ABSTRACT : CONCRETE FRAMED STRUCTURE : SUBSTRUCTURE
3 1 310.34
1 2.19 2
3 5.06 2
/ Site clearing of all bushes, shrubs, hedges and grass
S 6.62 2
girth not exceeding 500mm including grabbing up of
roots and filling in holes with suitable materials
448.94 1 322.02
449 2.19
I/ Termite nest removal including the searching of the 319.83
queen and filling the holes with nonexpensive
materials
item 1 320³
i tem FORMATIONS
XCAVATIONS
E / Backfilling around foundations with excavated material
C
compacted in 150mm layer to a specified density
S/ E
xcavate top soil avarage depth 150mm including 2.19 2
disposal of excavated materials maximum distance
100mm from the site
10.34
3 1 m³
2
310m² / Import granular nonexpensive filling materials,
C
hardcore compacted 95%
C/ E
xcavate to reduce levels commencing 150mm 86.9 2
below ground levels including levelling and ramming
bottoms average depth 300mm
310.34 1 87m³
310m³ C/ I mport granular nonexpensive filling materials to raise
levels
C/ E
xcavation commencing 450mm below ground level 8.59 2
for column bases
.62
6 2 9m³
30m³ PLUNKING AND STRUTTING
xtra over excavation on hard pickable ground
E S/ F ormwork to isolated columns of heigh not exceeding
C/ 5m
.32
1 2 36.54 2
1m³ 37m²
/ Extra over excavation on rocks
C S/ Formwork to the sides of the slab
0.66 2 19.72 2
1m³ 20m²
I/ K
eep excavations free from surface flowing water CONCRETE WORKS
and storm water
i tem 2 C/ R
einforced concrete grade 30mpA horizontal work to
item slab 579.54 2
/ S
S urface treatment with approved fumigent 580m³
10.34
3 2 S/ Strikking off and curring top surface of concrte
310m² 458.12 2
/
S S
carification and compaction of bottom soil to a 458m²
specified density
5
7 2 S/ Topping to concrete slab
75m² 22.91 2
I/ P
umbing and bailing of ground water 23m²
item 2 C/ R
einforced concrete grade 20mpA poured against face
earth for column base
item .79
1 2
2m³
/ R
C einforced concrete vertical work in columns
.06
5 2
5m³
/ Weak concrete blinding minimum thickness 50mm
C
including striking off and curing
.08
5 2
5m³
REINFORCEMENT
kg/ S
teel reinforcement to concrete columns
60.2
8 2
860kg
kg/ Steel reinforcement to concrete bases
62.65 2
63kg
kg/
S teel reinforcement to concrete slab both ground and
first floor.
7945
5 2
57954kg