PRICELIST OF MATERIALS

No. Mateial List Unit Price A


Cement and Admixtures
Portland Cement, Type I 217.00
Holcim Wallright 200.00
Flyash Maximizer 98.00
Hydrated Lime 225.00
Colored Cement
White Cement

Aggregates "Anita P. Sison"


Vibro Sand 650.00
Vibro Sand
Screened Sand 550.00
Screened Sand
White/Porac Sand 550.00
3/8" Gravel 750.00
3/4" Gravel 750.00
G-1 Gravel 660.00
4" Stone for Riprap
Boulders
Crushed Adobe
100x100 Binangonan Rocks

Ready Mix Concrete "Premier"


525 Ready Mixed Concrete
3,000 psi PCD 3,500.00
4,000 psi PCD 4,000.00
5,000 psi PCD 4,500.00
6,000 psi PCD 4,900.00
7,000 psi PCD 5,500.00
8,000 psi PCD 6,200.00
9,000 psi PCD 7,000.00
10,000 psi PCD 7,600.00

Miscellaneous Concreting Works


Perlite High Strength Light Aggregate
Perlite Concrete Grade (CG) (12 kgs./bag)
Air Entraining Agent (AEA)
Fibrin (2 lbs./ bag)
Light Aggregates (Dead Gravel)

Filling Materials
Earth Fill
Sub Base Course
Base Course

Concrete Hollow Blocks "Goldenmind"


8" CHB (Load Bearing)
8" CHB (Load Bearing)
8" CHB (Load Bearing)
6" CHB (Load Bearing)
6" CHB (Load Bearing)
6" CHB (Load Bearing)
6" CHB (Non-Load Bearing)
5" CHB (Load Bearing)
5" CHB (Load Bearing)
5" CHB (Non-Load Bearing)
4" CHB (Load Bearing)
4" CHB (Load Bearing)
4" CHB (Load Bearing)
4" CHB (Non-Load Bearing)
6" x 6" x 12" Louver Blocks
8" x 8" Glass Block

Concrete Paver Blocks "Vazpavers"


Wavy Gray 60mm thk, 2500 psi 10.00
Wavy Red 60mm thk, 2500 psi 13.00
Wavy Gray 60mm thk, 3000 psi 12.50
Wavy Red 60mm thk, 3000 psi 17.50
Wavy Gray 80mm thk, 3000 psi 19.00
Wavy Red 80mm thk, 3000 psi 26.00
Wavy Gray 80mm thk, 4000 psi 21.00
Wavy Red 80mm thk, 4000 psi 29.00
Wavy Gray 80mm thk, 6000 psi 22.00
Wavy Red 80mm thk, 6000 psi 32.00
Concrete Paving Blocks (Keyhole Pattern) 38 pcs./sq.m.

Asphalt Pavement
50mm thick FDLRC
75mm thick FDLRC
100mm thick FDLRC

Curing Compound
Asphalt Sealer
Asphalt Sealant
Diamond Blade
Asphalt Concrete
Asphalt Treatment
MC-70 (Bituminous Prime Coat)
SS-1 (Bituminous Tack Coat)

Deformed Bars
Grade 40 Deformed Bar 31.60
Grade 60 Deformed Bar 32.96

Structural Steel "Reagan"


Wide Flange 41.41
Angular/Flat Bar 45.54
Plain Round Bar
MS Plate 37.15

Formworks Material
Formworks per m2
Columns, Beams, Walls, etc. 300.00
Footings & Grade Beams 150.00
Formworks per m. 90.00
Scaffoldings 65.00

Steel Forms (W = 0.15 to 0.20m ;L=3.00 lm.) For Pavement


Steel Forms (W = 0.10m ;L=3.00 lm.) For Sidewalk
Steel Forms (W = 0.15m & 0.35m ;L=3.00 lm.) For Curbs & Gutter
Steel Forms (W = 0.35m ;L=3.00 lm.) For Curbs
Aluma Forms (Rental)
Table Forms (Rental)
Formworks for Lintel Beams & Stiff. Columns
1/2" thk. Phenollic Plywood
3/4" thk. Phenollic Plywood
9mm x 4' x 8' Marine Plywood
3/4"thk. Marine Plywood
1/4"thk. Marine Plywood
1/4"thk. Narra Plywood
1/4"thk. Ordinary Plywood
Rough Tanguile
Kd Tanguile
Kd Tanguile Moulding
Coco Lumber

