Grade of Concrete Cement Sand Aggregate Ready Mix Concrete (As per

( Bag ) ( cum ) ( cum ) Gujarat SOR , 2015-2016 )

M5 ( 1 : 5 : 10 ) 2.77 0.48 0.96 Grade of Price ( Rs. / cum.)


Concrete
M 7.5 (1:4:8) 3.41 0.47 0.95 M 15 3376 Rs. / cum.
M 10 (1:3:6) 4.44 0.46 0.92 M 20 4332 Rs. / cum.
M 15 (1:2:4) 6.34 0.44 0.88 M 25 4529 Rs. / cum.
M 20 ( 1 : 1.5 : 3 ) 8.06 0.42 0.84 M 30 4679 Rs. / cum.
M 25 (1:1:2) 11.1 0.39 0.77 M 35 4828 Rs. / cum.
M 30 8.13 0.45 0.9 50 Kg / Bag = 0.0348 m3
M 35 8.44 0.45 0.9 so, 1 m3 = 28.80 Bag

SLABS
Minimum reinforcement
mild steel Fe 250 0.15 % of cross sectional area
HYSD Fe 415 0.12 % of cross sectional area
Max reinforcement 4 % of cross sectional area

COLUMNS
Longitudinal reinforcement
minimum steel 0.8 % of cross sectional area
maximum steel 6 % of cross sectional area ( not lapped )
4 % of cross sectional area ( lapped )
Transverse reinforcement ( Lateral Ties )
minimum spacing of B x D
16 x dia. of Bar
300 mm

BEAMS
Tension reinforcement minimum area of steel As = 0.85 b d / fy
mild steel Fe 250 0.35 % of cross sectional area
HYSD Fe 415 0.2 % of cross sectional area
Max reinforcement 4 % of cross sectional area maximum 0.04 b D

Shear reinforcement ( stirrups ) maximum 0.75 d stirrups


300 mm
minimum area Asv = 0.4 b Sv / 0.87 fy Sv = stirrup spacing

FOOTINGS
Minimum reinforcement
mild steel Fe 250 0.15 % of cross sectional area
HYSD Fe 415 0.12 % of cross sectional area
Nominal reinforcement , thickness greater than 1 m shall be 360 mm 2 per metre length of concrete section in each direction on

FLOORING
Kota stone 25 mm - 30 mm thick 488 Rs. / Sq. Mt. ( Machine Cut )
500 Rs. / Sq. Mt. ( for step polished )
45-55 mm thick 550 Rs. / Sq. Mt.
Wood Floor 55 Rs. / Sq. Ft.
Granite Floor 130 Rs. / Sq. Ft.
Ceramic tiles ( 30 x 30 cm ) 495 Rs. / Sq. Mt.
Ceramic tiles ( 30 x 30 cm ) (Dado ) 480 Rs. / Sq. Mt.
Vitrified tiles glossy ( 590 -605 mm , 8-10 606 Rs. / Sq. Mt.
mm thick )
Marble 950 Rs. / Sq. Mt.
BRICK WORK 0.23 x 0.1 x 0.07 m size Brick , 12 mm thick motar for 1 m 3.
Cement Mortar Cement Sand
( Bag ) ( cum )
1:2 1.92 0.13
1:3 1.44 0.15
1:4 1.15 0.16
1:5 0.96 0.17
1:6 0.82 0.17

PLASTER WORK 12 mm thick for 100 m2.


Cement Sand
Cement Mortar ( Bag ) ( cum )
1:2 18.43 1.28
1:3 13.82 1.44
1:4 11.06 1.54
1:5 9.22 1.60
1:6 7.90 1.65

PLASTER WORK 8 mm thick for 100 m2.


