Professional Documents
Culture Documents
Coat of
Raw Supply Site
Sr. Freight to Fab. Fab. Epoxy Desgin Freight Site Erection Erection
Description Unit qty Material Rate Supply Price Touch Erection Price
No. Factory /Conversion Wast. Enemel+Sh cost to Site Expenses cost Rate (INR)
Basic (INR) Up
ot Blasting
+ Painting
1 Primary member Size kg 145000 65.00 1.20 25.00 1.40 3.20 1.00 1.20 98.00 ₹ 1,42,10,000.00 ₹ 0.50 ₹ 1.00 ₹ 6.00 ₹ 7.50 ₹ 10,87,500.00
2 Secondary member size kg 18000 76.00 1.20 10.00 0.50 0.00 1.00 1.20 89.90 ₹ 16,18,200.00 ₹ - ₹ 1.50 ₹ 6.00 ₹ 7.50 ₹ 1,35,000.00
Roofing sheets
(Machine profiling and
3 kg 15000 98.00 1.20 50.00 0.20 0.00 2.00 1.20 152.60 ₹ 22,89,000.00 ₹ - ₹ 1.50 ₹ 27.00 ₹ 28.50 ₹ 4,27,500.00
AL Clips considered in
conversion cost)
4 Cladding sheets kg 10000 98.00 1.20 5.00 0.20 0.00 2.00 1.20 107.60 ₹ 10,76,000.00 ₹ - ₹ 1.50 ₹ 21.00 ₹ 22.50 ₹ 2,25,000.00
5 Decking sheets kg 14000 98.00 1.20 5.00 0.40 0.00 2.00 1.20 107.80 ₹ 15,09,200.00 ₹ 1.50 ₹ 18.50 ₹ 20.00 ₹ 2,80,000.00
Turbovent (With
Nos. 18 14000.00 1.20 0.00 0.00 0.00 0.00 1.20 14002.40 ₹ 2,52,043.20 ₹ 45.00 ₹ 1,100.00 ₹ 1,145.00 ₹ 20,610.00
specilized base for SSR
system)
Sqm
Lighting strips (With fall
6 220 8000.00 0.00 0.00 0.00 0.00 0.00 0.00 8000.00 ₹ 17,60,000.00 ₹ 45.00 ₹ 490.00 ₹ 535.00 ₹ 1,17,700.00
protection)
Sqm
7 Roof Insulation 3276 534.00 ₹ 17,49,384.00 ₹ 45.00 ₹ 1,47,420.00
₹ 2,59,24,947.20 ₹ 24,76,730.00
₹ 2,84,01,677.20