Professional Documents
Culture Documents
HOUSE ON
PLOT No.288 BLOCK No.321 WAKISO DISTRICT FOR MR.
BBOSA
23/3/2023
SUMMARY
ITEM DESCRIPTION MATERIAL
COST
1 SUB TOTAL FOUNDATION WORK 17,620,000
2 SUB TOTAL SUPER STRUCTURE 6,437,000
3 SUB TOTAL ROOF STRUCTURE 33,637,200
GRAND TOTAL FOR SHELL HOUSE 57,694,200
Ceiling