Tie Wires "Appleton"


#16 Tie Wire 46.88
#14 Tie Wire

Welded Wire Mesh


50 x 50 x 2.5mm 44.44
50 x 50 x 3.0mm 79.17
50 x 50 x 6.0mm
75 x 75 x 2.5mm
75 x 75 x 6.0mm
100 x 100 x 3.0mm 52.78
100 x 100 x 6.0mm 381.94
150 x 150 x 3.0mm
150 x 150 x 6.0mm 126.39
200 x 200 x 6.0mm 96.76

Lathe and Beads


Expanded Metal Lathe 1"x1/2"x2mm "BI" 218.75
Expanded Metal Lathe 1"x1/2"x2mm "GI" 458.33
Plastic Lathe 10x10mm 87.08
Stop Bead 10mm 46.67
Corner Bead 10x10mm 43.75
Corner Bead 25x25mm 48.00
Corner Bead 32x32mm 48.00
Corner Bead, 1 1/4" x 8'
PVC Dampcourse 147.00
PVC Dowel Cap 25mmØ 51.75

Polyethelene Sheet "Hi Top"


4mils 11.36
6mils 15.38
8mils 20.00
10mils 28.33

ABC and Other Products "ABC"


Tile Grout "White/Grey" 16.80
Tile Grout "Regular Colors" 21.20
Tile Grout "Premium Colors" 47.00
Biotech Grout "White/Grey" 29.00
Biotech Grout "Regular Colors" 35.00
Biotech Grout "Premium Colors" 57.50
Sanded Grout 30.80
Grout Sealer 545.00
Grout Waterproofing 166.67
Tile Adhesive "Gray" 11.14
Tile Adhesive "White" 18.88
Heavy Duty Tile Adhesive "Gray" 19.00
Heavy Duty Tile Adhesive "White" 24.00
ABC Tile Adhesive
Tile Adhesive (Mortabond Premium)
ABC Adhesive (Baufix Economy ) For sizes 12" x 12" & 8" x 8" Tiles
ABC Adhesive (Original Italy) For sizes 16" x 16"
Zemcoat Regular "Gray" 11.60
Zemcoat Regular "White" 16.40
Zemcoat Super Fine "Gray" 22.00
Zemcoat Super Fine "White" 27.50
Gypsum Putty 860.00
Gypsum Joint Compound 21.33
Redifix (Polymer Dispersion) 210.00
Zembond (Plastering Aid) 72.00
Multibond (Vinyl/Parquet Adhesive) 430.00
Aquashield Plus (2 component waterproofing) 2,100.00
Aquaplug (hydraulic cement) 1,150.00
Silicone Sealant "Construction Grade" 154.00
Silicone Sealant "Glazing Grade" 138.00
Silicone Sealant "Sanitary Grade" 160.00
Acrylic Sealant 110.00
Polyurethane Sealant 385.00
Zemgrout (cementitious machinery grout) 27.20
Floor Hardener "Green" 28.60
Floor Hardener "Red" 17.00
Floor Hardener "Gray" 13.60
Floor Hardener
Self Levelling Mortar 17.20
Levelling Compound (UZIN)
Thermoshield (Insulating Mortar) 35.65
Non-shrink Cementitious Grout
Floor Sealer
Non-shrink Cementitious Grout
Asphalt Sealant
Curing Compound
Epoxy Grout
Concrete Epoxy

Joint Fillers
25mm thk. Styropor 83.33
12mm thk. Styropor 41.67
Non-extruding Joint Filler (Cork type) Compressible

1/2" x 4' x 8' Polystyrene (Styrofoam)


1" x 4' x 8' Polystyrene (Styrofoam)
2" x 4' x 8' Polystyrene (10 kg/m³) Styrofoam
3" x 4' x 8' Polystyrene (32 kg/m³) Styrofoam
20mm Bitumen Impregnated Compressed Filler
Board (3' x 10')

