Grey RAL 7006 ( SP 10 AN)
3 Track
Clip
complete Bottom:B3965,
details:with1.0mm thick1.63mm
5mm thick,H5967/B4125A
clear thick,
float Glass with necessary
of Saint Gobain make
from
2TrackInterpon
standard Top and Shade
Side:
accessories card),
B4175,
like Aluminium
1.5mm,
Gasket Oscaka 25 series: section
make,friction hinges
58694 Aluminium door & window \ SD3 as
25 per drawing
SERIES
details: and
ALUMINIUM direction
SLIDING of Engineer
DOOR: In charge at any floor. SQFT 2124.490 108.4000 230,294.72
2 Trackmake,handle
Mccoy Bottom:B4176, 1.63mm thick, make,Fisher screw
Mccoy/Insta/Ebco
Providing,fitting
3 Track
A section:Top and
B9763, and
Side: fixing
B3964,
1.63mm thick including
1.5mm transportation
thick, of 55 to 60 0 0.000 0.0000
Fisher
Micron make
powder N6x80,weather
coated from sealent etc.with
Alom(Grey RALprotective
7006 ( SP 10 tapeAN)all
3 Track
Horizontal
complete Bottom:B3965,
section:
with Shade B3959,
5mm thick 1.63mm
1.63mm
clear thick,
thick,
float Glass of Saintsection
Gobain make
from
2TrackInterpon
Top
Interlock: andandSide:
B9764,1.63mm card),
B4175, Aluminium
thick.1.5mm, 25 series:
58694 Aluminium door & window \ W9 as per drawing
Adjustable
details: Louver direction
Window: of Engineer In charge at any floor. SQFT 1511.270 95.2000 143,872.90
2 Track
With all Bottom:B4176,
necessary 1.63mm
standard thick,
Providing,fitting
3
A Track Top
section: and and
B9763, Side: fixing
1.63mm B3964, ofaccessories
thick55 to 60thick,
1.5mm
like wool
micron pile as
powder 0 0.000 0.0000
weather gasket
coated(Grey
3 Trackduty
Horizontal RAL 7006
Bottom:B3965,
section: B3959, ( SP1.63mm
1.63mm 10 AN)
thick,from Interpon Shade
thick,
Heavy
card),Aluminium bearing Roller
Adjustable Devson
Louver make,U
windowrubber
of Alom Bose/Oscaka
make.The
2Track Top
Interlock: and Side:
B9764,1.63mm B4175,thick.1.5mm,
59483 ALUMINIUM DOOR WINDOW WORK make,flush
W1
outer frame type
to be lock
made cum outhandle
in sizesof Mccoy/Insta
of 50mm x make,Fischer
25mm SQFT 6794.890 145.8000 990,694.96
\ W1
2 Track
With
make all Bottom:B4176,
N6necessary
* all
80 necessary
screws with1.63mm
standard pvc thick,
accessories
fastner like wool
of Fischer pile,1.2mm
as
make,weather
thick
A with
section:
weather B9763,
gasket 1.63mm standard
thick accessories like glazing 0 0.000 0.0000
sealent
clip,cleatetc.with
angle,EPDMprotectiveglazingtape all complete
gasket,Fischer with 5mm thick
makeBose/Oscaka
stainless
Horizontal
Heavy
clear duty
float section:
bearing
Glass of B3959,
Roller
Saint 1.63mm
Devson
Gobain makethick,
make,Uas perrubber
drawing and
steel screws N 6 x80 with PVC fastner etc. with adjustable
59483 ALUMINIUM DOOR WINDOW WORK Interlock:
make,flush
direction
W2
louver
B9764,1.63mm
of
blade
type
and
lock cum
Engineer
4mm
thick.
thick
handle
In charge
pin
at of
any Mccoy/Insta
floor.
head glass.
make,Fischer SQFT 3906.040 159.6000 623,403.98
\ W2 With
make all
N6 necessary
* 80 screws standard
with pvc accessories
fastner of like
Fischer wool pile as
make,weather
weather gasket protective tape all complete with 5mm thick 0 0.000 0.0000
sealent etc.with
Heavy dutyGlass
clear float bearing RollerGobain
of Saint Devson make,U
make as perrubber Bose/Oscaka
drawing and
59483 ALUMINIUM DOOR WINDOW WORK W3 make,flush
direction of type lock
Engineer cum
In handle
charge at of
any Mccoy/Insta
floor. make,Fischer SQFT 581.260 141.6000 82,306.42
\ W3 make N6 * 80 screws with pvc fastner of Fischer make,weather
sealent etc.with protective tape all complete with 5mm thick
clear float Glass of Saint Gobain make as per drawing and
direction of Engineer In charge at any floor.
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
59483 ALUMINIUM DOOR WINDOW WORK W4' SQFT 148.220 141.6000 20,987.95
\ W4' 0 0.000 0.0000
59483 ALUMINIUM DOOR WINDOW WORK W10' SQFT 298.380 129.6000 38,670.05
\ W10' 0 0.000 0.0000
59483 ALUMINIUM DOOR WINDOW WORK SD1 SQFT 1444.100 146.4000 211,416.24
\ SD1 0 0.000 0.0000
59483 ALUMINIUM DOOR WINDOW WORK SD2 SQFT 1895.380 155.4000 294,542.05
\ SD2 0 0.000 0.0000
59483 ALUMINIUM DOOR WINDOW WORK SD3 SQFT 2124.490 162.6000 345,442.07
\ SD3 0 0.000 0.0000
65741 34 Series Aluminum openable Cum Design & Engineering , Supplying ,fitting and fixing including SQFT 6794.890 243.0000 1,651,158.27
fixed casement windows transportation of 55 to 60 Micron powder coated from 0 0.000 0.0000
fabricated \ 34 SERIES FIXED WITH Alom(Grey RAL 7006 ( SP 10 AN) from Interpon Shade card),
OPENABLE WINDOW: Aluminium 34 series(Type-1) Casement series:
65741 34 Series Aluminum openable Cum Design & Engineering
Openable/Openable cum, Supplying ,fitting
Fixed window of and
Alomfixing
makeincluding
with SQFT 3906.040 266.0000 1,039,006.64
fixed casement windows transportation
section details ofas55 to 60 Micron34
follows:Outer powder
series coated
1.5mm from 0 0.000 0.0000
fabricated \ 34 SERIES FIXED WITH Alom(Grey RAL 7006 ( SP 10details:1.5mm
thick,H5966/B2082A,Mullion AN) from Interpon Shade card),
OPENABLE WINDOW: Aluminium 34 series(Type-1)details:
thick,H5964/B9139A,Shutter Casement 1.5mmseries:
65741 34 Series Aluminum openable Cum Design & Engineering
Openable/Openable
thick,H5965/B4124A,Cleat cum, Supplying
Fixed ,fitting
Anglewindow
details: and
of4.9mm
Alomfixing
makeincluding
with SQFT 581.260 236.0000 137,177.36
fixed casement windows transportation
section details of
as55 to 60 Micron
follows:Outer powder
34 series coated
1.5mm
thick,H5976/B2081A,Clip details: 1.0mm thick,H5967/B4125A from 0 0.000 0.0000
fabricated \ 34 SERIES FIXED WITH Alom(Grey RALstandard
7006 ( SPaccessories
thick,H5966/B2082A,Mullion
with necessary 10details:1.5mm
AN) fromlike Interpon
GasketShade
Oscakacard),
make,
OPENABLE WINDOW: Aluminium
friction 34 series(Type-1)
thick,H5964/B9139A,Shutter
hinges Mccoy make, Casement
details:
handle 1.5mm
Insta series:
make, Fisher screw
65741 34 Series Aluminum openable Cum Design & Engineering
Openable/Openable
thick,H5965/B4124A,Cleat cum, Supplying
Fixed
Angle ,fitting
window
details: and
of4.9mm
Alomfixing
make including
with SQFT 1350.460 276.0000 372,726.96
fixed casement windows Fisher make N6x80,weather
transportation of 55 sealent
to 60details:
Micron of Dow
powder Corning
coated frometc.with
section details as follows:Outer
thick,H5976/B2081A,Clip
protective tape 34 series
1.0mm 1.5mm
thick,H5967/B4125A 0 0.000 0.0000
fabricated \ 34 SERIES FIXED WITH Alom(Grey RALall complete
7006
thick,H5966/B2082A,Mullion
with necessary standard 10with
AN)5mm
( SPaccessories thick
fromlike
details:1.5mm
clear float Glass
Interpon
GasketShade
Oscakacard), of
make,
OPENABLE WINDOW: Saint Gobain
Aluminium make as per
34 series(Type-1) drawing and
Casement direction
series: of Engineer In
thick,H5964/B9139A,Shutter
friction
charge hinges Mccoy make, details:
handle 1.5mm
Insta make, Fisher screw
65741 34 Series Aluminum openable Cum Design at& any floor.
Engineering
Openable/Openable
thick,H5965/B4124A,Cleat cum, Supplying
Fixed
Angle ,fitting
window
details: and
of4.9mm
Alomfixing
make including
with SQFT 148.220 236.0000 34,979.92
fixed casement windows Fisher make
transportation N6x80,weather
of 55 sealent
to 60details:
Micron34 of
powder Dow Corning
coated frometc.with
section details
tape as
all follows:Outer
thick,H5976/B2081A,Clip
protective complete with 5mmseries
1.0mm thick1.5mm
thick,H5967/B4125A
clearShade
float Glass of
fabricated \ 34 SERIES FIXED WITH Alom(Grey RAL 7006
thick,H5966/B2082A,Mullion
with necessary standard ( SP 10 AN) from
details:1.5mm
accessories Interpon
like Gasketof Oscakacard),
make,
OPENABLE WINDOW: Saint Gobain
Aluminium make as per
34 series(Type-1) drawing and
Casement direction
series: Engineer In
thick,H5964/B9139A,Shutter
friction
charge hinges
at Mccoy make, details:
any floor. handle 1.5mm
Insta make, Fisher screw
Openable/Openable
thick,H5965/B4124A,Cleat
Fisher make N6x80,weathercum Fixed
Anglewindow
details:
sealent of Dowof4.9mm
Alom make
Corning with
etc.with Page 1 of 1
*Amount in INR section details
protective tape as
all follows:Outer
thick,H5976/B2081A,Clip
complete with34
details: series
1.0mm
5mm 1.5mm
thick,H5967/B4125A
thick clear float Glass of Report Generated By : Sounak Nandi
thick,H5966/B2082A,Mullion
with
Saintnecessary
Gobain makestandard details:1.5mm
as peraccessories
drawing andlike Gasketof
direction Oscaka make,
Engineer In Aug 19,2019 5:03 PM
thick,H5964/B9139A,Shutter
friction
charge athinges Mccoy make, details:
any floor. 1.5mm
handle Insta make, Fisher screw
thick,H5965/B4124A,Cleat Angle details: 4.9mm
SIDDHA SPHERE LLP
BOQ Estimation Report
65741 34 Series Aluminum openable Cum Design & Engineering , Supplying ,fitting and fixing including SQFT 148.220 236.0000 34,979.92
fixed casement windows transportation of 55 to 60 Micron powder coated from 0 0.000 0.0000
fabricated \ 34 SERIES FIXED WITH Alom(Grey RAL 7006 ( SP 10 AN) from Interpon Shade card),
OPENABLE WINDOW: Aluminium 34 series(Type-1) Casement series:
65741 34 Series Aluminum openable Cum Design & Engineering
Openable/Openable cum, Supplying
Fixed window ,fittingof and
Alom fixing
makeincluding
with SQFT 46.500 274.0000 12,741.00
fixed casement windows transportation
section details of as55 to 60 Micron34
follows:Outer powder
series coated
1.5mm from 0 0.000 0.0000
fabricated \ 34 SERIES FIXED WITH Alom(Grey RAL 7006 ( SP 10details:1.5mm
thick,H5966/B2082A,Mullion AN) from Interpon Shade card),
OPENABLE WINDOW: Aluminium 34 series(Type-1)details:
thick,H5964/B9139A,Shutter Casement 1.5mmseries:
65741 34 Series Aluminum openable Cum Design & Engineering
Openable/Openable
thick,H5965/B4124A,Cleat cum, Supplying
Fixed
Anglewindow,fitting
details: and
of4.9mm
Alom fixing
makeincluding
with SQFT 1044.330 310.0000 323,742.30
fixed casement windows transportation
section details of
as 55 to 60 Micron
follows:Outer powder
34 series
thick,H5976/B2081A,Clip details: 1.0mm thick,H5967/B4125A coated
1.5mm from 0 0.000 0.0000
fabricated \ 34 SERIES FIXED WITH Alom(Grey RALstandard
7006 ( SPaccessories
thick,H5966/B2082A,Mullion
with necessary 10details:1.5mm
AN) fromlike Interpon
GasketShade
Oscaka card),
make,
OPENABLE WINDOW: Aluminium 34 series(Type-1)
thick,H5964/B9139A,Shutter Casement
details: 1.5mmseries:
friction hinges Mccoy make, handle Insta make, Fisher screw
65741 34 Series Aluminum openable Cum Design & Engineering
Openable/Openable
thick,H5965/B4124A,Cleat cum, Supplying
Fixed
Anglewindow,fitting
details: and
of4.9mm
Alom fixing
make including
with SQFT 440.790 340.0000 149,868.60
fixed casement windows Fisher make N6x80,weather
transportation of 55 sealent
to 60details:
Micron of Dow
powder Corning
coated from etc.with
section details as
thick,H5976/B2081A,Clip
protective tape follows:Outer 34 series
1.0mm 1.5mm
thick,H5967/B4125A 0 0.000 0.0000
fabricated \ 34 SERIES FIXED WITH Alom(Grey RALall complete
7006
thick,H5966/B2082A,Mullion
with ( SP 10withAN)5mm
fromlike
details:1.5mm
thick clear float Glass
Interpon
GasketShade card), of
Saintnecessary
Gobain make standard
as peraccessories
drawing and direction Oscaka
of Engineermake,
In
OPENABLE WINDOW: Aluminium
friction hinges34 series(Type-1)
thick,H5964/B9139A,Shutter
Mccoy make, Casement
details: 1.5mm
handle,fitting
Insta series:
make, Fisher screw
65741 34 Series Aluminum openable Cum charge
Design at
& any floor.
Engineering
Openable/Openable cum, Supplying
Fixed window and
of4.9mm
Alom fixing
make including
with SQFT 298.380 216.0000 64,450.08
thick,H5965/B4124A,Cleat
Fisher make N6x80,weather Angle details:
sealent of Dow Corning etc.with
fixed casement windows transportation
section details of
as55
thick,H5976/B2081A,Clip to 60details:
Micron34
follows:Outer powder
series
1.0mm coated
1.5mm from
thick,H5967/B4125A 0 0.000 0.0000
fabricated \ 34 SERIES FIXED WITH protective
Alom(Grey tape
RALall complete
7006 10with
AN)5mm
( SPaccessories fromlikethick clearShade
Interpon float Glass
card), of
thick,H5966/B2082A,Mullion
with
Saint necessary
Gobain standard
make as per details:1.5mm
drawing and Gasket
direction Oscaka
of Engineermake,
In
OPENABLE WINDOW: Aluminium
friction hinges34 series(Type-1)
thick,H5964/B9139A,Shutter
Mccoy make, Casement
details:
handle 1.5mm
Insta series:
make, Fisher screw
65741 34 Series Aluminum openable Cum charge
Design at
& any floor.
Engineering
Openable/Openable cum, Supplying
Fixed window,fitting and
of4.9mm
Alom fixing
make including
with SQFT 434.000 274.0000 118,916.00
thick,H5965/B4124A,Cleat
Fisher make N6x80,weather Angle details:
sealent of Dow Corning etc.with
fixed casement windows transportation
section details of
as55
thick,H5976/B2081A,Clip to 60details:
Micron34
follows:Outer powder
series
1.0mm coated
1.5mm from
thick,H5967/B4125A 0 0.000 0.0000
fabricated \ 34 SERIES FIXED WITH protective
Alom(Grey tape
RALall complete
7006 10with
AN)5mm
( SPaccessories fromlikethick clear float Glass
Interpon of
thick,H5966/B2082A,Mullion
with
Saint necessary
Gobain standard
make as per details:1.5mm
drawing and GasketShade
direction Oscaka
of
card),
Engineermake,
In
OPENABLE WINDOW: Aluminium
friction hinges34 series(Type-1)
thick,H5964/B9139A,Shutter
Mccoy make, Casement
details:
handle 1.5mm
Insta series:
make, Fisher screw
65741 34 Series Aluminum openable Cum charge
Design at
& any floor.
Engineering
Openable/Openable cum, Supplying
Fixed , fitting
window and
of4.9mm
Alom fixing
make including
with SQFT 1444.100 244.0000 352,360.40
thick,H5965/B4124A,Cleat
Fisher make N6x80,weather Angle details:
sealent of Dow Corning etc.with
fixed casement windows transportation
section details of
as55
thick,H5976/B2081A,Clip to 60details:
Micron34
follows:Outer powder
series
1.0mm coated
1.5mm from
thick,H5967/B4125A 0 0.000 0.0000
protective tape
RALall
complete
10with
AN)5mm
thick clearShade
float Glass of
fabricated \ 25 SERIES ALUMINIUM Alom(Grey 7006
thick,H5966/B2082A,Mullion
with necessary standard ( SPaccessories fromlike
details:1.5mm Interpon
Gasket Oscaka card),
make,
SLIDING DOOR: Saint Gobain
Aluminium make
25 series: as per drawing and direction of Engineer In
65741 34 Series Aluminum openable Cum friction
charge
Design hinges
at
& Mccoy section
thick,H5964/B9139A,Shutter
any floor.
Engineering make, details:3
details:
handle
, Supplying
Track
1.5mm
Insta
, fitting and
TopFisher
make, and Side:
screw
fixingthick,2Track
including SQFT 1895.380 259.0000 490,903.42
B3964,
Fisher 1.5mm
make thick,3
thick,H5965/B4124A,Cleat Track
N6x80,weather Bottom:B3965,
Angle details:
sealent of Dow 1.63mm
4.9mm
Corning etc.with
fixed casement windows transportation
Top and Side: of 55 to1.5mm,2
B4175,
thick,H5976/B2081A,Clip 60details:
Micron powder
Track
1.0mm coated from1.63mm
Bottom:B4176,
thick,H5967/B4125A 0 0.000 0.0000
protective tape
RALall
complete
10with
5mm thick clear float Glass of
fabricated \ 25 SERIES ALUMINIUM Alom(Grey
thick,A
with section:
necessary 7006
B9763,
standard ( SP
1.63mm AN) fromlike Interpon
thick,Horizontal
accessories GasketShade
section:
Oscaka card),
B3959,
make,
Saint Gobain make as per drawing and direction of Engineer In
SLIDING DOOR: Aluminium
1.63mm
friction 25 series:
Mccoy section
thick,Interlock:
hinges details:3
B9764,1.63mm
make, handle Track
Insta TopFisher
thick.With
make, and Side:
all necessary
screw
65741 34 Series Aluminum openable Cum charge
Design at
& any floor.
Engineering , Supplying
B3964,
standard
Fisher 1.5mm
make thick,3 Track
accessories like
N6x80,weather wool pile, fitting
Bottom:B3965,
sealent as
of
and
weather
Dow
fixing
1.63mm including
thick,2Track
gasket,Heavy
Corning etc.with
SQFT 2124.490 271.0000 575,736.79
fixed casement windows transportation
Top
duty and Side:
bearing of 55
B4175,
Roller to 60 Micron
1.5mm,2
Devson powder
Track
make, coated
Bottom:B4176,
U rubber from 1.63mm 0 0.000 0.0000
protective tape all complete with 5mm thick Bose/Oscaka
clear float Glass of
fabricated \ 25 SERIES ALUMINIUM Alom(Grey
thick,A
make,flush RALB9763,
section:
type 7006cum
lock ( SP 10 AN)
1.63mm
handle from Interpon
thick,Horizontal
of Insta Shade
section:
make, Fischer card),
B3959,
make
Saint Gobain make as per drawing and direction of Engineer In
SLIDING DOOR: Aluminium
1.63mm
N6 * 80 screws25 series:
thick,Interlock:
with section
PVC details:3
B9764,1.63mm
fastner of Track
Fischer Top
thick.With and
all
make,weather Side:
necessary
65741 34 Series Aluminum openable Cum charge
Design
B3964, at
& any
1.5mm floor.
Engineering , Supplying ,fitting and fixing of 55 to 60 SQFT 1511.270 238.0000 359,682.26
fixed casement windows
standard
sealent
micron Dowthick,3
ofaccessories
powder Conrning Track
coated(Grey
Bottom:B3965,
likeetc.with
wool
RAL
pile as weather
protective
7006
1.63mm
tape thick,2Track
gasket,Heavy
allfrom
( SP Bose/Oscaka
10 AN) complete
Top
dutyand
with 5mm Side:
bearingthickB4175,
Roller
clear 1.5mm,2
Devson
float Track
make,
Glass of Bottom:B4176,
USaint
rubber Gobain make 1.63mm
as perof 0 0.000 0.0000
fabricated \ Adjustable Louver Interpon
thick,A
make,flush Shade
section: card),Aluminium
B9763, 1.63mm Adjustable
thick,Horizontal Louver window
section: B3959,
drawing and direction of Engineer In charge at any floor.make
type lock cum handle of Insta make, Fischer
Window: Alom
1.63mm
N6 * 80make.The outer
thick,Interlock:
screws with frame
PVC to beofmade
B9764,1.63mm
fastner Fischer outmake,weather
in sizes
thick.With allof 50mm x
necessary
65741 34 Series Aluminum openable Cum Design
25mm & accessories
Engineering
,1.2mm , Supplying ,fitting and fixing including SQFT 542.510 255.0000 138,340.05
fixed casement windows
standard
sealent of Dowthick
transportation
with
Conrning
of 55
likeallwool
necessary
to 60 etc.with
Micron
pile as standard
weather
protective
powder tape
coated
accessories
all completelike
gasket,Heavy
from
glazing
duty
with clip,
bearing
5mm thick cleat
Roller angle,EPDM
clear Devson glazing
make, U gasket,
rubber Fischer
make make
Bose/Oscaka 0 0.000 0.0000
fabricated \ 34 SERIES FIXED WITH Alom(Grey
stainless
make,flush RAL
steel
type 7006float
screws
lock (NSP
cum
Glass
10 AN)
6Engineer
x80
handle
offrom
with
SaintInterpon
ofInPVC
Insta
Gobain Shade
fastner
make, etc.
as
with
Fischer
per
card),
make
OPENABLE WINDOW: drawing
Aluminium and 34direction of
series(Type-1) Casement charge at
series: any floor.
adjustable
N6 * 80 screws louverwithblade
PVCand 4mmofthick
fastner Fischerpin head glass.
make,weather
75494 ALUMINIUM GLAZING -D&W \ CG B8858,B8857,B8865,B8650,B4360
Openable/Openable cum Fixed window of Alom SQFT 1063.700 426.5000 453,668.05
sealent of Dow Conrning etc.with protective tapemake with
all complete
section
with 5mm details
thickas follows:Outer
clear float Glass 34 seriesGobain
of Saint 1.5mm make as per 0 0.000 0.0000
Fixed & Openable: 8mm cleardetails:1.5mm
thick,H5966/B2082A,Mullion Toughened
drawing
Spandrel: and
8mm direction
Frosted. of Engineer In charge at any floor.
