Grade of Concrete Cement Sand Aggregate Ready Mix Concrete (As per

( Bag ) ( cum ) ( cum ) Gujarat SOR , 2015-2016 )

M5 ( 1 : 5 : 10 ) 2.77 0.48 0.96 Grade of Price ( Rs. / cum.)


Concrete
M 7.5 (1:4:8) 3.41 0.47 0.95 M 15 3376 Rs. / cum.
M 10 (1:3:6) 4.44 0.46 0.92 M 20 4332 Rs. / cum.
M 15 (1:2:4) 6.34 0.44 0.88 M 25 4529 Rs. / cum.
M 20 ( 1 : 1.5 : 3 ) 8.06 0.42 0.84 M 30 4679 Rs. / cum.
M 25 (1:1:2) 11.1 0.39 0.77 M 35 4828 Rs. / cum.
M 30 8.13 0.45 0.9 50 Kg / Bag = 0.0348 m3
M 35 8.44 0.45 0.9 so, 1 m3 = 28.80 Bag

SLABS
Minimum reinforcement
mild steel Fe 250 0.15 % of cross sectional area
HYSD Fe 415 0.12 % of cross sectional area
Max reinforcement 4 % of cross sectional area

COLUMNS
Longitudinal reinforcement
minimum steel 0.8 % of cross sectional area
maximum steel 6 % of cross sectional area ( not lapped )
4 % of cross sectional area ( lapped )
Transverse reinforcement ( Lateral Ties )
minimum spacing of B x D
16 x dia. of Bar
300 mm

BEAMS
Tension reinforcement minimum area of steel As = 0.85 b d / fy
mild steel Fe 250 0.35 % of cross sectional area
HYSD Fe 415 0.2 % of cross sectional area
Max reinforcement 4 % of cross sectional area maximum 0.04 b D

Shear reinforcement ( stirrups ) maximum 0.75 d stirrups


300 mm
minimum area Asv = 0.4 b Sv / 0.87 fy Sv = stirrup spacing

FOOTINGS
Minimum reinforcement
mild steel Fe 250 0.15 % of cross sectional area
HYSD Fe 415 0.12 % of cross sectional area
Nominal reinforcement , thickness greater than 1 m shall be 360 mm 2 per metre length of concrete section in each direction on

FLOORING
Kota stone 25 mm - 30 mm thick 488 Rs. / Sq. Mt. ( Machine Cut )
500 Rs. / Sq. Mt. ( for step polished )
45-55 mm thick 550 Rs. / Sq. Mt.
Wood Floor 55 Rs. / Sq. Ft.
Granite Floor 130 Rs. / Sq. Ft.
Ceramic tiles ( 30 x 30 cm ) 495 Rs. / Sq. Mt.
Ceramic tiles ( 30 x 30 cm ) (Dado ) 480 Rs. / Sq. Mt.
Vitrified tiles glossy ( 590 -605 mm , 8-10 606 Rs. / Sq. Mt.
mm thick )
Marble 950 Rs. / Sq. Mt.
BRICK WORK 0.23 x 0.1 x 0.07 m size Brick , 12 mm thick motar for 1 m 3.
Cement Mortar Cement Sand
( Bag ) ( cum )
1:2 1.92 0.13
1:3 1.44 0.15
1:4 1.15 0.16
1:5 0.96 0.17
1:6 0.82 0.17

PLASTER WORK 12 mm thick for 100 m2.


Cement Sand
Cement Mortar ( Bag ) ( cum )
1:2 18.43 1.28
1:3 13.82 1.44
1:4 11.06 1.54
1:5 9.22 1.60
1:6 7.90 1.65

PLASTER WORK 8 mm thick for 100 m2.