Cement Sand
Cement Mortar ( Bag ) ( cum )
1:1 18.43 0.64

INTERIOR PAINT 1 litre = 1.223


Cement Primer 205.00 Rs. / Lit. 215 Sq. Ft. / Lit. for 1 Coats 1 litre = 10 -3

Wall Putty 518.00 Rs. / 2 Kg. 20 Sq. Ft. / Kg. for 2 Coats = 0.001
Distemper Paint 74.00 Rs. / Kg. 85 Sq. Ft. / Kg. for 2 Coats 100 micron =
White wash Paint Rs. / 25
400.00 80 Sq. Ft. / Kg. for 1 Coats
( White Cement ) Kg Bag 0.001 =
Plastic Paint 135.00 Rs. / Lit. 60 Sq. Ft. / Lit. for 2 Coats
( emulsion Paint ) 0.001 =
EXTERIOR PAINT Area = 10
Weather Proof 266.00 Rs. / Lit. 40 Sq. Ft. / Lit. for 2 Coats means 1 litre paint = 10 sqm area.= 108
Emulsion
Excellent Finish & 506.00 Rs. / Lit. 50 Sq. Ft. / Lit. for 2 Coats
Long term similarly 1.223 kg paint = 10 sqm area.=
FORM WORK 1 kg paint = 8.2 sqm area. = 88 sq. Ft. a
Ply wood 8 ' x 4 ' thickness 12 mm 42 Rs. / Sqft. 1344 Rs. / No.
Wooden Battens 3 " x 3 " 375 Rs. / Cuft. (calculation based on 1.22times sqft o
Centering Plate 600 x 900 mm ( 2 ' x 3 ' ) Wooden Ballies 50 Rs./ Piece.( calculation base
600 x 1250 mm ( 2 ' x 4 ' ) Shuttering Oil 50 Rs./ Litre. ( calculation base
Nail 52 Rs./ Kg. ( calculation based
RAILING
HEIGHT 3' 6 "
Stainless Steel 850 Rs./Rft.
Aluminium 550 Rs./Rft.
Glass Railing 1950 Rs./Rft.
As per 2018-19
Cement 370 Rs. / Bag
Sand 1500 Rs. / cum ( Natural )
Aggregate 800 Rs. / cum ( 20 mm-25 mm )
Steel 49 Rs. / Kg. ( 10 mm - 25 mm dia. TMT )
Bricks 5.70 Rs. / No. ( II nd Class )
AAC Block 49 Rs. / No. ( 600 x 200 x 100 )

Ready Mix Plaster 200 Rs. / Bag ( 40 Kg per Bag ) 1.58 m2


Ready Mix Mortar 325 Rs. / Bag ( 40 Kg per Bag ) ( 1 : 2 to 1 : 6 ) 0.02 m3
For Brickwork 12 mm Thick
Density of Sand 1920 Kg / m3 For Flooring #REF! mm Thick
Density of Steel Bar 7850 Kg / m3
Density of Cement 1440 Kg / m3

LABOUR
MATE / m3 511
LABOUR / m3 464
BHISTI / m3 484
MIXER OPERATOR / m3 511
MIXER / m3 464
VIBRATOR / m3 511
MASON / m3 511
CARPENTER FOR FORMWORK / m2 511
LABOUR FOR FORMWORK / m2 464
BAR BINDER / Kg. 484
0.85 b d / fy LABOUR FOR REINFORCEMENT / 464

te section in each direction on each face.


Kg.
m3
m3
0.1 mm

Area x thick

Area x 0.1/1000
m 2

itre paint = 10 sqm area.= 108 sq. Ft. area

1.223 kg paint = 10 sqm area.= 108 sq. Ft. area


t = 8.2 sqm area. = 88 sq. Ft. area

on based on 1.22times sqft of ply in Rft )


