S.no Description Rate Unit Nos.

L
a. Volume of Concrete per Block (Cum.) Cum
b. Facia Area per Block (Sqm.) Sqm

1 No of Blocks per Sqm Facia Area of RE Wall Nos/Sqm

2 M-35 Grade Quantity per Sqm Facia Area of RE Cum/Sqm


Wall
As per M-35 Block Casting Mix Design Consumption of Ingredients
a. Cement MT/Sqm
b. Course Sand MT/Sqm
c. Aggregate (10mm) MT/Sqm

Geogrid (Block)
As Standard Conversion Ratio : 1 Sqm Facia Area requires 7.91 Sqm of Geogrid
Cost Analysis for RE Wall Block work per Sqm of Facia Area
1 Cement 5949.375 Rs/MT
2 Course Sand 577.5 Rs/MT
3 Aggregate (10mm) 819 Rs/MT

4 Geogrid 63.17 Rs/Sqm.

Total Amount (Rs)


B H Quantity Remarks
0.0179
0.104

10

0.172

0.069
0.168
0.167

410
97
137

Note:
500 G40/G60/G80/G100/G120/
G150 Type of geogrid is
used for Block work so Avg.
Rate of these geogrid are
considered in this analysis
Total Amount (Rs) 1143
Calculation of Concrete Volume per Block :
Area of Block : 0.0778 Sqm
Height of Block : 0.230 m
Hence
Volume of Block = 0.0778x0.230 = 0.0179 Cum
S.no Description Rate Unit Nos. L
a. Standard Thickness of Panel Mtr.

b. M-35 Grade Quantity per Sqm Facia Area of RE Cum/Sqm


Wall (Panel)
As per M-35 Panel Casting Mix Design Consumption of Ingredients
a. Cement MT/Sqm
b. Course Sand MT/Sqm
c. Aggregate (10mm) MT/Sqm
d. Aggregate (20mm) MT/Sqm

Miscellaneous Items
1 Geogrid (Panel)
As Standard Conversion Ratio : 1 Sqm Facia Area requires 3.34 Sqm of Geogrid
2 MS Loops
As Standard Conversion Ratio : 3.229 Sqm Facia Area requires 12 Nos. of MS Loops
3 GI Toggle Bar
As Standard Conversion Ratio : 3.229 Sqm Facia Area requires 4 Nos. of Toggle Bar
4 EPDM Pad
Minimum 2 Nos. of EPDM Pad is required for Single Panel (Standard Area=3.229 Sqm.)
5 Geotextile
As per Standard Panel Geotextile required = 1.938 Sqm. 7.75
As Standard Conversion Ratio : 1 Sqm Facia Area requires 0.600 Sqm of Geotextile
6 Reinforcement ( 8 Dia. & 10 Dia.)
As Standard Conversion Ratio : 1 Sqm Facia Area requires 4.5 kg of reinforcement
Cost Analysis for RE Wall Panel work per Sqm of Facia Area
1 Cement 5949.375 Rs/MT
2 Course Sand 577.5 Rs/MT
3 Aggregate (10mm) 819 Rs/MT
4 Aggregate (20mm) 1050 Rs/MT
5 MS Loops 12.5 Rs/Piece
6 GI Toggle Bar 65 Rs/Piece
7 EPDM Pad 10 Rs/Piece
8 Geotextile 20 Rs/Sqm.
9 Reinforcement 40710 Rs/MT
10 Geogrid 73.88 Rs/Sqm.

Total Amount (Rs)


B H Quantity Remarks
0.18

0.180

0.068
0.131
0.091
0.137

.229 Sqm.)

0.25 1.938

407
76
74
144
46
81
20
12
183
Note:
247 G40/G60/G80/G100/G120/
G150/G200/G250 Type of
geogrid is used for Panel
work so Avg. Rate of these
geogrid are considered in
this analysis
Total Amount (Rs) 1290
S.no Description Unit Rate/Unit (Rs)

1 Cement MT 5218.75
14perc.

2 Coarse Sand MT 550


5per.

3 Aggregate-10mm MT 780
5per.

4 Aggregate-20mm MT 1000
5per.

5 TMT RE BAR 8mm MT 35000


18perc.

6 TMT RE BAR 10mm MT 34000

7 TMT RE BAR 12mm MT 33500

8 TMT RE BAR 16mm MT 33200

9 TMT RE BAR 20mm MT 33200

10 Geogrid G40 grade Sqm. 44

11 Geogrid G60 grade Sqm. 51

12 Geogrid G80 grade Sqm. 61

13 Geogrid G100 grade Sqm. 68

14 Geogrid G120 grade Sqm. 75

15 Geogrid G150 grade Sqm. 80

16 Geogrid G200 grade Sqm. 97

17 Geogrid G250 grade Sqm. 115

18 EPDM Pad Nos. 10

19 GI Toggle Nos. 65

20 Geo-Textile Sqm. 20

21 MS Loops Nos. 12.5

Note: All Rates are Standard rates exclusive of all types of taxes
730.625 5949.375

27.5 577.5

39 819

50 1050

6300 41300

6120 40120