Professional Documents
Culture Documents
(i) Excavation, ground beam foundation and all other ancillary works
associated with foundations up to and including ground floor slab.
(iii) The contractor is strongly advised to visit the site before pricing
this bill as no variation on things that are physically seen would be
entertained.
Disposal of water
C Ground water and surface water item 25,000.00
To Collection 313,700.00
MATERIAL LABOUR
ITEMS DESCRIPTION QTY UNIT RATE AMOUNT RATE AMOUNT
E10: MIXING/CASTING/CURING/IN-SITU CONCRETE
Plain in-situ concrete; mix 1:10, 20 aggregate; blinding;
Ground beam 40 m3
generally
WATERPROOFING
J30: LIQUID APPLIED TANKING/DAMP PROOF
MEMBRANES
Two layers of 1000 guage polythene or other approved equivalent as
damp proof membrane.
To Collection 250,000.00
SUBSTRUCTURE
Carried to Summary 2,255,075.00
MATERIAL LABOUR
ITEMS DESCRIPTION QTY UNIT RATE AMOUNT RATE AMOUNT
IN - SITU CONCRETE/ LARGE PRECAST CONCRETE
Columns
A generally 4 m3
A Beam/Upstand beam; 16 m3
attached to slab
Roof beams; sides and soffit; attached to slab 153 m2 1,200.00 183,600.00
regular shaped; rectangular
To Collection 175,000.00
COLLECTION
Cement 21 bags
sand/30tons reuse from extra on site 0
garanite/30tons reuse from Extra on site 0
MASONRY
F10: BRICK/BLOCK WALLING
Walls;
230mm thick; stretcher bond 325 m2
L20: DOORS/SHUTTERS/HATCHES
Casement Windows
TIMBER DOORS(REF:……..)
Supply and Fix
Manufacturer:
FLUSH DOOR
Timber door
SECURITY DOOR
Double leave security door as manufactured by Jinhua complete with
all necessary iron mongeries
P21: IRONMONGERY
Supply and fix the following items
Supply and fix ironmongery; "Union products" (or other equal and
approved) in satin anodised aluminium.
FURNITURE/EQUIPMENT
Mirrors; B.S.952, clear float, SG, silvered and protected with copper backing,
undercoat paint and stoved enamel
6mm thick; fixing to masonry through vulnerable materials, with brass screws,
chromium plated domical covers, rubber sleeves and washers
50mm diameter Stainless steel Handrails and 12mm diameter infill bars with 50mm
diameter baluster posts to 100mm thick sandcrete block stringers including
accessories; all screwed and grounded smooth in accordance with Architect's design
pattern
WARDROBE (REF:…...)
Supply and fix Wenge Laminated Timber wardrobe 1800 x 600 x 2200mm with
D built in drawers,2 sliding leaves with mirror recessed in the door with 19mm dia,
long cylindrical, brushed stainless steel handles and accessories
4 Nr
SURFACE FINISHES
A Level and to falls only not exceeding 15 degrees from horizontal 197 m2
600 x 600mm x 8mm thick Matt Porcelain tile as manufactured by CDK Nig. Ltd
liad horizonally, buff; 3 joints, symmetrical layout; bedding in 10 cement mortar
(1:3); pointing in cement mortar (1:3)
Tiles 267 m2
Cement 48 Bags
Gum Cement 69 Bags
spacers 3 packets
Sharp sand / 30tons 1 Trip
Cutting Disc 1 dozen
WATERPROOFING
Bathrooms, Toilets,Kitchen and roof terrace ; to cement and sand base with
E
excedding 300mm flat; Sum
FLOOR FINISHINGS
To Summary 240,000.00
MATERIAL LABOUR
ITEMS DESCRIPTION QTY UNIT RATE AMOUNT RATE AMOUNT
WALL FINISHINGS
SURFACE FINISHES
300mm x 300mm x 10mm units commercially Quality Polished Ceramic White tiles
to walls on cement and sand base; level or to falls only not exceeding 15 degrees
from horizontal;
Cement 22 bags
Plaster Sand 1 trip
SURFACE FINISHES
INTERNALLY
M60: PAINTING/CLEAR FINISHING CAPL PAINT
Apply Fine coat shield emulsion paint or other approved quality; Mist coat, two full
coats Texcoat paint
WALL FINISHINGS
To Summary 1,558,600.00
MATERIAL LABOUR
ITEMS DESCRIPTION QTY UNIT RATE AMOUNT RATE AMOUNT
CEILING FINISHINGS
SURFACE FINISHES
M20: PLASTERED/RENDERED/ROUGHCAST COATINGS
Gypsum plaster board; POP gypsum suspended ceiling board, Thistle, insulating
grade; 5 joints, filled with plaster and scrimmed; fixing with galvanised nails, and
joint finished with POP including perimeter shadow gap and paint of the ceiling
board in accordance with manufacturer's instruction.
Apply "Dulux" or other approved quality; Mist coat, two full coats emulsion paint
Cement rendered, POP skimmed and sand paper smooth general surfaces
FRAMES 203,500.00
PRELIMINARIES 1,000,000.00
MAIN BUILDING
To General summary 7,430,025.00