Rs./ Piece.( calculation based on 0.37 times sqft of ply in no. )
Rs./ Litre. ( calculation based on 0.006 times sqft of ply in litre )
Rs./ Kg. ( calculation based on 0.9 times sqft of ply and 10 times of ballies in No. )
17 Sq.Ft. / Bag
17 Sq.Ft. / Bag
0.669291 Cu.Ft. / Bag
#REF! Cu.Ft. / Bag
ESTIMATE OF FOOTING
INPUT
GRADE OF CONCRETE M 25 ( 1 : 1 : 2 )
TYPE OF CONCRETE Ready Mix Concrete
TYPE OF FOOTING STEPPED FOOTING
BOTTOM LENGTH OF FOOTING ( m ) 3.45
BOTTOM WIDTH OF FOOTING ( m ) 2.95
BOTTOM HEIGHT OF FOOTING ( m ) 0.23
NO. OF FOOTING 1
TOP LENGTH OF FOOTING ( m ) 0.9
TOP WIDTH OF FOOTING ( m ) 0.4
UPPER HEIGHT OF FOOTING ( m ) 0.97
GRADE OF STEEL Fe 415
DIA OF STEEL ALONG LENGTH 12
DIA OF STEEL ALONG WIDTH 12
NO. OF BAR ALONG LENGTH 20
NO. OF BAR ALONG WIDTH 24
OUTPUT MATERIAL
FOOTING QUANTITY 2.69 m3
CEMENT 29.86 Bag
SAND 1.05 m3
AGGREGATE 2.07 m3
CONCRETE COST ( Rs. ) 12183.12 Rs.
NO. OF STEEL ALONG LENGTH 20 No.
NO. OF STEEL ALONG WIDTH 24 No.
STEEL COST ( Rs. ) 5943.70 Rs.

TOTAL COST 21482.01 Rs.


WATER CHARGES 1.5 % 322.23 Rs.
SUNDRIES ( INCLUDING MIXER MACHINE ,
TRANSPORTATION ETC.) 7.5 % 1611.15 Rs.
CONTRACTOR'S PROFIT 10 % 2148.20 Rs.
TOTAL COST OF GIVEN FOOTING 25563.59 Rs.
LABOUR FORMWORK
MASON / m3 233.68 Rs. PLY 12 mm THK. 8 ' x 4 ' SIZE ( NO. )
LABOUR / m3 2496.34 Rs. WOODEN BATTENS ( 3 " x 3 " ) ( RFT.)
BHISTI / m3 1171.77 Rs. WOODEN BALLIES ( NO.)
MIXER OPERATOR / m3 96.22 Rs. NAIL ( NO.)
MIXER / m3 87.37 Rs. SHUTTERING OIL ( LITRE)
VIBRATOR / m3 96.22 Rs. WOODEN CLAMP ( 3 " x 3 " ) ( RFT.)
CARPENTER FOR FORMWORK / m2 376.10 Rs. TOTAL FORMWORK COST
LABOUR FOR FORMWORK / m2 273.20 Rs.
BAR BINDER / Kg. 587.09 Rs.
LABOUR FOR REINFORCEMENT / Kg. 562.83 Rs.
TOTAL LABOUR COST 5980.84 Rs.
1330.94 Rs.
906.11 Rs.
586.25 Rs.
37.90 Rs.
9.51 Rs.
412.20 Rs.
1094.30 Rs.
M5 ( 1 : 5 : 10 )
M 7.5 (1:4:8)
M 10 (1:3:6)
M 15 ( 1 : 2 : 4 ) SLOPED FOOTING
M 20 ( 1 : 1.5 : 3 ) PAD FOOTING
M 25 ( 1 : 1 : 2 ) STEPPED FOOTING
M 30
M 35
Ready Mix Concrete 6 Fe 250
Site Mix Concrete 8 Fe 415
10
SLOPED FOOTING 12
PAD FOOTING 14
STEPPED FOOTING 16
18
20
25
30
32
ESTIMATE OF FOOTING
INPUT
GRADE OF CONCRETE M 25 ( 1 : 1 : 2 )
TYPE OF CONCRETE Ready Mix Concrete
TYPE OF FOOTING STEPPED FOOTING
BOTTOM LENGTH OF FOOTING ( m ) 3.45
BOTTOM WIDTH OF FOOTING ( m ) 2.95
BOTTOM HEIGHT OF FOOTING ( m ) 0.23
NO. OF FOOTING 1
TOP LENGTH OF FOOTING ( m ) 0.9
TOP WIDTH OF FOOTING ( m ) 0.4
UPPER HEIGHT OF FOOTING ( m ) 0.97
GRADE OF STEEL Fe 415
DIA OF STEEL ALONG LENGTH 12
DIA OF STEEL ALONG WIDTH 12
NO. OF BAR ALONG LENGTH 20
NO. OF BAR ALONG WIDTH 24
OUTPUT MATERIAL
FOOTING QUANTITY 2.69 m3
CEMENT 29.86 Bag
SAND 1.05 m3
AGGREGATE 2.07 m3
CONCRETE COST ( Rs. ) 12183.12 Rs.
NO. OF STEEL ALONG LENGTH 20 No.
NO. OF STEEL ALONG WIDTH 24 No.
STEEL COST ( Rs. ) 5943.70 Rs.