thick,H5964/B9139A,Shutter details: 1.5mm
thick,H5965/B4124A,Cleat Angle details: 4.9mm Category 12,097,248.15 Category
thick,H5976/B2081A,Clip details: 1.0mm thick,H5967/B4125A Total: Total:
with
Siddha Galaxia Phase-II ,OPHELIA,LIFT necessary standard accessories like Gasket Oscaka make,
WORK,
65221 LIFT WORK \ 13 PASSENGER LIFT friction
SUKRANTI- hinges Mccoy
MR-C/ make, handleLIFT/
13 PASSENGER Insta 884make,
KgsFisher screw/ 15
/15 Floors NOS 1.000 1,186,411.0000 1,186,411.00
Fisher make N6x80,weather
Stops / PRE-COATED STEEL Car Cabin sealent of Dow Corning etc.with
protective tape all complete with 5mm thick clear float Glass of 0 0.000 0.0000
Saint Gobain make as per drawing and direction of Engineer In
65221 LIFT WORK \ 10 PASSENGER LIFT charge
SUKRANTI- at any floor.10 PASSENGER LIFT/ 680 Kgs / 15 Floors /
MR-C/ NOS 1.000 1,016,949.0000 1,016,949.00
15 Stops / PRE-COATED STEEL Car Cabin 0 0.000 0.0000
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
70739 Interior Work \ Labour charges for FLOORING WORK: SQM 86.000 269.0000 23,134.00
laying true to the line & level
vitrified/rectified or similar types of
floor til
1.5 FOLD HINGS 3" X 2" X NOS 0.1395 11.997 0.0000
3/4"
COMMERCIAL VENEER NOS 0.3 25.800 0.0000
WOODEN SCREW 19X6 PACK 10 860.000 0.0000
NAILS 1-1/4"(14 NO) KGS 0.0116 0.998 0.0000
WOODEN SCREW 1-1/2" X NOS 0.0116 0.998 0.0000
8MM
ARALDITE -90 GRM. PACK 0.0116 0.998 0.0000
PACK
NAILS 1-1/2"(14 NO) KGS 0.0116 0.998 0.0000
HEADLESS PIN 1" X NO.- PACK 0.1163 10.002 0.0000
17
KAJARIA-BOTTICHINO SQFT 10.764 925.704 0.0000
SATIN 1200MMX1200MM
ARALDITE 1.8 KG PACK. PACK 0.0116 0.998 0.0000
FEVIQUICK NOS 0.15 12.900 0.0000
WIRE NAILS 2-1/2" KGS 0.0581 4.997 0.0000
WOODEN SCREW 60MM BOX 0.0116 0.998 0.0000
X 8 MM
Wooden Screw 75MM x NOS 0.0116 0.998 0.0000
10MM
SOMANY - PORTLAND SQFT 0.0116 0.998 0.0000
BIANCO - 600MM X
300MM
NAILS 1"(17 NO) KGS 0.0581 4.997 0.0000
SS SCREW FULL PACK 0.1163 10.002 0.0000
THREADED 25 X 7 MM
ARALDITE -180 GRM. PACK 0.0116 0.998 0.0000
PACK
19 MM PLYWOOD 8' X 4' SQFT 0.4651 39.999 0.0000
(COMMERCIAL)
FULL COARSE SAND MT 0.0116 0.998 0.0000
L.N.HEAD LESS PIN -1/4 X PACK 0.1163 10.002 0.0000
17
NAILS 2-1/2"(14 NO) KGS 0.0581 4.997 0.0000
TENAX HARDENER 45ML NOS 0.0349 3.001 0.0000
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
70739 Interior Work \ Labour charges for FLOORING WORK: SQM 9.000 450.0000 4,050.00
laying true to the line & level 0 0.000 0.0000
Granite fixing set in 20mm (Av)
sand cement mort
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
70739 Interior Work \ Labour charges for FLOORING WORK: SQM 9.000 450.0000 4,050.00
laying true to the line & level
Granite fixing set in 20mm (Av)
sand cement mort
70739 Interior Work \ Labour charges for FLOORING WORK: SQM 97.000 425.0000 41,225.00
fitting & fixing ceramic tiles set in 0 0.000 0.0000
sand cement mortar (1:4) up to
20mm thick i
70739 Interior Work \ Labour charges for FLOORING WORK: SQM 63.000 968.0000 60,984.00
fitting & fixing italian marble at lift 0 0.000 0.0000
fascia over 20mm (Av.) thick base
of ceme
70739 Interior Work \ Labour charges of CARPENTRY WORK: SQM 61.000 1,506.0000 91,866.00
carpentry work of paneling work 0 0.000 0.0000
19mm solid ply, fixing with one side
veneer finish
70739 Interior Work \ Labour charges of CARPENTRY WORK: SQM 67.000 699.0000 46,833.00
carpentry work of paneling work 0 0.000 0.0000
19mm solid ply, fixing with one side
veneer finis
70739 Interior Work \ Labour charges of CARPENTRY WORK: RMT 588.000 330.0000 194,040.00
carpentry work for cutting & fixing 0 0.000 0.0000
wooden louver (50 X 50 mm)
paneling work above
70739 Interior Work \ Labour charges for CARPENTRY WORK: NOS 33.000 550.0000 18,150.00
cutting, making & fixing small size 0 0.000 0.0000
of leaf (75 X 225 mm) including
complete as p
70739 Interior Work \ Labour charges for CARPENTRY WORK: NOS 33.000 750.0000 24,750.00
cutting, making & fixing Big size of 0 0.000 0.0000
leaf (150 X 450 mm) including
complete as pe
70739 Interior Work \ Labour charges of CARPENTRY WORK: SQM 0.000 1,550.0000 0.00
carpentry work of paneling work 0 0.000 0.0000
with hard wood frame & 12mm solid
ply, fixing with
70739 Interior Work \ Supplying & Labour FALSE CEILING WORK: SQM 331.000 236.0000 78,116.00
charges for painting (Grey Paint 0 0.000 0.0000
Finish) at wooden/wall surface &
celling includi
70739 Interior Work \ Proving & fixing FALSE CEILING WORK: SQM 103.000 732.0000 75,396.00
Gypsum Board (12.5 mm thick) 0 0.000 0.0000
including all required tools &
tackles for proposed ar
70739 Interior Work \ Proving & fixing FALSE CEILING WORK: RMT 75.000 732.0000 54,900.00
Gypsum Board (12.5 mm thick) 0 0.000 0.0000
including all required tools &
tackles for Cove area a
70739 Interior Work \ All charges for false FALSE CEILING WORK: RMT 50.000 810.0000 40,500.00
ceiling work with veneer fixing 0 0.000 0.0000
above 12mm ply at cove area with
polishing of
70739 Interior Work \ Supplying & Labour FALSE CEILING WORK: LUMP SUM 1.000 15,000.0000 15,000.00
charges for scaffolding work with 0 0.000 0.0000
bamboo & coir rope as per
requirement at any le
Category 768,944.00 Category
Total: Total:
Siddha Galaxia Phase-II ,OPHELIA,ELECTRICAL WORK,
48814 labour charge for Internal Electrical Distribution point wiring with 2x1.0 sq. mm copper wire through EACH 100.000 150.0000 15,000.00
Work of Gr. floor of G+14 storied 20mm bore pvc alkathene/rigid pipe concealed in wall /ceiling, METAL MODULAR BOX - 8 NOS 0.3125 31.250 0.0000
residential building of Bloc \ 1. pipe laying at the time of slab & wall casting with pulling the 16 MODULES
Distribution point wiring with 2x1.0 SWG steel GI as fish wire & it release at the time of shatter
sq. mm copper wire through 20mm dismantling ) to light/fan/call bell/ex.fan/br.fan point with 6A
bore pvc alkathene/rigid modular switch incl. fixing of modular box inside the wall &
connection & testing as per direction of EIC.(All materials
supply by client)(Avr. run - 9 mtr.)
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
48814 labour charge for Internal Electrical Distribution point wiring with 2x1.0 sq. mm copper wire through EACH 100.000 150.0000 15,000.00
Work of Gr. floor of G+14 storied 20mm bore pvc alkathene/rigid pipe concealed in wall /ceiling,
residential building of Bloc \ 1. pipe laying at the time of slab & wall casting with pulling the 16
Distribution point wiring with 2x1.0 SWG steel GI as fish wire & it release at the time of shatter
sq. mm copper wire through 20mm dismantling ) to light/fan/call bell/ex.fan/br.fan point with 6A 1.5 SQMM (COLOUR- METRE 20.625 2062.500 0.0000
bore pvc alkathene/rigid modular switch incl. fixing of modular box inside the wall & GREEN) -FLAME
connection & testing as per direction of EIC.(All materials RETARDANT LOW
supply by client)(Avr. run - 9 mtr.) SMOKE ( FR-LSH ) WIRE
PVC INSULATED
(UNSHEATHED ) SINGLE
CORE MULTI STRAND
WITH ELECTROLYTIC
GRADE ANNEALED
COPPER CONDUCTOR
SUITABLE UPTO 1100
VOLT GRADE
CONFIRMING TO IS : 694
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
48814 labour charge for Internal Electrical Fixing of 250V,6A,5pin modular type plug socket with 6A EACH 7.000 30.0000 210.00
Work of Gr. floor of G+14 storied modular switch fixed on existing switch board incl. connection 0 0.000 0.0000
residential building of Bloc \ 2. & testing.(All materials supply by client)
Fixing of 250V,6A,5pin modular type
48814 labour charge
plug socket withfor6A
Internal Electrical
modular switch Fixing of 250V,6A,5pin modular type plug socket with 6A EACH 2.000 75.0000 150.00
Work of Gr.
fixed on floor switch
existing of G+14 storied modular switch fixed on 3 module M.S. Board fixed inside the 0 0.000 0.0000
residential building of Bloc \ 3. wall incl. fixing the cover plate with connection & testing.(All
Fixing of 250V,6A,5pin modular type materials supply by client)
48814 labour charge
plug socket withfor6A
Internal Electrical
modular switch Fixing of 250V,16A,6pin modular type plug socket with 16A EACH 8.000 80.0000 640.00
Work of Gr.
fixed on floor ofM.S.
3 module G+14 storied modular switch fixed on 3 module M.S. Board fixed inside the 0 0.000 0.0000
residential building of Bloc \ 4. wall incl. fixing the cover plate with connection & testing.(All
Fixing of 250V,16A,6pin modular materials supply by client)
48814 labour charge
type plug socket forwith
Internal
16A Electrical
modular Fixing of 250V,16A,6pin/6A 5 pin modular type plug socket EACH 2.000 70.0000 140.00
Work
switchoffixed
Gr. floor
on 3 of G+14 M.S
module storied /switch only fixed on 2 module M.S. Board Fixed inside the wall 0 0.000 0.0000
residential building of Bloc \ 5. incl. fixing the cover plate with connection & testing.(All
Fixing of 250V,16A,6pin/6A 5 pin materials supply by client)
48814 labour
modular charge for Internal
type plug socket Electrical
/switch Fixing of 250V,20A modular type A.C stater only fixed on 2 EACH 2.000 70.0000 140.00
Work of Gr.onfloor
only fixed of G+14
2 module storied
M.S. module M.S. Board fixed inside the wall incl. fixing the cover 0 0.000 0.0000
residential building of Bloc \ 6. plate & connection & testing.(All materials supply by client)
Fixing of 250V,20A modular type
48814 labour charge
A.C stater onlyfor Internal
fixed Electrical
on 2 module Fixing of modular type TV/Tel. socket fixed on 2 module M.S. EACH 2.000 70.0000 140.00
Work of Gr. fixed
M.S. Board floor inside
of G+14thestoried Board fixed inside the wall incl fixing the cover plate (All 0 0.000 0.0000
residential building of Bloc \ 7. materials supply by client)
Fixing of modular type TV/Tel.
48814 labour
socket charge
fixed onfor Internal M.S.
2 module Electrical Fixing of modular type electronic fan regulator fixed on existing EACH 1.000 30.0000 30.00
Work
Boardof Gr. floor
fixed insideoftheG+14
wallstoried
incl fix M.S. Switch Board incl. connection & testing. (All materials 0 0.000 0.0000
residential building of Bloc \ 8. supply by client)
Fixing of modular type electronic
48814 labour chargefixed
fan regulator for Internal Electrical
on existing M.S. Drawing of 2x1.5 sq.mm + 1x1.0 sq. mm copper wire through 20 MTR 200.000 25.0000 5,000.00
Work
SwitchofBoard
Gr. floor
incl.ofconnect
G+14 storied mm dia. Pvc pipe incl. laying of pipe with pulling the 16 SWG 0 0.000 0.0000
residential building of Bloc \ 9. steel GI as fish wire & it release at the time of shatter
Drawing of 2x1.5 sq.mm + 1x1.0 sq. dismantling from DB to switch board & switch board to 6A
mm copper wire through 20 mm dia. individual board.(All materials are supply by client)
Pvc pipe incl. laying of pip
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
48814 labour charge for Internal Electrical Drawing of 2x1.5 sq.mm + 1x1.0 sq. mm copper wire through 20 MTR 200.000 25.0000 5,000.00
Work of Gr. floor of G+14 storied mm dia. Pvc pipe incl. laying of pipe with pulling the 16 SWG
residential building of Bloc \ 9. steel GI as fish wire & it release at the time of shatter
Drawing of 2x1.5 sq.mm + 1x1.0 sq. dismantling from DB to switch board & switch board to 6A
48814 labour charge
mm copper wireforthrough
Internal20Electrical
mm dia. Drawing
individualofboard.(All
2x2.5 sq.mm + 1x1.5
materials sq.supply
are mm copper wire through 20 MTR
by client) 250.000 30.0000 7,500.00
Work of Gr.
Pvc pipe floor
incl. of G+14
laying of pipstoried mm dia. Pvc pipe incl. laying of pipe with pulling the 16 SWG 0 0.000 0.0000
residential building of Bloc \ 10. steel GI as fish wire & it release at the time of shatter
Drawing of 2x2.5 sq.mm + 1x1.5 sq. dismantling from DB to A.C points & other 16A power points.
48814 labour charge
mm copper wireforthrough
Internal20Electrical
mm dia. Drawing of RG-6
(All materials are co-axial
supply by cable for TV connection through 20
client) MTR 20.000 25.0000 500.00
Work of Gr.
Pvc pipe floor
incl. of G+14
laying of pi storied mm dia. Pvc pipe incl. laying of pipe from riser to TV/Tel JB & 0 0.000 0.0000
residential building of Bloc \ 11. JB to TV points.(All materials are supply by client)
Drawing of RG-6 co-axial cable for
48814 labour charge for
TV connection Internal
through 20 Electrical
mm dia. Drawing of Cat-6 or telephone wire for Telephone/Intercom/LAN MTR 20.000 25.0000 500.00
Work of Gr.
Pvc pipe floor
incl. of G+14
laying of pipstoried connection through 20 mm dia. Pvc pipe incl. laying of pipe with 0 0.000 0.0000
residential building of Bloc \ 12. pulling the 16 SWG steel GI as fish wire & it release at the time
Drawing of Cat-6 or telephone wire of shatter dismantling from riser to TV/Tel JB & JB to
48814 labour charge for Internal Electrical
for Telephone/Intercom/LAN Laying
Telephoneof 4coreX4sq.
points.(All mm PVC/Un-Armoured
materials are supply bycopper
client) cable MTR 50.000 45.0000 2,250.00
Work of Gr. through
connection floor of G+14
20 mm storied
dia. Pvc through 25 mm dia. PVC pipe concealed in slab incl. pipe laying 0 0.000 0.0000
residential building of Bloc \ 13. at the time of slab casting with pulling the 16 SWG steel GI as
Laying of 4coreX4sq. mm PVC/Un- fish wire & it release at the time of satter dismantling &
48814 labour
Armouredcharge for Internal
copper Electrical
cable through 25 Fixing of 28/40
connection wattend
at both fluo.&Tube light fittings
testing.(All on ceiling
materials supplywith
by client) EACH 82.000 75.0000 6,150.00
Work
mm dia.of Gr.
PVCfloor
pipeofconcealed
G+14 storied
in sl required fixing materials.(material supply by client) 0 0.000 0.0000
residential building of Bloc \ 14.
Fixing of 28/40 watt fluo. Tube light
48814 labour
fittingscharge for Internal
on ceiling Electrical
with required Fixing the 300mm sweep exhaust fan fixed on wall & connection EACH 5.000 200.0000 1,000.00
Work
fixing of Gr. floor of G+14 storied
materials.(materi as per direction of EIC. T5 - 4' LED TUBE LIGHT SET 50 250.000 0.0000
residential building of Bloc \ 15. FITTING WITH
Fixing the 300mm sweep exhaust COMPLETE SET.
fan fixed on wall & connection as
per direction of EIC. CHANDELIER NOS 2 10.000 0.0000
30WATT RECESSED NOS 50 250.000 0.0000
FALSE CEILLING LIGHT
BAKELITE COVER 9"X 17" NOS 120 600.000 0.0000
48814 labour charge for Internal Electrical Fixing of 6way TPN DB concealed in wall incl. dressing & EACH 2.000 480.0000 960.00
Work of Gr. floor of G+14 storied connection the DBs incoming & outgoing connection. 0 0.000 0.0000
residential building of Bloc \ 16.
Fixing of 6way TPN DB concealed in
48814 labour charge
wall incl. for Internal
dressing Electrical
& connection the Fixing the 200mmX200JB concealed in wall for TV/Tel./Intercom EACH 2.000 100.0000 200.00
Work of Gr. floor
DBs incoming of G+14 storied
& outgoing line distribution. 0 0.000 0.0000
residential building of Bloc \ 17.
Fixing the 200mmX200JB concealed
48814 labour charge
in wall for for Internal Electrical
TV/Tel./Intercom line Fixing the 150mmX100JB concealed in wall for stair riser. EACH 4.000 75.0000 300.00
Work of Gr. floor of G+14 storied
distribution. 0 0.000 0.0000
residential building of Bloc \ 18.
Fixing the 150mmX100JB concealed
52383 labour charge
in wall for stairfor Internal Electrical
riser. Labour charges for laying of conduit pipe & fixing of all SQFT 120627.000 4.0000 482,508.00
Work of Typical Floor of G+14 Electrical boxes (i.e. rate including rigid conduit pipe laying of
Storied Residential Building of \ 1. all dia, Circular box, Fan box, Bakelite Sheet (4mm) with Screw
Labour charges for laying of for mod box template, G.I. wire Metal hooks, nails, saddles and
conduit pipe & fixing of all other hardwares will be required including Ceiling rose, PVC
Electrical boxes (i.e. rate includ tapes, copper crimping sockets etc, if any other consumable
require to execute the whole job) complete before pouring of Page 1 of 1
*Amount in INR Concrete in within MIVAN Shuttering as per approved drawing Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
or instruction of EIC.
SIDDHA SPHERE LLP
BOQ Estimation Report
52383 labour charge for Internal Electrical Labour charges for laying of conduit pipe & fixing of all SQFT 120627.000 4.0000 482,508.00
Work of Typical Floor of G+14 Electrical boxes (i.e. rate including rigid conduit pipe laying of CAT 5E - SOLID BARE METRE 0.0415 5006.020 0.0000
Storied Residential Building of \ 1. all dia, Circular box, Fan box, Bakelite Sheet (4mm) with Screw COPPER CONDUCTOR 4
Labour charges for laying of for mod box template, G.I. wire Metal hooks, nails, saddles and PAIR UNSHIELDED
conduit pipe & fixing of all other hardwares will be required including Ceiling rose, PVC TWISTED PAIR ( UTP )
Electrical boxes (i.e. rate includ tapes, copper crimping sockets etc, if any other consumable INDUSTRIAL CABLES
require to execute the whole job) complete before pouring of FOR COMPUTER LAN
Concrete in within MIVAN Shuttering as per approved drawing NETWORK WITH GREY
or instruction of EIC. COLOUR & FR PVC
JACKET .
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
52383 labour charge for Internal Electrical Labour charges for laying of internal wiring inside the flat area SQFT 120627.000 2.0000 241,254.00
Work of Typical Floor of G+14 as well as common area (i.e. Lift Lobby, Stair Lobby & Half 0 0.000 0.0000
Storied Residential Building of \ 2. Landing area) as per drawing or instruction of EIC.
Labour charges for laying of
52383 labour
internalcharge
wiring for Internal
inside Electrical
the flat area Labour charges for fixing of switch, socket, plate with complete SQFT 120627.000 2.0000 241,254.00
Work ofas
as well Typical
common Floorarea of G+14
(i.e. Li connection (in all location) as per drawing or instruction of EIC. 0 0.000 0.0000
Storied Residential Building of \ 3.
Labour charges for fixing of switch,
52383 labour
socket,charge for Internal
plate with complete Electrical Labour charges for fixing of MCB, DB with complete connection SQFT 120627.000 1.5000 180,940.50
Work of Typical
connection (in allFloor of G+14
location) as (in all location) as per drawing or instruction of EIC. 0 0.000 0.0000
Storied Residential Building of \ 4.
Labour charges for fixing of MCB,
52383 labour
DB withcharge for Internal
complete connection Electrical
(in all Labour charges for electrical Connection of main line to meter SQFT 120627.000 2.0000 241,254.00
Work of Typical
location) Floor of G+14
as per drawing or room as per drawing or instruction of EIC. 0 0.000 0.0000
Storied Residential Building of \ 5.
Labour charges for electrical
52383 labour charge
Connection of for
main Internal
line toElectrical
meter Charges for testing & commissioning of electrical fitting & SQFT 120627.000 3.5000 422,194.50
Work
room of
as Typical Flooror
per drawing ofinstruction
G+14 fixtures & successful completion of the same. 0 0.000 0.0000
Storied Residential Building of \ 6.
Charges for testing &
66968 ELECTRICAL
commissioning WORK \ Fixingfitting
of electrical of & Fixing of Bollard Type pole Light(L1) 13W LED 3.5-5M Avg. NOS 38.000 1,000.0000 38,000.00
Bollard
fixtures Type pole Light(L1)
& successful 13W of
completion height White arm colour including c.c. foundation for the WALL BRACKET 18 WATT NOS 0.2632 10.002 0.0000
LED
t 3.5-5M Avg. height White arm same,connection & testing complete. WITH DECORATIVE LAMP
colour including c.c. fou
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
colour including c.c. fou
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
66968 ELECTRICAL WORK \ Fixing of Fixing of Spike Uplighter(L2) 15W LED White Warm colour with NOS 44.000 115.0000 5,060.00
Spike Uplighter(L2) 15W LED White necessary connection & testing complete 0 0.000 0.0000
Warm colour with necessary
connection & testing complet
66968 ELECTRICAL WORK \ Fixing of LED Fixing of LED Strip light(L3) 10W/M White Warm colour with MTR 60.000 50.0000 3,000.00
Strip light(L3) 10W/M White Warm necessary connection & testing complete. 0 0.000 0.0000
colour with necessary connection &
testing complete.
66968 ELECTRICAL WORK \ Fixing of Wall Fixing of Wall recessed Step light(L4) 12W White Warm colour NOS 8.000 115.0000 920.00
recessed Step light(L4) 12W White with necessary connection & testing complete. 0 0.000 0.0000
Warm colour with necessary
connection & testing co
66968 ELECTRICAL WORK \ Fixing of 8 Fixing of 8 way SPN DB in concrete wall with necessary NOS 2.000 250.0000 500.00
way SPN DB in concrete wall with connection of MCB including dressing & testing complete. 0 0.000 0.0000
necessary connection of MCB
including dressing & testi
66968 ELECTRICAL WORK \ Laying of Laying of 2core x 1.5 sq mm cu unarmoured cable through PVC MTR 500.000 25.0000 12,500.00
2core x 1.5 sq mm cu unarmoured rigid pipe. 1.50 SQMM X 3 CORE NOS 1.6 800.000 0.0000
cable through PVC rigid pipe. COPPER FLEXIBLE
POWER CABLE WITH
POWER CORD FOR
SUBMERSIBLE PUMP
66968 ELECTRICAL WORK \ Laying of Laying of 2x6.0+1x6.0 sq. mm FRLS Cu wire through rigid pipe. MTR 200.000 45.0000 9,000.00
2x6.0+1x6.0 sq. mm FRLS Cu wire 0 0.000 0.0000
through rigid pipe.
66968 ELECTRICAL WORK \ Distn. Point Distn. Point wiring with 3 x 1.5 sq.mm copper wire through pvc EACH 10.000 150.0000 1,500.00
wiring with 3 x 1.5 sq.mm copper rigid pipe concealed in wall to light point with 6A switch fixed 6MM GI NUT FOR TIE NOS 120 1200.000 0.0000
wire through pvc rigid pipe on modular switch board. ROD
concealed in wall to light
GI ANCHOR FASTNER NOS 120 1200.000 0.0000
6MM X 25MM
6MM GI WASHER NOS 220 2200.000 0.0000
PVC INSULATION TAPE NOS 30 300.000 0.0000
3" LONG CIRCULAR NOS 220 2200.000 0.0000
SCREW
1" LONG DB SCREW NOS 120 1200.000 0.0000
GI NUT 6MM NOS 110 1100.000 0.0000
6MM TIE ROD (FULL NOS 120 1200.000 0.0000
THREDED)
66968 ELECTRICAL WORK \ Distn. Point Distn. Point wiring with 3 x 1.5 sq.mm copper wire through pvc EACH 2.000 30.0000 60.00
wiring with 3 x 1.5 sq.mm copper rigid pipe concealed in wall to 6A socket with 6A switch fixed on 0 0.000 0.0000
wire through pvc rigid pipe existing modular switch board.
concealed in wall to 6A so
66968 ELECTRICAL WORK \ Fixing of Wall Fixing of Wall Bracket Light with necessary connection & NOS 6.000 60.0000 360.00
Bracket Light with necessary testing complete. 0 0.000 0.0000
connection & testing complete.
66968 ELECTRICAL WORK \ Fixing of Fixing of ceiling Light with necessary connection & testing NOS 4.000 60.0000 240.00
ceiling Light with necessary complete. 0 0.000 0.0000
connection & testing complete.
66968 ELECTRICAL WORK \ Laying of 25 Laying of 25 mm PVC Rigid pipe. MTR 800.000 19.0000 15,200.00
mm PVC Rigid pipe. 0 0.000 0.0000
66968 ELECTRICAL WORK \ Fixing of Fixing of 6"x4"x3" MS JB in concrete wall. NOS 34.000 75.0000 2,550.00
6"x4"x3" MS JB in concrete wall. 0 0.000 0.0000
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
66968 ELECTRICAL WORK \ Fixing of Fixing of 6"x4"x3" MS JB in concrete wall. NOS 34.000 75.0000 2,550.00
6"x4"x3" MS JB in concrete wall.
66968 ELECTRICAL WORK \ Fixing of Fixing of 4"x4"x3" MS JB in concrete wall. NOS 104.000 65.0000 6,760.00
4"x4"x3" MS JB in concrete wall. 0 0.000 0.0000
70099 ELECTRICAL WORK \ Labour Labour charges for Installation of distribution points for light NOS 50.000 100.0000 5,000.00
charges for Installation of etc. along with CKT. By (3x1.5) sq. mm. PVC insulated 1.1 KV 25 X 1MM ALUMINIUM NOS 4 200.000 0.0000
distribution points for light etc. FRLS Copper flexible Conductor wires (ends duly soldered) on STRIP.
along with CKT. By (3x1.5) sq. wall/ceiling/beam/column surface through medium gauge 19mm
dia. PVC rigid conduit (ISI marked) by saddling at 0.5mtr. 8 WAY DOUBLE DOOR NOS 0.1 5.000 0.0000
interval including providing all necessary components and SPN DBS, IP42
accessories i.e .Elbow /Tee /Saddle etc.(ISI marked) and 25MM DIA PVC RIGID METRE 4 200.000 0.0000
mending good all damages as will be required and providing CONDUIT PIPE (MMS)
modular 6A switch/board etc. PVC Circular Box (65 mm dia. MAKE - PRECISION
35mm deep) - 1 way/2 way/4 way with other hardware etc.
having average run 2mt. Including end connection, testing & PVC CONDUIT - SPACE NOS 9 450.000 0.0000
commissioning complete. BAR SADDLE - 25MM
ALLUMINIUM HAL PATTI METRE 5 250.000 0.0000
1MM THICK X 25MM
WIDTH
1.5 SQMM (COLOUR- METRE 5 250.000 0.0000
YELLOW) -FLAME
RETARDANT LOW
SMOKE ( FR-LSH ) WIRE
PVC INSULATED
(UNSHEATHED ) SINGLE
CORE MULTI STRAND
WITH ELECTROLYTIC
GRADE ANNEALED
COPPER CONDUCTOR
SUITABLE UPTO 1100
VOLT GRADE
CONFIRMING TO IS : 694
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
70099 ELECTRICAL WORK \ Labour Labour charges for Installation of 6A, 3/2 pin modular socket NOS 40.000 55.0000 2,200.00
charges for Installation of 6A, 3/2 with 6A modular switch on separate 3 modular box including 1.5 SQMM-SINGLE CORE METRE 28 1120.000 0.0000
pin modular socket with 6A modular interconnection, testing & commissioning complete. MULTISTRAND WIRE(FR-
switch on separate 3 m LSH)SUITABLE UPTO
1100 VOLT GRADE
CONFIRMING TO IS:694
70099 ELECTRICAL WORK \ Labour Labour charges for Installation of distribution circuit wiring with RMT 200.000 38.0000 7,600.00
charges for Installation of 3x1.5 sq.mm. PVC insulated 1100V. FRLS copper conductor 4 CORE X 16 SQMM. - L.T. METRE 2.5 500.000 0.0000
distribution circuit wiring with 3x1.5 wires (ends duly soldered) on vertical (30-40mtr.) wall, CABLE, ALUMINIUM
sq.mm. PVC insulated 1100V ceiling/beam/column surface through medium gauge 19mm dia. CONDUCTOR,
rigid PVC conduit with all accessories e.g. Elbow/Tee including ARMOURED, XLPE
CB etc. by saddling at 0.75mtr. Maximum interval from Lighting INSULATED, PVC
Main switch(16A/DP-MCB) to switch board or from switch board SHEATHED, 1.1 KV AS
to switch board /socket board etc. including interconnections, PER IS : 1544 / 7908
testing & commissioning complete. (PART-1) 1988 WITH
LATEST AMENDMENTS.
