PLOT 2239, KANSANGA - GGABA RD

TEL: +256 (0) 392 200 3485


Email: zeusarc16@gmail.com

ESTIMATED MATERIALS QUOTATION FOR CONSTRUCTION OF A PROPOSED RESIDENTIAL HOUSE IN


MPIGI TOWN COUNCIL

ITE DESCRIPTION QTY UNIT RATE AMOUNT


M
ELEMENT NO 1: SUBSTRUCTURE

A Steel works for starter columns

12mm high tensile bars 25 Kgs


8mm mild steel bars 18 Kgs
Binding Wire 20 Kgs

B Formwork for starter columns


Wooden formwork for starter columns (1"x10" 6 Pieces
x 3.35m)

C Plinth wall

200mm thick brick wall with 1:4 cement: sand 150 Sm


mortar constructed outburnt clay bricks

D Approved hardcore filling as described


150mm thick hardcore bed well compacted and 140 Sm
blinded with sand

E Anti-termite treatment
Provide and apply anti-termite treatment to the 2 20 Liter
sides and bases of excavated trenches jerrycans

F Sawn formwork as described

Formwork to edges of the slab over 75mm 15 Pieces


1"x10" x3.35m)

G Dump proofing

1000 guage polyethene sheeting 140 Sm

H Insitu Concrete class 15 (mix 1:3:6)

75mm thick Ground Bearing slab 140 Sm

ELEMENT NO 2: SUPERSTRUCTURE

I Walling

230mm wide Hessian based bituminous felt 80 Lm


damp proof course bedded in cement sand
mortar

200mm thick brick with 1:4 cement:sand 290 Sm


mortar wall constructed out of burnt clay bricks

J Steel reinforcement to column and beams

12mm high tensile bars 310 kgs

8mm mild steel bars (stirrups) 210 kgs

Binding Wire 20 kgs

K Reinforced insitu concrete (1:3:6)


In beams and column 5 CM

L Sawn formwork as described to:

Sides of beams and column 200 Lm

M ROOF CONSTRUCTION
Gauge 28 prepainted iron sheets 120 No

Ridges (Gauge 28) 5 No

Valleys (Gauge 28) 5 No

100 x 50 x 3.35m length timber rafters 195 Lm

100 x 75 x 3.35 length Timber wall plate 95 Lm

150 x 50 length Timber tie beams 160 Lm

75x50mm x 3.35m length struts and ties 130 No

75x50mm x 3.35m length timber purlins 230 Lm

25x225mm fascia board 65 Lm

75x50mm x 3.35m length timber for joists and 500 Lm


brandering

Approved wood preservative to surfaces of 2 20 liter


roofing timber jerrycan

Roofing nails 30 Kg

6'' Nails 40 Kg

3" Nails 40 Kg

4'' Nails 50 Kg

2'' Nails 50 Kg
Hoop Iron 1 roll

Expanded metal lathing (8"x2") 10 Bundles

N FINISHES

Plastering to walls, floor screed and ceiling 950 Sm

O Painting

Prepare and apply 1 undercoat layer onto the 5 20


wall jerrycan
liters

Prepare and apply 2 weatherguard paint coats 10 20


onto the wall jerrycan
liters

MATERIALS

SUB-STRUCTURE

Cement 210 Bags


32,000 6,720,000
Fine aggregates(Lake sand) 2 12 tonne
truck 600,000 1,200,000

Fine aggregates(Plaster sand) 1 12 tonne


truck 500,000 500,000

Coarse aggregates (Machine crushed 4 12 tonne


agggregates) truck 1,200,00 4,800,000
0

Hardcore 9 12 tonne
truck 350,000 3,150,000

12mm bars high tensile bars 3 No


25,000 75,000
Binding Wire 20 Kgs
6,000 120,000
8mm mild steel bars 8 No
6,000 48,000
Burnt claybricks 14,00 No
0 300 4,200,000
1000 gauge polythene sheeting 140 Sm
3,000 420,000
Timber for formwork (1"x10" x3.35m) 21 Pieces
10,000 210,000