TOTAL COST 21482.01 Rs.


WATER CHARGES 1.5 % 322.23 Rs.
SUNDRIES ( INCLUDING MIXER MACHINE ,
TRANSPORTATION ETC.) 7.5 % 1611.15 Rs.
CONTRACTOR'S PROFIT 10 % 2148.20 Rs.
TOTAL COST OF GIVEN FOOTING 25563.59 Rs.
LABOUR FORMWORK
MASON / m3 233.68 Rs. PLY 12 mm THK. 8 ' x 4 ' SIZE ( NO. )
LABOUR / m3 2496.34 Rs. WOODEN BATTENS ( 3 " x 3 " ) ( RFT.)
BHISTI / m3 1171.77 Rs. WOODEN BALLIES ( NO.)
MIXER OPERATOR / m3 96.22 Rs. NAIL ( NO.)
MIXER / m3 87.37 Rs. SHUTTERING OIL ( LITRE)
VIBRATOR / m3 96.22 Rs. WOODEN CLAMP ( 3 " x 3 " ) ( RFT.)
CARPENTER FOR FORMWORK / m2 376.10 Rs. TOTAL FORMWORK COST
LABOUR FOR FORMWORK / m2 273.20 Rs.
BAR BINDER / Kg. 587.09 Rs.
LABOUR FOR REINFORCEMENT / Kg. 562.83 Rs.
TOTAL LABOUR COST 5980.84 Rs.
1330.94 Rs.
906.11 Rs.
586.25 Rs.
37.90 Rs.
9.51 Rs.
412.20 Rs.
1094.30 Rs.
M5 ( 1 : 5 : 10 )
M 7.5 (1:4:8)
M 10 (1:3:6)
M 15 ( 1 : 2 : 4 ) SLOPED FOOTING
M 20 ( 1 : 1.5 : 3 ) PAD FOOTING
M 25 ( 1 : 1 : 2 ) STEPPED FOOTING
M 30
M 35
Ready Mix Concrete 6 Fe 250
Site Mix Concrete 8 Fe 415
10
SLOPED FOOTING 12
PAD FOOTING 14
STEPPED FOOTING 16
18
20
25
30
32
ESTIMATE OF FOOTING
INPUT
GRADE OF CONCRETE M 25 ( 1 : 1 : 2 )
TYPE OF CONCRETE Ready Mix Concrete
TYPE OF FOOTING STEPPED FOOTING
BOTTOM LENGTH OF FOOTING ( m ) 3.45
BOTTOM WIDTH OF FOOTING ( m ) 2.95
BOTTOM HEIGHT OF FOOTING ( m ) 0.23
NO. OF FOOTING 1
TOP LENGTH OF FOOTING ( m ) 0.9
TOP WIDTH OF FOOTING ( m ) 0.4
UPPER HEIGHT OF FOOTING ( m ) 0.97
GRADE OF STEEL Fe 415
DIA OF STEEL ALONG LENGTH 12
DIA OF STEEL ALONG WIDTH 12
NO. OF BAR ALONG LENGTH 20
NO. OF BAR ALONG WIDTH 24
OUTPUT MATERIAL
FOOTING QUANTITY 2.69 m3
CEMENT 29.86 Bag
SAND 1.05 m3
AGGREGATE 2.07 m3
CONCRETE COST ( Rs. ) 12183.12 Rs.
NO. OF STEEL ALONG LENGTH 20 No.
NO. OF STEEL ALONG WIDTH 24 No.
STEEL COST ( Rs. ) 5943.70 Rs.

