BILL OF QUANTITY TEBAL ERKERASAN

Perkiraan Harga Satuan Jumlah Harga-Harga


Uraian Pekerjaan Satuan
Kuantitas (Rupiah) (Rupiah)

a b c d F = (c x d)
REKAPITULASI PERKERASAN BERBUTIR

Lapis Pondasi Agregat Kelas B M3 3.360,00 773.555,00 2.599.144.800


Lapis Pondasi Agregat Kelas A M3 3.360,00 827.410,87 2.780.100.526

Jumlah Harga Satuan Pekerjaan I 5.379.245.326

REKAPITULASI PERKERSAN ASPAL

Lapis Resap Pengikat (Prime Coat) Liter 17.920,00 16.193,00 290.178.560


AC-Base Ton 7.470,40 1.370.295,00 10.236.651.768
Lapis Perekat (Take Coat) Liter 17.920,00 16.193,00 290.178.560
AC-Binder Ton 3.091,20 1.401.370,00 4.331.914.944
Lapis Perekat (Take Coat) Liter 17.920,00 16.193,00 290.178.560
AC-WC Ton 2.060,80 1.388.315,26 2.861.040.097
Jumlah Harga Satuan Pekerjaan II 18.300.142.489
Jumlah Total Harga Satuan Pekerjaan ( I + II ) 23.679.387.489