Description Rate/Unit
No.
e.Below 100cm from ground level and extra % from above Rs. 20%
Rs.
5 Dry Rubble work (Dressed)
…………../Cft
6 Earth Filling (Watering and compacting will be charged Extra) Rs. 7.00/Cft
Rs.
10 Stair case Brick work step
350.00/Each
a.Pile cap Including shuttering, steel work and concrete Rs. 250.00/Cft
Rs.
16 R.C.C for folding step (minimum 1m length)
2000.00/Each
R.C.C slab (above 10cm ht.) including shuttering Steel work and
17 Rs. 165.00/Cft
concrete
Rs.
19 R.C.C. Retaining wall above 15cm. thick
280.00/Cft.
Rs.
24 Fixing of door & window frames
500.00/Each
Rs.
25 Fixing of window frames (more than two leaves)
750.00/Each
Sr.
Description Rate/Unit
No.
Rs.
26 Ventilator
300.00/Each
Rs.
27 Fixing of door & window frames (after brick work)
700.00/Each
Rs.
28 Fixing of window frames more than two leaves (After brick work)
1000.00/Each
Rs.
29 Ventilator (after brick work)
400.00/Each
Rs. 1.50 / Sq
3 Emulsion 1 coat (1.25)
ft
Rs.
8 Making air holes
500.00/Each
Rs.
12 AC hole finishing
500.00/Each
Rs.
16 Flower trough finishing
…………../Rft
Sr. No. Description Rate/Unit
Rs.
18 Cover block making
00.75/Each
Rs.
19 Arch finishing (small)
1000.00/Each
Rs.
20 Arch finishing (big)
2000.00/Each
Rs.
21 AC frame fixing
150.00/Each
Rs.
24 Arch mould making (medium)
1000.00/Each
Rs.
25 Eave board finishing
………/Each