TOTAL COST 21482.01 Rs.


WATER CHARGES 1.5 % 322.23 Rs.
SUNDRIES ( INCLUDING MIXER MACHINE ,
TRANSPORTATION ETC.) 7.5 % 1611.15 Rs.
CONTRACTOR'S PROFIT 10 % 2148.20 Rs.
TOTAL COST OF GIVEN FOOTING 25563.59 Rs.
LABOUR FORMWORK
MASON / m3 233.68 Rs. PLY 12 mm THK. 8 ' x 4 ' SIZE ( NO. )
LABOUR / m3 2496.34 Rs. WOODEN BATTENS ( 3 " x 3 " ) ( RFT.)
BHISTI / m3 1171.77 Rs. WOODEN BALLIES ( NO.)
MIXER OPERATOR / m3 96.22 Rs. NAIL ( NO.)
MIXER / m3 87.37 Rs. SHUTTERING OIL ( LITRE)
VIBRATOR / m3 96.22 Rs. WOODEN CLAMP ( 3 " x 3 " ) ( RFT.)
CARPENTER FOR FORMWORK / m2 376.10 Rs. TOTAL FORMWORK COST
LABOUR FOR FORMWORK / m2 273.20 Rs.
BAR BINDER / Kg. 587.09 Rs.
LABOUR FOR REINFORCEMENT / Kg. 562.83 Rs.
TOTAL LABOUR COST 5980.84 Rs.
1330.94 Rs.
906.11 Rs.
586.25 Rs.
37.90 Rs.
9.51 Rs.
412.20 Rs.
1094.30 Rs.
M5 ( 1 : 5 : 10 )
M 7.5 (1:4:8)
M 10 (1:3:6)
M 15 ( 1 : 2 : 4 ) SLOPED FOOTING
M 20 ( 1 : 1.5 : 3 ) PAD FOOTING
M 25 ( 1 : 1 : 2 ) STEPPED FOOTING
M 30
M 35
Ready Mix Concrete 6 Fe 250
Site Mix Concrete 8 Fe 415
10
SLOPED FOOTING 12
PAD FOOTING 14
STEPPED FOOTING 16
18
20
25
30
32
ESTIMATE OF FOOTING
INPUT
GRADE OF CONCRETE M 25 ( 1 : 1 : 2 )
TYPE OF CONCRETE Ready Mix Concrete
TYPE OF FOOTING STEPPED FOOTING
BOTTOM LENGTH OF FOOTING ( m ) 3.45
BOTTOM WIDTH OF FOOTING ( m ) 2.95
BOTTOM HEIGHT OF FOOTING ( m ) 0.23
NO. OF FOOTING 1
TOP LENGTH OF FOOTING ( m ) 0.9
TOP WIDTH OF FOOTING ( m ) 0.4
UPPER HEIGHT OF FOOTING ( m ) 0.97
GRADE OF STEEL Fe 415
DIA OF STEEL ALONG LENGTH 12
DIA OF STEEL ALONG WIDTH 12
NO. OF BAR ALONG LENGTH 20
NO. OF BAR ALONG WIDTH 24
OUTPUT MATERIAL
FOOTING QUANTITY 2.69 m3
CEMENT 29.86 Bag
SAND 1.05 m3
AGGREGATE 2.07 m3
CONCRETE COST ( Rs. ) 12183.12 Rs.
NO. OF STEEL ALONG LENGTH 20 No.
NO. OF STEEL ALONG WIDTH 24 No.
STEEL COST ( Rs. ) 5943.70 Rs.

TOTAL COST 21482.01 Rs.