Cement Sand
Cement Mortar ( Bag ) ( cum )
1:1 18.43 0.64

INTERIOR PAINT 1 litre = 1.223


Cement Primer 205.00 Rs. / Lit. 215 Sq. Ft. / Lit. for 1 Coats 1 litre = 10 -3

Wall Putty 518.00 Rs. / 2 Kg. 20 Sq. Ft. / Kg. for 2 Coats = 0.001
Distemper Paint 74.00 Rs. / Kg. 85 Sq. Ft. / Kg. for 2 Coats 100 micron =
White wash Paint Rs. / 25
400.00 80 Sq. Ft. / Kg. for 1 Coats
( White Cement ) Kg Bag 0.001 =
Plastic Paint 135.00 Rs. / Lit. 60 Sq. Ft. / Lit. for 2 Coats
( emulsion Paint ) 0.001 =
EXTERIOR PAINT Area = 10
Weather Proof 266.00 Rs. / Lit. 40 Sq. Ft. / Lit. for 2 Coats means 1 litre paint = 10 sqm area.= 108
Emulsion
Excellent Finish & 506.00 Rs. / Lit. 50 Sq. Ft. / Lit. for 2 Coats
Long term similarly 1.223 kg paint = 10 sqm area.=
FORM WORK 1 kg paint = 8.2 sqm area. = 88 sq. Ft. a
Ply wood 8 ' x 4 ' thickness 12 mm 42 Rs. / Sqft. 1344 Rs. / No.
Wooden Battens 3 " x 3 " 375 Rs. / Cuft. (calculation based on 1.22times sqft o
Centering Plate 600 x 900 mm ( 2 ' x 3 ' ) Wooden Ballies 50 Rs./ Piece.( calculation base
600 x 1250 mm ( 2 ' x 4 ' ) Shuttering Oil 50 Rs./ Litre. ( calculation base
Nail 52 Rs./ Kg. ( calculation based
RAILING
HEIGHT 3' 6 "
Stainless Steel 850 Rs./Rft.
Aluminium 550 Rs./Rft.
Glass Railing 1950 Rs./Rft.
As per 2018-19
Cement 370 Rs. / Bag
Sand 1500 Rs. / cum ( Natural )
Aggregate 800 Rs. / cum ( 20 mm-25 mm )
Steel 49 Rs. / Kg. ( 10 mm - 25 mm dia. TMT )
Bricks 5.70 Rs. / No. ( II nd Class )
AAC Block 49 Rs. / No. ( 600 x 200 x 100 )

Ready Mix Plaster 200 Rs. / Bag ( 40 Kg per Bag ) 1.58 m2


Ready Mix Mortar 325 Rs. / Bag ( 40 Kg per Bag ) ( 1 : 2 to 1 : 6 ) 0.02 m3
For Brickwork 12 mm Thick
Density of Sand 1920 Kg / m3 For Flooring 40 mm Thick
Density of Steel Bar 7850 Kg / m3
Density of Cement 1440 Kg / m3

LABOUR
MATE / m3 511
LABOUR / m3 464
BHISTI / m3 484
MIXER OPERATOR / m3 511
MIXER / m3 464
VIBRATOR / m3 511
MASON / m3 511
CARPENTER FOR FORMWORK / m2 511
LABOUR FOR FORMWORK / m2 464
BAR BINDER / Kg. 484
0.85 b d / fy LABOUR FOR REINFORCEMENT / 464

te section in each direction on each face.


Kg.
m3
m3
0.1 mm

Area x thick

Area x 0.1/1000
m 2

itre paint = 10 sqm area.= 108 sq. Ft. area

1.223 kg paint = 10 sqm area.= 108 sq. Ft. area


t = 8.2 sqm area. = 88 sq. Ft. area

on based on 1.22times sqft of ply in Rft )