Backer Rod
30mmØ 7.57
28mmØ
25mmØ 5.39
20mmØ 3.67
16mmØ 2.66
12mmØ 1.26
10mmØ

Sealants "Wall Vision"


Fire Sealant 450.00
Elastomeric Sealant 380.00
Polyurethane Sealant 280.00
Polyurethane Sealant
PU Sealant, Bostik (600ml/ssg.
ABC Polyurethane Construction Joint Sealant

Gypsum Boards "Boral"


9mm thk. "REG", 4' x 8' 280.00
9mm thk. "MR", 4' x 8'
9mm thk. "FR", 4' x 8'
12mm thk. "REG", 4' x 8' 360.00
12mm thk. "MR", 4' x 8' 660.00
12mm thk. "FR", 4' x 8' 545.00
12mm thk. "ECOSTOP", 4' x 8' 965.00
12.7mm thk. "REG", 4' x 8' 325.00
12.7mm thk. "MR", 4' x 8' 535.00
12.7mm thk. "FR", 4' x 8' 570.00
12.7mm thk. "ECOSTOP", 4' x 8' 1,250.00
16mm thk. "REG", 4' x 8'
16mm thk. "MR", 4' x 8'
16mm thk. "FR", 4' x 8' 700.00
16mm thk. "ECOSTOP", 4' x 8'

Ficem Boards "Hardiflex"


3.5mm x 4' x 8' 360.00
4.5mm x 4' x 8' 426.00
6mm x 4' x 8' 596.00
9mm x 4' x 8' 888.00
12mm x 4' x 8' 1,181.00
16mm x 4' x 8' 1,962.00
18mm x 4' x 8'
Senepa 9mm x 10" x 8' 182.00
Senepa 12mm x 10" x 8' 273.00
Senepa 12mm x 12" x 8' 327.00

Acoustic Boards "JAEFER"


2' x 4' Optima 150.00
2' x 4' Armstrong Cortega 200.00
2' x 4' Armstrong Fissured 200.00
2' x 4' Armstrong Fine Fissured 215.00
2' x 4' Armstrong Georgian 235.00
2' x 4' Donne Fine Fissure/Concorde 160.00
2' x 2' Armstrong Textura 175.00
2' x 2' Armstrong Textura Teg/Bev
16x600x600 RH-90 Non-sagging Acoustic Board
16x600x600 Minaboard Fissured Acoustic Board
Acoustic Ceiling Board Fine Fissured Humiguard on Suspension
Baked Enamel Grid System (5/8" x 24" x 24")
Calcium Silicate board on Baked Enamel T-runner (6mm x 24" x 24")
Calcium Silicate board on Metal Furrings (6mm thk.)
Gypsum Board on Metal Furrings (12mm thk.)
VCT-8 Armstrong Imperial Series Vinyl Composition Tiles (3mm thk.)
-do-
0.60 x 1.20m RH-90 Acoustic Board

Particle Boards "Jaefer"


9mm x 4' x 8' 350.00
12mm x 4' x 8' 460.00
15mm x 4' x 8' 550.00
18mm x 4' x 8' 630.00
25mm x 4' x 8' 880.00
30mm x 4' x 8' 1,040.00

MDF Boards "Jaefer"


3mm x 4' x 8' 200.00
4mm x 4' x 8' 280.00
6mm x 4' x 8' 370.00
9mm x 4' x 8' 505.00
12mm x 4' x 8' 670.00
15mm x 4' x 8' 820.00
18mm x 4' x 8' 980.00

Laminates "MAC/Jaefer"
0.6mm x 4' x 8' White 250.00
0.7mm x 4' x 8' Solid Colors 470.00
0.7mm x 4' x 8' Wood Grains 515.00
0.7mm x 4' x 8' Patterns 550.00
1.0mm x 4' x 8' Brushed Aluminum 2,050.00

Drywall Assemblies Ga.24 (0.6mm)