Provide and apply anti-termite treatment to the 2 20 Liter


sides and bases of excavated trenches jerrycans 60,000 120,000

Carried to collection - Element No.1


21,563,00
0

SUPER-STRUCTURE

Cement 360 Bags


32,000 11,520,000
Fine aggregates (Lake sand) 4 12 tonne
truck 600,000 2,400,000

Fine aggregates (Plaster sand) 6 12 tonne


truck 500,000 3,000,000

Coarse aggregates (Machine crushed) 1 7 tonne


truck 600,000 600,000

12mm bars high tensile bars 33 No


25,000 825,000
8mm mild steel bars 85 No
6,000 510,000
Binding Wire 20 Kgs
6,000 120,000
Burnt claybricks 24,00 No
0 300 7,200,000
230mm wide Hessian based bituminous felt 2 Rolls
damp proof course bedded in cement sand 60,000 120,000
mortar

Timber for formwork (1"x10" x3.35) 60 No


10,000 600,000

Carried to collection - Element No.2


26,895,00
0

Windows

W1 5 No
300,000 1,500,000
W2 2 No
150,000 300,000

Carried to collection - Element No.2


1,800,000

Doors

D1 1 No
1,500,00 1,500,000
0
D2 10 No
250,000 2,500,000

Carried to collection - Element No.2


4,000,000

Roofing

100 x 50 x 3.35m length timber rafters 65 No


11,000 715,000
100 x 75 x 3.35 length Timber wall plate 35 No
20,000 700,000
150 x 50 length Timber tie beams 60 No
20,000 1,200,000
75x50mm x 3.35m length struts and ties 130 No
9,000 1,170,000
75x50mm x 3.35m length timber batterns 65 No
9,000 585,000
230mm x 25mm x3.35m fascia board 23 No
30,000 690,000
Expanded metal lathe 10 Bundles
31,000 310,000
75x50mm x 3.35m length timber for Joists and 180 No
brandering 9,000 1,620,000

Gauge 28 prepainted iron sheets (3x0.75m) 120 No


35,000 4,200,000
Ridges (Gauge 28) 5 No
13,000 65,000
Valleys (Gauge 28) 5 No
15,000 75,000
Wood preservative to surfaces of roofing 2 20 Liter
timber jerrycan 50,000 100,000

Nails

Roofing nails 30 Kgs


6,500 195,000
6'' Nails 40 Kgs
5,000 200,000
3" Nails 40 Kgs
5,000 200,000
4'' Nails 50 Kgs
5,000 250,000
2'' Nails 50 Kgs
5,000 250,000
Hoop Iron 1 Roll
50,000 50,000

Carried to collection - Element No.2


12,575,00
0

-
Painting
-
Undercoat paint 5 Jerrycan
s 60,000 300,000
Silk vinyl paint 10 Jerrycan
s 260,000 2,600,000

Carried to collection - Element No.2


2,900,000

COLLECTION

Substructure (Element No.1)


21,563,00
0
Superstructure (Element No.2)
48,170,00
0

GRAND TOTAL
69,733,00
0

Tiling

Cement 65 Bags
33,000 2,145,000
Adhesive cement 28 Bags
25,000 700,000
Ceramic floor tiles 140 Sm
35,000 4,900,000
Ceramic wall tiles 11 Sm
35,000 385,000
Total estimated materials cost for tiling works
8,130,000
TOILET

Cement 19 Bags
33,000 627,000

Burnt clay bricks 1500 No


300 450,000

Fine aggregates (Plaster sand) 1 2.5


tonne 150,000 150,000
truck

Fine aggregates (Lake sand) 1 2.5


tonne 165,000 165,000
truck
Coarse aggregates 1 2.5
tonne 160,000 160,000
truck
Wire mesh 2 No
25,000 50,000

16mm high tensile bars 3 No


43,000 129,000

Gauge 28 prepainted iron sheets 3 No


25,000 75,000

75x50mm x3.35m timber 9 No


9,000 81,000

Doors 3 No
100,000 300,000

Total
2,237,000

Labour estimates (this varries, it is usually 20 -


30% of total materials cost)