Rs./ Piece.( calculation based on 0.37 times sqft of ply in no. )
Rs./ Litre. ( calculation based on 0.006 times sqft of ply in litre )
Rs./ Kg. ( calculation based on 0.9 times sqft of ply and 10 times of ballies in No. )
17 Sq.Ft. / Bag
17 Sq.Ft. / Bag
0.669291 Cu.Ft. / Bag
2.230971 Cu.Ft. / Bag
ESTIMATE OF FLOORING
INPUT
GRADE OF CONCRETE 1:6
TYPE OF CONCRETE Site Mix Concrete
LENGTH OF FLOORING ( m ) 3
WIDTH OF FLOORING ( m ) 3
THICKNESS OF MORTAR ( mm ) 40
NO. OF FLOOR 1
LENGTH OF DADO ( m ) 3
TYPE OF FLOORING Wood Floor
OUTPUT MATERIAL
MORTAR QUANTITY 9.45 m2
CEMENT 2.488 Bag
SAND 0.518 m3
CONCRETE COST ( Rs. ) 1698.28 Rs.
FLOOR COST ( RS. ) 5328.14 Rs.

TOTAL COST 11602.29 Rs.


WATER CHARGES 1.5 % 174.03 Rs.
SUNDRIES ( INCLUDING MIXER MACHINE ,
TRANSPORTATION ETC.) 7.5 % 870.17 Rs.
CONTRACTOR'S PROFIT 10 % 1160.23 Rs.
TOTAL COST OF GIVEN FLOORING 13806.73 Rs.
Wood Floor
LABOUR
MASON / m3 482.90 Rs.
LABOUR / m3 438.48 Rs.
BHISTI / m3 45.74 Rs.
LABOUR FOR MORTAR MAKING/ m3 3288.60 Rs.
BHISTI FOR MORTAR MAKING / m3 320.17 Rs.
TOTAL LABOUR COST 4575.88 Rs.
0.61 0.04 100 1:2 6
0.46 0.05 0.04 1:3 8
0.37 0.05 4 1:4 10
0.31 0.05 4.8 1:5 15
0.26 0.05 6.4 1:6 18
0.23 0.06 1:7 20
0.20 0.06 1:8 40
50
Ready Mix Concrete 6 Fe 250 Kota stone ( 25-30 mm thick )
Site Mix Concrete 8 Fe 415 Kota stone ( 45-55 mm thick )
10 Wood Floor
12 Granite Floor
Ceramic tiles ( 30 x 30 cm )
Ceramic tiles ( 30 x 30 cm ) ( DADO )
Vitrified tiles glossy ( 590 -605 mm , 8-10 mm thick )
Marble
ESTIMATE OF FLOORING
INPUT
GRADE OF CONCRETE 1:6
TYPE OF CONCRETE Site Mix Concrete
LENGTH OF FLOORING ( m ) 3
WIDTH OF FLOORING ( m ) 3
THICKNESS OF MORTAR ( mm ) 40
NO. OF FLOOR 1
LENGTH OF DADO ( m ) 3
TYPE OF FLOORING Wood Floor
OUTPUT MATERIAL
MORTAR QUANTITY 9.45 m2
CEMENT 2.488 Bag
SAND 0.518 m3
CONCRETE COST ( Rs. ) 1698.28 Rs.
FLOOR COST ( RS. ) 5328.14 Rs.

TOTAL COST 11602.29 Rs.