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
70099 ELECTRICAL WORK \ Labour Labour charges for Installation of distribution circuit wiring with RMT 200.000 38.0000 7,600.00
charges for Installation of 3x1.5 sq.mm. PVC insulated 1100V. FRLS copper conductor
distribution circuit wiring with 3x1.5 wires (ends duly soldered) on vertical (30-40mtr.) wall,
sq.mm. PVC insulated 1100V SIDDHA SPHERE LLP
ceiling/beam/column surface through medium gauge 19mm dia.
rigid PVC conduit with all accessories e.g. Elbow/Tee including
CB etc. by saddling at 0.75mtr. Maximum interval from Lighting
Main switch(16A/DP-MCB) to switch board or from switch board
to switch board /socket board etc. including interconnections, BOQ Estimation Report
testing & commissioning complete.
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
70099 ELECTRICAL WORK \ Labour Labour charges for Installation of power line laying with 4 Core RMT 200.000 60.0000 12,000.00
charges for Installation of power 16 Sq.mm. Al-XLPE or PVC/Ar. Cable 1100V on Lift Shaft 0 0.000 0.0000
line laying with 4 Core 16 Sq.mm. vertical (30-40mtr.) wall surface by saddling at maximum
Al-XLPE or PVC/Ar. Cable interval of 0.5mtr. or otherwise as will be suitable for the site
70099 ELECTRICAL WORK \ Labour Labour
conditioncharges fornearest
from the Installation
MeterofRoom
8 way to
double door SPN
TPN Power Power
DB at top SET 2.000 350.0000 700.00
charges for Installation of 8 way DB
floor(Metal IP-42) on inter-connection,
etc. including wall / column etc.testing
with 1&no. 40A four pole
commissioning 0 0.000 0.0000
double door SPN Power DB (Metal MCB & 3 nos. 10A to 16A SP-MCB as outgoing including
complete.
IP-42) on wall / column etc interconnections testing & commissioning complete with
70099 ELECTRICAL WORK \ Labour Labour
Earthlingcharges for Fixing of Tube (2x14w.T-5) light fittings /
attachment. NOS 50.000 75.0000 3,750.00
charges for Fixing of Tube Industrial bulkhead light (11w-CFL) fitting on wall / ceiling / 0 0.000 0.0000
(2x14w.T-5) light fittings / Industrial beam etc. Complete with lamp & accessories including
bulkhead light (11w-CFL) f connection with cu flexible PVC wires as will be required.
70099 ELECTRICAL WORK \ Labour Labour charges for Installation of GI Earth Strip (25x5) mm from RMT 200.000 45.0000 9,000.00
charges for Installation of GI Earth Lift Earth Pit below GL. To Lift pit & Earth pit to Meter Room by 0 0.000 0.0000
Strip (25x5) mm from Lift Earth Pit saddling at 0.5 meter maximum interval on vertical (30-40mtr)
below GL. To Lift pi shaft wall including inter-connection & jointing of strips by
70099 ELECTRICAL WORK \ Labour Labour charges
drilling & bolting,for Finishing
testing Armd. Cable Ends
& commissioning (4C-16Sq.mm.)
complete. SET 2.000 100.0000 200.00
charges for Finishing Armd. Cable with single compression type Gland & Copper Cable Sockets 2.5 SQMM (COLOUR- METRE 90 180.000 0.0000
Ends (4C-16Sq.mm.) with single including connections testing & commissioning complete. GREEN) -FLAME
compression type Gland & Cop RETARDANT LOW
SMOKE ( FR-LSH ) WIRE
PVC INSULATED
(UNSHEATHED ) SINGLE
CORE MULTI STRAND
WITH ELECTROLYTIC
GRADE ANNEALED
COPPER CONDUCTOR
SUITABLE UPTO 1100
VOLT GRADE
CONFIRMING TO IS : 694
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
70099 ELECTRICAL WORK \ Labour Labour charges for making hole on RCC lift wall of required size ITEM 2.000 700.0000 1,400.00
charges for making hole on RCC lift for entry the 2 (two) nos. GI strip, 1 (one) no. cable & 1 (one) no. 0 0.000 0.0000
wall of required size for entry the 2 conduit pipe with skilled santras & helper.
(two) nos. GI strip
74460 ELECTRICAL WORK \ Rectification Rectification work due to change of provision from video door NOS 116.000 120.0000 13,920.00
work due to change of provision phone to normal call bell.
from video door phone to normal (a) Pull out & re-fixing the modular box from concrete wall
call bell. provided for video door phone indoor unit & socketing the PVC
pipes. Page 1 of 1
*Amount in INR (b) Chase cutting, circular box fixing and pipe fixing from D.B. Report Generated By : Sounak Nandi
to Circular box beside the D.B location. Aug 19,2019 5:03 PM
(c) Mending good the damages and fish wire
SIDDHA SPHERE LLP
BOQ Estimation Report
74460 ELECTRICAL WORK \ Rectification Rectification work due to change of provision from video door NOS 116.000 120.0000 13,920.00
work due to change of provision phone to normal call bell. LED PANEL LIGHT NOS 2.3 266.800 0.0000
from video door phone to normal (a) Pull out & re-fixing the modular box from concrete wall ROUND (SURFACE) - 12W
call bell. provided for video door phone indoor unit & socketing the PVC
pipes.
(b) Chase cutting, circular box fixing and pipe fixing from D.B. CASSETTE AC NOS 0.02 2.320 0.0000
to Circular box beside the D.B location. (CAPACITY -4.0 TON )
(c) Mending good the damages and fish wire MODULAR COVER PLATE NOS 0.04 4.640 0.0000
checking. 4 MODULE
MCB TP 40AMPS, 10KA, NOS 0.035 4.060 0.0000
"C" CURVE
2.5 SQMM (COLOUR- COIL 0.2 23.200 0.0000
GREEN) -FLAME
RETARDANT LOW
SMOKE ( FR-LSH ) WIRE
PVC INSULATED
(UNSHEATHED ) SINGLE
CORE MULTI STRAND
WITH ELECTROLYTIC
GRADE ANNEALED
COPPER CONDUCTOR
SUITABLE UPTO 1100
VOLT GRADE
CONFIRMING TO IS : 694
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
74460 ELECTRICAL WORK \ Rectification Rectification work due to change of provision from normal call NOS 116.000 120.0000 13,920.00
work due to change of provision bell to door phone 0 0.000 0.0000
from normal call bell to door phone (a) Fixing the Modular box at concrete wall inside
the flat for door phone indoor unit.
74460 ELECTRICAL WORK \ Fixing of light Fixing of light fittings on Wall/Ceiling/False Ceiling/Beam
(b) Chase cutting etc.
and pipe fixing NOS 310.000 60.0000 18,600.00
fittings on Wall/Ceiling/False Complete
from Doorwith lamp
phone out&door
accessories including
unit to indoor unit.connecting cu 0 0.000 0.0000
Ceiling/Beam etc. Complete with flexible wires as will be required. (c) Mending good
lamp & accessories in the damages and fish wire checking.
74460 ELECTRICAL WORK \ Fixing of Fixing of Tube light fittings on Wall/Ceiling/Beam etc. Complete NOS 70.000 60.0000 4,200.00
Tube light fittings on with lamp & accessories including connecting CU flexible wires 0 0.000 0.0000
Wall/Ceiling/Beam etc. Complete as will be required.
with lamp & accessories including
74460 ELECTRICAL WORK \ Fixing of LED Fixing of LED Strip light including necessary interconnections RMT 200.000 10.0000 2,000.00
Strip light including necessary and testing complete. 0 0.000 0.0000
interconnections and testing
complete.
74460 ELECTRICAL WORK \ Installation of Installation of distribution modular point wiring at fire platform, NOS 4.000 150.0000 600.00
distribution modular point wiring at mumpty room & roof top for light/fan/call bell etc. with 3X1.5 sq. 0 0.000 0.0000
fire platform, mumpty room & roof mm. (PVC insulated 1.1 KV FRLS Copper flexible Conductor
top for ligh wires in concealed heavy duty 25mm/20mm dia. (in case of
single point only) PVC conduit through floor slab/wall including
pulling the 16 SWG steel GI as fish wire and mending good all
damages as will be required providing modular 6A switch, PVC
Circular Box 1way/2way/4way with Ceiling rose etc. as per Page 1 of 1
*Amount in INR requirement including end connection, testing & Report Generated By : Sounak Nandi
commissioning complete. Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
74460 ELECTRICAL WORK \ Installation of Installation of 6A, 3/2 pin modular socket at fire platform, NOS 4.000 70.0000 280.00
6A, 3/2 pin modular socket at fire mumpty room & roof top, with 6A modular switch on common 0 0.000 0.0000
platform, mumpty room & roof top, modular frame front plate & box for light/fan including inter
with 6A modular connection, testing & commissioning complete.
74460 ELECTRICAL WORK \ Installation of Installation of distribution circuit wiring at fire platform, mumpty RMT 100.000 32.0000 3,200.00
distribution circuit wiring at fire room & roof top with 3X1.5 sq. mm. PVC insulated 1100V. FRLS 0 0.000 0.0000
platform, mumpty room & roof top copper conductor wires in concealed heavy duty 25mm/20mm
with 3X1.5 sq. dia. PVC conduit form DB to switch board or from switch board
74460 ELECTRICAL WORK \ Labour Labour
to switchcharges for pipeboard/Motor
board/socket socketing with necessary
starter chipping in
etc. including NOS 120.000 120.0000 14,400.00
charges for pipe socketing with Kitchen & Toilet
pulling the 16 SWGplumbing
steel GIcutout
as fishareas
wire,and rechecking
soldering inter-the 0 0.000 0.0000
necessary chipping in Kitchen & same with fish
connections wire. complete.
& testing
Toilet plumbing cutout areas
86411 ELECTRICAL WORK \ Supply of Al Supply of Al Air Terminal of 2000mm Length with mounting NOS 2.000 1,316.0000 2,632.00
Air Terminal of 2000mm Length with accessories 0 0.000 0.0000
mounting accessories
86411 ELECTRICAL WORK \ Supply of Air Supply of Air Terminal Interception Tip NOS 2.000 110.0000 220.00
Terminal Interception Tip 0 0.000 0.0000
86411 ELECTRICAL WORK \ Supply of Air Supply of Air Terminal conductor joining clamp NOS 2.000 253.0000 506.00
Terminal conductor joining clamp 0 0.000 0.0000
86411 ELECTRICAL WORK \ Supply of Air Supply of Air Rod Base NOS 2.000 706.0000 1,412.00
Rod Base 0 0.000 0.0000
86411 ELECTRICAL WORK \ Supply of 10 Supply of 10 mm Al round conductor/ (25mm x 3mm) Al Tape METRE 250.000 108.0000 27,000.00
mm Al round conductor/ (25mm x for ring on roof level 0 0.000 0.0000
3mm) Al Tape for ring on roof level
86411 ELECTRICAL WORK \ Supply of Supply of Clamp for fixing the above rod NOS 250.000 188.0000 47,000.00
Clamp for fixing the above rod 0 0.000 0.0000
86411 ELECTRICAL WORK \ Supply of Supply of Aluminium Ferrule/Suitable Clamp for interconnecting NOS 8.000 204.0000 1,632.00
Aluminium Ferrule/Suitable Clamp Aluminum round conductor/ Al Tape 0 0.000 0.0000
for interconnecting Aluminum
round conductor/ Al Tape
86411 ELECTRICAL WORK \ Supply of Supply of Expansion piece with connector SET 8.000 236.0000 1,888.00
Expansion piece with connector 0 0.000 0.0000
86411 ELECTRICAL WORK \ Supply of Supply of Cross Clamp SET 30.000 366.0000 10,980.00
Cross Clamp 0 0.000 0.0000
86411 ELECTRICAL WORK \ Supply of Supply of TeeClamp SET 4.000 366.0000 1,464.00
TeeClamp 0 0.000 0.0000
86411 ELECTRICAL WORK \ Supply of Supply of Roof conductor holder SET 12.000 146.0000 1,752.00
Roof conductor holder 0 0.000 0.0000
86411 ELECTRICAL WORK \ SUPPLY OF SUPPLY OF PLSTIC SUPPORT FOR CONCRETE NOS 2.000 1,059.0000 2,118.00
PLSTIC SUPPORT FOR CONCRETE BASE=2+3+2+3=10 NOS 0 0.000 0.0000
BASE=2+3+2+3=10 NOS
86411 ELECTRICAL WORK \ MV CLAMP MV CLAMP WITH EXPANSION PC.=8+16+8+20=52 NOS NOS 8.000 334.0000 2,672.00
WITH EXPANSION 0 0.000 0.0000
PC.=8+16+8+20=52 NOS
86411 ELECTRICAL WORK \ Supply of 10 Supply of 10 mm Al round conductor/(25mm x 3mm) Al Tape METRE 390.000 107.0000 41,730.00
mm Al round conductor/(25mm x through the surface 0 0.000 0.0000
3mm) Al Tape through the surface
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
86411 ELECTRICAL WORK \ Supply Supply Suitable clamps for fixing the Al round conductor SET 390.000 187.0000 72,930.00
Suitable clamps for fixing the Al through the surface 0 0.000 0.0000
round conductor through the
surface
86411 ELECTRICAL WORK \ Supply of Supply of Aluminium Ferrule/Suitable Clamp for interconnecting NOS 7.000 182.0000 1,274.00
Aluminium Ferrule/Suitable Clamp Aluminum round conductor/ Al Tape 0 0.000 0.0000
for interconnecting Aluminum
round conductor/ Al Tape
86411 ELECTRICAL WORK \ Supply of 10 Supply of 10 mm Cu bonded steel rod / (25mm x 3mm) Cu.Tape METRE 16.000 311.0000 4,976.00
mm Cu bonded steel rod / (25mm x for connection between Test joint to Earth pit 0 0.000 0.0000
3mm) Cu.Tape for connection
between Test joint to Ea
86411 ELECTRICAL WORK \ Supply of 10 Supply of 10 mm Cu bonded steel rod / (25mm x 3mm) Cu.Tape METRE 190.000 311.0000 59,090.00
mm Cu bonded steel rod / (25mm x for Equipotential Bonding 0 0.000 0.0000
3mm) Cu.Tape for Equipotential
Bonding
86411 ELECTRICAL WORK \ Supply Of Supply Of Exothermic Joint as per IEC Standard EACH 15.000 2,534.0000 38,010.00
Exothermic Joint as per IEC 0 0.000 0.0000
Standard
86411 ELECTRICAL WORK \ Supply of Supply of Test Joint NOS 7.000 329.0000 2,303.00
Test Joint 0 0.000 0.0000
86411 ELECTRICAL WORK \ Supply of Supply of 17.2 mm Cu. Bonded Steel Earth Rod (3000mm long) NOS 7.000 2,340.0000 16,380.00
17.2 mm Cu. Bonded Steel Earth 0 0.000 0.0000
Rod (3000mm long)
86411 ELECTRICAL WORK \ Supply of Supply of Universal Clamp SET 7.000 780.0000 5,460.00
Universal Clamp 0 0.000 0.0000
86411 ELECTRICAL WORK \ Supply of Supply of connecting points NOS 7.000 780.0000 5,460.00
connecting points 0 0.000 0.0000
32007 Piling Work \ 2.a On Single pile of 2 Vertical routine load test (compression) by Hydraulic jacks on EACH 4.000 40,000.0000 160,000.00
load 113 M.T. pile/ piles ( load capacity 80 ton) with 1.5 times of the design 0 0.000 0.0000
load including preparation of the head of piles with concrete of
required strength for receiving the jacks with all ancillary
32007 Piling Work \ 2.b Labour charges for 2 Vertical routine
arrangements forload testup
setting (compression) by Hydraulic
gauges, construction jacks on
of suitable MT 88.000 285.0000 25,080.00
adding extra over the rate of 2.a) pile/ piles (keeping
platforms, load capacity 80 dismantling,
the load, ton) with 1.5 removing
times of theall design 0 0.000 0.0000
i.e. initial load of 113 ton load including etc.
arrangements preparation
completeofas the head
per of piles
direction ofwith
E.I.C concrete
includingof
required strengthoffor
cost of carriage allreceiving
materialsthe
as jacks
per I.Swith all ancillary
Specification.
39626 Routine load test (Compression) for Vertical
(Cementroutine
arrangements
bag & forload test
setting
silver sand(compression)
up
forgauges,
load test by Hydraulic
construction
shall jacks
byon
of suitable
be provided EACH 1.000 46,500.0000 46,500.00
piles under block "OPHELIA" of pile/ piles (keeping
platforms,
developer). load capacity 90 ton)
the load, with 1.5 times
dismantling, of the
removing alldesign 0 0.000 0.0000
Siddha Galaxia - II \ 1.a On Single load including etc.
arrangements preparation
completeofas the head
per of piles
direction ofwith
E.I.C concrete
includingof
pile of load 135.00 M.T. required strengthoffor
cost of carriage allreceiving
materialsthe
as jacks
per I.Swith all ancillary
Specification.
arrangements
(Cement bag & for setting
silver sandupforgauges,
load testconstruction of suitable
shall be provided by Category 9,354,260.00 Category
platforms,
developer).keeping the load, dismantling, removing all Total: Total:
arrangements
Siddha Galaxia Phase-II ,OPHELIA,PLUMBING etc. complete
& SANITARY WORK, as per direction of E.I.C including
cost of carriage of all materials as per I.S Specification.
52468 Labour Charges for FITTING & Labour charges for laying & fixing PP-R pipe line including RMT 1800.000 55.0000 99,000.00
(Cement bag & silver sand for load test shall be provided by
FIXING PPR Pipe for A.C. Water necessary fittings all joints with fusion welding on roof or wall PPR ELBOW 32MM NOS 0.2485 447.300 0.0000
developer)
discharge of Block- 10 (BIANCA) at of concrete structure before concreting as per drawing &
PPR PIPE PN 16 - 3 MTRS METRE 0 0.000 0.0000
Siddh \ 1. Labour charges for laying direction of E.I.C. (PP-R pipe shall be provided by developer).
LONG - 32MM DIA (MONO
& fixing PP-R pipe line including 1.1) For diameter 32mm.
necessary fittings all joints with LAYER)
PPR Pipe PN 16 , 3 Mtrs MTR 1 1800.000 0.0000
Long and 32mm dia
PPR PIPE PN 16 - 3 MTRS METRE 0.8 1440.000 0.0000
LONG - 32MM DIA (3
LAYER)
PPR TEE - 32MM DIA NOS 0.2485 447.300 0.0000
PPR END CAP - 32MM DIA NOS 0.4 720.000 0.0000
55936 Plumbing work at Siddha Galaxia-II PLUMBING WORK METRE 1.000 0.0000 0.00
under SSLLP. \ 1. PLUMBING SWR PIPE DOUBLE NOS 135 135.000 0.0000
WORK SOCKET TYPE-A 75MM
(2-1/2") DIA. 3MTR. (10FT.)
CONFIRMING TO IS 13592
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
56667 CP fittings at Siddha Galaxia-II \ 1. 1. CP and sanitary fittings EACH 1.000 0.0000 0.00
CP and sanitary fittings GLASS PUDDING. KGS 0 0.000 0.0000
TEFLON TAPE NOS 1260 1260.000 0.0000
WASTE PIPE FOR BASIN FT 756 756.000 0.0000
CP EXTENSION PC 1/2" X NOS 315 315.000 0.0000
2"
SEAT COVER FOR EWC NOS 252 252.000 0.0000
BASIN MIXER NOS 252 252.000 0.0000
WASH BASIN NOS 252 252.000 0.0000
SINGLE LEVER NOS 252 252.000 0.0000
CONCEALED DIVERTOR
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
58430 Plumbing & Sanitary work \ 1a.i.Toilet work to be done without staging & scaffolding...with EACH 0.000 4,500.0000 0.00
1.a.i.Toilet work to be done without ppr pipe 0 0.000 0.0000
staging & scaffolding
58430 Plumbing & Sanitary work \ 1a.ii.Toilet work to be done without staging & scaffolding...with EACH 168.000 4,400.0000 739,200.00
1a.ii.Toilet work to be done without upvc/cpvc pipe CP EXTENSION PC 1/2" X NOS 1 168.000 0.0000
staging & scaffolding...with 2.1/2"
upvc/cpvc pipe
UPVC PIPE 25MM (1") NOS 2.381 400.008 0.0000
SCH-40, 3MTR. LONG, AS
PER ASTM D 1785
WASH BASIN NOS 1.6667 280.006 0.0000
UPVC MTA 3/4" NOS 0.8929 150.007 0.0000
6MM TIE ROD (FULL NOS 1.7857 299.998 0.0000
THREDED)
PVC ELBOW 40 MM NOS 1.7857 299.998 0.0000
BASIN MIXER NOS 1 168.000 0.0000
CPVC 3/4" PASS OVER NOS 3 504.000 0.0000
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
58430 Plumbing & Sanitary work \ 1.b.i.Toilet work to be done with staging & scaffolding...with ppr EACH 0.000 4,800.0000 0.00
1.b.i.Toilet work to be done with pipe 0 0.000 0.0000
staging & scaffolding...with ppr pipe
58430 Plumbing & Sanitary work \ 1.b.ii.Toilet work to be done with staging & scaffolding...with EACH 110.000 4,700.0000 517,000.00
1.b.ii.Toilet work to be done with upvc/cpvc pipe 0 0.000 0.0000
staging & scaffolding..with
upvc/cpvc pipe.
58430 Plumbing & Sanitary work \ 1.c.i.With UPVC pipe in waste line for 1nos. kitchen & 1no. EACH 0.000 1,800.0000 0.00
1.c.i.With UPVC pipe in waste line verandah in (G+13) blocks manual lifting up to 4th floor & lifting 0 0.000 0.0000
for 1nos. kitchen & 1no. verandah in by material hoist provided by client above 4th floor up to 13th
(G+13)...with ppr pipe floor and above roof work if any. (Rate is included for 1 nos.
58430 Plumbing & Sanitary work \ 1.c.ii.With
kitchen & 1UPVC pipe in waste
no. verandah, line for
washing 1nos. point
machine kitchen & 1no. of
complete EACH 125.000 1,700.0000 212,500.00
1.c.ii.With UPVC pipe in waste line verandah in (G+13)
one flat.)....with ppr blocks
pipe manual lifting up to 4th floor & lifting 0 0.000 0.0000
for 1nos. kitchen & 1no.verandah in by material hoist provided by client above 4th floor up to 13th
(G+13)...with upvc/cpvc pipe floor and above roof work if any. (Rate is included for 1 nos.
58430 Plumbing & Sanitary work \ 2.Labour
kitchen &charges for horizontal
1 no. verandah, SWR
washing pipe line
machine 110mm
point beyond
complete of RMT 40.000 70.0000 2,800.00
2.Labour charges for horizontal 2.0m from building
one flat.)....with line to nearest
upvc/cpvc pipe pit. 0 0.000 0.0000
SWR pipe line 110mm beyond 2.0m
from building line to nearest pit.
58430 Plumbing & Sanitary work \ 3.Labour charges for laying 1:3:6 plain cement concrete (P.C.C.) CUM 5.000 800.0000 4,000.00
3.Labour charges for laying 1:3:6 of required thickness. 0 0.000 0.0000
plain cement concrete (P.C.C.) of
required thickness.
58430 Plumbing & Sanitary work \ 4.Fixing 4.Fixing of tank paddle piece for feed connection etc EACH 0.000 500.0000 0.00
of tank paddle piece for feed 0 0.000 0.0000
connection etc
57753 Labour Charges for Fitting, Fixing & Labour charges for fitting & fixing UPVC or any other similar EACH 0.000 4,500.0000 0.00
Installation of all Sanitary & type of pipe of soil & waste water, UPVC rain water line, 0 0.000 0.0000
Plumbing Work \ 1. Labour charges PPR/PVC/CPVC concealed water distribution line in toilet,
for fitting & fixing UPVC or any kitchen, washing machine point i/c. ring main line with tank
57753 Labour Charges
other similar typefor
ofFitting,
pipe of Fixing
soil & & Labour
connectioncharges for fitting
complete in alland fixingfixing
respect, U.P.V.C or bath
of all any otherroom fitting EACH 258.000 5,000.0000 1,290,000.00
Installation
waste water,of all Sanitary & similar type
as briefly of pipe of
described in soil andofwaste
scope work water,
& as perU.P.V.C
drawing Rain& water DUCT SHOE (TYPE-A) PCS 2 516.000 0.0000
Plumbing Work \ Labour charges line, PPR/PVC/CPVC
direction concealedetc.
of E.I.C./Consultants water
All distribution
connection of line in toilet,
pipes (800MMX32MMX6MM)
for fitting and fixing U.P.V.C or any kitchen, washingceiling/
through garage machine point
below including
ground up toring main line
building line.with
All as
other similar type of pipe of soil and tank connection complete in all respect, fixing of PVC SWR SINGLE "Y" NOS 1 258.000 0.0000
a complete job, rates are inclusive of all labour i/c.allcarriage
bath room&
waste wa fitting as necessary
briefly described 160MM (6") DIA.
lifting of tools &in scope scaffolding,
tackles, of work and testing
as per drawing
etc.
and direction of Engineer-in-charges/Consultants CONFIRMING TO IS 14735
complete in (G+13) blocks manual lifting up to 4th etc. floorAll
& lifting
connection of pipes
by material hoist through
provided bygarage ceiling4th
client above / below
floor ground upto
up to 13th
building line up
floor & above to pit
roof work line
if with
any. Labor charges for laying 1:3:6 BUTTERFLY VALVE - NOS 0.1938 50.000 0.0000
plain cement
1.a) Toilet concrete
work to be done(P.C.C) of required
without stagingthickness
& scaffolding. below pipe
80MM
line.
