ABSTRACT : CONCRETE FRAMED STRUCTURE : SUBSTRUCTURE

 UNIT                          +  PAGE                      ­  UNIT                     +   AGE                   ­


P  PAGE
 SITE PREPARATION  DISPOSALS
 Nr/ c
  utting down of trees girth exceeding 500mm but less   /
C D
  isposal of excavated materials to a dump site
than 1000mm including grabbing up of roots and found by the contractor
filling in holes wuth suitable materials

 
3  1  310.34  
1  2.19  2
 3  5.06  2
  /  Site clearing of all bushes, shrubs, hedges and grass
S  6.62  2
girth not exceeding 500mm including grabbing up of
roots and filling in holes with suitable materials
 448.94  1  322.02
 449  ­2.19
 I/  Termite nest removal including the searching of the  319.83
queen and filling the holes with non­expensive
materials
 item  1  320³
i tem  FORMATIONS
  XCAVATIONS
E   /  Backfilling around foundations with excavated material
C
compacted in 150mm layer to a specified density

 S/ E
  xcavate top soil avarage depth 150mm including  2.19  2
disposal of excavated materials maximum distance
100mm from the site

  10.34
3  1   m³
2
 310m²   /  Import granular non­expensive filling materials,
C
hardcore compacted 95%

 C/ E
  xcavate to reduce levels commencing 150mm  86.9  2
below ground levels including levelling and ramming
bottoms average depth 300mm
 310.34  1  87m³
 310m³  C/ I mport granular non­expensive filling materials to raise
levels
 C/ E
  xcavation commencing 450mm below ground level  8.59  2
for column bases
  .62
6  2  9m³
 30m³  PLUNKING AND STRUTTING
  xtra over excavation on hard pickable ground
E  S/ F   ormwork to isolated columns of heigh not exceeding
 C/ 5m
  .32
1  2  36.54  2
 1m³  37m²
  /  Extra over excavation on rocks
C  S/  Formwork to the sides of the slab
 0.66  2  19.72  2
 1m³  20m²
 I/ K
  eep excavations free from surface flowing water  CONCRETE WORKS
and storm water
i tem  2  C/ R
  einforced concrete grade 30mpA horizontal work to
 item slab  579.54  2
 / S
S   urface treatment with approved fumigent  580m³

  10.34
3  2  S/  Strikking off and curring top surface of concrte
 310m²  458.12  2
 /
S S
  carification and compaction of bottom soil to a  458m²
specified density
 5
7  2  S/  Topping to concrete slab 
 75m²  22.91  2
 I/ P
  umbing and bailing of ground water  23m²
 item  2  C/ R
  einforced concrete grade 20mpA poured against face
earth for column base
 item   .79
1  2
 2m³
  / R
C   einforced concrete vertical work in columns
  .06
5  2
 5m³
  /  Weak concrete blinding minimum thickness 50mm
C
including striking off and curing

  .08
5  2
 5m³
 REINFORCEMENT
 kg/ S
  teel reinforcement to concrete columns

  60.2
8  2
 860kg
 kg/  Steel reinforcement to concrete bases
 62.65  2
 63kg
 kg/  
S teel reinforcement to concrete slab both ground and
first floor.

  7945
5  2
 57954kg