industry:-
Shuttering: 2.40 to 2.50 times the plan area of slab (it contains col./beams/sides etc)
Roughly 0.25 cubic metres of mortar and 500 bricks are needed for 1 cubic metre of
brickwork
Formwork: (1). Shuttering = 6 times the quantity of concreting.(or2.4 times the plinth area)
Suppose we have a covered area is 200o square feet and over there we need to construct the
R.C.C slab. So we need to calculate the quantity to tell the contractor.
1. To calculate the quantity of Shuttering Plywood, Nails, Shuttering oil, clamps etc.?
Given Data:
= 2000 x 0.24
Wooden Ballies:
= 2000 x 0.16
= 480 x 0.5
Ms Clamps:
= 2000 x 0.08
Shuttering Oil:
= 2000 x 0.006