1.a.i)All as PPR
With a complete
Pipe. job. Rates are inclusive of all labor
including carriage & Lifting of necessary tool & tackles, GI PIPE CLAMP - 61MM NOS 0.5 129.000 0.0000
providing & erection of scaffolding, testing etc. complete in UPVC FEMALE ADAPTOR NOS 0.5814 150.001 0.0000
(G+13) blocks manual lifting upto 4th floor & lifting by material BRASS THREADED(FABT)
hoist provided by client above 4th floor upto 13 th floor and 32 MM (1-1/4") DIA. AS
above roof work if any. PER ASTM D 2467
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
57753 Labour Charges for Fitting, Fixing & Toilet work to be done with staging & scaffolding. EACH 0.000 0.0000 0.00
Installation of all Sanitary & 1.b.i) With PPR Pipe. 0 0.000 0.0000
Plumbing Work \ 1.b) Toilet work to
be done with staging & scaffolding.
57753 Labour Charges for Fitting, Fixing & With UPVC pipe in waste line for 1 nos. kitchen and 1/ 2 nos. EACH 116.000 2,000.0000 232,000.00
Installation of all Sanitary & verandahs in (G+13) blocks manual lifting upto 4th floor & lifting PVC SWR PLAIN BEND NOS 0.75 87.000 0.0000
Plumbing Work \ With UPVC pipe in by material hoist provided by client above 4th floor upto 25th 160MM DIA
waste line for 1 nos. kitchen and 1/ floor and above roof work if any. (Rate is included for 1 no.
2 nos. verandahs in (G+13) blocks kitchen and 1/2 nos. verandah complete of one flat) BATH SPOUT WITH WALL NOS 1 116.000 0.0000
manual lift FLANGE
UPVC END CAP 32 MM (1- NOS 1 116.000 0.0000
1/4") DIA. SCH-80, AS PER
ASTM D 2467
SS GRATING 5" NOS 1 116.000 0.0000
BASIN MIXER NOS 1 116.000 0.0000
UPVC SOCKET 15MM NOS 2.1552 250.003 0.0000
(1/2")
UPVC ELBOW 20MM (3/4") NOS 1 116.000 0.0000
45 DEGREE SCH-80, AS
PER ASTM D 1785
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
57753 Labour Charges for Fitting, Fixing & With UPVC pipe in waste line for 1nos. kitchen & 2nos. EACH 0.000 1,800.0000 0.00
Installation of all Sanitary & verandah in (G+13) blocks manual lifting up to 4th floor & lifting 0 0.000 0.0000
Plumbing Work \ 1.c) With UPVC by material hoist provided by client above 4th floor up to 13th
pipe in waste line for 1nos. kitchen floor & above roof work if any. (Rate is included for 1 nos.
57753 Labour
& 2nos. Charges
verandahfor in Fitting,
(G+13) Fixing
blocks& With
kitchenUPVC/CPVC Pipe.
& 1 nos. verandah complete of one flat.) EACH 1.000 1,700.0000 1,700.00
Installation of all Sanitary &
manual lifting 1.c.i) With PPR Pipe. UPVC REDUCING TEE NOS 0.9369 0.937 0.0000
Plumbing Work \ 1.c.ii) With 25MM X 15MM (1" X 1/2")
UPVC/CPVC Pipe. (SCH-80)
SWR REDUCING BUSH- NOS 2.1081 2.108 0.0000
50MMX40MM
PVC HEAVY DUTY NOS 0.5856 0.586 0.0000
SOLVENT CEMENT
1000ML
UNIVERSAL CLAMP 50 NOS 1 1.000 0.0000
MM
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
Installation of all Sanitary &
Plumbing Work \ 1.c.ii) With
UPVC/CPVC Pipe.
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
57753 Labour Charges for Fitting, Fixing & Labour charges for horizontal SWR pipe line 110mm beyond RMT 100.000 70.0000 7,000.00
Installation of all Sanitary & 2.0m from building line to nearest pit i/c. earthwork. PVC PIPE CLAMP 110MM NOS 1 100.000 0.0000
Plumbing Work \ 2. Labour charges
for horizontal SWR pipe line 110mm
beyond 2.0m from building line to PVC SWR PLAIN BEND NOS 0.1 10.000 0.0000
nearest pit i 110MM (4") DIAMETER,
CONFIRMING TO IS
14735/99
Wooden Screw 60MM x NOS 2 200.000 0.0000
08MM
PVC SWR BEND (45 NOS 0.1 10.000 0.0000
DEGREE) 160MM
GI DUCT SHOE (TYPE-E) NOS 1 100.000 0.0000
(450 MM X 32MMX 6MM)
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
57753 Labour Charges for Fitting, Fixing & Labour charges for laying 1:3:6 plain cement concrete (P.C.C.) CUM 0.000 800.0000 0.00
Installation of all Sanitary & of required thickness.
Plumbing Work \ 3. Labour charges
for laying 1:3:6 plain cement
concrete (P.C.C.) of required
thickness. Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
57753 Labour Charges for Fitting, Fixing & Labour charges for laying 1:3:6 plain cement concrete (P.C.C.) CUM 0.000 800.0000 0.00
Installation of all Sanitary & of required thickness. 0 0.000 0.0000
Plumbing Work \ 3. Labour charges
for laying 1:3:6 plain cement
57753 Labour
concrete Charges
(P.C.C.)for
of Fitting,
requiredFixing & Fixing of tank paddle piece for feed connection etc. EACH 0.000 500.0000 0.00
Installation
thickness. of all Sanitary & 0 0.000 0.0000
Plumbing Work \ 4. Fixing of tank
paddle piece for feed connection
61975 PLUMBING
etc. & SANITARY WORK \ Labour charges for fitting and fixing U.P.V.C or any other NOS 258.000 5,000.0000 1,290,000.00
Labour charges for fitting and fixing
similar type of pipe of soil and waste water, U.P.V.C Rain water 0 0.000 0.0000
U.P.V.C or any other similar type ofline, PPR/PVC/CPVC concealed water distribution line in toilet,
pipe of soil and waste wa kitchen, washing machine point including ring main line with
61975 PLUMBING & SANITARY WORK \ With UPVC pipe in
tank connection waste line
complete forrespect,
in all 1 nos. kitchen and
fixing of all 1/ 2 nos.
bath room NOS 116.000 2,000.0000 232,000.00
With UPVC pipe in waste line for 1 verandahs in (G+13)
fitting as briefly blocksinmanual
described lifting
scope of work upto
and4th
as floor & lifting
per drawing 0 0.000 0.0000
nos. kitchen and 1/ 2 nos. by
andmaterial
directionhoist provided by client above 4th flooretc.
of Engineer-in-charges/Consultants uptoAll25th
verandahs in (G+13) blocks manual floor and above
connection roof through
of pipes work if any. (Rate
garage is included
ceiling / belowfor 1 no. upto
ground
lift kitchen
buildingandline1/2
up nos.
to pitverandah
line with complete of onefor
Labor charges flat)
laying 1:3:6 Category 4,627,200.00 Category
plain cement concrete (P.C.C) of required thickness below pipe Total: Total:
line. All as a complete job. Rates are inclusive of all labor
Siddha Galaxia Phase-II ,OPHELIA,FLOORING,
55892 Flooring works at Siddha Galaxia-II including carriage & Lifting of necessary tool & tackles,
Flooring works SQFT 1780.000 0.0000 0.00
under SSLLP. \ 1. Flooring works providing & erection of scaffolding, testing etc. complete in
(G+13) blocks manual lifting upto 4th floor & lifting by material TILOFIX. KGS 0.014 24.920 0.0000
hoist provided by client above 4th floor upto 13 th floor and ISMC 400 MT 0.0112 19.936 0.0000
above roof work if any. ISMB 150 MT 0.0112 19.936 0.0000
MS PLATE 12MM KGS 1.1236 2000.008 0.0000
SOMANY - PORTLAND SQFT 0.6 1068.000 0.0000
BIANCO TILES 600MM X
600MM
SOMANY - PORTLAND SQFT 0.6 1068.000 0.0000
BIANCO TILES - 600MM X
300MM.
KAJARIA-BOTTICHINO SQFT 0.6 1068.000 0.0000
SATIN 1200MMX1200MM
ISMB 400MM MT 0.1124 200.072 0.0000
SIKA CRACK SEAL KGS 0.006 10.680 0.0000
TROPICANA WHITE - BOX 0.0483 85.974 0.0000
DOUBLE CHARGED -
VITRIFIED TILES - 800MM
X 800MM
MS PLATE 16MM KGS 1.1236 2000.008 0.0000
ISMB 600 MT 0.0112 19.936 0.0000
ISMC 250 MT 0.0112 19.936 0.0000
ISMB 200 MT 0.0112 19.936 0.0000
CUDDAPA STONE SQFT 5.9551 10600.078 0.0000
(Random Size)
ISMC 150 MT 0.0112 19.936 0.0000
ISMB 450 MT 0.0112 19.936 0.0000
SOMANY - PORTLAND SQFT 0.6 1068.000 0.0000
BIANCO - 600MM X
300MM
ISMC 200 MT 0.0112 19.936 0.0000
GREEN MARBLE - CUT SQFT 4.0933 7286.074 0.0000
SIZE
GRANITE - IKON BROWN SQFT 1.8854 3356.012 0.0000
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
56764 Flooring works at Siddha Galaxia-II \ Flooring works at Siddha Galaxia-II SQFT 1.000 0.0000 0.00
1. Flooring works at Siddha Galaxia- AGL-IMPERIO-GALAXY SQFT 1 1.000 0.0000
II WHITE-DOUBLE CHARGE
VITRIFIED TILES-800MM
X 800MM
CERA - LU6202 - 600mm x SQFT 1 1.000 0.0000
600mm
56764 Flooring works at Siddha Galaxia-II \ 2.Flooring work at Toilet & Kitchen SQFT 1.000 0.0000 0.00
2.Flooring work at Toilet & Kitchen RAK- MILANO DBR SQFT 76 76.000 0.0000
300MM X 450MM
RAK- DYNA LT SQFT 128 128.000 0.0000
300MMX450MM
RAK- GLACIAR GREEN SQFT 43 43.000 0.0000
300MM X 300MM
RAK- GLACIAR GREEN SQFT 77 77.000 0.0000
300MM X 450MM
QUTONE DOVER BROWN SQFT 80 80.000 0.0000
- 300MMx300MM
57725 Labour Charges for Flooring Work Labour charges for laying true to the line & level SQM 9500.000 150.0000 1,425,000.00
in Flat B at 2nd floor including vitrified/rectified or similar types of floor tiles of sizes up to WHITE CEMENT KGS 0.01 95.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \ 800X800X10 mm thick floor skirting set in 20mm (Av) sand
CEMENT BAGS 0.1 950.000 0.0000
1. Labour charges for laying true to cement mortar 1:4 (1 Cement : 4 Sand) shall be laid after
the line & level vitrified/rectified or application of slurry using 1.75Kg cement per m2 in floor & floor
similar types of floor tiles shall be laid by applying 2mm thick cement slurry back
side of tiles using 2.91kg of cement per Sqm. all joint to be
grouted with admixture of white cement & coloring pigment to
match the color of tiles where necessary & cleaning the surface
of tiles & acid polishing as per direction of E.I.C. complete.
(Rates include all labour tools & tackles, lift up to 4th floor.) Page 1 of 1
*Amount in INR 1.a) Vitrified tiles flooring. Report Generated By : Sounak Nandi
1.a.i) In running bill payment will be made without Acid Aug 19,2019 5:03 PM
polishing.
SIDDHA SPHERE LLP
BOQ Estimation Report
57725 Labour Charges for Flooring Work Labour charges for laying true to the line & level SQM 9500.000 150.0000 1,425,000.00
in Flat B at 2nd floor including vitrified/rectified or similar types of floor tiles of sizes up to
Kitchen, Toilet for Block 7A (OPHE \ 800X800X10 mm thick floor skirting set in 20mm (Av) sand
1. Labour charges for laying true to cement mortar 1:4 (1 Cement : 4 Sand) shall be laid after
the line & level vitrified/rectified or application of slurry using 1.75Kg cement per m2 in floor & floor KERAKOLL-UNSANDED KGS 0.0737 700.150 0.0000
similar types of floor tiles shall be laid by applying 2mm thick cement slurry back GROUT-PORCELENA 0-5
side of tiles using 2.91kg of cement per Sqm. all joint to be (COLOUR-IVORY)
grouted with admixture of white cement & coloring pigment to TILOFIX. KGS 0.1053 1000.350 0.0000
match the color of tiles where necessary & cleaning the surface
of tiles & acid polishing as per direction of E.I.C. complete. KERAKOLL- CEMENT KGS 0.0158 150.100 0.0000
(Rates include all labour tools & tackles, lift up to 4th floor.) GROUT - DOVE GREY -
1.a) Vitrified tiles flooring. CODE-52KK
1.a.i) In running bill payment will be made without Acid VISTA PUMP CARE 200 PACK 0.01 95.000 0.0000
polishing. GM
AGL-IMPERIO-GALAXY SQFT 10 95000.000 0.0000
WHITE-DOUBLE CHARGE
VITRIFIED TILES-800MM
X 800MM
MEDIUM COURSE SAND MT 0.018 171.000 0.0000
(ZONE -III)
POP (COMMERCIAL) KGS 0.1684 1599.800 0.0000
CEMENT BAGS 0.3 2850.000 0.0000
GREEN MARBLE SQFT 0.316 3002.000 0.0000
CERA - LU6202 - 600mm x SQFT 1.25 11875.000 0.0000
600mm
FLOOR PROTECTIVE SQFT 1 9500.000 0.0000
POLYTHENE SHEET.
SOMANY - 300MM X SQFT 0.1053 1000.350 0.0000
600MM FOLK LIGHT
FAIRFIX MORTAR KGS 0.211 2004.500 0.0000
KERAKOLL - COFFEE KGS 0.0158 150.100 0.0000
48KK
FULL COARSE SAND MT 0.0021 19.950 0.0000
MEDIUM COARSE SAND MT 0.0321 304.950 0.0000
AGL- RODIZ SLATE PLUS SQFT 0.0147 139.650 0.0000
300MMX300MM
FLOOR PROTECTION SQFT 5.3 50350.000 0.0000
MAT.
PSC CEMENT (MINI BAGS 0.0264 250.800 0.0000
PLANT)
KERAKOLL - FUGABELA KGS 0.0158 150.100 0.0000
PORCELENA ECO 0-5
(COLOUR-BAHAMA
BEIGE)
TRANSPERANT KGS 0.0053 50.350 0.0000
POLYTHIN SHEET
KERAKOLL - FUGABELLA KGS 0.0316 300.200 0.0000
0-5 LIMESTONE 45KK
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
57725 Labour Charges for Flooring Work After acid polishing, cleaning of site & handing over of SQM 78.000 16.0000 1,248.00
in Flat B at 2nd floor including complete work, remaining Rs. 15.00/Sqm. will be made. KERAKOLL FUGABELLA KGS 0.2564 19.999 0.0000
Kitchen, Toilet for Block 7A (OPHE \ CEMENT GROUT 2-12
1.a.ii) After acid polishing, cleaning (CARAMEL)
of site & handing over of complete
work, remaining Rs. 15.00/ KERAKOLL FUGABELLA KGS 0.2564 19.999 0.0000
CEMENT GROUT 2-12
(TERACOTTA)
KERAKOLL GROUT KGS 0.2564 19.999 0.0000
FUGABELLA ECO 2-12
(BAHAMA BEIGE)
KERAKOLL- CEMENT KGS 0.2564 19.999 0.0000
GROUT- FUGABELLA 0-5
(COLOUR - IVORY)
KERAKOLL GROUT KGS 0.2564 19.999 0.0000
FUGABELLA ECO 2-12
(BLACK)
KERAKOLL FUGABELLA KGS 0.2564 19.999 0.0000
CEMENT GROUT 2-12
(IRON GREY)
MURATIC ACID LTR 12.8205 999.999 0.0000
KERAKOLL GROUT KGS 0.2564 19.999 0.0000
FUGABELLA ECO 2-12
(WHITE)
KERAKOLL GROUT KGS 0.2564 19.999 0.0000
FUGABELLA ECO 0-5
(COFFEE)
KERAKOLL GROUT KGS 0.2564 19.999 0.0000
FUGABELLA ECO 2-12
(ANTRACITA)
57725 Labour Charges for Flooring Work Vitrified tiles skirting RMT 70.000 38.5000 2,695.00
in Flat B at 2nd floor including 1.b.i) In running bill payment will be made without Acid AGL-IMPERIO-GALAXY SQFT 1.4286 100.002 0.0000
Kitchen, Toilet for Block 7A (OPHE \ polishing. WHITE-DOUBLE CHARGE
1.b) Vitrified tiles skirting VITRIFIED TILES-800MM
X 800MM
CERA -T311702 - 600mm x SQFT 167.1429 11700.003 0.0000
600mm
CERA - LU6202 - 600mm x SQFT 1 70.000 0.0000
600mm
CEMENT BAGS 0.0286 2.002 0.0000
TILOFIX. KGS 88.5714 6199.998 0.0000
CEMENT BAGS 1 70.000 0.0000
PSC CEMENT (MINI BAGS 21.4286 1500.002 0.0000
PLANT)
57725 Labour Charges for Flooring Work After acid polishing cleaning of site & handing over of complete RMT 70.000 1.5000 105.00
in Flat B at 2nd floor including work, remaining Rs. 1.50/Rmt. will be made. 0 0.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \
1.b.ii) After acid polishing cleaning
57725 Labour
of site &Charges
handingfor Flooring
over Work
of complete Labour Charges for fitting & fixing ceramic tiles set in sand SQM 10.000 140.0000 1,400.00
in Flatremaining
work, B at 2nd floor including
Rs. 1.50/Rm cement mortar (1:4) up to 20mm thick including backing course
Kitchen, Toilet for Block 7A (OPHE \ if required or tilofix after applying 2mm thick cement slurry at
2. Labour Charges for fitting & back side of tiles & finishing the joint with white cement,
fixing ceramic tiles set in sand cleaning the surface, acid policing etc. complete as per
cement mortar (1:4) up to 20mm direction of E.I.C. & drawing. (Labour rate includes all labour all Page 1 of 1
*Amount
thicin INR tools & tackles, scaffolding etc.) up to 4th floor level. Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
2.a) Flooring at toilet & kitchen tiles sizes up to 600X300 mm. /
450X300 mm. / 300X300 mm.
SIDDHA SPHERE LLP
BOQ Estimation Report
57725 Labour Charges for Flooring Work Labour Charges for fitting & fixing ceramic tiles set in sand SQM 10.000 140.0000 1,400.00
in Flat B at 2nd floor including cement mortar (1:4) up to 20mm thick including backing course SOMANY F- AZZARO SQFT 8 80.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \ if required or tilofix after applying 2mm thick cement slurry at BEIGE - 300MM x300MM
2. Labour Charges for fitting & back side of tiles & finishing the joint with white cement,
fixing ceramic tiles set in sand cleaning the surface, acid policing etc. complete as per MEDIUM COARSE SAND MT 0.1 1.000 0.0000
cement mortar (1:4) up to 20mm direction of E.I.C. & drawing. (Labour rate includes all labour all RAK -DIANA DBR FL - SQFT 0.1 1.000 0.0000
thic tools & tackles, scaffolding etc.) up to 4th floor level. 300mm X 300mm
2.a) Flooring at toilet & kitchen tiles sizes up to 600X300 mm. / CEMENT BAGS 0.8 8.000 0.0000
450X300 mm. / 300X300 mm.
2.a.i) In running bill payment will be made without Acid QUTONE DOVER BROWN SQFT 8 80.000 0.0000
polishing. - 300MMx300MM
57725 Labour Charges for Flooring Work After acid polishing, cleaning of site & hand over of complete SQM 10.000 15.0000 150.00
in Flat B at 2nd floor including work, remaining Rs. 15.00/Sqm. will be made. 0 0.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \
2.a.ii) After acid polishing, cleaning
57725 Labour
of site &Charges
hand overforof
Flooring Work
complete Toilet & kitchen wall tiles size up to 600X300 mm./450X300 SQM 55.000 145.0000 7,975.00
in Flatremaining
work, B at 2nd floor including
Rs. 15.00/Sqm mm./300X300 mm. QUTONE - LUX GRIS -DK - SQFT 1.4 77.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \ 2.b.i) In running bill payment will be made without Acid 300MM X 450MM
2.b) Toilet & kitchen wall tiles size polishing.
up to 600X300 mm./450X300 RAK- DYNA DK SQFT 1 55.000 0.0000
mm./300X300 mm. 300MMX450MM
CEMENT BAGS 0 0.000 0.0000
KERAKOLL GROUT KGS 1 55.000 0.0000
FUGABELLA ECO 2-12
(BLACK)
RAK- DIANA DBR - 300mm SQFT 0.0182 1.001 0.0000
X 450mm
QUTONE - LUX GRIS -LT - SQFT 2.1091 116.000 0.0000
300MM X 450MM
KERAKOLL FUGABELLA KGS 1 55.000 0.0000
CEMENT GROUT 2-12
(IRON GREY)
RAK- MILANO DBR SQFT 18.1818 999.999 0.0000
300MM X 450MM
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
57725 Labour Charges for Flooring Work After acid polishing, cleaning of site & hand over of complete SQM 55.000 15.0000 825.00
in Flat B at 2nd floor including work, remaining Rs. 15.00/Sqm. will be made. 0 0.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \
2.b.ii) After acid polishing, cleaning
57725 Labour
of site &Charges forof
hand over Flooring Work
complete Stair raiser skirting. RMT 1.000 38.5000 38.50
in Flatremaining
work, B at 2nd floor including
Rs. 15.00/Sqm 2.c.i) In running bill payment will be made without Acid Vitrified Tiles 600x600mm SQFT 1 1.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \ polishing.
2.c) Stair raiser skirting.
CEMENT BAGS 1 1.000 0.0000
MEDIUM COARSE SAND MT 1 1.000 0.0000
57725 Labour Charges for Flooring Work After acid polishing, cleaning of site & handing over of RMT 0.000 1.5000 0.00
in Flat B at 2nd floor including complete work, remaining Rs. 1.50/Rmt. will be made. 0 0.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \
2.c.ii) After acid polishing, cleaning
57725 Labour
of site &Charges
handingfor Flooring
over Work
of complete Kitchen floor skirting. RMT 10.000 38.5000 385.00
in Flatremaining
work, B at 2nd floor including
Rs. 1.50/R 2.d.i) In running bill payment will be made without Acid CEMENT BAGS 1 10.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \ polishing.
SOMANY F- AZZARO SQFT 1 10.000 0.0000
2.d) Kitchen floor skirting.
BEIGE - 300MM x300MM
57725 Labour Charges for Flooring Work After acid polishing, cleaning of site & handing over of RMT 10.000 1.5000 15.00
in Flat B at 2nd floor including complete work, remaining Rs. 1.50/Rmt. will be made. 0 0.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \
2.d.ii) After acid polishing, cleaning
57725 Labour
of site &Charges
handingfor Flooring
over Work
of complete Labour charges for fitting & fixing black stone slab up to 4th SQM 2.000 250.0000 500.00
in Flatremaining
work, B at 2nd floor including
Rs. 1.50/R floor level. CUDDAPA STONE SQFT 11 22.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \ 3.a) Black stone slab under cooking platform of granite slabs. (Random Size)
3. Labour charges for fitting & fixing
black stone slab up to 4th floor
57725 Labour
level. Charges for Flooring Work Black stone inlay work for supporting cooking platform. SQM 5.000 250.0000 1,250.00
in Flat B at 2nd floor including
Kitchen, Toilet for Block 7A (OPHE \
3.b) Black stone inlay work for
supporting cooking platform.
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
57725 Labour Charges for Flooring Work Black stone inlay work for supporting cooking platform. SQM 5.000 250.0000 1,250.00
in Flat B at 2nd floor including POP (COMMERCIAL) KGS 20 100.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \
3.b) Black stone inlay work for CUDDAPA STONE SQFT 11 55.000 0.0000
supporting cooking platform. (Random Size)
CEMENT BAGS 5 25.000 0.0000
CEMENT BAGS 10 50.000 0.0000
MEDIUM COARSE SAND MT 6 30.000 0.0000
57725 Labour Charges for Flooring Work Labour charges for fitting fixing granite slab with cement mortar SQM 2.000 275.0000 550.00
in Flat B at 2nd floor including over slab or black stone including rounding off in front, PSC CEMENT (MINI BAGS 4000 8000.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \ polishing etc. complete as per direction of E.I.C. up to 4th floor PLANT)
4.a) Labour charges for fitting fixing level.
granite slab with cement mortar CEMENT BAGS 25 50.000 0.0000
over slab or black stone incl CEMENT BAGS 1 2.000 0.0000
MEDIUM COARSE SAND MT 5 10.000 0.0000
GRANITE - IKON BROWN SQFT 11 22.000 0.0000
57725 Labour Charges for Flooring Work Extra labour for half molding. RMT 5.000 75.0000 375.00
in Flat B at 2nd floor including 0 0.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \
4.b) Extra labour for half molding.
