2.

PEK GRILL BESI PENUTUP SELOKAN DI DEPAN KAMAR RUDI


Volume / Harga Satuan. Jumlah Harga Total Material Total upah kerja
NO. URAIAN PEKERJAAN
Satuan ( Rp.) ( Rp.) ( Rp.) ( Rp.)

1 Gril besi penutup bak kontrol


Besi siku 50 mm x 50 mm 6.0 btng 367,600.00 2,205,600.00 2,205,600.00
Besi siku 30 mm x 30 mm 4.0 btng 203,900.00 815,600.00 815,600.00
Besi plat 30 mm 54 btng 72,100.00 3,893,400.00 3,893,400.00
Besi nako 10.0 btng 40,200.00 402,000.00 402,000.00
kawat las RB - 26 0.70 box 175,600.00 122,920.00 122,920.00
Resibon potong 10.00 pcs 8,000.00 80,000.00 80,000.00
Resibon penghalus 5.00 pcs 18,750.00 93,750.00 93,750.00
Upah kerja pembuatan gril besi penutup TYPE 1 9 bh 287,700.00 2,589,300.00 2,589,300.00
Upah kerja pembuatan gril besi penutup TYPE 2 4 bh 198,600.00 794,400.00 794,400.00
7 Cat dasar besi zink chromate 1.70 klng 247,325.00 420,452.50 420,452.50
8 Cat nippe 2000 1.00 klng 223,600.00 223,600.00 223,600.00
9 tinner 1.00 ltr 163,000.00 163,000.00 163,000.00
10 Upah pekerjaan pengecatan 12.0 bh 54,600.00 655,200.00 655,200.00

8,420,322.50 4,038,900.00

12,459,222.50
fee kontraktor fee 15 % 1,868,883.38
fee arsitek fee 5 % 622,961.13
14,951,067.00