Stud 32x51mm 92.00
Stud 35x64mm 99.33
Stud 35x76mm 108.00
Stud 35x92mm 119.33
Stud 35x102mm 125.67
Stud 50x75mm 138.00
Stud 50x100mm 156.00
Stud 50x150mm 195.20
Studs Ga. 22, 76mm x 3m
Tracks Ga. 22, 76mm x 3m
Track 32x51mm 81.33
Track 35x64mm 90.67
Track 35x76mm 99.00
Track 35x92mm 109.67
Track 35x102mm 116.67
Track 50x75mm 126.40
Track 50x100mm 144.40
Track 50x150mm 180.80

Ceiling Assemblies Ga.26 (0.4mm)


19x50mm J-Furring 47.60
19x25mm Single Furring 36.00
12x37mm Z-Furring 32.64
23x37mm Batten Type 55.20
25x25mm Wall Angle 29.00
12x22x30mm J-Type Wall Angle 30.00
Ga.22 (0.8mm)
12x38mm C-Channel 56.60
Shadow Line 1"x1"x1"x1"x3m
Shadow Line, 2" x 8'

Wall Angle, 25x25x1.4mm x 3m


Wall Angle, 25x25x1.4mm x 3.60m
Furring Channel, Ga. 24 x 5m
Carrying Channel, Ga. 24 x 5m
Suspension Rod + Steel Angle + Sus. Clip + Rod Joiner
Steel Angle
Main Tee, 12'-long
Cross Tee, 4'-long
Cross Tee, 2'-long
Hanger rods
Furring Clip
Rod Joiner
Carrying Channel Clip
Metal Clad Ceiling
25mm x 25mm Wood Cornice
32mm x 3mm Ceiling Trim

Tee Runners "EXCELCON"


1" x 1.5" x 12' Main Tee 240.00
1" x 1" x 4' Cross Tee 80.00
1" x 1" x 2' Cross Tee 40.00
1" x 1" x 10' Wall Angle 200.00
Alum. T-runner

Drywall/Ceiling Accessories "EXCELCON"


W-clip (double) 8.00
W-clip (single) 8.00
Locking Key 6.90
Batten Clip 10.80
Double/J-Furring Joiner 12.80
C-channel Joiner 11.60
C-channel Hanger for Rod #6 44.80
Twisted Hanger 23.40
Steel Angle 13.90
Corner Beads 25x25mm 42.50
Suspension Clip 12.80
Rod Joiner 19.00
Suspension Clip + Rod Joiners for Rod #8 31.80
Hanger Bracket/J-Type Hanger Bracket 28.30
Hanger Rod #8 22.30
Hanger Rod #6 28.30
Threaded Bolt 1/4" x 48" 61.00
Threaded Bolt 5/16" x 48" 66.00
Threaded Bolt 3/8" x 48" 69.00
Threaded Bolt 3/8" x 3m 267.10
Powerload 16.90
Drive Pin w/ Cartridge 1" RAMSET/COBRA
Drive Pin w/ Cartridge 1" HILTI Manual
Drive Pin w/ Cartridge 1" HILTI Automatic
Drive Pin (threaded) 25.50
Drive Pin (nailhead) 11.50
Drive Pin (eyelet) 44.50
Drive Pin, 1-1/2"
Bolt and Tox 13.50
Hex Nut & Washer 4.20
Wafer Teks/Stud Screw 10x16mm 1.15
Wafer Teks/Stud Screw 10x32mm 1.35
Gypsum Black Screw 6x1" (pointed) 0.80
Gypsum Black Screw 6x1" (flutted) 0.95
Gypsum Black Screw 6x1 1/4" (pointed) 0.90
Gypsum Black Screw 6x1 1/4" (flutted) 1.05
Gypsum Black Screw 6x1 1/2" (pointed) 1.10
Gypsum Black Screw 6x1 1/2" (flutted) 1.15
Gypsum Black Screw 6x2" (pointed) 1.60
Gypsum Black Screw 6x2" (flutted) 1.75
Board Screw, 1-1/2"
Board Screw, 2"
Gypsum Screw 6 x 1" Needle-point
Blind Rivet 1/8" x 3/8" (4-4) 1.10
Blind Rivet 1/8" x 1/2" (4-6) 1.30
Expansion Shield 1/4" 17.50
Expansion Shield 3/8" 25.90
Streaker Grabber Screw 8mm x 1 1/4" 1.10
Streaker Grabber Screw 8mm x 1" 1.05
Streaker Grabber Screw 8mm x 3/4" 0.95
Fibergalss Mesh Tape 2"
Flexible Corner Bead 2"
Paper Mesh Tape 2"
Masking Tape 3/4"
Sand Paper
Mesh Tape, 2" x 250m
Gypsum Tape/Fiberglass
Gypsum Compound (Hardistop)
Cartridge
Gypsum Putty (ABC)

