ESTIMATION OF A BITUMEN ROAD FOR PLOTED
Overall lengthof road 160m

MEASUREMENT SHEET

S.NO Particulars of item No Length (m) Width (m)

1 1 160 m 10.2

Box Cutting in Road crust & consolidating & dressing


subgrade to specified grade & camber

2 1 160 10.2
Double brick flat soilingwith over burnt brick with break
joints

b.i 1 160 10
Bottom layer,supplying overburnt brick metal at road
side at regular interval

ii 1 160 10
Labour for spreading & consolidation of stone metal

ci
Top layer supplying stone metal & stacked a road side at
regular interval
1 160 10

ii

Labour for spreading & consolidation of stone metal 1 160 10

3 Wearing coat

i
supplying bitumen delivered & stacked at site 1 160 10

Quantity of bitumen=40x2.45=98 tons


98 tonsx3.5%=3.43 Tons
ii supplying trap stoned chips 12mm delivered at site 1 160 10

1 160 10
laying the premix uniformly with WBM surface applying
iii track coat & consolidating 25mm thick carpet

4 Brick on end edging with over burnt brick 2 160

QUANTITY OF MATERIAL

Over burn brick for single soiling @ 1/0.2x0.1 =50 Nos/m2. For double sharing 6000rpm @ 6000/0.1 =60
1. a =2460000+60000=2520000 Nos
2 Over burn brick metal =3600 m3
3 Trap stone metal =2688 m3
4i Bitumen =51.45 Tons
4 ii Trap stone chips = 600 m3

s.no Particulars of item Quantity Rate Amount

Box Cutting in Road crust & consolidating


& dressing subgrade to specified grade &
1 camber 652.8 m2 40 26,112

Base course ,Double brick flat soilingwith


2 over burnt brick with break joints 1632 m2 2 3,264

Bottom layer,supplying overburnt brick


metal at road side at regular interval
3 240 m3 800 192,000
Labour for spreading & consolidation of
4 stone metal 240 m3 200 48,000
Top layer supplying stone metal &
5 stacked a road side at regular interval 179.2 m3 150 268,800
Labour for spreading & consolidation of
6 stone meta 179.2 m3 200 35,840
Wearing coat
supplying bitumen delivered & stacked at
7 site 40 m3 4000 160,000
supplying trap stoned chips 12mm
8 delivered at site 40 m3 250 10,000
laying the premix uniformly with WBM
surface applying track coat &
9 consolidating 25mm thick carpet 600 m2 100 6,000

10 Brick on end edging with over burnt brick 320rpm 20 6,400

TOTAL AMOUNT= 756,416


ROAD FOR PLOTED LAYOUT

Height (m) Quantity Remarks

0.4 652.8 m2

- 1632 m2

100mm compacted
0.15 240 m3 when loose
100+100/2
ht=150mm

0.15 240 m3

75mm compacted
loose will
0.112 179.2 m3 75+75/2=112.5

0.025 40 m3

Density bitumen
mix as per design is
2.45t/m3 and
0.025 40 m3 content is 3.5%
0.025 40 m3

- 1600 m2

320 rm

6000rpm @ 6000/0.1 =6000 Nos . Total brick required


Nos