₹ 905,625 ₹ 787,500
SR. NO. DESCRIPTION OF WORK UNIT QUANTITY RATE
1 RCC Work sq.ft. 11064.00 ₹ 190.00
(a) Add for 1st floor, 5% of Area (2766.00 sq.ft.) = 138.3 sq.ft. sq.ft. 138.30 ₹ 190.00
(b) Add for 2nd floor, 10% of Area (2766.00 sq.ft.) = 276.6 sq.ft. sq.ft. 276.60 ₹ 190.00
(c) Add for 3rd floor 15% of Area (2766.00 sq.ft.) = 414.9 sq.ft. sq.ft. 414.90 ₹ 190.00
2 Centering material shifting - - -
(a) Transportation charges
(b) Loading/Unloading charges - - -
(a) Foundation level half rate= 95.00
3 (b) Pile foundation triangular steel work= 5.00 Total rate= 100.00 sq.ft. 2766.00 ₹ 100.00
Slab Concrete
Loft Lintel
Chipping
Amount Paid to Rupali Constructions
Total Paid Amount
Total Remaining Balance
AMOUNT
₹ 21,02,160.00
₹ 26,277.00
₹ 52,554.00
₹ 78,831.00
₹ 32,000.00
₹ 15,800.00
₹ 2,76,600.00
₹ 1,79,790.00
₹ 8,989.50
₹ 1,52,130.00
₹ 15,213.00
₹ 60,000.00
₹ 2,29,578.00
₹ 1,62,500.00
₹ 10,000.00
₹ 35,100.00
₹ 1,18,125.00
₹ 29,800.00
₹ 65,300.00
₹ 24,000.00
₹ 36,74,747.50
₹ 2,20,484.85
₹ 38,95,232.35
₹ 40,000.00
₹ 29,500.00
₹ 56,000.00
₹ 33,000.00
₹ 10,000.00
₹ 22,15,000.00
₹ 23,83,500.00
₹ 15,11,732.35