Plywood Glory Lumber


Ordinary 1/4" x 4' x 8' 310.00
Ordinary 3/8" x 4' x 8' 500.00
Ordinary 1/2" x 4' x 8'
Ordinary 3/4" x 4' x 8' 870.00
Ordinary 1" x 4' x 8'
Marine 1/4" x 4' x 8' 350.00
Marine 3/8" x 4' x 8' 600.00
Marine 1/2" x 4' x 8' 750.00
Marine 3/4" x 4' x 8' 970.00
Marine 1" x 4' x 8' 1,200.00

Lumber
Narra
Yakal
Guijo
Rough Tanguile
KD Tanguile
KD Tanguile (1" x 1")
Red Lauan

CW Nails
CW Nails

Waterstops
9" x 3/16" Dumbell type w/ Centerbulb PVC Waterstops
9" x 1/4" Dumbell type w/ Centerbulb PVC Waterstops

ABC Thermoshield (Insulating Mortar)

PVC Ribbed expandable Center Bulb x 6.4mm x 6" Waterstops

Brass Strips
1/4" x 1/2" Brass Strip

PE Nylon Rope
10mmø PE Nylon Rope
10mmø PP Nylon Rope

Polysack Cloth
Polysack Cloth x 2.40m

Tinsmithry Works
Prepainted GI Sheet
Ga. # 24 Pre-painted long span GI Sheets Roofing
Ga. # 24 Pre-painted long span GI Sheets Ridge Rolls
Ga. # 24 Pre-painted long span GI Sheets Flashing
Ga. # 24 Pre-painted long span GI Sheets Gutter
Ga. # 26 Pre-painted long span GI Sheets Roofing
Ga. # 24 Pre-painted long span GI Sheets Ridge Rolls x 0.60m
Ga. # 24 Pre-painted long span GI Sheets Flashing x 0.90m
Ga. # 24 Pre-painted long span GI Sheets Gutter x 1.20m
Fiberglass Insulation (16.0kg/m³) w/ double sided
factory laminated alum. foil incl. chicken wire
Roof Accessories
Roof Nails
Spandek 0.40mm x 1.133mm x 2.44m Roofing (For Bunkhouse & Fencing)
Ridge Rolls 0.40mm x 0.610mm x 2.44m
Tekscrew # 3, 12.11 x 50mm
Doors & Windows
Steel Doors (By LEC Steel - Fire Rated)
Steel Flush Door (0.90 x 2.10) Fire Exit Door incl. Panic device, door closer,
lever type handle, 4 pcs. Butt hinges, lockset and acc.
Steel Flush Door (0.90 x 2.10) includes 4 pcs. Butt hinges, locksets and acc.
Steel Flush Door (1.80 x 2.10) includes 8 pcs. Butt hinges, lockset and acc.
Steel Flush Door (0.90 x 2.10) includes 4 pcs. Butt hinges, lever handle, locksets and acc.
Steel Louver Door (0.90 x 2.10) includes 4 pcs. Butt hinges, lockset and acc. & insect scree
Steel Louver Door (0.90 x 1.90)

1.00 x 2.10m Steel Flush Door SP (Using Ga.# 20 MS Panel on Ga. # 16 MS Jamb)
1.60 x 2.10m Steel Flush Door DP (Using Ga.# 20 MS Panel on Ga. # 16 MS Jamb)
1.00 x 2.10m Steel Flush Door SP with Bottom Louvers (Using Ga.# 20 MS Panel on Ga. # 16
1.60 x 2.10m Steel Flush Door DP (Using Ga.# 20 MS Panel with Honeycomb Insulation on Ga
1.60 x 2.10m Steel Flush Door DP (Using Ga.# 18 MS Louver Blades, Ga. # 18 MS Tubular Fr

