ELEMENT NR 1 : SUBSTRUCTURE
Disposal of Water
H Allow for keeping excavations free from water
(except spring or running water) by pumping, baling
or by other means necessary Item 100,000.00
Planking and Strutting
Hardcore
J 150mm Bed levelled and blinded 30 m² 20,000.00 600,000.00
Soil Sterilization
CONCRETE WORK
Plain Concrete Grade '15'
M Strip foundation 8 m³ 300,000.00 2,400,000.00
2/1/1
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
To Collection TSH 9,330,000.00
Reinforcement (provisional)
Sawn formwork to
Walling
Sundries
COLLECTION
2/1/2
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
ELEMENT NR 2: FRAME
CONCRETE WORK
Reinforcement (provisional)
Sawn formwork to
2/2/3
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
ELEMENT NR.2: FRAME CARRIED TO
SUMMARY TSH 2,080,000.00
2/2/4
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
ELEMENT NR 3: WALLS
2/3/5
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
2/3/6
ITEM DESCRIPTION QTY UNIT RATE
ELEMENT NR 4: DOORS
2/4/7
AMOUNT
4,500,000.00
4,500,000.00
2/4/8
ITEM DESCRIPTION QNTY UNIT RATE AMOUNT
ELEMENT NR 5: WINDOWS
Metalwork
2/5/9
ELEMENT NR 5: WINDOWS CARRIED TO
SUMMARY TSH 1,200,000.00
2/5/10
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
ELEMENT NR 6 - ROOF
ROOF COVERINGS
STRUCTURE:
C 150 x 50mm. Rafters. (TOP & BOTTOM MEMBER) 126 m 10,000 1,260,000.00
2/6/11
ELEMENT NR 6 - ROOF CARRIED TO SUMMARY TSH 3,865,000.00
2/6/12
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
ELEMENT NR 7: FINISHING
INSITU FINISHING
F Suspended ceiling
2/7/13
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
INTERNAL WORK
B Gypsum ceiling
32 m² 8,000 256,000.00
2/9/14
ELEMENT NR. 8 DECORATIONS CARRIED TO
SUMMARY
TSH 6,236,000.00
2/9/15
SUMMARY OF BILL
VAT 18 % 8,841,960.00
2S/A
GRAND TOTAL TSHS 57,963,960.00
2S/A