57725 Labour Charges for Flooring Work Making granite slab bids in front of cooking platform as per RMT 5.000 65.0000 325.00
in Flat B at 2nd floor including direction of E.I.C. ARALDITE -180 GRM. PACK 2 10.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \ PACK
4.c) Making granite slab bids in
front of cooking platform as per ARALDITE 1.8 KG PACK. PACK 1 5.000 0.0000
direction of E.I.C. ARALDITE -90 GRM. PACK 3 15.000 0.0000
PACK
CEMENT BAGS 4 20.000 0.0000
MEDIUM COARSE SAND MT 4 20.000 0.0000
GRANITE - IKON BROWN SQFT 1.2 6.000 0.0000
57725 Labour Charges for Flooring Work Making holes in granite slab for gas pipe. EACH 1.000 50.0000 50.00
in Flat B at 2nd floor including 0 0.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \
4.d) Making holes in granite slab for
57725 Labour
gas pipe.Charges for Flooring Work Labour charges for fitting & fixing marble slab in floor, stair SQM 1.000 200.0000 200.00
in Flat B at 2nd floor including landing, stair treads etc. over 20mm (Av.) thick base of cement CEMENT BAGS 1 1.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \ mortar (1:4) laid with white cement slurry as directed by E.I.C.
5. Labour charges for fitting & including grinding & polishing complete as per direction of MEDIUM COARSE SAND MT 1 1.000 0.0000
fixing marble slab in floor, stair E.I.C. up to 4th floor level. GREEN MARBLE - CUT SQFT 1 1.000 0.0000
landing, stair treads etc. over 5.a) In flooring of stair, landing. SIZE
57725 Labour Charges for Flooring Work Over stair trade. RMT 1.000 55.0000 55.00
in Flat B at 2nd floor including GREEN MARBLE - CUT SQFT 1 1.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \ SIZE
5.b) Over stair trade.
MEDIUM COARSE SAND MT 1 1.000 0.0000
CEMENT BAGS 1 1.000 0.0000
57725 Labour Charges for Flooring Work In stair, landing skirting. RMT 0.000 50.0000 0.00
in Flat B at 2nd floor including GREEN MARBLE - CUT SQFT 1 0.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \ SIZE
5.c) In stair, landing skirting.
TILOFIX. KGS 1 0.000 0.0000
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
57725 Labour Charges for Flooring Work In stair, landing skirting. BOQ
RMT Estimation Report
0.000 50.0000 0.00
in Flat B at 2nd floor including
Kitchen, Toilet for Block 7A (OPHE \
5.c) In stair, landing skirting.
57725 Labour Charges for Flooring Work Extra labour charges for manual lifting of tiles, stone slab, SQM 0.000 8.0000 0.00
in Flat B at 2nd floor including cement, sand etc. above 4th floor level if required during 0 0.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \ unavailability of passenger hoist for all floors from 5th to 13th
6. Extra labour charges for manual floor & above roof.
57725 Labour
lifting ofCharges for Flooring
tiles, stone Work
slab, cement, Extra labour for laying screed concrete required for leveling SQM 1.000 55.0000 55.00
in
sandFlatetc.
B atabove
2nd floor including
4th floor l course up to thickness of 50mm (av.) in all floor up to 14 thick CEMENT BAGS 100 100.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \ floor. This item shall be applicable where the av. Backing mortar
10MM STONE CHIPS MT 50 50.000 0.0000
7. Extra labour for laying screed thickness will exceed 35mm. (Item should be executed as per
concrete required for leveling specific instruction of E.I.C.) CEMENT BAGS 50 50.000 0.0000
course up to thickness of 50mm MEDIUM COARSE SAND MT 30 30.000 0.0000
(av.
57725 Labour Charges for Flooring Work Labour charges sink position cutting in black stone & fixing the EACH 1.000 300.0000 300.00
in Flat B at 2nd floor including groove cutting with granite fixing at top. 0 0.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \
8. Labour charges sink position
57725 Labour Charges
cutting in for Flooring
black stone & fixingWork
the Labour charges for fitting & fixing angle iron bracket (40X40X6 EACH 0.000 12.0000 0.00
in Flat Bcutting
groove at 2nd with
floorgranite
including
fixi mm) for supporting kitchen slab. 0 0.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \
9. Labour charges for fitting & fixing
57725 Labour Charges
angle iron bracketfor(40X40X6
Flooring mm)
Work Labour charges for making hole in stair trade marble flooring EACH 0.000 35.0000 0.00
in
forFlat B at 2ndkitchen
supporting floor including
slab. for fixing railing. 0 0.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \
10. Labour charges for making hole
57725 Labour Charges
in stair trade for Flooring
marble flooring Work
for Hacking in concrete wall dado for fixing wall tiles in toilets, SQM 0.000 5.3800 0.00
in Flatrailing.
fixing B at 2nd floor including Corridor & Kitchen. 0 0.000 0.0000
Kitchen, Toilet for Block 7A (OPHE \
11.Hacking in concrete wall dado
64581 FLOORING
for fixing wall tiles in toilets, Labour charges for laying floor protection polythene sheet SQFT 90000.000 1.5000 135,000.00
Corridor & Kitchen. along with proper cleaning, laying, joining with tape & removal CELLO TAPE 2" NOS 0.0022 198.000 0.0000
as required & as per instruction of E.I.C.
SOFT BROOM (PHOOL NOS 0.0001 9.000 0.0000
JHARU)
Note: Floor Protection Sheet & Tape would be supplied by
Siddha. FLOOR PROTECTIVE SQFT 1 90000.000 0.0000
POLYTHENE SHEET.
BROWN TAPE 2" NOS 0.0028 252.000 0.0000
FLOOR PROTECTION SQFT 0.15 13500.000 0.0000
MAT.
OLD CLOTH NOS 0.0001 9.000 0.0000
69438 Flooring work-Acid wash & 1.a.Labour charges for acid polishing & Cleaning after flooring SQM 650.000 16.0000 10,400.00
Grouting \ 1.a.Labour charges for work..1.aVitrified tiles flooring ( Bed room, L/D, Balcony Lift 0 0.000 0.0000
acid polishing & Cleaning after Lobby)
flooring work..Vitrified tiles flooring
69438 Flooring
( Bed work-Acid wash & Labour charges for acid polishing & Cleaning after flooring RMT 650.000 1.5000 975.00
Grouting \ 1.b.Labour charges for work..Vitrified tiles Skirting 0 0.000 0.0000
acid polishing & Cleaning after
flooring work.Vitrified tiles Skirting.
69438 Flooring work-Acid wash & 1.c.Labour charges for acid polishing & Cleaning after flooring SQM 450.000 15.0000 6,750.00
Grouting \ 1.c.Labour charges for work..Ceremic Tiles Flooring & wall (Toilet,Kitchen,FRP) 0 0.000 0.0000
acid polishing & Cleaning after
flooring work..Ceremic Tiles
69438 Flooring
Flooring work-Acid
& wall wash & 1.d.Labour charges for acid polishing & Cleaning after flooring RMT 110.000 1.5000 165.00
Grouting \ 1.d.Labour charges for work...Ceremic Tiles Skirting (Kitchen, FRP) 0 0.000 0.0000
acid polishing & Cleaning after
flooring work...Ceremic Tiles
85224 Labour
Skirtingcharges
(Kitch for Vitrified Tiles Backing with Stone Chips. : SQM 8.960 180.0000 1,612.80
Cladding, Granite Cladding, Groove 0 0.000 0.0000
Making, Granite Edge Polishing \ 1. Labour charges for granite backing in 02 layers (50mm) with
Backing with Stone Chips. : stone chips.
85224 Labour charges for Vitrified Tiles Granite Slab Fixing: RMT 140.000 99.1500 13,881.00
Cladding, Granite Cladding, Groove PSC CEMENT (MINI BAGS 0.3 42.000 0.0000
Making, Granite Edge Polishing \ 2. Labour charges for fixing granite slab on the three sides of lift PLANT)
Granite Slab Fixing: opening.
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
85224 Labour charges for Vitrified Tiles Granite Slab Fixing: RMT 140.000 99.1500 13,881.00
Cladding, Granite Cladding, Groove
Making, Granite Edge Polishing \ 2. Labour charges for fixing granite slab on the three sides of lift
Granite Slab Fixing: opening.
10MM STONE CHIPS MT 0.015 2.100 0.0000
SAND - ZONE III MT 0.05 7.000 0.0000
POLISHED GRANITE - SQFT 2.6 364.000 0.0000
IKON BROWN
OPC CEMENT BAGS 0.15 21.000 0.0000
ARALDITE KGS 0.013 1.820 0.0000
SAND - ZONE II MT 0.05 7.000 0.0000
GRANITE - IKON BROWN SQFT 2.6 364.000 0.0000
85224 Labour charges for Vitrified Tiles Groove Making: RMT 138.600 40.0000 5,544.00
Cladding, Granite Cladding, Groove Labour charges for making of groove in the granite slabs on 0 0.000 0.0000
Making, Granite Edge Polishing \ 3. three sides of lift opening.
Groove Making:
85224 Labour charges for Vitrified Tiles Edge Polishing: RMT 140.000 64.0000 8,960.00
Cladding, Granite Cladding, Groove Labour charges for polishing the edges of the granite fixed on 0 0.000 0.0000
Making, Granite Edge Polishing \ 4. the three sides of lift opening.
Edge Polishing:
85224 Labour charges for Vitrified Tiles Black Stone Slab Fixing: RMT 29.400 99.1500 2,915.01
Cladding, Granite Cladding, Groove Labour charges for fixing black stone slab on the top sides of CUDDAPAH STONE SQFT 2.3 67.620 0.0000
Making, Granite Edge Polishing \ 5. lift opening. (Random Size)
Black Stone Slab Fixing:
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
62652 WATERPROOFING WORKS \ Labour for laying 35-45mm average thick screed concrete of SQM 1500.000 70.0000 105,000.00
Labour for laying 35-45mm average proportion 1: 2 : 4 over treated surface in slope Same as toilet
thick screed concrete of proportion water proofing BOQ Estimation Report
1: 2 : 4 over treated surface
77453 Supplying of Waterproofing All charges for Drilling holes of dia 18mm maximum upto half of NOS 100.000 166.0000 16,600.00
Chemical & Application of the same the depth of the wall. Fix the PVC Nozzles of dia 15mm & fix it 0 0.000 0.0000
for Overhead Tank Water Proofing with Fosroc Renderoc Plug. Injecting cementtious Grout Fosroc
Work \ 1.a) Application of Cebex 100, within the prefixed nozzles under pressure using
77453 Supplying of Waterproofing
Comentitious Injection Grout at Surface
grout pump should beall
to fill clean, dry, free
possible pores.from laitance,
Grooves loosebe
should particles
filled SQM 40.000 372.0000 14,880.00
Chemical & Application
Construction Joint: of the same and
with previous coatings.NITOBOND
polymer modified This shouldSBR. be achieved by blast 0 0.000 0.0000
for Overhead Tank Water Proofing cleaning, water jetting, wire brushing or grinding. Blow holes, if
Work \ 1.b) Surface Preparation: any, should be filled with epoxy putty Nitomortar FC.
77453 Supplying of Waterproofing 2.a)
1.c) Application
Antifunhal Food of Comentitious
Grade Epoxy Injection
CoatingGrout at Construction
Providing mixing and NOS 140.000 166.0000 23,240.00
Chemical & Application of the same Joint:
applying over the finished substrate using Nitocote EP405 0 0.000 0.0000
for Overhead Tank Water Proofing waterproofing lining to thanks/reservoir lining, supplied in two
Work \ 2. For Fire Flushing Tank: All charges
(2) pack for coating
epoxy Drilling holes of dia designed
specifically 18mm maximum upto with
for contract half of
77453 Supplying of Waterproofing All
the surfaces
depth
potable of which
water.theThe areFix
wall.
cured to the
receive
film PVC
shall the coating
Nozzles
comply of must
dia
with be free
15mm
the & fixfrom
it SQM 46.000 441.0000 20,286.00
Chemical & Application of the same Oil,
with Grease,
Fosroc Wax,
Renderoc Dirt or any
Plug. other
Injecting form of foreign
cementtious
requirements of IS: 9833-1981 specifically designed to provide a matter
Grout that
Fosroc 0 0.000 0.0000
for Overhead Tank Water Proofing might
tough,affect
Cebex 100, adhesion.
within
Solvent freethe Typically
prefixed
& Non-Toxic, concrete
nozzles surfaces
under
Impermeable, can using
pressure
chemical be
Work \ 2.b) Surface Preparation: cleaned
grout
resistance,using
pump to a high
fill
corrosion all pressure
possible
resistant water
pores. jet and
Grooves
film and thick detergent.
abrasionshould bePoor
resistantfilled
77453 Supplying of Waterproofing Providing
quality,
with and
friable
polymer applying
orwith 20mm average,
contaminated
modified NITOBOND surfaces
SBR. screed
require concrete or
grit-blasting SQM 16.000 142.0000 2,272.00
Chemical & Application of the same lining. Adhesion
mixing ration concrete
(1:2:4)surfaces
for horizontalshould be greater
areacontaining
admixed with than 100mm
scrabbling.
shall Spalled or those largeComplast
blow- 5/8" STONE CHIPS MT 0.1 1.600 0.0000
for Overhead Tank Water Proofing WL
holes@beand
applied
125mlother
over
50KGprepare
persuch bag of substrate
defects cementbe
should
at athe
over thickness
repaired Nitocote
using
of 200
CM210
Fosroc
micron (100 micro/ coat) dry film in two (2) coats for internal FULL COARSE SAND MT 0.05 0.800 0.0000
Work \ 3.) Providing and applying coated
approved surface
repair (Cement,
mortar orSand & Stone chips will be supplied by
render.
20mm average, thick screed sides
the of tank, strictly following the instructions as per Fosroc FLY ASH - BAGS MT 0.15 2.400 0.0000
2.c) client
Coating at work
Specification.
point
with Nitobond on FOC
SBRbasic).
Latesx:
concrete mixing ration (1:2:4) for MEDIUM COURSE SAND MT 0.05 0.800 0.0000
horizontal All charges for covering all the junctions with fillet of size 75X75 (ZONE -III)
mm with CM 1:3 admixed with Nitobond SBR Latesx. PSC CEMENT (MINI BAGS 0.5 8.000 0.0000
2.d) Application of Waterproofing Layer: PLANT)
The waterproofing coating shall be Nitocote CM210, an OPC CEMENT BAGS 0.5 8.000 0.0000
elastomeric cementitious coating approved under the UK WBS 10MM STONE CHIPS MT 0.1 1.600 0.0000
(WRC Listed) Scheme No. 0510522. The cured coating, after SAND - ZONE III MT 0.05 0.800 0.0000
immersion, shall be capable of withstanding cracked substrate
cyclic movement from 0-300-0 microns at 15ºC for 6,000
77453 Supplying of Waterproofing Providing and applying
cycles without failure. It20mm average,
shall have thick plaster
the capability mixing
to resist a SQM 30.000 88.0000 2,640.00
Chemical & Application of the same ration (1:4) for vertical area admixed with Complast WL
positive water pressure of 5 bar and a negative water pressure @ 125ml FULL COARSE SAND MT 0.04 1.200 0.0000
for Overhead Tank Water Proofing per of 2 50KG bag tested
bar when of cement over the Nitocote CM210 coated
to ITM/FTM-181.
Work \ 4.) Providing and applying surface (Cement & Sand will be supplied by the client at work PSC CEMENT (MINI BAGS 0.3 9.000 0.0000
PLANT)
20mm average, thick plaster mixing point on FOC
It should havebasic).
the following performance criteria:
ration (1:4) for vertical area admixed SAND - ZONE III MT 0.04 1.200 0.0000
Static Crack Accommodation : 0.9 mm MEDIUM COURSE SAND MT 0.04 1.200 0.0000
(ZONE -III)
Abrasion Resistance : Water Index
(ASTM D4060) (Equivalent to 40 N conc.)
77453 Supplying of Waterproofing Labour charges for neat cement punning above screed and SQM 46.000 45.0000 2,070.00
Chemical & Application of the same plaster layer at inside
CO Diffusion Resistance of overhead tank including all concrete as PSC CEMENT (MINI BAGS 0.1 4.600 0.0000
for Overhead Tank Water Proofing per direction
(Taywood of E.I.C. 50m
method):> (Only cement
after free issue
5,000hrs QUV2by Us.) PLANT)
Work \ 5.) Labour charges for neat
cement punning above screed and Note1: Nitocode CM210 will bridge an existing crack of up to 0.5
plaster layer at inside of overhead mm in width. Category 1,119,988.00 Category
tank Total: Total:
Siddha Galaxia Phase-II ,OPHELIA,FABRICATION WORK,
57075 Labour charges for Barricading Labour charges for making fitting & fixing temporary railing for EACH 14.000 3,000.0000 42,000.00
Stair Railing, Balconies, Lift staircase, all balconies, two lift opening, all duct opening, any 0 0.000 0.0000
opening, Duct etc. for Safety type of opening at corridor, two nos. of Stair door of Block
Purposes \ 1. Labour charges for Ophelia (7A) with scrap rod of 10mm dia. & 12 mm dia. including
57608 Supplying, Fitting
making fitting & Fixing
& fixing in
temporary Supplying
welding of fitting & fixing
all joints makingornamental grill made
hole in concrete for from
fixingM.S.
lugsFlat, KGS 960.000 65.0000 62,400.00
Position
railing forVerandah
staircase,orall
Stair Railing
balconies, Bars
(Rate&includes
Pipe as all
perlabours,
approved design
tools, & drawing,
tackles & weldingall rod
joints
as per 0 0.000 0.0000
made
two li from M.S. Section with weldin continually welded inofone
drawing & direction side
E.I.C. & tag
(Rate forwelding incomposite
per floor other side,work)
\ 1. Supplying fitting & fixing using electrode ferosil brand of I. S. No. 8 or 10 with M.S.
57608 Supplying,
ornamentalFitting & Fixing
grill made from inM.S. Stair Railing
section of verandah or stair railing etc. clearing the surface KGS 250.000 70.0000 17,500.00
Position
Flat, BarsVerandah
& Pipe asorper
Stair Railing
approved properly up to satisfaction of E.I.C. & filling the uneven welded 0 0.000 0.0000
made
desi from M.S. Section with weldin joints with putty (Shalimar or Similar approved brand) applying
\ 1.b) Stair Railing one coat of red led primer, fitted & fixed with necessary screws
57608 Supplying, Fitting & Fixing in A. C. Ledge
& lugs after cutting hole in concrete/marble flooring or brick KGS 650.000 70.0000 45,500.00
Position Verandah or Stair Railing work etc. complete. Including mending good damages.
made from M.S. Section with weldin
\ 1.c) A. C. Ledge (Rate includes all labour, materials, tools & tackles necessary
welding electrode, putty, paints etc.)
Page 1 of 1
*Amount in INR M. S. Section to be used of Shyam Steel or CRM. Report Generated By : Sounak Nandi
1.a) Varandah Railing Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
57608 Supplying, Fitting & Fixing in A. C. Ledge KGS 650.000 70.0000 45,500.00
Position Verandah or Stair Railing 0 0.000 0.0000
made from M.S. Section with weldin
\ 1.c) A. C. Ledge
57075 Labour charges for Barricading Labour charges for making fitting & fixing 2 Nos. gate at main EACH 14.000 500.0000 7,000.00
Stair Railing, Balconies, Lift stair entry made from scrap rod of 10mm & 12mm dia. of mesh 0 0.000 0.0000
opening, Duct etc. for Safety size 200mm X 200mm including welding of all joints, making
Purposes \ 2. Labour charges for hole in concrete for fixing in wall etc. complete of size
63360 Fabrication
making fittingWork \ Fabrication
& fixing Work
2 Nos. gate Stair Railing .
2250mmX1150mm for 2 Nos. Gate. (as Lump Sum) KGS 4000.000 74.0000 296,000.00
at main stair entry made from scrap 0 0.000 0.0000
rod of
63360 Fabrication Work \ Fabrication Work Balcony Railing. KGS 4800.000 74.0000 355,200.00
0 0.000 0.0000
63360 Fabrication Work \ Fabrication Work AC Ledge KGS 12000.000 74.0000 888,000.00
0 0.000 0.0000
66396 FABRICATION WORK \ Balcony Supplying fitting & fixing ornamental grill made from M.S. Flat, KGS 440.000 72.0000 31,680.00
Railing Bars & Pipe as per approved design & drawing, all joints 0 0.000 0.0000
continually welded in one side & tag welding in other side,
using electrode ferosil brand of I.S. No. 8 or 10 with M.S. section
66396 FABRICATION WORK \ A. C. Ledge Supplying
of Balconyfitting & fixing
Railing, ornamental
A.C.Ledge grill made
etc. clearing from M.S.
the surface Flat, KGS
properly 320.000 72.0000 23,040.00
Bars
up to & Pipe as perofapproved
satisfaction design
E.I.C. & filling the& uneven
drawing,weldedall joints
joints 0 0.000 0.0000
continually welded in
with putty applying one
one side
coat of&redtagled
welding
primer,infitted
other&side,
fixed with
using electrode
necessary screwsferosil brand
& lugs afterofcutting
I.S. No.hole
8 orin10concrete/marble
with M.S. section
72588 Duct sealing with M.S.frame,Sera 1.Labour
of orcharges
Balcony
flooring Railing,
brick for M.S
etc.Fabrication
A.C.Ledge
work work including
etc. clearing
complete. the mending
Including surface properly
good SQM 90.000 1.0000 90.00
Board and concreting. \ 1.Labour cutting,fitting
up to &
satisfaction
damages. fixing
of at typical
E.I.C. & floor
filling the duct area
uneven for
weldedduct sealing
joints MS ANGLE (50 X50 X KGS 22 1980.000 0.0000
charges for M.S Fabrication work purpose
with puttywith sera board/Calcium
applying one coat of redSilicate boardfitted
led primer, over&the M.Swith
fixed 6)MM
including cutting,fitting & fixing at structure.
necessary screws & lugs after cutting hole in concrete/marble
(Rate includes all labour, materials, tools & tackles necessary
typical floor duct SHERA BOARD 18MM X 8' SQFT 10 900.000 0.0000
flooring
welding or brick work
electrode, etc.paints
putty, complete.
etc.) Including mending good X 4'
damages.
SHERA BOARD 6MM X 8' SQFT 10 900.000 0.0000
(Rate includes all labour, materials, tools & tackles necessary X 4'
welding electrode, putty, paints etc.) SHERA BOARD SQFT 10 900.000 0.0000
12mmX8'X4'
SHERA BOARD 8MM X 8' SQFT 10 900.000 0.0000
X 4'
72588 Duct sealing with M.S.frame,Sera 2.Labour charges for laying concrete avarage 50 to 75mm SQM 90.000 1.0000 90.00
Board and concreting. \ 2.Labour thick(1:1.5:3) above sera/calcium silicate board including patta 10MM STONE CHIPS MT 1 90.000 0.0000
charges for laying concrete avarage finish.
MEDIUM COURSE SAND MT 0.1 9.000 0.0000
50 to 75mm thick(1:1.5:3) above
(ZONE -III)
sera/calcium silicate b
5/8" STONE CHIPS. MT 1 90.000 0.0000
PSC CEMENT (MINI BAGS 0.5 45.000 0.0000
PLANT)
CEMENT BAGS 0.5 45.000 0.0000
74049 FABRICATION WORK Supply, fabrication & fixing stair railing, fabricated structure KGS 2700.000 81.0000 218,700.00
made from 0 0.000 0.0000
a) 40 mm MS Tube medium grade
b) 20 mm square bar solid
74060 FABRICATION WORK Supply,
c) 10 mmfabrication
insert plate & fixing fabricated structure made from KGS 13700.000 88.0000 1,205,600.00
a)
d) 12
25 mm
x 6 MS squareFlat bar solid 0 0.000 0.0000
b) 50 XShoe
e) MS 25 RHS medium
(Black grade
Colour)
c) 10 mm
f) MS Bend insert plate
74498 FABRICATION WORK Work
d) 40 X
(Make Order
6 MSfor FlatLabour and hire charges for making/ Equivalent
TATA/NEZONE/BHUSHAN/BANSAL/JINDAL hole in NOS 344.000 30.0000 10,320.00
green
e) Shoe marble
(if any) of stair case of tread at stair
as approved by Siddha) as per approved design & drawing, trades for railing all 0 0.000 0.0000
installation
f) MS Bend
joints in position
(If
continually any)welded including all tools,
in one side & tagtackles
welding & inmachineries
other
as perusing
(Make
side, direction of E.I.C.
TATA/NEZONE/BHUSHAN/BANSAL/JINDAL
electrode ferosil brand of I.S.No. 8 or 10 / with
Equivalent
M.S.
76710 FABRICATION WORK \ SUPPLY, Supply,
as approved fabrication,
by Siddha)Erection
as perat approved
Balcony &designFire Refuse Platform
& drawing, KGS 400.000 80.0000 32,000.00
FABRICATION, ERECTION & FIXING Section,
including cleaning
fixing the surface
fabricated properly
structure madeup to satisfaction
from of all
joints
E.I.C. & continually welded in
filling the uneven one side
welded & tag
joints withwelding in other or
putty (Shalimar
FOR MS RAILING AT BALCONY & a) 60 using
side, mm MS Tube medium
electrode ferosil grade.
brand one
of I.S.No. 8 or 10Lead
with M.S.
FIRE REFUSE PLATFORM Similar
b) 12 mm approved
square bar Brand), applying
solid. coat of Red Primer,
Section,
fitted & cleaning
fixed with the surface
necessary properly
screws & up to mechanical
lugs, satisfaction anchor
of
INCLUDING FI c) 32 X&6filling
E.I.C. MS Flat. theafter
uneven welded
fastener (if any) cutting hole joints with putty (Shalimar
in concrete/marble, flooringor
Similar
etc. approved
complete (Any Brand),
kind applying
of civil workone coatcutting/Supply
/Core of Red Lead Primer,
of Page 1 of 1
(Make
fitted &TATA/NEZONE/BHUSHAN/BANSAL/JINDAL/
fixed with Equivalent
*Amount in INR anchor
as fastener
approved by (ifnecessary
any) will
Siddha) bescrews
asinper
& lugs
Siddha’s
approved scope, mechanical
design or&will anchor
be paid
drawing,
Report Generated By : Sounak Nandi
fastener
extra). after cutting hole concrete complete (Any kind ofall Aug 19,2019 5:03 PM
joints continually
civil work welded in oneofside
/Core cutting/Supply & tagfastener
anchor weldingwillin other
be
side, using electrode ferosil brand of I.S.No. 8 or 10 with M.S.