0.90m x 2.10m Hollow Metal Door w/ Jamb


0.90m x 2.10m Hollow Metal Door w/ Jamb w/ view glass door
1.60m x 2.10m Hollow Metal Door w/ Jamb
0.80m x 2.10m Hollow Metal Louver Door w/ Jamb
1.60m x 2.10m Hollow Metal Louver Door w/ Jamb

44mmthk. Plain type Metaflus Door using Ga. 20 Panel with


Honeycomb Insulation, SS Flag Hinges, Lockset with Primer
with 6" wide Ga. 16 Double Rabbet Jambs (0.800MW x 2.100MH)
-do- but with 7" Double Rabbet Jambs (0.900MW x 2.100MH)

Wooden Doors
Wooden Louver Door (Single Door)
Wooden Louver Door (Double Door)
0.80 x 2.10m Hollow Core Flush Door
0.90 x 2.10m Wood Panel Door
Wooden Flush Door w/ Bottom Louver

Yacal Jamb

Alum. Framed Glass Door


Aluminum Sliding Glass Door

Installation unit
unit

Glass Flooring

PVC Doors
0.90 x 2.10m PVC Door with PVC Jamb

Hardwares
Concealed Hinges
Magnetic Catches
Toyo Panic Device
Door Lockset
Door Closer
SUS Push Plate
Double Cylindrical Key Lock & Dead Bolt
Loose Pin Hinges
Spring Loaded Foot and Head Bolt
Stainless Hinges (3 ea per Door)
Cabinet Handles
Concealed Hinges
3-1/2" x 3-1/2" LPB Hinges (Brass)
(Chrome Plated)
(Stainless)
MBC Flush bolt
Flush & Head bolt (Ives B 457)
4" x 4" Toyo Butt Hinge

Painting Works
Painting (QDE)
Painting (QDE)
Painting (Epoxy Primer)
Ducco Paint
Ducco Paint

Fuel & Oil


Premium Fuel
Diesel
Lubricating Oil

Steel Sheet Piles


Steel Sheet Piles

Steel Decking
0.80mm x 0.90m x LS Steel Deck 2 (80,000 psi)
Waferteks 10mm x 16mm
0.80mm x 0.955 x LS Steel Deck 2 (80,000 psi)
Welding Rod
Gabions
2.00 x 1.00 x 1.00m Gabions (Heavy galvanized) w/ 10 x 12cm opening

Flex Beam Guardrail


Prepainted Metal Flex Beam Guardrail 2.6mm thk. x 12" x 14'

Waterproofing
4kg. Torch Applied Membrane
3mm Torch Applied Membrane
Capillary Type Waterproofing
Epoxy Lining
Epoxy Tank Lining (Devron 207)
Elastomeric Waterproofing
Superseal 4000 Waterproofing Membrane

Non-skid Tile
200x200x25mm Non-skid Tile 9.00

Homogenous Tile
600 x 600 x 8mm
400 x 400 x 8mm
300 x 300 x 8mm
100 x 100 x 8mm

Ceramic Tiles
100x100 Ceramic Unglazed Floor Tiles
100x200 -do-
150x150 -do-
200x200 -do-
300x300 -do-
400x400 -do-
450x450 -do-
600x600 -do-
300 x 300 Vit. Floor Tiles w/ Integral Nosing

100x100 Ceramic Glazed Wall Tiles


100x200 -do-
100x300 -do-
200x200 -do-
200x300 -do-
300x300 -do- 28.00-40.00
400x400 -do-
450x450 -do-
600x600 -do-
2"x12" Ceramic Tile Nosing
Tile Fittings

Marbles & Granite


18mm thk. Granite Slab
20mm thk. Marble Slabs
12" x 12" Granite Tiles
12" x 12" Polished Granite Tiles w/ Integral Nosing
16" x 16" Polished Granite
Marble Chips
Marble Dust
19x600x600 Marble Slab incl. Polishing
CDS Marble