WATER CHARGES 1.5 % 322.23 Rs.
SUNDRIES ( INCLUDING MIXER MACHINE ,
TRANSPORTATION ETC.) 7.5 % 1611.15 Rs.
CONTRACTOR'S PROFIT 10 % 2148.20 Rs.
TOTAL COST OF GIVEN FOOTING 25563.59 Rs.
LABOUR FORMWORK
MASON / m3 233.68 Rs. PLY 12 mm THK. 8 ' x 4 ' SIZE ( NO. )
LABOUR / m3 2496.34 Rs. WOODEN BATTENS ( 3 " x 3 " ) ( RFT.)
BHISTI / m3 1171.77 Rs. WOODEN BALLIES ( NO.)
MIXER OPERATOR / m3 96.22 Rs. NAIL ( NO.)
MIXER / m3 87.37 Rs. SHUTTERING OIL ( LITRE)
VIBRATOR / m3 96.22 Rs. WOODEN CLAMP ( 3 " x 3 " ) ( RFT.)
CARPENTER FOR FORMWORK / m2 376.10 Rs. TOTAL FORMWORK COST
LABOUR FOR FORMWORK / m2 273.20 Rs.
BAR BINDER / Kg. 587.09 Rs.
LABOUR FOR REINFORCEMENT / Kg. 562.83 Rs.
TOTAL LABOUR COST 5980.84 Rs.
1330.94 Rs.
906.11 Rs.
586.25 Rs.
37.90 Rs.
9.51 Rs.
412.20 Rs.
1094.30 Rs.
M5 ( 1 : 5 : 10 )
M 7.5 (1:4:8)
M 10 (1:3:6)
M 15 ( 1 : 2 : 4 ) SLOPED FOOTING
M 20 ( 1 : 1.5 : 3 ) PAD FOOTING
M 25 ( 1 : 1 : 2 ) STEPPED FOOTING
M 30
M 35
Ready Mix Concrete 6 Fe 250
Site Mix Concrete 8 Fe 415
10
SLOPED FOOTING 12
PAD FOOTING 14
STEPPED FOOTING 16
18
20
25
30
32
ESTIMATE OF FOOTING
INPUT
GRADE OF CONCRETE M 25 ( 1 : 1 : 2 )
TYPE OF CONCRETE Ready Mix Concrete
TYPE OF FOOTING STEPPED FOOTING
BOTTOM LENGTH OF FOOTING ( m ) 3.45
BOTTOM WIDTH OF FOOTING ( m ) 2.95
BOTTOM HEIGHT OF FOOTING ( m ) 0.23
NO. OF FOOTING 1
TOP LENGTH OF FOOTING ( m ) 0.9
TOP WIDTH OF FOOTING ( m ) 0.4
UPPER HEIGHT OF FOOTING ( m ) 0.97
GRADE OF STEEL Fe 415
DIA OF STEEL ALONG LENGTH 12
DIA OF STEEL ALONG WIDTH 12
NO. OF BAR ALONG LENGTH 20
NO. OF BAR ALONG WIDTH 24
OUTPUT MATERIAL
FOOTING QUANTITY 2.69 m3
CEMENT 29.86 Bag
SAND 1.05 m3
AGGREGATE 2.07 m3
CONCRETE COST ( Rs. ) 12183.12 Rs.
NO. OF STEEL ALONG LENGTH 20 No.
NO. OF STEEL ALONG WIDTH 24 No.
STEEL COST ( Rs. ) 5943.70 Rs.

TOTAL COST 21482.01 Rs.