SIDDHA SPHERE LLP
BOQ Estimation Report
76710 FABRICATION WORK \ SUPPLY, Supply, fabrication, Erection at Balcony & Fire Refuse Platform KGS 400.000 80.0000 32,000.00
FABRICATION, ERECTION & FIXING including fixing fabricated structure made from 0 0.000 0.0000
FOR MS RAILING AT BALCONY & a) 60 mm MS Tube medium grade.
FIRE REFUSE PLATFORM b) 12 mm square bar solid.
79160 Supply,
INCLUDING Fabrication
FI & Fixing of Supply,
c) 32 X 6fabrication
MS Flat. & fixing stair railing, fabricated structure KGS 210.000 81.0000 17,010.00
Fabricated Structure for MS Stair made from 0 0.000 0.0000
Railing at 7th floor (i.e. Model F \ 1. a)40
(Make mm MS Tube medium grade
TATA/NEZONE/BHUSHAN/BANSAL/JINDAL/ Equivalent
Supply, fabrication & fixing stair b)20 mm square
as approved bar solid
by Siddha) as per approved design & drawing, all
85952 Supply, Fabrication,
railing, fabricated Erection
structure for
made Supply,
c)10
jointsmm Fabrication,
insert plate
continually Erection
welded in oneforsidemaking& tag including
welding Fixing in other KGS 1950.000 80.0000 156,000.00
making
from including FIXING BALCONY Balcony
side, using electrode ferosil brand of I.S.No. 8with
d)25 x 6 Railing
MS Flat by M.S Hollow Pipe (62 Dia.) or 10 One with Coat
M.S. 0 0.000 0.0000
RAILING BY M.S HOLLOW PIPE (62 Primer e)MS
Section, incleaning
Shoe position
(Black the including
surfaceallproperly
Colour) tools, tackles & machineries
up to satisfaction of as
Dia \ 1.Supply, Fabrication, Erection perf)MS direction
Bend of E.I.C.
E.I.C. & filling the uneven welded joints with putty (Shalimar or
85952 Supply,
for makingFabrication,
includingErection for
Fixing Balcony Supply,
1.a)
(Make Block Fabrication,
Ophelia. Erection for making including /Fixing
TATA/NEZONE/BHUSHAN/BANSAL/JINDAL Equivalent KGS 1950.000 80.0000 156,000.00
making including FIXING BALCONY Similar
Balcony approved
Railing Brand),
by applying
M.S Hollow Pipeone (62coatDia.) ofwithRedOne Lead Primer,
Coat
Railing by M.S Hollow Pipe (62 D as approved
fitted & fixed by
withSiddha)
necessary as per approved
screws & design
lugs, & drawing,
mechanical anchorall 0 0.000 0.0000
RAILING BY M.S HOLLOW PIPE (62 Primer joints in positionwelded
continually including all tools, tackles & machineries as
fastener after cutting holeininone side &
concrete/marble, tag welding flooring in other
etc.
Dia \ 1. Supply, Fabrication, per
side, direction
using of E.I.C. ferosil brand of I.S.No. 8 or 10 with M.S.
electrode
Siddha
ErectionGalaxia Phase-II
for making including complete.
,OPHELIA,FABRICATION
1.b) Block WORK,FABRICATION WORK
Bianca.
Section, cleaning the surface properly up to satisfaction of
Fixing Balcony
76676 FABRICATION WORK Railing by M.S Supply,
E.I.C. & fabrication,
filling the Erection
uneven at Balcony
welded joints with & Fire Refuse Platform KGS 400.000 80.0000 32,000.00
Hollow Pipe (62 (Rate includes Lifting & Delivery Charges, allputty
labour, (Shalimar
Materials, or
including
Similar&approved fixing fabricated structure
Brand), applying made
one coatfromof Red Lead Primer, 0 0.000 0.0000
Tools Tackles Necessary Welding Electrode, Putty, Paints
a) 60 mm MS Tube medium grade.
fitted
etc.) & fixed with necessary screws & lugs, mechanical anchor
b) 12 mm(ifsquare
fastener bar solid.
any) after cutting hole in concrete/marble, flooring
c) 32complete
X 6 MS Flat. Sub Category 32,000.00 Sub
etc. (Any kind of Civil Work /Core Cutting / Supply of
Total: Category
anchor fastener (if any) will be Siddha’s scope or will be paid
(Make Total:
extra). TATA/NEZONE/BHUSHAN/BANSAL/JINDAL/ Equivalent
as approved by Siddha) as per approved design & drawing, all Category 3,596,130.00 Category
joints continually
(Rate includes welded
Lifting in one side
& Delivery & tagall
Charges, welding
labour,inMaterials,
other Total: Total:
side,
Toolsusing& Tackles electrode ferosilWelding
Necessary brand ofElectrode,
I.S.No. 8 or 10 with
Putty, M.S.
Paints
Siddha Galaxia Phase-II ,OPHELIA,FALSE Section,CEILING cleaningWORK, the surface properly up to satisfaction of
etc.)
57616 supplying, fitting & fixing of false E.I.C. & filling
Providing the uneven
& fixing of falsewelded
ceiling joints
made with fromputty (Shalimar or
595X595X6mm SQFT 150.000 67.0000 10,050.00
ceiling in mock up flat of Block 7A thickSimilar approved
Calcium Brand), applying
Silicate/Non Asbestos one coatCement
Fibre of Red Ceiling
Lead Primer, 0 0.000 0.0000
(OPHELIA) for Siddha Galaxi \ 1. fitted &offixed
Board with necessary
approved screws &tolugs,
make (confirming mechanical
IS 14862) fixing itanchoron G.I.
Providing & fixing of false ceiling fastener
Grid (minimum after cutting hole in
24g) frame concrete/marble,
suspension systemflooring consisting etc.of
57616 supplying,
made from fitting & fixing of
595X595X6mm false
thick Providing
complete.
main runner & fixing false ceiling
up to 3600mm long, asCross
per approved
Tee 1200/600mm drawing made long & SQFT 1.000 67.0000 67.00
ceiling
CalciuminSilicate/Non
mock up flatAsbestos
of Block Fib
7A from 6mm thick
wall angle. The wallCalcium
angleSilicate/Non
shall be fixed Asbestos Fibre Cement
on the perimeter of wall 0 0.000 0.0000
(OPHELIA) for Siddha Galaxi \ 2. Ceiling
(Rate
by steel Board
includes
screws of approved
Lifting
@ make Charges,
& Delivery
300mm center (confirming
to c/c. theallmain to ISrunner
labour, 14862) fixing
Materials,
to be
Providing & fixing false ceiling as it on G.I.
Tools
placed Grid
1200(minimum
&@Tackles mmNecessary 24g)
c/c. the suspension
Welding
Cross TeeElectrode,
1200mm system consisting
Putty,
will be Paints
inserted of
67580 FALSE CEILING
per approved WORKmade
drawing \ Providing
from Providing
maintherunner
etc.)
in precut & fixing
up of
of false
main ceiling
to 3600mm
slots made
long, Cross
runner at regularfrom1200/600mm
Tee 595X595X6mm
interval of 600mmlong & SQFT 11760.000 68.0000 799,680.00
&
6mmfixing of false
thick ceiling
Calcium made from thick
Silicate/Non wall
to from Calcium
angle. TheSilicate
a modular wallgrid Ceiling
angle shall Board
of 1200X600mm of approved
be fixed on the perimeter
Additional make
Cross Tee of wall 0 0.000 0.0000
595X595X6mm thick Calcium (confirming
by
600mmsteelshallscrewstobeIS@ 14862)
300mm
placed fixing
center it on
perpendicular to G.I.
c/c.toGrid
the (minimum
the main
Cross runner 24g)
Tee 1200mmto be
Silicate Ceiling Board of ap frame
placed tosuspension
@ 1200from mmsystem
c/c. of consisting
grid the Cross Tee of main runner
1200mm will
mmbe up tobe
inserted
67580 FALSE CEILING WORK \ Providing long
finally module size 600X600 shall
Providing
3600mm & fixing
long, Cross of
of Calcium
Tee Silicate (6mm) Board includingThe all SQFT 1830.000 68.0000 124,440.00
in the precut
supported byslots
suitable G.I.1200/600mm
main runner
tie fromat longwith
regular
ceiling &interval
wall
properangle.
offastening
600mm
& fixing of Calcium Silicate (6mm) required
wall
to angle
from a tool & Tackles
shall
modular be fixed
grid for
ofon Proposed
the
1200X600mmperimeterArea ofwall
of
Additional Kitchen
by Pipe
steel
Cross screws
Tee 0 0.000 0.0000
Board including all required tool & arrangement
Boxing
@ 300mm
600mm (Rate
shall
as
center
be
per drawing
includes c/c.all
to holes,
placed
& direction
thematerials,
main runner
perpendicular labour
to to
of E.I.C.
thebe&Cross including
Transportation).
placed Tee @1200mm
1200
filling
Tackles for Propose up the in equalities scratches, crack joint of board to be
mm
long c/c.
finished the
to finally
by Cross
fromTee
proper grid1200mm
taping of&module
putty will becomplete
size
etc. inserted
600X600as in
mm the
per precut
shall be
drawing
67580 FALSE CEILING WORK \ Providing slots Providingof main & fixing
runner of Calcium Silicate (6mm) Board toincluding a all RFT 2800.000 68.0000 190,400.00
& fixing of Calcium Silicate (6mm) supported
& direction
required by
toolof& E.I.C. atG.I.
suitable regular
fortie
interval
from ceilingof 600mm
(Applicable with inproper
Toilet)fromfastening
modular grid
arrangement of Tackles
as 1200X600mm Proposed
per drawing &Additional
Area
direction of
of Balcony
Cross
E.I.C.Tee i/c.600mm
for shall
filling up 0 0.000 0.0000
Board including all required tool & covering
be placed ofperpendicular
vertical wastetoline theby making
Cross Box
Teejoint
1200mm (Ratelong includes all
the in equalities holes, scratches, crack of board totobe
Tackles for Propose materials,
finally from labour
grid of&taping
Transportation).
module size 600X600 mm shall be supported
finished by proper & putty
67580 FALSE CEILING WORK \ Proving & Proving & fixing Gypsum Board (12.5 mm thick) including all etc. complete as per drawing SQFT 2245.000 68.0000 152,660.00
fixing Gypsum Board (12.5 mm by
& suitable
direction
required G.I.E.I.C.
of
tools &tie from ceiling
tackles with proper
for proposed area fastening
(Applicable
of Lift Lobby in Lift
(Rate 0 0.000 0.0000
thick) including all required tools & includes all materials, labour & Transportation). including filling
arrangement
Lobby) as per drawing & direction of E.I.C.
up the in equalities holes, scratches, crack joint of board to be
tackles for proposed ar
67580 FALSE CEILING WORK \ Where the finished Where the byheight
properortapingwidth&ofputty etc. complete
the decorative falseasceilingper drawing
work is RFT 1260.000 68.0000 85,680.00
height or width of the decorative & direction
less than 1-of 00E.I.C. for proposed
payments will be made area of perToilet
Rft. (Rate includes 0 0.000 0.0000
false ceiling work is less than 1- 00 all materials, labour & Transportation).
payments will be m
Category 1,362,977.00 Category
Total: Total:
Siddha Galaxia Phase-II ,OPHELIA,PAINTING WORK,
56108 Supplying & Applying Ready Mixed Priming one coat on timber door frame surface with ready EACH 132.000 62.0000 8,184.00
Wood Primer on Door Frames of mixed synthetic oil bound primer of approved quality ( Tarpin WOODEN PRIMER LTR 0.05 6.600 0.0000
Block 09 (OPHELIA) of Siddha Oil mixing not allowed) including smoothing surface by sand
Galaxia \ 1. Priming one coat on papering etc. (Rate including all labour & material) of section 98
56108 Supplying
timber door&frame
Applying Ready
surface Mixed X
with Door
60mmframe
withtype
38 XB 15mm
(0.895 bid.
wide X 2.15 ht.) EACH 341.000 59.0000 20,119.00
Wood Primersynthetic
ready mixed on Door Frames
oil boundof 1.i) Door frame type A (0.995 to 1.145 wide X 2.15 ht.) WOODEN PRIMER LTR 0.02 6.820 0.0000
Block
primer 09
of (OPHELIA)
app of Siddha
Galaxia \ 1.ii) Door frame type B
(0.895 wide X 2.15 ht.)
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
56108 Supplying & Applying Ready Mixed Door frame type C (0.745 wide X 2.15 ht.) EACH 309.000 56.0000 17,304.00
Wood Primer on Door Frames of WOODEN PRIMER LTR 0.02 6.180 0.0000
Block 09 (OPHELIA) of Siddha
Galaxia \ 1.iii) Door frame type C
56108 Supplying
(0.745 wide&XApplying
2.15 ht.) Ready Mixed Extra labour charge for painting of frame which are not with the EACH 500.000 4.0000 2,000.00
Wood Primer on Door Frames of wall but painting to be done by positioning the frame in wall or WOODEN PRIMER LTR 0.02 10.000 0.0000
Block 09 (OPHELIA) of Siddha any vertical surface after taking it from stack & restacking after
Galaxia \ 2. Extra labour charge for drying of painting.
67545 PAINTING
painting ofWORK \ Providing
frame which and
are not with Providing and applying of two coats wooden primer EACH 116.000 145.0000 16,820.00
applying of two
the wall but coatstowooden
painting be done by (Asian/Berger/ICI) for main door frame and shutter (one side 0 0.000 0.0000
primer (Asian/Berger/ICI) for main only), with proper surface preparation including all necessary
door frame and shutter tools and tackles.
67545 PAINTING WORK \ Providing and Providing and applying of two coats synthetic enamel paint EACH 116.000 170.0000 19,720.00
applying of two coats synthetic (Asian/Berger/ICI) for main door frame and shutter (one side 0 0.000 0.0000
enamel paint (Asian/Berger/ICI) for only), with proper surface preparation including all necessary
main door frame an tools and tackles.
67545 PAINTING WORK \ Providing and Providing and applying of two coats wooden primer EACH 309.000 225.0000 69,525.00
applying of two coats wooden (Asian/Berger/ICI) for bed room door frame and shutter (both 0 0.000 0.0000
primer (Asian/Berger/ICI) for bed side) with proper surface preparation including all necessary
room door frame and shu tools and tackles.
67545 PAINTING WORK \ Providing and Providing and applying of two coats synthetic enamel paint EACH 309.000 260.0000 80,340.00
applying of two coats synthetic (Asian/Berger/ICI) for bed room door frame and shutter (both 0 0.000 0.0000
enamel paint (Asian/Berger/ICI) for side) with proper surface preparation including all necessary
bed room door fr tools and tackles.
67545 PAINTING WORK \ Providing and Providing and applying of two coats wooden primer EACH 284.000 195.0000 55,380.00
applying of two coats wooden (Asian/Berger/ICI) for toilet door frame and shutter (both side) 0 0.000 0.0000
primer (Asian/Berger/ICI) for toilet with proper surface preparation including all necessary tools
door frame and shutt and tackles.
67545 PAINTING WORK \ Providing and Providing and applying of two coats synthetic enamel paint EACH 284.000 230.0000 65,320.00
applying of two coats synthetic (Asian/Berger/ICI) for toilet door frame and shutter (both side) 0 0.000 0.0000
enamel paint (Asian/Berger/ICI) for with proper surface preparation including all necessary tools
toilet door frame and tackles.
68140 PAINTING WORK \ Providing & Providing & applying one coat primer (make & brand ICI SQFT 28500.000 3.7500 106,875.00
applying one coat primer (make & Delux/Asian Paint or INFI), on celling wall with proper surface 0 0.000 0.0000
brand ICI Delux/Asian Paint or INFI), preparation including all necessary tools & tackles. As per
on celling wall w direction E.I.C.
72331 PAINTING WORK \ Providing & Providing & applying of two coats wooden primer EACH 116.000 145.0000 16,820.00
applying of two coats wooden (Asian/Berger/ICI) for main door frame & shutter (one side only) 0 0.000 0.0000
primer (Asian/Berger/ICI) for main with proper surface preparation by scraping & removing
door frame & shutter (on scales, dusts etc. before applying the 1st coat & for a smooth
72331 PAINTING WORK \ Providing & Providing & applying
finish applying filler &ofre-scraping
two coats white
beforesynthetic enamel
the 2nd coat as paint EACH 116.000 170.0000 19,720.00
applying of two coats white (Asian/Berger/ICI) for main door
directed & as per approved frame (inside)
manufacturer’s & shutter (one
specification 0 0.000 0.0000
synthetic enamel paint side only) all
including with proper surface
necessary tools &preparation
tackles. including all
(Asian/Berger/ICI) for main door necessary tools & tackles.
72331 PAINTING
fram WORK \ Providing & Providing & applying of two coats synthetic enamel paint of RMT 900.000 27.7500 24,975.00
applying of two coats synthetic approved shade colour (Asian/Berger/ICI) for main door frame 0 0.000 0.0000
enamel paint of approved shade (outside) & shutter (hinge side), with proper surface preparation
colour (Asian/Berger/ICI) including all necessary tools & tackles.
72331 PAINTING WORK \ Providing & Providing & applying of two coats wooden primer EACH 309.000 225.0000 69,525.00
applying of two coats wooden (Asian/Berger/ICI) for Bed Room & Study Room door frame & 0 0.000 0.0000
primer (Asian/Berger/ICI) for Bed shutter (both side) with proper surface preparation by scraping
Room & Study Room door fr & removing scales, dusts etc. before applying the 1st coat & for
72331 PAINTING WORK \ Providing & Providing & applying
a smooth finish of two
applying coats
filler wooden primer
& re-scraping before the 2nd coat EACH 284.000 195.0000 55,380.00
applying of two coats wooden (Asian/Berger/ICI)
as directed & as per forapproved
Toilet & Balcony door frame
manufacturer’s & shutter
specification 0 0.000 0.0000
primer (Asian/Berger/ICI) for Toilet (both side)allwith
including proper surface
necessary tools & preparation
tackles. by scraping &
& Balcony door frame & removing scales, dusts etc. before applying the 1st coat & for a
72331 PAINTING WORK \ Providing & Providing & applying
smooth finish applying offiller
one coat primer (Asian/Berger/ICI)
& re-scraping for
before the 2nd coat SQFT 7200.000 3.0000 21,600.00
applying of one coat primer MS railing of&Verandah
as directed & Stair manufacturer’s
as per approved Case with proper surface
specification 0 0.000 0.0000
(Asian/Berger/ICI) for MS railing of preparation
including allincluding
necessary alltools
necessary tools & tackles.
& tackles.
Verandah & Stair Case w
72331 PAINTING WORK \ Providing & Providing & applying of two coats synthetic enamel paint SQFT 7200.000 8.0000 57,600.00
applying of two coats synthetic (Asian/Berger/ICI) of MS railing for Verandah & Stair Case with 0 0.000 0.0000
enamel paint (Asian/Berger/ICI) of proper surface preparation including all necessary tools &
MS railing for Verand tackles.
72331 PAINTING WORK \ Providing & Providing & applying of one coat Primer & two coat Acrylic SQFT 50000.000 11.0000 550,000.00
applying of one coat Primer & two emulsion paint (Asian/Berger/ICI) for Lobby & Staircase with 0 0.000 0.0000
coat Acrylic emulsion paint proper surface preparation including all tools & tackles.
(Asian/Berger/ICI) for Lob
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
72331 PAINTING WORK \ Providing & Providing & applying of two coats primer (Asian/Berger/ICI) SQFT 1800.000 5.0000 9,000.00
applying of two coats primer over false ceiling at kitchen. 0 0.000 0.0000
(Asian/Berger/ICI) over false ceiling
at kitchen.
72331 PAINTING WORK \ Providing & Providing & applying of two coats of wood primer SQFT 6000.000 3.6500 21,900.00
applying of two coats of wood (Asian/Berger/ICI) to the wooden door frames & shutters with 0 0.000 0.0000
primer (Asian/Berger/ICI) to the proper surface preparation by scraping & removing scales,
wooden door frames & shut dusts etc. before applying the 1st coat & for a smooth finish
72331 PAINTING WORK \ Providing & Providing & applying
applying filler of two coats
& re-scraping beforeofthe
Synthetic
2nd coatEnamel Paint&
as directed SQFT 6000.000 4.0500 24,300.00
applying of two coats of Synthetic (Asian/Berger/ICI) to the woodenspecification,
as per approved manufacturer’s door frames &with
shutters
cost &with 0 0.000 0.0000
Enamel Paint (Asian/Berger/ICI) to proper surface
conveyance preparation
of all materials by sand papering,
& labour completesmoothening,
for duct door
the wooden door fr cleaning theatdusts
(both side) typicaletc. as directed
floor lobby. & as per approved
74233 Painting work \ 1.Providing and 1.Providing
manufacturer’sandspecification,
applying of two coats
with costwooden primer of all
& conveyance EACH 1.000 1.0000 1.00
applying of two coats wooden (Asian/Berger/ICI)
materials & labourfor main door
complete frame
for duct and(both
door shutter (one
side) at side
typical 0 0.000 0.0000
primer (Asian/Berger/ICI) for main only), with proper surface preparation including all necessary
floor lobby.
door frame and shutt tools and tackles.
74233 Painting work \ 2.Providing and 2.Providing and applying of two coats synthetic enamel paint EACH 1.000 1.0000 1.00
applying of two coats synthetic (Asian/Berger/ICI) for main door frame and shutter (one side 0 0.000 0.0000
enamel paint (Asian/Berger/ICI) for only), with proper surface preparation including all necessary
main door frame tools and tackles
74233 Painting work \ 3.Providing and Providing and applying of two coats wooden primer EACH 1.000 1.0000 1.00
applying of two coats wooden (Asian/Berger/ICI) for bed room door frame and shutter (both 0 0.000 0.0000
primer (Asian/Berger/ICI) for bed side) with proper surface preparation including all necessary
room door frame and s tools and tackles.
74233 Painting work \ 4.Providing and 4.Providing and applying of two coats synthetic enamel paint EACH 1.000 1.0000 1.00
applying of two coats synthetic (Asian/Berger/ICI) for bed room door frame and shutter (both 0 0.000 0.0000
enamel paint (Asian/Berger/ICI) for side) with proper surface preparation including all necessary
bed room door tools and tackles
74233 Painting work \ 5.Providing and 5.Providing and applying of two coats wooden primer EACH 1.000 1.0000 1.00
applying of two coats wooden (Asian/Berger/ICI) for toilet door frame and shutter (both side) 0 0.000 0.0000
primer (Asian/Berger/ICI) for toilet with proper surface preparation including all necessary tools
door frame and shu and tackles.
74233 Painting work \ 6.Providing and 6.Providing and applying of two coats synthetic enamel paint EACH 1.000 1.0000 1.00
applying of two coats synthetic (Asian/Berger/ICI) for toilet door frame and shutter (both side) 0 0.000 0.0000
enamel paint (Asian/Berger/ICI) for with proper surface preparation including all necessary tools
toilet door fram and tackles
69876 PAINTING WORK \ Supply & Supply & Application of 02 coats of snow cem paint in the Lift SQFT 10500.000 4.4000 46,200.00
Application of 02 coats of snow shaft for installation of lift Excluding scaffolding . 0 0.000 0.0000
cem paint in the Lift shaft for
installation of lift Exclud
69876 PAINTING WORK \ Supply & Supply & Application of 01 coat primer in typical & Ground floor SQFT 18875.000 2.7500 51,906.25
Application of 01 coat primer in lift before installation of services line . 0 0.000 0.0000
typical & Ground floor lift before
installation of service
75225 PAINTING WORK \ Providing & Providing & applying of Two Coat Primer & Two Coat Acrylic SQFT 4501.000 11.0000 49,511.00
applying of Two Coat Primer & Two Emulsion Paint for Wall and Ceiling surface of Internal Flats 0 0.000 0.0000
Coat Acrylic Emulsion Paint for with proper surface preparation including all tools & tackles
Wall and Ceiling surfa necessary scaffolding at any level as per drawing/directed by
77137 PAINTING WORK \ Supply & EXTERNAL
E.I.C. WALL: SQFT 103000.000 6.0000 618,000.00
Application of External Painting Supply & application, Surface preparation (normal patchwork) 0 0.000 0.0000
Work 1st coat polymer acrylic primer (white pigment) & cement putty
(with Grey cement).
77137 PAINTING WORK \ Supply & EXTERNAL WALL: SQFT 103000.000 5.0000 515,000.00
Application of External Painting Supply & application, Base coat applying texture materials (1 0 0.000 0.0000
Work coat by fur Roller in thick liquid form).
77137 PAINTING WORK \ Supply & EXTERNAL WALL: SQFT 103000.000 11.5000 1,184,500.00
Application of External Painting Supply & application, Final coat (paste form) (Styrene acrylic 0 0.000 0.0000
Work pure silica Base) with Small Bubble Spray Texture Gun with
pigment complete in all respect (with material, Labour, RSP,
77137 PAINTING WORK \ Supply & BALCONY:
Tools and tackles etc. in contractors scope) to the satisfaction SQFT 22000.000 4.0000 88,000.00
Application of External Painting Supply & application, Surface preparation (normal patchwork),
of E.I.C./Architect. 0 0.000 0.0000
Work 1st coat applying sand polymer.
77137 PAINTING WORK \ Supply & BALCONY: SQFT 22000.000 8.0000 176,000.00
Application of External Painting Supply & application, 2nd base coat applying sand texture 0 0.000 0.0000
Work materials with fur roller (paste form).
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
77137 PAINTING WORK \ Supply & BALCONY: SQFT 22000.000 2.0000 44,000.00
Application of External Painting Supply & application, 3rd coat applying stipple sand texture 0 0.000 0.0000
Work roller for decorative looking complete in all respect (with
materials, Labour, RSP, Tools & tackles etc. in contractor's
77137 PAINTING WORK \ Supply & INTERNAL
scope) to theSHAFT:
satisfaction of E.I.C./Architect. SQFT 27500.000 4.0000 110,000.00
Application of External Painting Supply & application, Surface preparation (normal patchwork), 0 0.000 0.0000
Work 1st coat applying sand polymer.