Red Bricks
1" x 4" x 8" Red Bricks
2" x 2" x 8" Red Bricks
100 x 200 Brick Tiles

Pebbles
Beige Pebbles # 10
Beige Pebbles # 5
Black Pebbles # 10
Black Pebbles # 5
Assorted Pebbles

Mosaic Tiles
300 x 300mm Mosaic Tiles

Non-skid Tiles
200x200 Non-skid Floor Tiles (URRA)

Green Slate Tiles


200x200 Green Slate Tiles

Roof Tiles
12" x 12" Roof Tiles

Vinyl Tile
300x300x3.0mm Vinyl Tiles (Local)
(Imported)
300x300x3.0mm Vinyl Tiles (Anti-static)
Vinyl Adhesive
2mm thk. Gerfloor Parasafe Vinyl by Multi-line
Vitreous Tile
600 x 600 x 6mm
400 x 400 x 6mm
300 x 300 x 6mm
200 x 200 x 6mm
100 x 100 x 6mm

Porcelain Tile
600 x 600 x 6mm
400 x 400 x 6mm
300 x 300 x 6mm
200 x 200 x 6mm
100 x 100 x 6mm

Stair Nosing
Brass 50x50x3mm 1,066.33
Brass 38x38x2mm 344.40
Stainless Steel ST-350 "Tsukitora" 1,481.48
Aluminum 40x40mm 186.96
Aluminum 30x30mm 62.32

Insulation "Phil. Insulation"


12kg. 50mm thk. CSR Glasswool 119.06
16kg. 25mm thk. CSR Glasswool 79.67
16kg. 50mm thk. CSR Glasswool 158.78
24kg. 25mm thk. CSR Glasswool 125.50
24kg. 50mm thk. CSR Glasswool 258.56
28kg. 25mm thk. CSR Glasswool 145.78
28kg. 50mm thk. CSR Glasswool 277.67
32kg. 13mm thk. CSR Glasswool 144.93
32kg. 25mm thk. CSR Glasswool 199.28
32kg. 50mm thk. CSR Glasswool 398.55

48kg. 13mm thk. CSR Glasswool 202.90


48kg. 25mm thk. CSR Glasswool 269.20
48kg. 50mm thk. CSR Glasswool 536.59
40kg. 50mm thk. CSR Rockwool 319.44
50kg. 50mm thk. CSR Rockwool 347.22
60kg. 50mm thk. CSR Rockwool 375.00
60kg. 70mm thk. CSR Rockwool
60kg. 80mm thk. CSR Rockwool
80kg. 50mm thk. CSR Rockwool 530.56

2" Rockwool Insulation


CSR Fibertex Rockwool, 48kg/m³, 50mm thk., bare
CSR Fibertex Rockwool, 48kg/m³,70mm thk., bare
CSR Fibertex Rockwool, 48kg/m³,80mm thk., bare
12mm thk. Foam Insulation w/ one side Alum. Foil

Miscellaneous Steel Works


3"ø x 6.00m BI Pipe Seamless Sch. 160
2mm thk. x 4"ø Stainless Steel Tubing
1.5mm thk. x 4"ø Stainless Steel Tubing
2mm thk. x 3"ø Stainless Steel Tubing
2mm thk. x 2-1/2"ø Stainless Steel Tubing
2mm thk. x 2"ø Stainless Steel Tubing
1.5mm thk. x 1-1/2"ø Stainless Steel Tubing
3"ø SS Elbow
2-1/2"ø SS Elbow
2"ø SS Elbow
1-1/2"ø SS Elbow
3"ø SS Flange
2-1/2"ø SS Flange
2"ø SS Flange
1-1/2"ø SS Flange
20mmø x 6.00m Stainless Steel Rod
16mmø x 6.00m Stainless Steel Rod
3/16" x 1" x 6.00m SS Flat bar
1/4" x 4' x 8' Stainless Steel Plate
3/16" x 4' x 8' Stainless Steel Plate
1/8" x 4' x 8' Stainless Steel Plate
Ga. # 24 Stainless Steel Plate
Ga. # 26 Stainless Steel Plate
2.8mmø x 6' x 10m x 2" x 2" Cyclone Wire
3.4mmø x 6' x 10m x 2" x 2" Cyclone Wire
Ga. # 10 x 6' x 8m x2" x 2" Cyclone Wire
2.8mmø x 6' x 10m x 2" x 2" Welded Wire Mesh
3.0mmø x 4' x 8' x 2" x 2" Welded Wire Mesh
3.5mmø x 6' x 10m x 2" x 2" Welded Wire Mesh
8mmø x 6' x 20' x 8" x 8" Welded Wire Mesh
6mmø x 6' x 20' x 6" x 6" Welded Wire Mesh
7.5mmø x 6' x 20' x 8" x 8" Welded Wire Mesh