WATER CHARGES 1.5 % 322.23 Rs.
SUNDRIES ( INCLUDING MIXER MACHINE ,
TRANSPORTATION ETC.) 7.5 % 1611.15 Rs.
CONTRACTOR'S PROFIT 10 % 2148.20 Rs.
TOTAL COST OF GIVEN FOOTING 25563.59 Rs.
LABOUR FORMWORK
MASON / m3 233.68 Rs. PLY 12 mm THK. 8 ' x 4 ' SIZE ( NO. )
LABOUR / m3 2496.34 Rs. WOODEN BATTENS ( 3 " x 3 " ) ( RFT.)
BHISTI / m3 1171.77 Rs. WOODEN BALLIES ( NO.)
MIXER OPERATOR / m3 96.22 Rs. NAIL ( NO.)
MIXER / m3 87.37 Rs. SHUTTERING OIL ( LITRE)
VIBRATOR / m3 96.22 Rs. WOODEN CLAMP ( 3 " x 3 " ) ( RFT.)
CARPENTER FOR FORMWORK / m2 376.10 Rs. TOTAL FORMWORK COST
LABOUR FOR FORMWORK / m2 273.20 Rs.
BAR BINDER / Kg. 587.09 Rs.
LABOUR FOR REINFORCEMENT / Kg. 562.83 Rs.
TOTAL LABOUR COST 5980.84 Rs.
1330.94 Rs.
906.11 Rs.
586.25 Rs.
37.90 Rs.
9.51 Rs.
412.20 Rs.
1094.30 Rs.
M5 ( 1 : 5 : 10 )
M 7.5 (1:4:8)
M 10 (1:3:6)
M 15 ( 1 : 2 : 4 ) SLOPED FOOTING
M 20 ( 1 : 1.5 : 3 ) PAD FOOTING
M 25 ( 1 : 1 : 2 ) STEPPED FOOTING
M 30
M 35
Ready Mix Concrete 6 Fe 250
Site Mix Concrete 8 Fe 415
10
SLOPED FOOTING 12
PAD FOOTING 14
STEPPED FOOTING 16
18
20
25
30
32
ESTIMATE OF FOOTING
INPUT
GRADE OF CONCRETE M 25 ( 1 : 1 : 2 )
TYPE OF CONCRETE Ready Mix Concrete
TYPE OF FOOTING STEPPED FOOTING
BOTTOM LENGTH OF FOOTING ( m ) 3.45
BOTTOM WIDTH OF FOOTING ( m ) 2.95
BOTTOM HEIGHT OF FOOTING ( m ) 0.23
NO. OF FOOTING 1
TOP LENGTH OF FOOTING ( m ) 0.9
TOP WIDTH OF FOOTING ( m ) 0.4
UPPER HEIGHT OF FOOTING ( m ) 0.97
GRADE OF STEEL Fe 415
DIA OF STEEL ALONG LENGTH 12
DIA OF STEEL ALONG WIDTH 12
NO. OF BAR ALONG LENGTH 20
NO. OF BAR ALONG WIDTH 24
OUTPUT MATERIAL
FOOTING QUANTITY 2.69 m3
CEMENT 29.86 Bag
SAND 1.05 m3
AGGREGATE 2.07 m3
CONCRETE COST ( Rs. ) 12183.12 Rs.
NO. OF STEEL ALONG LENGTH 20 No.
NO. OF STEEL ALONG WIDTH 24 No.
STEEL COST ( Rs. ) 5943.70 Rs.

TOTAL COST 21482.01 Rs.