WATER CHARGES 1.5 % 174.03 Rs.
SUNDRIES ( INCLUDING MIXER MACHINE ,
TRANSPORTATION ETC.) 7.5 % 870.17 Rs.
CONTRACTOR'S PROFIT 10 % 1160.23 Rs.
TOTAL COST OF GIVEN FLOORING 13806.73 Rs.
Wood Floor
LABOUR
MASON / m3 482.90 Rs.
LABOUR / m3 438.48 Rs.
BHISTI / m3 45.74 Rs.
LABOUR FOR MORTAR MAKING/ m3 3288.60 Rs.
BHISTI FOR MORTAR MAKING / m3 320.17 Rs.
TOTAL LABOUR COST 4575.88 Rs.
0.61 0.04 100 1:2 6
0.46 0.05 0.04 1:3 8
0.37 0.05 4 1:4 10
0.31 0.05 4.8 1:5 15
0.26 0.05 6.4 1:6 18
0.23 0.06 1:7 20
0.20 0.06 1:8 40
50
Ready Mix Concrete 6 Fe 250 Kota stone ( 25-30 mm thick )
Site Mix Concrete 8 Fe 415 Kota stone ( 45-55 mm thick )
10 Wood Floor
12 Granite Floor
Ceramic tiles ( 30 x 30 cm )
Ceramic tiles ( 30 x 30 cm ) ( DADO )
Vitrified tiles glossy ( 590 -605 mm , 8-10 mm thick )
Marble
ESTIMATE OF FLOORING
INPUT
GRADE OF CONCRETE 1:6
TYPE OF CONCRETE Site Mix Concrete
LENGTH OF FLOORING ( m ) 3
WIDTH OF FLOORING ( m ) 3
THICKNESS OF MORTAR ( mm ) 40
NO. OF FLOOR 1
LENGTH OF DADO ( m ) 3
TYPE OF FLOORING Wood Floor
OUTPUT MATERIAL
MORTAR QUANTITY 9.45 m2
CEMENT 2.488 Bag
SAND 0.518 m3
CONCRETE COST ( Rs. ) 1698.28 Rs.
FLOOR COST ( RS. ) 5328.14 Rs.

TOTAL COST 11602.29 Rs.


WATER CHARGES 1.5 % 174.03 Rs.
SUNDRIES ( INCLUDING MIXER MACHINE ,
TRANSPORTATION ETC.) 7.5 % 870.17 Rs.
CONTRACTOR'S PROFIT 10 % 1160.23 Rs.
TOTAL COST OF GIVEN FLOORING 13806.73 Rs.
Wood Floor
LABOUR
MASON / m3 482.90 Rs.
LABOUR / m3 438.48 Rs.
BHISTI / m3 45.74 Rs.
LABOUR FOR MORTAR MAKING/ m3 3288.60 Rs.
BHISTI FOR MORTAR MAKING / m3 320.17 Rs.
TOTAL LABOUR COST 4575.88 Rs.
0.61 0.04 100 1:2 6
0.46 0.05 0.04 1:3 8
0.37 0.05 4 1:4 10
0.31 0.05 4.8 1:5 15
0.26 0.05 6.4 1:6 18
0.23 0.06 1:7 20
0.20 0.06 1:8 40
50
Ready Mix Concrete 6 Fe 250 Kota stone ( 25-30 mm thick )
Site Mix Concrete 8 Fe 415 Kota stone ( 45-55 mm thick )
10 Wood Floor
12 Granite Floor
Ceramic tiles ( 30 x 30 cm )
Ceramic tiles ( 30 x 30 cm ) ( DADO )
Vitrified tiles glossy ( 590 -605 mm , 8-10 mm thick )
Marble
ESTIMATE OF FLOORING
INPUT
GRADE OF CONCRETE 1:6
TYPE OF CONCRETE Site Mix Concrete
LENGTH OF FLOORING ( m ) 3
WIDTH OF FLOORING ( m ) 3
THICKNESS OF MORTAR ( mm ) 40
NO. OF FLOOR 1
LENGTH OF DADO ( m ) 3
TYPE OF FLOORING Wood Floor
OUTPUT MATERIAL
MORTAR QUANTITY 9.45 m2
CEMENT 2.488 Bag
SAND 0.518 m3
CONCRETE COST ( Rs. ) 1698.28 Rs.
FLOOR COST ( RS. ) 5328.14 Rs.

TOTAL COST 11602.29 Rs.