77137 PAINTING WORK \ Supply & INTERNAL SHAFT: SQFT 27500.000 3.0000 82,500.00
Application of External Painting Supply & application, 2nd base coat applying sand texture 0 0.000 0.0000
Work materials with fur roller (paste form).
77137 PAINTING WORK \ Supply & INTERNAL SHAFT: SQFT 27500.000 4.0000 110,000.00
Application of External Painting Supply & application, 3rd coat applying finish Fur roller (Liquid 0 0.000 0.0000
Work form) complete in all respect (with materials, Labour, RSP,
Tools & tackles etc. in contractor’s scope) to the satisfaction of
E.I.C./Architect. Category 4,408,030.25 Category
Total: Total:
Siddha Galaxia Phase-II ,OPHELIA,Survey Work,
73272 AS BUILT SURVEY WORK \ AS AS BUILT SURVEY WORK SQFT 9204.000 1.2500 11,505.00
BUILT SURVEY WORK 0 0.000 0.0000
86996 Labour Charges Miscellaneous Filling good earth in the pockets of the Grass Paver Blocks laid CUM 0.000 12.0000 0.00
Work at Initial Four Blocks (i.e. over the ground up to the height leaving 25 mm from the top 0 0.000 0.0000
Ophelia, Bianca, Orion & Cygnus) at face level & watering for compaction.
S \ 8. Filling good earth in the
86996 Labour
pocketsCharges Miscellaneous
of the Grass Paver Blocks Haulage path repairing. CUM 0.000 40.0000 0.00
Work at Initial
laid over Four Blocks
the ground (i.e.
up to the 0 0.000 0.0000
Ophelia,
height Bianca, Orion & Cygnus) at
S \ 9. Haulage path repairing.
Category 100,000.00 Category
Total: Total:
Siddha Galaxia Phase-II ,OPHELIA,CARPENTARY WORK,
55093 Labour charges for fitting of door fitting of door frame EACH 0.000 0.0000 0.00
frame of different size for Block DOOR FRAME WOODEN- NOS 32 0.000 0.0000
CYGNUS of Siddha Galaxia-I \ fitting 2150MM X 1150MM
of door frame
55093 Labour charges for fitting of door fitting of door frame EACH 1.000 0.0000 0.00
frame of different size for Block DOOR FRAME WOODEN - NOS 1 1.000 0.0000
CYGNUS of Siddha Galaxia-I \ fitting 745MM X 2145MM
of door frame
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
55093 Labour charges for fitting of door fitting of door shutter EACH 1.000 0.0000 0.00
frame of different size for Block WOODEN LIPPING 4MM X RFT 1157 1157.000 0.0000
CYGNUS of Siddha Galaxia-I \ fitting 35MM
of door shutter
FLUSH DOOR SHUTTER - NOS 1 1.000 0.0000
35MM SIZE - 815MM X
2065MM
FLUSH DOOR SHUTTER - NOS 1 1.000 0.0000
35MM SIZE - 915MM X
2070MM
FLUSH DOOR SHUTTER - NOS 1 1.000 0.0000
35MM SIZE - 2080MM X
915MM
FLUSH DOOR SHUTTER - NOS 18 18.000 0.0000
35MM SIZE - 665MM X
2080MM
ANCHOR FASTNER NOS 100 100.000 0.0000
HEADLESS PIN 1-1/4" X BOX 5 5.000 0.0000
NO.-17
FEVICOL. KGS 50 50.000 0.0000
FLUSH DOOR SHUTTER - NOS 1 1.000 0.0000
35MM SIZE - 1015MM X
2065MM
SS HATCH BOLT 10" NOS 50 50.000 0.0000
FLUSH DOOR SHUTTER - NOS 24 24.000 0.0000
35MM SIZE - 815MM X
2070MM
SS HINGES 4" X 1" X 1" NOS 358 358.000 0.0000
FLUSH DOOR SHUTTER - NOS 1 1.000 0.0000
35MM SIZE - 915MM X
2065MM
FLUSH DOOR SHUTTER- NOS 2 2.000 0.0000
35MM SIZE-1065MM X
2060MM
FLUSH DOOR SHUTTER - NOS 56 56.000 0.0000
35MM SIZE - 1015MM X
2060MM
HEADLESS PIN 3/4" X PACK 9 9.000 0.0000
NO.-20
FLUSH DOOR SHUTTER - NOS 1 1.000 0.0000
35MM SIZE - 665MM X
2065MM
SS SCREW 35X7 NOS 2900 2900.000 0.0000
56478 Labour Charges for fitting of door Labour charges for fitting & fixing of door frame with 6/7 nos. EACH 19.000 260.0000 4,940.00
frame of different size for Block 10 anchor fastener in its position after aligning the frame as per ANCHOR FASTNER NOS 7 133.000 0.0000
(ORION) at Siddha Galaxia \ 1. drawing & direction of E.I.C. The rate includes the cost all
DOOR FRAME WOODEN - NOS 1 19.000 0.0000
Labour charges for fitting & fixing labour, cost of anchor fasteners, carriage of door frame within
of door frame with 6/7 nos. anchor lead distance from ground floor stock & lift up to 2nd floor, for 1095MM X 2140MM
fastener in its position a above 2nd floor, developer will provide multifunctional hoist.
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
56478 Labour Charges for fitting of door Door frame size 2.14m X 0.895m to 2.14m X 0.745m with 6 nos. EACH 45.000 260.0000 11,700.00
frame of different size for Block 10 anchor fastener. DOOR FRAME WOODEN - NOS 0.4889 22.000 0.0000
(ORION) at Siddha Galaxia \ 1.b) 745MM X 2140MM
Door frame size 2.14m X 0.895m to
2.14m X 0.745m with 6 nos. anchor
fastener. DOOR FRAME WOODEN - NOS 0.5333 23.998 0.0000
895MM X 2140MM
57765 Fixing of door frame of different Fixing of door frame of different block of SG-II EACH 1.000 0.0000 0.00
block of SG-II \ 1. Fixing of door 1.5 SQMM (COLOUR- METRE 2880 2880.000 0.0000
frame of different block of SG-II BLACK) -FLAME
RETARDANT LOW
SMOKE ( FR-LSH ) WIRE
PVC INSULATED
(UNSHEATHED ) SINGLE
CORE MULTI STRAND
WITH ELECTROLYTIC
GRADE ANNEALED
COPPER CONDUCTOR
SUITABLE UPTO 1100
VOLT GRADE
CONFIRMING TO IS : 694
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
61217 Door Frame Fixing with Anchor Labour charges for drilling, cleaning and fixing with proper EACH 724.000 150.0000 108,600.00
Fastners alignment of Door Frame with Anchor Fastener make FISCHER DOOR FRAME WOODEN - NOS 0.4337 313.999 0.0000
(HFV-10/120 through 10mm dia. hole. Including all tools & 895MM X 2140MM
tackles required. ( All materials will be supplied by us )
6 numbers fasteners ( 10 x 120 ) for all doors
7 numbers fasteners ( 10 x 120 ) for entrance door DOOR FRAME WOODEN - NOS 0.1671 120.980 0.0000
7 numbers fasteners ( 10 x 100 ) for toilet door 1095MM X 2140MM
61388 Door Frame Fixing with Anchor Anchor Fasteners Supplied by Company EACH 724.000 150.0000 108,600.00
Fastners (FISCHER) \ Labour 0 0.000 0.0000
charges for drilling, cleaning and
fixing with proper alignment of Door
61388 Door
FrameFrame Fixing with
with Anchor Fas Anchor Same as above , but supply of anchor fastener ( Fischer ) will be EACH 0.000 260.0000 0.00
Fastners (FISCHER) \ Labour under the scope of contractor 0 0.000 0.0000
charges for drilling, cleaning and
fixing with proper alignment of Door
65135 CARPENTARY WORK
Frame with Anchor Fas\ Fitting & Fitting & fixing 35mm thick 1015mm wide flush door shutter NOS 120.000 154.0000 18,480.00
fixing 35mm thick 1015mm wide with wooden door frame in position at Site with 4 hinges. 4 MM PLYWOOD 8' X 4' SQM 0.0083 0.996 0.0000
flush door shutter with wooden
FLUSH DOOR SHUTTER - NOS 0.0083 0.996 0.0000
door frame in position at Sit
35MM SIZE - 910MM X
2000MM
PVC DOOR BUFFER NOS 0.0083 0.996 0.0000
ROUND WHITE 4"
SS SCREW 35X7 NOS 216.6667 26000.004 0.0000
CENTURY SAMOA TEAK- NOS 0.9667 116.004 0.0000
456
MORTISE LOCK 60 X 85 NOS 3 360.000 0.0000
SS HAFELE
12 MM PLYWOOD 8' X 4' SQM 1.3333 159.996 0.0000
HANDLE NOS 2 240.000 0.0000
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
65135 CARPENTARY WORK \ Fitting & Fitting & fixing 660 to 815 mm wide door shutter with wooden NOS 620.000 143.0000 88,660.00
fixing 660 to 815 mm wide door door frame in position at Site with 3 hinges. FLUSH DOOR SHUTTER - NOS 0.0016 0.992 0.0000
shutter with wooden door frame in 35MM SIZE - 665MM X
position at Site with 3 h 2075MM
FLUSH DOOR SHUTTER - NOS 0.0016 0.992 0.0000
35MM SIZE - 815MM X
2065MM
FLUSH DOOR SHUTTER - NOS 0.0016 0.992 0.0000
35MM SIZE - 815MM X
2070 MM
SS HINGES 3" X 3/4" NOS 0.0016 0.992 0.0000
FLUSH DOOR SHUTTER - NOS 0.0016 0.992 0.0000
35MM SIZE - 660MM X
2000MM
FLUSH DOOR SHUTTER - NOS 0.0016 0.992 0.0000
35MM SIZE - 815MM X
2070MM
SS SCREW (FULL BOX 0.0016 0.992 0.0000
THREAD) 25MM X 6MM.
FLUSH DOOR SHUTTER - NOS 0.0016 0.992 0.0000
35MM SIZE - 665MM X
2080MM
FLUSH DOOR SHUTTER - NOS 0.0016 0.992 0.0000
35MM SIZE - 810MM X
2060MM
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
65135 CARPENTARY WORK \ Fitting & Fitting & fixing decorative lamination in one side to wood door NOS 116.000 275.0000 31,900.00
fixing decorative lamination in one shutter with adhesive & proper clipping as per direction of E.I.C. CENTURY SAMOA TEAK- NOS 0.0086 0.998 0.0000
side to wood door shutter with & without damaging the existing shutter complete in all respect. 456
adhesive & proper clipp (Main door)
FEVICOL. KGS 0.0086 0.998 0.0000
FEVICOL SR KGS 0.0086 0.998 0.0000
65135 CARPENTARY WORK \ Fitting & Fitting & fixing of cover molding bead over the outside of door NOS 740.000 33.0000 24,420.00
fixing of cover molding bead over frame. HEADLESS PIN 5/4" X PACK 0.0014 1.036 0.0000
the outside of door frame. NO.-17
HEADLESS PIN 3/4" X BOX 0.0014 1.036 0.0000
NO.-17
WOODEN CORNER RFT 0.0014 1.036 0.0000
MOULDING BIT 1/2"x1-1/2"
65135 CARPENTARY WORK \ Fitting & Fitting & fixing of corner molding bead over the inside of door NOS 450.000 33.0000 14,850.00
fixing of corner molding bead over frame.
the inside of door frame.
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
65135 CARPENTARY WORK \ Fitting & Fitting & fixing of corner molding bead over the inside of door NOS 450.000 33.0000 14,850.00
fixing of corner molding bead over frame. HEADLESS PIN 3/4" X PACK 0.0022 0.990 0.0000
the inside of door frame. NO.-20
L.N. HEADLESS PIN - 1" X PACK 0.0022 0.990 0.0000
20
L.N.HEAD LESS PIN -3/4 X PACK 0.0022 0.990 0.0000
20
HEADLESS PIN 3/4" X BOX 0.0022 0.990 0.0000
NO.-17
CORNER BIT 1/2" X 1/2" RFT 30 13500.000 0.0000
WOODEN CORNER RFT 0.0022 0.990 0.0000
MOULDING BIT 1/2"x1-1/2"
65135 CARPENTARY WORK \ Fitting & Fitting & fixing door handle. NOS 116.000 33.0000 3,828.00
fixing door handle. 0 0.000 0.0000
65135 CARPENTARY WORK \ Lipping of Lipping of door shutter. NOS 116.000 33.0000 3,828.00
door shutter. WOODEN LIPPING 4MM X RFT 0.0086 0.998 0.0000
35MM
HEADLESS PIN 1" X NO.- PACK 0.0086 0.998 0.0000
17
HEADLESS PIN 5/4" X PACK 0.0086 0.998 0.0000
NO.-17
HEADLESS PIN 1-1/4" X BOX 0.0086 0.998 0.0000
NO.-17
HEADLESS PIN 3/4" X BOX 0.0086 0.998 0.0000
NO.-17
HEADLESS PIN 3/4" X PACK 0.0086 0.998 0.0000
NO.-20
65135 CARPENTARY WORK \ Fitting & Fitting & fixing of door eye. NOS 116.000 33.0000 3,828.00
fixing of door eye. MAGIC EYE NOS 0.0086 0.998 0.0000
65135 CARPENTARY WORK \ Fixing of Fixing of Door Lock. EACH 620.000 143.0000 88,660.00
Door Lock. DOOR LOCK for NOS 0.0016 0.992 0.0000
BEDROOM
65135 CARPENTARY WORK \ Fixing of Fixing of Hatch Bolt. EACH 16.000 33.0000 528.00
Hatch Bolt. SS HATCH BOLT 10" NOS 0.0625 1.000 0.0000
12" SS HATCH BOLT NOS 0.0625 1.000 0.0000
65135 CARPENTARY WORK \ Fixing of Fixing of Tower Bolt. NOS 16.000 22.0000 352.00
Tower Bolt. TOWER BOLT 3" NOS 0.0625 1.000 0.0000
BALL TYPE TOWER BOLT NOS 0.0625 1.000 0.0000
8''
Tower Bolt 10" NOS 0.0625 1.000 0.0000
65135 CARPENTARY WORK \ Labour Labour charges of fixing door buffer. EACH 720.000 5.5000 3,960.00
charges of fixing door buffer.
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
65135 CARPENTARY WORK \ Labour Labour charges of fixing door buffer. EACH 720.000 5.5000 3,960.00
charges of fixing door buffer. PVC DOOR BUFFER WITH NOS 0.1944 139.968 0.0000
SCREW 3"
3" DOOR BUFFER ROUND NOS 0.0014 1.008 0.0000
WHITE
PVC DOOR BUFFER NOS 0.0014 1.008 0.0000
ROUND WHITE 4"
BUFFER PCS 0.0014 1.008 0.0000
NYLON BUFFER 3'' NOS 0.0014 1.008 0.0000
DOOR BUFFER 4" SS NOS 0.0014 1.008 0.0000
65135 CARPENTARY WORK \ Labour Labour charges for shifting all type of door shutters from a EACH 720.000 20.0000 14,400.00
charges for shifting all type of door designated location to the block & vertical lifting all type door 0 0.000 0.0000
shutters from a designated location shutters above 1st floor up to 13th floor or above up to the
to the block & vert required work location (Through hoist provided by Siddha).
66195 GF Carpentary work \ GF Work GF Work SQFT 1.000 1.0000 1.00
0 0.000 0.0000
68002 Carpentry work at G.Floor \ Labour Labour charges for panneling work at G.Floor of Block-Ophelia SQFT 300.000 1.0000 300.00
charges for panneling work at WHITE GRAVEL KGS 0.04 12.000 0.0000
G.Floor of Block-Ophelia
CREAM TENEX 1.7 KGS KGS 0.0133 3.990 0.0000
PACK (SEMI SOLID)
BROOM NOS 0.0333 9.990 0.0000
2-1/2"X1-1/2" KAPOOR CU.FT. 0.2 60.000 0.0000
WOOD( RANDA FINISH)
HEADLESS PIN 1" X NO.- PACK 0.0033 0.990 0.0000
17
CENTURY VENEER NOS 0.0667 20.010 0.0000
ANEGRE
POP (GOOD QUALITY) KGS 1 300.000 0.0000
SOMANY - PORTLAND SQFT 0.0033 0.990 0.0000
BIANCO TILES - 600MM X
300MM.
MASKING TAPE 1" NOS 0.0033 0.990 0.0000
HEADLESS PIN 5/4" X PACK 0.0033 0.990 0.0000
NO.-17
HEADLESS PIN 3/4" X BOX 0.0033 0.990 0.0000
NO.-17
MACHINE SCREW 2-1/2" NOS 0.0033 0.990 0.0000
WHITE CEMENT KGS 1.1667 350.010 0.0000
2" X 1-1/2" -KAPOOR CU.FT. 0.2 60.000 0.0000
WOOD (RANDA FINISH)
TEAK WOOD. CU.FT. 0.0033 0.990 0.0000
HEADLESS PIN 3/4" X PACK 0.0033 0.990 0.0000
NO.-20
RED OXIDE. KGS 0.0033 0.990 0.0000
TENEX KGS 0.0133 3.990 0.0000
FEVICOL SR KGS 0.3333 99.990 0.0000
19 MM PLYWOOD 8' X 4' SQFT 0.0033 0.990 0.0000
COMMERCIAL VENEER NOS 0.05 15.000 0.0000
PINE WOOD. CU.FT. 0.01 3.000 0.0000
GYPSUM SCREW 25MM NOS 0.0033 0.990 0.0000
25/6 MM WOODEN BOX 0.0033 0.990 0.0000
SCREW
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
68247 CARPENTARY WORK \ Labour Labour charges for making, fitting & fixing of Duct door shutter SQFT 186.090 75.0000 13,956.75
charges for making, fitting & fixing of different sizes made from block board with matching door HEADLESS PIN 3/4" X PACK 0.162 30.147 0.0000
of Duct door shutter of different frame of size 2X1.5, including fixing Moulding Bid, Magnet, Door NO.-20
sizes made from block Handle, fixing with required no of Hinge etc. complete in all
respect as per drawing, design & direction of E.I.C. (Rate NAILS 2"(10 NO) KGS 0.04 7.444 0.0000
includes all labour tool & tackles complete.) WOODEN SCREW 75MM BOX 0.05 9.304 0.0000
X 8 MM
TEAK LIPPING - 1" X 1/4" RFT 0.5 93.045 0.0000
(For model floor only). X 7'
HEADLESS PIN 3/4" X PACK 0.0537 9.993 0.0000
NO.-20
MS HINGES 3" NOS 0.5 93.045 0.0000
SCREW 60MM X 8 MM NOS 16.139 3003.306 0.0000
SCREW 50MM X 8MM NOS 16.139 3003.306 0.0000
BLOCK BOARD 19MM (5' SQFT 1 186.090 0.0000
X 4')
FEVICOL SR KGS 0.05 9.304 0.0000
SCREW - 75MM X 10MM NOS 11 2046.990 0.0000
KAPOOR WOOD CU.FT. 0.1 18.609 0.0000
2" X 1-1/2" -KAPOOR CU.FT. 0.1 18.609 0.0000
WOOD (RANDA FINISH)
GREENLAM LAMINATES - SQFT 3.446 641.266 0.0000
COPPER TAINT - 5854
BLOCK BOARD 19MM (6' SQFT 1 186.090 0.0000
X 4')
BLOCK BOARD 19MM (7' SQFT 1 186.090 0.0000
X 3')
12 MM PLYWOOD 8' X 4' SQFT 1 186.090 0.0000
WOODEN MOULDING BIT RFT 0.5 93.045 0.0000
- 35MM
SS HANDLE 4" NOS 0.2 37.218 0.0000
HEADLESS PIN 3/4" X PACK 0.162 30.147 0.0000
NO.-17
BRASS HINGES 3" X 3/4" NOS 0.5 93.045 0.0000
X 3/4"
WOODEN SCREW 50MM PCS 5.3737 999.992 0.0000
X 8MM
FEVICOL KGS 0.108 20.098 0.0000
WOODEN SCREW 35/10 BOX 0.0537 9.993 0.0000
DOOR HANDLE 4" NOS 0.2 37.218 0.0000
SAND PAPER NOS 0.01 1.861 0.0000
DOOR MAGNET NOS 0.2 37.218 0.0000
SS SCREW (FULL BOX 0.03 5.583 0.0000
THREAD) 25MM X 6MM.
25/6 MM WOODEN BOX 0.03 5.583 0.0000
SCREW
NAILS 1"(17 NO) KGS 0.04 7.444 0.0000
WOODEN SCREW 2-1/2" X NOS 0.2 37.218 0.0000
8MM
FEVICOL. KGS 0.05 9.304 0.0000
SS SCREW FULL BOX 0.03 5.583 0.0000
THREADED -3/4''
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
68247 CARPENTARY WORK \ Labour Labour charges for decorative paneling work on lift fascia 6mm SQFT 86.170 107.0000 9,220.19
charges for decorative paneling thick ply board fixing on 12mm thick ply board support at 0 0.000 0.0000
work on lift fascia 6mm thick ply 600mm interval both horizontal & vertical direction, laying &
board fixing on 12mm thick fixing 3X6mm groove in horizontal & 6X6mm groove in vertical
75352 CARPENTARY WORK Labour charges
direction, for
pasting Typical Floor
lamination withLobby Duct
adhesive Door
like & Lift
favicol orFascia
any NOS 1.000 1.0000 1.00
making.
other approved adhesive on 6mm ply, making groove for etc. SCREW - 75MM X 10MM NOS 1000 1000.000 0.0000
complete as per design, drawing & direction of E.I.C. complete
in all respect.
82509 Labour charges for Decorative Labour charges for decorative paneling work on lift facia fixing SQFT 800.000 110.0000 88,000.00
Paneling Work on Lift Fascia from 6mm thick ply board over 12mm thick ply board support at NAILS 2" KGS 0.005 4.000 0.0000
1ST to 4TH & 6TH floor at Block - 600mm interval both horizontal & vertical direction to create
Op \ 1. Labour charges for 3X6mm groove in horizontal & 6X6mm groove in vertical
decorative paneling work on lift direction and pasting lamination with adhesive like fevicol or
facia fixing 6mm thick ply board any other approved adhesive on 6mm Ply. Complete in all
over 12mm th respect as per Drawing, Design & Direction of E.I.C.
Page 1 of 1
*Amount in INR (Rate includes all Labours, Tools & Tackles Complete.) Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
82509 Labour charges for Decorative Labour charges for decorative paneling work on lift facia fixing SQFT 800.000 110.0000 88,000.00
Paneling Work on Lift Fascia from 6mm thick ply board over 12mm thick ply board support at
1ST to 4TH & 6TH floor at Block - 600mm interval both horizontal & vertical direction to create
HEADLESS PIN 1" X NO.- PACK 0.0125 10.000 0.0000
Op \ 1. Labour charges for 3X6mm groove in horizontal & 6X6mm groove in vertical
17
decorative paneling work on lift direction and pasting lamination with adhesive like fevicol or
facia fixing 6mm thick ply board any other approved adhesive on 6mm Ply. Complete in all WOODEN SCREW 50MM PCS 1 800.000 0.0000
over 12mm th respect as per Drawing, Design & Direction of E.I.C. X 8MM
SCREW 60MM X 8 MM NOS 0.75 600.000 0.0000
(Rate includes all Labours, Tools & Tackles Complete.)
HEADLESS PIN 1" X NO.- PACK 0.0125 10.000 0.0000
20
WOODEN SCREW 35MM BOX 1 800.000 0.0000
X 7MM
MASKING TAPE 1" NOS 0.025 20.000 0.0000
NAILS 1-1/2" KGS 0.005 4.000 0.0000
FEVICOL KGS 0.0625 50.000 0.0000
SCREW 50MM X 8MM NOS 0.75 600.000 0.0000
HEADLESS PIN 3/4" X PACK 0.0125 10.000 0.0000
NO.-20
HEADLESS PIN 3/4" X PACK 0.0125 10.000 0.0000
NO.-17
GREENLAM LAMINATES - SQFT 0.85 680.000 0.0000
COPPER TAINT - 5854
FEVICOL. KGS 0.0626 50.080 0.0000
PLYWOOD 12MM - 8' X 4' SQFT 0.85 680.000 0.0000
HEADLESS PIN 1" X NO.- PACK 0.0126 10.080 0.0000
17
GREENLAM- LAMINATE- NOS 0.025 20.000 0.0000
COPPER TAINT 5854
12 MM PLYWOOD 8' X 4' SQM 0.076 60.800 0.0000
PLYWOOD 6MM - 8' X 4' SQFT 0.85 680.000 0.0000
MASKING TAPE NOS 0.05 40.000 0.0000
6 MM PLYWOOD 8' X 4' SQM 0.076 60.800 0.0000
87770 CARPENTRY WORK \ WORK Installation of Elena Handle (GODREJ). EACH 116.000 45.0000 5,220.00
ORDER OF LABOUR FOR 0 0.000 0.0000
INSTALLATION OF DOOR LOCKS
(GODREJ) IN BLOCK OPHELIA OF
87770 CARPENTRY WORK \ WORK
SIDDHA GALAXIA-II Re - Installation of Locks (GODREJ). EACH 19.000 50.0000 950.00
ORDER OF LABOUR FOR 0 0.000 0.0000
INSTALLATION OF DOOR LOCKS
(GODREJ) IN BLOCK OPHELIA OF
SIDDHA GALAXIA-II Category 649,182.94 Category
Total: Total:
Siddha Galaxia Phase-II ,OPHELIA,HVAC Work,
74915 For installation of 2 nos. Cassette Standard Installation Charges. EACH 2.000 1,500.0000 3,000.00
AC (i.e. HITACHI Make CASATTE CASSETTE AC NOS 1 2.000 0.0000
A.C, Model No. - RAG122HYD) at (CAPACITY -2.0 TON )
Dou \ 1. Standard Installation
Charges.