WATER CHARGES 1.5 % 322.23 Rs.
SUNDRIES ( INCLUDING MIXER MACHINE ,
TRANSPORTATION ETC.) 7.5 % 1611.15 Rs.
CONTRACTOR'S PROFIT 10 % 2148.20 Rs.
TOTAL COST OF GIVEN FOOTING 25563.59 Rs.
LABOUR FORMWORK
MASON / m3 233.68 Rs. PLY 12 mm THK. 8 ' x 4 ' SIZE ( NO. )
LABOUR / m3 2496.34 Rs. WOODEN BATTENS ( 3 " x 3 " ) ( RFT.)
BHISTI / m3 1171.77 Rs. WOODEN BALLIES ( NO.)
MIXER OPERATOR / m3 96.22 Rs. NAIL ( NO.)
MIXER / m3 87.37 Rs. SHUTTERING OIL ( LITRE)
VIBRATOR / m3 96.22 Rs. WOODEN CLAMP ( 3 " x 3 " ) ( RFT.)
CARPENTER FOR FORMWORK / m2 376.10 Rs. TOTAL FORMWORK COST
LABOUR FOR FORMWORK / m2 273.20 Rs.
BAR BINDER / Kg. 587.09 Rs.
LABOUR FOR REINFORCEMENT / Kg. 562.83 Rs.
TOTAL LABOUR COST 5980.84 Rs.
1330.94 Rs.
906.11 Rs.
586.25 Rs.
37.90 Rs.
9.51 Rs.
412.20 Rs.
1094.30 Rs.
M5 ( 1 : 5 : 10 )
M 7.5 (1:4:8)
M 10 (1:3:6)
M 15 ( 1 : 2 : 4 ) SLOPED FOOTING
M 20 ( 1 : 1.5 : 3 ) PAD FOOTING
M 25 ( 1 : 1 : 2 ) STEPPED FOOTING
M 30
M 35
Ready Mix Concrete 6 Fe 250
Site Mix Concrete 8 Fe 415
10
SLOPED FOOTING 12
PAD FOOTING 14
STEPPED FOOTING 16
18
20
25
30
32
ESTIMATE OF FOOTING
INPUT
GRADE OF CONCRETE M 25 ( 1 : 1 : 2 )
TYPE OF CONCRETE Ready Mix Concrete
TYPE OF FOOTING STEPPED FOOTING
BOTTOM LENGTH OF FOOTING ( m ) 3.45
BOTTOM WIDTH OF FOOTING ( m ) 2.95
BOTTOM HEIGHT OF FOOTING ( m ) 0.23
NO. OF FOOTING 1
TOP LENGTH OF FOOTING ( m ) 0.9
TOP WIDTH OF FOOTING ( m ) 0.4
UPPER HEIGHT OF FOOTING ( m ) 0.97
GRADE OF STEEL Fe 415
DIA OF STEEL ALONG LENGTH 12
DIA OF STEEL ALONG WIDTH 12
NO. OF BAR ALONG LENGTH 20
NO. OF BAR ALONG WIDTH 24
OUTPUT MATERIAL
FOOTING QUANTITY 2.69 m3
CEMENT 29.86 Bag
SAND 1.05 m3
AGGREGATE 2.07 m3
CONCRETE COST ( Rs. ) 12183.12 Rs.
NO. OF STEEL ALONG LENGTH 20 No.
NO. OF STEEL ALONG WIDTH 24 No.
STEEL COST ( Rs. ) 5943.70 Rs.

TOTAL COST 21482.01 Rs.


WATER CHARGES 1.5 % 322.23 Rs.
SUNDRIES ( INCLUDING MIXER MACHINE ,
TRANSPORTATION ETC.) 7.5 % 1611.15 Rs.
CONTRACTOR'S PROFIT 10 % 2148.20 Rs.
TOTAL COST OF GIVEN FOOTING 25563.59 Rs.
LABOUR FORMWORK
MASON / m3 233.68 Rs. PLY 12 mm THK. 8 ' x 4 ' SIZE ( NO. )
LABOUR / m3 2496.34 Rs. WOODEN BATTENS ( 3 " x 3 " ) ( RFT.)
BHISTI / m3 1171.77 Rs. WOODEN BALLIES ( NO.)
MIXER OPERATOR / m3 96.22 Rs. NAIL ( NO.)
MIXER / m3 87.37 Rs. SHUTTERING OIL ( LITRE)
VIBRATOR / m3 96.22 Rs. WOODEN CLAMP ( 3 " x 3 " ) ( RFT.)
CARPENTER FOR FORMWORK / m2 376.10 Rs. TOTAL FORMWORK COST
LABOUR FOR FORMWORK / m2 273.20 Rs.
BAR BINDER / Kg. 587.09 Rs.
LABOUR FOR REINFORCEMENT / Kg. 562.83 Rs.
TOTAL LABOUR COST 5980.84 Rs.
1330.94 Rs.
906.11 Rs.
586.25 Rs.
37.90 Rs.
9.51 Rs.
412.20 Rs.
1094.30 Rs.
M5 ( 1 : 5 : 10 )
M 7.5 (1:4:8)
M 10 (1:3:6)
M 15 ( 1 : 2 : 4 ) SLOPED FOOTING
M 20 ( 1 : 1.5 : 3 ) PAD FOOTING
M 25 ( 1 : 1 : 2 ) STEPPED FOOTING
M 30
M 35
Ready Mix Concrete 6 Fe 250
Site Mix Concrete 8 Fe 415
10
SLOPED FOOTING 12
PAD FOOTING 14
STEPPED FOOTING 16
18
20
25
30
32