WATER CHARGES 1.5 % 174.03 Rs.
SUNDRIES ( INCLUDING MIXER MACHINE ,
TRANSPORTATION ETC.) 7.5 % 870.17 Rs.
CONTRACTOR'S PROFIT 10 % 1160.23 Rs.
TOTAL COST OF GIVEN FLOORING 13806.73 Rs.
Wood Floor
LABOUR
MASON / m3 482.90 Rs.
LABOUR / m3 438.48 Rs.
BHISTI / m3 45.74 Rs.
LABOUR FOR MORTAR MAKING/ m3 3288.60 Rs.
BHISTI FOR MORTAR MAKING / m3 320.17 Rs.
TOTAL LABOUR COST 4575.88 Rs.
0.61 0.04 100 1:2 6
0.46 0.05 0.04 1:3 8
0.37 0.05 4 1:4 10
0.31 0.05 4.8 1:5 15
0.26 0.05 6.4 1:6 18
0.23 0.06 1:7 20
0.20 0.06 1:8 40
50
Ready Mix Concrete 6 Fe 250 Kota stone ( 25-30 mm thick )
Site Mix Concrete 8 Fe 415 Kota stone ( 45-55 mm thick )
10 Wood Floor
12 Granite Floor
Ceramic tiles ( 30 x 30 cm )
Ceramic tiles ( 30 x 30 cm ) ( DADO )
Vitrified tiles glossy ( 590 -605 mm , 8-10 mm thick )
Marble
ESTIMATE OF FLOORING
INPUT
GRADE OF CONCRETE 1:6
TYPE OF CONCRETE Site Mix Concrete
LENGTH OF FLOORING ( m ) 3
WIDTH OF FLOORING ( m ) 3
THICKNESS OF MORTAR ( mm ) 40
NO. OF FLOOR 1
LENGTH OF DADO ( m ) 3
TYPE OF FLOORING Wood Floor
OUTPUT MATERIAL
MORTAR QUANTITY 9.45 m2
CEMENT 2.488 Bag
SAND 0.518 m3
CONCRETE COST ( Rs. ) 1698.28 Rs.
FLOOR COST ( RS. ) 5328.14 Rs.

TOTAL COST 11602.29 Rs.


WATER CHARGES 1.5 % 174.03 Rs.
SUNDRIES ( INCLUDING MIXER MACHINE ,
TRANSPORTATION ETC.) 7.5 % 870.17 Rs.
CONTRACTOR'S PROFIT 10 % 1160.23 Rs.
TOTAL COST OF GIVEN FLOORING 13806.73 Rs.
Wood Floor
LABOUR
MASON / m3 482.90 Rs.
LABOUR / m3 438.48 Rs.
BHISTI / m3 45.74 Rs.
LABOUR FOR MORTAR MAKING/ m3 3288.60 Rs.
BHISTI FOR MORTAR MAKING / m3 320.17 Rs.
TOTAL LABOUR COST 4575.88 Rs.
0.61 0.04 100 1:2 6
0.46 0.05 0.04 1:3 8
0.37 0.05 4 1:4 10
0.31 0.05 4.8 1:5 15
0.26 0.05 6.4 1:6 18
0.23 0.06 1:7 20
0.20 0.06 1:8 40
50
Ready Mix Concrete 6 Fe 250 Kota stone ( 25-30 mm thick )
Site Mix Concrete 8 Fe 415 Kota stone ( 45-55 mm thick )
10 Wood Floor
12 Granite Floor
Ceramic tiles ( 30 x 30 cm )
Ceramic tiles ( 30 x 30 cm ) ( DADO )
Vitrified tiles glossy ( 590 -605 mm , 8-10 mm thick )
Marble
ESTIMATE OF FLOORING
INPUT
GRADE OF CONCRETE 1:6
TYPE OF CONCRETE Site Mix Concrete
LENGTH OF FLOORING ( m ) 3
WIDTH OF FLOORING ( m ) 3
THICKNESS OF MORTAR ( mm ) 40
NO. OF FLOOR 1
LENGTH OF DADO ( m ) 3
TYPE OF FLOORING Wood Floor
OUTPUT MATERIAL
MORTAR QUANTITY 9.45 m2
CEMENT 2.488 Bag
SAND 0.518 m3
CONCRETE COST ( Rs. ) 1698.28 Rs.
FLOOR COST ( RS. ) 5328.14 Rs.