74915 For installation of 2 nos. Cassette Copper piping with Communication Cable. RFT 200.000 200.0000 40,000.00
AC (i.e. HITACHI Make CASATTE 0 0.000 0.0000
A.C, Model No. - RAG122HYD) at
Dou \ 2. Copper piping with
74915 For installation of
Communication 2 nos. Cassette
Cable. Communication Cable. RFT 200.000 40.0000 8,000.00
AC (i.e. HITACHI Make CASATTE 0 0.000 0.0000
A.C, Model No. - RAG122HYD) at
Dou \ 3. Communication Cable.
74915 For installation of 2 nos. Cassette Drain Water Piping. RFT 180.000 30.0000 5,400.00
AC (i.e. HITACHI Make CASATTE 0 0.000 0.0000
A.C, Model No. - RAG122HYD) at
Dou \ 4. Drain Water Piping.
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
74915 For installation of 2 nos. Cassette M.S. Angle for Outdoor Unit. EACH 2.000 500.0000 1,000.00
AC (i.e. HITACHI Make CASATTE 0 0.000 0.0000
A.C, Model No. - RAG122HYD) at
Dou \ 5. M.S. Angle for Outdoor
Unit. Category 57,400.00 Category
Total: Total:
Siddha Galaxia Phase-II ,OPHELIA,WATER PROOFING TREATMENT,
55116 Labour charges for water proofing Applying waterproofing coat in 2 (two) layers including supply SQM 120.000 150.0000 18,000.00
treatment in lift well of various of materials on concrete floor & walls of lift pit or any other FULL COARSE SAND MT 0.0542 6.504 0.0000
block of Siddha Galaxia-II \ 1. similar surface with Dr. Fixit power Crete/Tap Crete - 151 (CICO
CEMENT BAGS 0.3083 36.996 0.0000
Applying waterproofing coat in 2 brand) or any other equivalent polymer of approved quality
(two) layers including supply of (approved by CTA) following technical specification of MEDIUM COARSE SAND MT 0.0542 6.504 0.0000
materials on concrete floor & w manufacturer including a layer of protective coat plastering of
55116 Labour charges for water proofing thickness 15mmfor
Labour charges with 1:4cement
neat (1 cement: 4 sand)
finishing cement
work mortar.
(at least 1.5m) SQM 120.000 25.0000 3,000.00
treatment in lift well of various Before application of water
over protective plastering work. proofing layer on surface, top layer
of all tripatti hole to be cleaned from loose mortar at least up to CEMENT BAGS 0.0583 6.996 0.0000
block of Siddha Galaxia-II \ 2.
Labour charges for neat cement 15mm depth & sealed the same with P.M.C mortar in the ratio 1
58487 finishing
Water Proofing
work (atTreatment in Toilets
least 1.5m) over cement
Applying: 3water
sandproofing
10% of polymer
coat in 2by weight
(two) of mortar
layers includingafter
supply SQM 25.000 150.0000 3,750.00
& Kitchen in Mockup 2nd
protective plastering work. floor, Flat applying
of materialswaterproof
on cum.
concrete bond
floor & coat of
concrete same
wallbrand
or (as
brick per
wall MEDIUM COARSE SAND MT 0.06 1.500 0.0000
marked B of Block 09 (OPHELI \ 1. water surface proofing layer) terrace/O.H.
of toilet/roof to make the tanksurface
withcomplete water proof
Dr. Fixit power
as per direction CEMENT BAGS 0.4 10.000 0.0000
Applying water proofing coat in 2 Crete/Tape Creteof151 E.I.C. (Rate
(CICO includes
Brand) theother
or any cost equivalent
of all labour,
(two) layers including supply of materials
polymer as except sandby
approved & cement, lifting,the
CTA following carrying at site,
technical
materials on concrete floor & handling of all as
specifications working materials
laid down including afree
in A, including issue
layer martials,
of protective Category 24,750.00 Category
scaffolding,
coat plastering removing debris15
of thickness & to
cleaning
25 mmthe site
with 1:4after
(1 Cement: 4 Total: Total:
completion
Sand) mortar.of Rate
work). includes all labour, materials & equipments
Siddha Galaxia Phase-II ,OPHELIA,ALUFORM SHUTTERING,
including the cost of hydro testing but excluding the cost of
59997 Hire charges for Aluform Shuttering cement,
Hire charges
sandforetc.aluform
water &Shuttering
electricity will be supplied by this end SET 1.000 1,050,000.0000 1,050,000.00
\ Hire charges for aluform at specific single point in each floor. 0 0.000 0.0000
Shuttering
Contractor have to submit at least of 2 years guarantee against
any leakage & security money will be release after 2 (two) years. Category 1,050,000.00 Category
Total: Total:
Siddha Galaxia Phase-II ,OPHELIA,Fire Fightning,
This rate also includes the cost of all labour for lifting, carrying
67040 Fire Fightning \ 250 mm NB (6.35 to site, handing
PIPING (ABOVE etc. of all working
GROUND PIPING) materials as well as free METRE 0.000 0.0000 0.00
mm Thk.) issued materials of our work, scaffolding & removing if any,
0 0.000 0.0000
removing debris & cleaning the site after completion of work
before handing over. Developer will provide the facility of
67040 Fire Fightning \ 200 mm NB (6.35 multipurpose
PIPING (ABOVE hoist for lifting
GROUND materials above 4th floor.
PIPING) METRE 0.000 720.0000 0.00
mm Thk.) 1.i) In Toilets & Kitchen. MS ERW PIPE 25NB DIA - MTR 69 0.000 0.0000
HEAVY
MS ERW BLACK PIPE MTR 180 0.000 0.0000
150NB- MEDIUM
MS ERW BLACK PIPE MTR 32 0.000 0.0000
80NB-MEDIUM
67040 Fire Fightning \ 150 mm NB PIPING (ABOVE GROUND PIPING) METRE 45.000 610.0000 27,450.00
(Medium Grade) MS ERW BALCK PIPE MTR 2.5 112.500 0.0000
25NB-MEDIUM
MS ERW BLACK PIPE MTR 7.4 333.000 0.0000
65NB-MEDIUM
100MM NB - CAST IRON NOS 0.2 9.000 0.0000
NON RETURN VALVE
RATING: PN-1.6
25 NB GLOBE VALVE FOR NOS 0.2 9.000 0.0000
SWING HOSE REEL.
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
(Medium Grade)
67040 Fire Fightning \ 100 mm NB PIPING (ABOVE GROUND PIPING) METRE 0.000 495.0000 0.00
(Medium Grade) 0 0.000 0.0000
67040 Fire Fightning \ 80 mm NB (Medium PIPING (ABOVE GROUND PIPING) METRE 8.000 370.0000 2,960.00
Grade) 0 0.000 0.0000
67040 Fire Fightning \ 50 mm NB (Medium PIPING (ABOVE GROUND PIPING) METRE 0.000 231.0000 0.00
Grade) 0 0.000 0.0000
67040 Fire Fightning \ "25 mm NB (Heavy PIPING (ABOVE GROUND PIPING) METRE 17.000 105.0000 1,785.00
grade) for Hose reel & Air release 0 0.000 0.0000
Valve."
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
67040 Fire Fightning \ 150 mm NB CAST IRON GATE VALVE (PN 1.6) NOS 2.000 900.0000 1,800.00
150MM NB - CAST IRON NOS 8 16.000 0.0000
GATE VALVE
150MM NB - CAST IRON NOS 4 8.000 0.0000
NON-RETURN VALVE
(WAFER TYPE)
CONFIRMING TO IS:5312,
WORKING PRESSURE:
8KG/SQCM, RATING: PN-
10, FLANGED END
67040 Fire Fightning \ 150 mm NB "CAST IRON NON RETURN VALVE NOS 1.000 900.0000 900.00
(Wafer Type) (PN 1.6)" 0 0.000 0.0000
67040 Fire Fightning \ Landing valve for HYDRANT SYS. ACCESSORIES NOS 15.000 200.0000 3,000.00
indoor hydrants LANDING VALVE FOR NOS 60 900.000 0.0000
INDOOR HYDRANT AS
PER IS:5290, TYPE-A;
FLOW RATE OF 900 LPM
AT 7KG/SQCM
67040 Fire Fightning \ 15 M long Hose with HYDRANT SYS. ACCESSORIES NOS 30.000 70.0000 2,100.00
couplings (63 mm dia) HOSE WITH COUPLING NOS 120 3600.000 0.0000
OF 15 METRE LENGTH
AND MADE OF JACKET
OF COTTON OR
SYNTHETIC MATERIAL
AND RUBBER LINED
CONFIRMING TO IS:636
(TYPE-A) HAVING DIA OF
63MM (INTERNAL).
COUPLING SHALL BE
MULTISERRATED
INSTANTANEOUS
PATTERN WITH LUGS OF
QUICK RELEASE TYPE,
MILLED HEAD
CONSISTING OF MALE
AND FEMALE COUPLING
CONFIRMING TO IS:903;
63MM DIA WITH SELF
LOCKING PLUNGER.
67040 Fire Fightning \ Jet Nozzle with HYDRANT SYS. ACCESSORIES NOS 15.000 25.0000 375.00
branch pipe JET NOZZLE WITH NOS 60 900.000 0.0000
BRANCH PIPE
67040 Fire Fightning \ Hose cabinet with HYDRANT SYS. ACCESSORIES NOS 15.000 400.0000 6,000.00
support for indoor hydrants.
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
67040 Fire Fightning \ Hose cabinet with HYDRANT SYS. ACCESSORIES NOS 15.000 400.0000 6,000.00
support for indoor hydrants. HOSE CABINET WITH NOS 60 900.000 0.0000
SUPPORT FOR INDOOR
HYDRANTS. CABINET
BODY SHALL BE OF MS
CONFIRMING TO IS:2062
OF 16SWG THICKNESS
AND 3MM GLASS PANEL
WITH THE WORD FIRE
WRITTEN IN 150MM
LETTER SIZE IN RED
COLOUR. EACH CABINET
SHALL BE PROVIDED
WITH LOCKING
ARRANGEMENT AND
HAVE 1 NOZZLE
SPANNER & 1 HAMMER
EACH
67040 Fire Fightning \ Swinging Hose reel HYDRANT SYS. ACCESSORIES NOS 14.000 750.0000 10,500.00
drum & S.S. bend pipe with 20 mm SWINGING HOSE REEL NOS 56 784.000 0.0000
dia 30M long rubber hose including DRUM & S.S. BEND PIPE
shut of nozzl WITH 20 MM DIA 30M
LONG RUBBER HOSE
INCLUDING SHUT-OFF
NOZZLE. HOSE REEL
SHALL BE AS PER IS:884
(TYPE-A). HOSE REEL
TUBING SHALL BE OF
RUBBER IS:444; NOZZLE
WITH BRANCH PIPE &
COUPLING SHALL
CONFIRM TO IS:8090;
PIPE & FITTINGS SHALL
BE OF STEEL AND
CONFIRM TO IS:1239;
STOP VALVE SHALL
CONFIRM TO IS:778
67040 Fire Fightning \ 4 Way Fire brigade HYDRANT SYS. ACCESSORIES NOS 1.000 500.0000 500.00
inlet connection with 4 way inbuilt 4 WAY FIRE BRIGADE NOS 4 4.000 0.0000
non return valve for risers & INLET CONNECTION
network. WITH 4 WAY INBUILT
NON RETURN VALVE
67040 Fire Fightning \ 80 mm NB on ORIFICE PLATE (SS 304) (6 mm thk.) LOT 1.000 1,000.0000 1,000.00
upstream of hydrant valves (As 0 0.000 0.0000
required)
67040 Fire Fightning \ 25 NB Globe Valve ORIFICE PLATE (SS 304) (6 mm thk.) NOS 14.000 200.0000 2,800.00
for swing Hose reel 0 0.000 0.0000
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
67040 Fire Fightning \ 25mm NB with one SPRINKLER SYSTEM NOS 1.000 250.0000 250.00
no. root valve & Vent valve (Ball ABOVE GROUND PIPING 0 0.000 0.0000
type) on top of each risers for
Hydrant system
67040 Fire Fightning \ "Pressure Gauge SPRINKLER SYSTEM NOS 1.000 200.0000 200.00
with half Cupling, nipple, root ABOVE GROUND PIPING 0 0.000 0.0000
valve (Globe type), adapter,
vibration dampe
67040 Fire Fightning \ 150 mm NB SPRINKLER SYSTEM METRE 30.000 600.0000 18,000.00
(Medium Grade) ABOVE GROUND PIPING 0 0.000 0.0000
67040 Fire Fightning \ 100 mm NB SPRINKLER SYSTEM METRE 72.000 495.0000 35,640.00
(Medium Grade) ABOVE GROUND PIPING 0 0.000 0.0000
67040 Fire Fightning \ 80 mm NB (Medium SPRINKLER SYSTEM METRE 72.000 370.0000 26,640.00
Grade) ABOVE GROUND PIPING 0 0.000 0.0000
67040 Fire Fightning \ 65 mm NB (Medium SPRINKLER SYSTEM METRE 114.000 240.0000 27,360.00
Grade) ABOVE GROUND PIPING 0 0.000 0.0000
67040 Fire Fightning \ 50 mm NB (Medium SPRINKLER SYSTEM METRE 66.000 225.0000 14,850.00
Grade) ABOVE GROUND PIPING 0 0.000 0.0000
67040 Fire Fightning \ 40 mm NB (Heavy SPRINKLER SYSTEM METRE 96.000 210.0000 20,160.00
Grade) ABOVE GROUND PIPING 0 0.000 0.0000
67040 Fire Fightning \ 32 mm NB (Heavy SPRINKLER SYSTEM METRE 48.000 175.0000 8,400.00
Grade) ABOVE GROUND PIPING 0 0.000 0.0000
67040 Fire Fightning \ 25 mm NB (Heavy SPRINKLER SYSTEM METRE 744.000 120.0000 89,280.00
Grade) ABOVE GROUND PIPING 0 0.000 0.0000
67040 Fire Fightning \ "32 mm NB for drain SPRINKLER SYSTEM METRE 20.000 90.0000 1,800.00
riser (Medium Grade)" ABOVE GROUND PIPING 0 0.000 0.0000
67040 Fire Fightning \ "25 mm NB for drain SPRINKLER SYSTEM METRE 12.000 75.0000 900.00
riser (Medium Grade)" ABOVE GROUND PIPING 0 0.000 0.0000
67040 Fire Fightning \ 150 mm NB CAST IRON GATE VALVE(PN 1.6) NOS 1.000 800.0000 800.00
0 0.000 0.0000
67040 Fire Fightning \ 150 mm NB "CAST IRON NON RETURN VALVE NOS 2.000 780.0000 1,560.00
(Wafer Type) (PN 1.6)" 0 0.000 0.0000
67040 Fire Fightning \ 100 mm NB "CAST IRON NON RETURN VALVE NOS 2.000 430.0000 860.00
(Wafer Type) (PN 1.6)" 0 0.000 0.0000
67040 Fire Fightning \ 65 mm NB "CAST IRON NON RETURN VALVE NOS 0.000 430.0000 0.00
(Wafer Type) (PN 1.6)" 0 0.000 0.0000
67040 Fire Fightning \ 50 mm NB "CAST IRON NON RETURN VALVE NOS 0.000 400.0000 0.00
(Wafer Type) (PN 1.6)" 0 0.000 0.0000
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
67040 Fire Fightning \ 150 mm NB CAST IRON BUTTERFLY VALVE (PN 1.6) NOS 2.000 1,020.0000 2,040.00
0 0.000 0.0000
67040 Fire Fightning \ 100 mm NB CAST IRON BUTTERFLY VALVE (PN 1.6) NOS 2.000 780.0000 1,560.00
0 0.000 0.0000
67040 Fire Fightning \ 80 mm NB CAST IRON BUTTERFLY VALVE (PN 1.6) NOS 0.000 400.0000 0.00
0 0.000 0.0000
67040 Fire Fightning \ 65 mm NB CAST IRON BUTTERFLY VALVE (PN 1.6) NOS 0.000 390.0000 0.00
0 0.000 0.0000
67040 Fire Fightning \ 50 mm NB CAST IRON BUTTERFLY VALVE (PN 1.6) NOS 0.000 375.0000 0.00
0 0.000 0.0000
67040 Fire Fightning \ 150 mm NB INSTALLATION CONTROL VALVE (CAST IRON) NOS 1.000 2,000.0000 2,000.00
0 0.000 0.0000
67040 Fire Fightning \ 25 mm NB (For G.M. GLOBE VALVE NOS 4.000 200.0000 800.00
drain connection) FAST RESPONSE SIDE NOS 5 20.000 0.0000
WALL TYPE SPRINKLER,
'K' FACTOR: 81;
TEMPERATURE RATING
68 DEGREE
67040 Fire Fightning \ 25 mm NB with one AIR RELEASE VALVE NOS 0.000 400.0000 0.00
no. root valve & Vent valve (Ball 0 0.000 0.0000
type) on top of each risers for
Sprinkler syst
67040 Fire Fightning \ Pendent type "FAST RESPONSE SPRINKLER HEAD K-81, 680C NOS 411.000 75.0000 30,825.00
Sprinkler with escutcheon plate RATING (Fast 0 0.000 0.0000
(For Floor) response)"
67040 Fire Fightning \ Side wall Pendent Side wall Pendent type Sprinkler NOS 8.000 75.0000 600.00
type Sprinkler 0 0.000 0.0000
67040 Fire Fightning \ 150 mm NB Flow Switch with all accessories. NOS 2.000 570.0000 1,140.00
0 0.000 0.0000
67040 Fire Fightning \ 100 mm NB Flow Switch with all accessories. NOS 2.000 500.0000 1,000.00
0 0.000 0.0000
67040 Fire Fightning \ S.S. Orifice plate for S.S. Orifice plate for 150 NB/100NB / 80NB pipe with companion LOT 1.000 4,000.0000 4,000.00
150 NB/100NB / 80NB pipe with flanges & required fasteners. (6 mm thk.) if reqd. 0 0.000 0.0000
companion flanges & required
fasteners. (6 mm t
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
67040 Fire Fightning \ S.S. Orifice plate for S.S. Orifice plate for 150 NB/100NB / 80NB pipe with companion LOT 1.000 4,000.0000 4,000.00
150 NB/100NB / 80NB pipe with flanges & required fasteners. (6 mm thk.) if reqd.
companion flanges & required
fasteners. (6 mm t
67040 Fire Fightning \ Pressure Gauge Pressure Gauge with half coupling, nipple, root valve (Ball NOS 5.000 330.0000 1,650.00
with half coupling, nipple, root type), adaptor, vibration damper as per sketch enclo. 0 0.000 0.0000
valve (Ball type), adaptor, vibration
damper as per
79428 Fire Fightning \ FIRE ALARM FIRE ALARM PANEL (Analogue addressable type, BMS SET 1.000 5,500.0000 5,500.00
PANEL (Analogue addressable Compatible, Networkable) 4 LOOP complete with all alarms, FIRE ALARM PANEL SET 1 1.000 0.0000
type, BMS Compatible, hooter, fire/fault indicators, audio/visual signals, solid state
NETWORK CARD NOS 1 1.000 0.0000
Networkable) 4 LOOP complete with logic circuit, selector switches, rectifier, battery (24 hrs.+15
all a min.), battery charger & M.S. Battery box, UPS with
79428 Fire Fightning \ REPEATER PANEL necessary
REPEATER PANELsupporting frame with
complete workall
auxiliary contacts complete SET
accessories. 1.000 1,500.0000 1,500.00
complete with all accessories. with Hardware, Software, Dongle including auto dialer etc.as REPEATER PANEL NOS 1 1.000 0.0000
detailed in the detailed technical specification.( No. of Panel &
Loop to be decided by the Bidder with future provision). Any
79428 Fire Fightning \ ANALOGUE ANALOGUE ADDRESSABLE
other accessories material asMULTICRITERIA
may be requiredDETECTOR
for complete(Heat NOS 7.000 75.0000 525.00
ADDRESSABLE MULTICRITERIA cum Smoke - optical type) with JB & all other accessories
system. ANALOGUE NOS 1 7.000 0.0000
DETECTOR (Heat cum Smoke - ADDRESSABLE
optical type) with JB & all other MULTICRITERIA
acce DETECTOR
79428 Fire Fightning \ "ANALOGUE "ANALOGUE ADDRESSABLE DUCT DETECTOR/SMOKE NOS 63.000 75.0000 4,725.00
ADDRESSABLE DUCT DETECTOR ANALOGUE NOS 1 63.000 0.0000
DETECTOR/SMOKE DETECTOR (Smoke - optical type) with JB & all other accessories" ADDRESSABLE DUCT
(Smoke - optical type) with JB & all DETECTOR/ SMOKE
other access DETECTOR
79428 Fire Fightning \ ANALOGUE ANALOGUE ADDRESSABLE MANUAL CALL POINT with JB & NOS 29.000 75.0000 2,175.00
ADDRESSABLE MANUAL CALL all other accessories ANALOGUE NOS 1 29.000 0.0000
POINT with JB & all other ADDRESSABLE MANUAL
accessories CALL POINT
79428 Fire Fightning \ ANALOGUE ANALOGUE ADDRESSABLE CONTROL MODULE with JB & all NOS 29.000 75.0000 2,175.00
ADDRESSABLE CONTROL other accessories 0 0.000 0.0000
MODULE with JB & all other
accessories
79428 Fire Fightning \ "ANALOGUE "ANALOGUE ADDRESSABLE ISOLATOR MODULEwith JB & all NOS 8.000 75.0000 600.00
ADDRESSABLE ISOLATOR other accessories ANALOGUE NOS 1 8.000 0.0000
MODULEwith JB & all other (to be provided after every 16 detectors)" ADDRESSABLE
accessories (to be provided after ISOLATOR MODULE
every 16
79428 Fire Fightning \ HORN cum HORN cum STROBE complete with JB & all other accessories NOS 29.000 75.0000 2,175.00
STROBE complete with JB & all to be used with Control Module CONVENTIONAL HORN NOS 1 29.000 0.0000
other accessories to be used with CUM STROBE
Control Module
79428 Fire Fightning \ a) 2C x 1.5 mm2 a) 2C x 1.5 mm2 CUPVC FRLS (UNARMOURED CABLE) MTR 2750.000 20.0000 55,000.00
CUPVC FRLS (UNARMOURED 2C X 1.5 SQMM FRLS METRE 1.2 3300.000 0.0000
CABLE) FLEXIBLE CABLE
79428 Fire Fightning \ "c) 4C x 1.5 mm2 "c) 4C x 1.5 mm2 XLPE FRLS METRE 500.000 20.0000 10,000.00
XLPE FRLS Armoured Cable Armoured Cable Barried Type" 0 0.000 0.0000
Barried Type"
79428 Fire Fightning \ PA CONSOLE PA CONSOLE capacity 250 watt complete with Amplifier unit SET 1.000 30,115.0000 30,115.00
capacity 250 watt complete with with selector switch for individual /all call, rectifier, 2 Nos. 42 0 0.000 0.0000
Amplifier unit with selector switch Amp battery, battery charger & M.S. Battery box, UPS with
for individual necessary supporting frame work auxiliary contacts etc.as
79428 Fire Fightning \ CEILING MOUNTED CEILING MOUNTED
detailed in SPEAKER
the detailed complete
technical with all accessories
specification.Selection of (6 NOS 0.000 590.0000 0.00
SPEAKER complete with all Watt)
watts of Amplifier shall be decided by Bidder with future 0 0.000 0.0000
accessories (6 Watt) provision.
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
79428 Fire Fightning \ CEILING MOUNTED CEILING MOUNTED SPEAKER complete with all accessories (6 NOS 0.000 590.0000 0.00
SPEAKER complete with all Watt)
accessories (6 Watt)
79428 Fire Fightning \ WALL MOUNTED WALL MOUNTED SPEAKER NOS 33.000 1,000.0000 33,000.00
SPEAKER 0 0.000 0.0000
79428 Fire Fightning \ a) 2C x 1.5 mm2 2C x 1.5 mm2 CUPVC FRLS ARMOURED CABLE) METRE 1000.000 20.0000 20,000.00
CUPVC FRLS ARMOURED CABLE) 2C X 1.5 SQMM FRLS METRE 1.2 1200.000 0.0000
FLEXIBLE CABLE
2C X 1.5 SQ.MM COPPER METRE 1.2 1200.000 0.0000
ARMOURED CABLE
79428 Fire Fightning \ c) 12C x 1.5 mm2 c) 12C x 1.5 mm2 CUPVC FRLS Un Armoured Cable (PA METRE 19.000 20.0000 380.00
CUPVC FRLS Un Armoured Cable Console to JB) 0 0.000 0.0000
(PA Console to JB)
79428 Fire Fightning \ Supply, erection, Supply, erection, testing and commissioning of MASTER SET SET 1.000 28,175.0000 28,175.00
testing and commissioning of with mounting arrangement 0 0.000 0.0000
MASTER SET with mounting
arrangement
79428 Fire Fightning \ FIELD HAND SET FIELD HAND SET with front glass door kept under lock & key & NOS 27.000 1,190.5000 32,143.50
with front glass door kept under complete with all accessories 0 0.000 0.0000
lock & key & complete with all
accessories
79428 Fire Fightning \ a) 4C x 0.5 FLEXIBLE WIRE complete with lugs, laying inside conduits and METRE 938.000 20.0000 18,760.00
sq.mm.Unarmoured Cable termination of both ends. 4C X 0.5 SQMM FRLS METRE 1.2 1125.600 0.0000
FLEXIBLE CABLE
80067 Fire Fightning 5 pair 2C X 0.5 sqmm armoured cable NOS 1000.000 20.0000 20,000.00
LOOP CARD SET 0.001 1.000 0.0000
ANALOGUE NOS 29 29000.000 0.0000
ADDRESSABLE
CONTROL MODULE
ADDRESSABLE NOS 0.03 30.000 0.0000
HOOTERBASE MODULE
4C X 1.5 SQ.MM COPPER METRE 550 550000.000 0.0000
ARMOURED CABLE
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
SIDDHA SPHERE LLP
BOQ Estimation Report
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM
0.00
0.00
0.00
Page 1 of 1
*Amount in INR Report Generated By : Sounak Nandi
Aug 19,2019 5:03 PM