You are on page 1of 10

ELEMENTAL COSTING AND SUMMARY FOR NUST SECURITY GUARD HOUSE PROJECT, GROUP 2.

Primary
Code Element Unit Component Unit
100.00 Substructure m²
Unreinforced
Concrete Strip
100.10 footing m
Clear site m²
top soil
excavations m³
trench
excavation m³
extra over
for hard
pickable
ground m³
extra over
for rocks m³
earthwork
support m²
Ant proofing m²
Backflilling m³
Concrete m³
compaction m²
Concrete
Blinding m²
100.40 Brickwork m
230 mm
brickwork m²
230mm
brickforce m
115mm bwk m²
100.60 Sundries m²
Keeping
excavations
free from
surface and
storm water Item 1 100.00 100
Pumping
and bailing
of ground
water Item 1 150.00 150
Cartaway m³ 5 7.20 36
115mm
brickforce m 20 0.18 3.6
GROUP 2 ELEMENTAL COSTING AND SUMMARY FOR NUST SECURITY GUARD HOUSE

ELEMENTAL COSTING AND SUMMARY FOR NUST SECURITY GUARD HOUSE PROJECT, GROUP 2.

101.00 Ground floor m²


101.10 Solid floors m² hardcore m³
compaction m²
sand blinding m²
Mesh wire m²
Dpm m²
Concrete m³
curing m²

Primary
Code Element Unit Component Unit
103.00 External Façade m²
103.10 Brick walls m²
230mm
Brickwork m²
230mm DPC m²
230mm
brickforce m²
115mm
brickwork m²
115mm DPC m²
115mm
brickforce m²
Beam Filling m²
Racking
cutting m²
Mortar
bedding for
roof
coverings m²
Mortar
bedding for
wall plate m²
Air Bricks
internal no
Air Bricks
external no

GROUP 2 ELEMENTAL COSTING AND SUMMARY FOR NUST SECURITY GUARD HOUSE

ELEMENTAL COSTING AND SUMMARY FOR NUST SECURITY GUARD HOUSE PROJECT, GROUP 2.

103.50 Windows m²
Window
Frame ND2F NO
Window
Frame NC2F No
Window
Frame ND4F No
Window
Frame ND1 No
Painting to
steel frames m²
Brick on
Edge for
external
window cills m²
External and
Internal
plaster to
Reveals m²
External and
Internal
paint to
Reveals m²
External and
Internal
plaster to
heads m²
External and
Internal
paint to
heads m²
Primary
Code Element Unit Component Unit
103.65 Doors No
Internal
Door No
External
Door No
230mm
door frames No
115mm
door frames No
Painting to
door frames m²
Door
painting m²

GROUP 2 ELEMENTAL COSTING AND SUMMARY FOR NUST SECURITY GUARD HOUSE
ELEMENTAL COSTING AND SUMMARY FOR NUST SECURITY GUARD HOUSE PROJECT, GROUP 2.

3 lever
mortice
locksets No
2 lever
mortice
locksets No
Door
Stopper No
104.00 ROOFS m²
104.10 Construction m²
Trusses Item
Wall plate m
Roof Ties no
104.15 Covering m²
Roof
coverings m²
Batterns m²
104.50 Eaves m
Eave Soffit m
104.55 Verges m
Verge soffit m
107.00 FLOOR FINISHES m²
Applied Floor
107.10 Finishes m²
Tiles m²
107.30 Skirting m
Skirting m
INTERNAL WALL
108.00 FINISHES m²
108.10 Finishes m²
External
Plaster m²
Internal
Plaster m²
External
Paint m²
Internal
Plaster m²

GROUP 2 ELEMENTAL COSTING AND SUMMARY FOR NUST SECURITY GUARD HOUSE

ELEMENTAL COSTING AND SUMMARY FOR NUST SECURITY GUARD HOUSE PROJECT, GROUP 2.

CEILING
109.00 FINISHES m²
Nailed-up
109.15 ceiling m²
Ceiling
Boards
Painting
Ceiling
Trap door
109.30 Cornices m
75mm coved
cornice m

CODE DESCRIPTION COST QUANTITY


100.00 Substructure 17482.77 67
101.00 Ground Floor 1847.08 48
103.00 External Façade 12150.44 207
104.00 Roofs 5332.32 48
107.00 Floor Finishes 1275.4 48
Internal Wall
108.00 finishes 6237 207
109.00 Ceiling Finishes 2340.33 48
700.00 Preliminaries 9333.069 1
Contigency
800.00 Allowances 2333.267 1
1000.00 VAT 6999.802 1
65331.482

GROUP 2 ELEMENTAL COSTING AND SUMMARY FOR NUST SECURITY GUARD HOUSE
OJECT, GROUP 2.

Quantity Rate Amount


67 260.94 17482.77

13767.75
97 100.00 9700

11 1.50 16.5

40 10.55 422

4 35.00 140

2 40.00 80

127 1.00 127


67 3.50 234.5
5 11.40 57
13 180.00 2340
67 1.25 83.75

54 10.50 567
3715.02

48 61.44 2949.12

189 0.20 37.8


5 30.50 152.5
286
OJECT, GROUP 2.

48 38.48 1847.08
8 49.00 392
48 1.25 60
48 6.45 309.6
48 15.25 732
48 1.13 54.24
5 49.00 245
48 1.13 54.24

Quantity Rate Amount


12150.44
10098.67

190 49.00 9310


17 0.75 12.75

742 0.22 163.24

17 0
1 0.35 0.35

64 0.23 14.72
11 49.21 541.31

3 1.52 4.56

3 0.54 1.62

20 0.57 11.4

16 1.21 19.36

16 1.21 19.36

OJECT, GROUP 2.

1219.88
1 83.20 83.2

1 39.88 39.88

5 94.10 470.5

5 38.92 194.6

24 12.57 301.68

15 1.20 18

4 6.71 26.84

4 11.96 47.84

2 6.71 13.42

2 11.96 23.92

Quantity Rate Amount


831.894

3 75.88 227.64

1 124.75 124.754

1 70.10 70.1

3 42.50 127.5

3 5.60 16.8

11 14.70 161.7
OJECT, GROUP 2.

1 28.70 28.7

3 21.50 64.5

1 10.20 10.2
5332.32
4080
1 3000.00 3000
20 49.50 990
60 1.50 90
991.92

61 8.40 512.4
48 9.99 479.52
159.6
19 8.40 159.6
100.8
12 8.40 100.8
1275.4

806.4
48 16.80 806.4
469
67 7.00 469

6237
6237

211 6.75 1424.25

167 6.75 1127.25

211 9.75 2057.25

167 9.75 1628.25

OJECT, GROUP 2.

2340.33
2169.48

m² 48 35.00 1680

m² 48 9.75 468
No 1 21.48 21.48
170.85

67 2.55 170.85
ELEMENTAL SUMMARY
UNIT COST/ UNIT COST/m2COST % TOTAL
m² 260.94 260.94 26.76
m² 38.48 38.48 2.83
m² 58.70 58.70 18.60
m² 111.09 111.09 8.16
m² 26.57 26.57 1.95

m² 30.13 30.13 9.55


m² 48.76 48.76 3.58
m² 9333.07 9333.07 14.29

m² 2333.27 2333.27 3.57


m² 6999.80 6999.80 10.71

You might also like