TOTAL COST 11602.29 Rs.


WATER CHARGES 1.5 % 174.03 Rs.
SUNDRIES ( INCLUDING MIXER MACHINE ,
TRANSPORTATION ETC.) 7.5 % 870.17 Rs.
CONTRACTOR'S PROFIT 10 % 1160.23 Rs.
TOTAL COST OF GIVEN FLOORING 13806.73 Rs.
Wood Floor
LABOUR
MASON / m3 482.90 Rs.
LABOUR / m3 438.48 Rs.
BHISTI / m3 45.74 Rs.
LABOUR FOR MORTAR MAKING/ m3 3288.60 Rs.
BHISTI FOR MORTAR MAKING / m3 320.17 Rs.
TOTAL LABOUR COST 4575.88 Rs.
0.61 0.04 100 1:2 6
0.46 0.05 0.04 1:3 8
0.37 0.05 4 1:4 10
0.31 0.05 4.8 1:5 15
0.26 0.05 6.4 1:6 18
0.23 0.06 1:7 20
0.20 0.06 1:8 40
50
Ready Mix Concrete 6 Fe 250 Kota stone ( 25-30 mm thick )
Site Mix Concrete 8 Fe 415 Kota stone ( 45-55 mm thick )
10 Wood Floor
12 Granite Floor
Ceramic tiles ( 30 x 30 cm )
Ceramic tiles ( 30 x 30 cm ) ( DADO )
Vitrified tiles glossy ( 590 -605 mm , 8-10 mm thick )
Marble
ESTIMATE OF FLOORING
INPUT
GRADE OF CONCRETE 1:6
TYPE OF CONCRETE Site Mix Concrete
LENGTH OF FLOORING ( m ) 3
WIDTH OF FLOORING ( m ) 3
THICKNESS OF MORTAR ( mm ) 40
NO. OF FLOOR 1
LENGTH OF DADO ( m ) 3
TYPE OF FLOORING Wood Floor
OUTPUT MATERIAL
MORTAR QUANTITY 9.45 m2
CEMENT 2.488 Bag
SAND 0.518 m3
CONCRETE COST ( Rs. ) 1698.28 Rs.
FLOOR COST ( RS. ) 5328.14 Rs.

TOTAL COST 11602.29 Rs.


WATER CHARGES 1.5 % 174.03 Rs.
SUNDRIES ( INCLUDING MIXER MACHINE ,
TRANSPORTATION ETC.) 7.5 % 870.17 Rs.
CONTRACTOR'S PROFIT 10 % 1160.23 Rs.
TOTAL COST OF GIVEN FLOORING 13806.73 Rs.
Wood Floor
LABOUR
MASON / m3 482.90 Rs.
LABOUR / m3 438.48 Rs.
BHISTI / m3 45.74 Rs.
LABOUR FOR MORTAR MAKING/ m3 3288.60 Rs.
BHISTI FOR MORTAR MAKING / m3 320.17 Rs.
TOTAL LABOUR COST 4575.88 Rs.
0.61 0.04 100 1:2 6
0.46 0.05 0.04 1:3 8
0.37 0.05 4 1:4 10
0.31 0.05 4.8 1:5 15
0.26 0.05 6.4 1:6 18
0.23 0.06 1:7 20
0.20 0.06 1:8 40
50
Ready Mix Concrete 6 Fe 250 Kota stone ( 25-30 mm thick )
Site Mix Concrete 8 Fe 415 Kota stone ( 45-55 mm thick )
10 Wood Floor
12 Granite Floor
Ceramic tiles ( 30 x 30 cm )
Ceramic tiles ( 30 x 30 cm ) ( DADO )
Vitrified tiles glossy ( 590 -605 mm , 8-10 mm thick )
Marble