3" ø Sch. 20 GI Pipes


2" ø Sch. 20 GI Pipes
1-1/2" ø Sch. 20 GI Pipes

2" ø BI Pipes
1-3/4" ø BI Pipes
3/4" ø BI Pipes
2mm x 1" x 1" BI Square Tubing
3mm x 1" x 1" BI Square Tubing
2mm x 1" x 2" BI Square Tubing
2mm x 2" x 2" BI Square Tubing
3mm x 2" x 2" BI Square Tubing
2mm x 2" x 4" BI Tubular Pipe
3mm x 2" x 4" BI Tubular Pipe
2mm x 2" x 6" BI Tubular Pipe
3mm x 2" x 6" BI Tubular Pipe
0.80 mm x 4' x 8' Aluminum Sheet
1.00 mm x 4' x 8' Aluminum Sheet
1.50 mm x 4' x 8' Aluminum Sheet
3.00 mm x 4' x 8' Aluminum Sheet
1/8" x 4' x 8' Checkered Plate
3/16" x 4' x 8' Checkered Plate

3/4" x 4mm x 6.00m Flat Bar 50.00

Barbed Wire (L = 135.00m/roll)

Ga. # 16 x 2" x 6" Tubular Pipes


Ga. # 16 x 2" x 4" Tubular Pipes
6mm x 4" x 20' Flat bar
2" x 4" x 6.00m Channel 9.40
1-1/2" x 3" x 6.00m Channel 6.90

3mm - 3/4" x 1-1/2" x 4' x 8' Expanded Metal (BI)


2mm - 3/4" x 1-1/2" x 4' x 8' Expanded Metal (BI)
2mm - 1/2" x 1" x 4' x 8' Expanded Metal (BI)
1.5mm - 1/2" x 1" x 4' x 8' Expanded Metal (BI)
1.1mm - 1/2" x 1" x 4' x 8' Expanded Metal (BI)
1.1mm x 3/8" 3/4" x 4' x 8' Expanded Metal (BI)
0.90mm x 3/8" 3/4" x 4' x 8' Expanded Metal (BI)

1mø x 20mm thk. x 6.00m Spiral Welded Steel Pipes ASTM A-252
0.80mø x 20mm thk. x 6.00m -do-
0.65møx 4.5mm thk. x 6.00m -do-
0.45møx 4.5mm thk. x 6.00m -do-
50mm x 4' x 8' MS Plates
20mm x 4' x 8' -do-
6mm x 4' x 8' MS Plates

1/4" x 1/2" x 16" Carborundum Strips


Baked Acrylic Paint
0.80mmø Migweld (Stainless)

1.60mmø Migweld (Stainless) Type 308 Filler Rod


1.00mmø Migweld (Stainless)

6mm x 12mm x 2.40m Stainless Insert

28mmø x 1.20m A307 Anchor bolts


32mmø x 1.50m A307 Anchor bolts
12mmø x 4" Expansion bolts

Sprint Metaltech (Johnson Uyseco) Tel No. 432-45-99 ; 443-39-46 ; Telefax 440-07-15
Stainless Steel Ladder Rung
Spiral Stair
Seismic Gap (Floor & Wall)
Railings

12mm thk. Tempered Glass


12 x 12mm Alum. C-Channel

Steel Windows (As of January 2008)


Casement Type excl. Grilles
Awning Type excl. Grilles
Grilles
6mm thk. Clear Glass

6"ø Heavy duty Roller


4"ø Heavy duty Roller
Straight Gear

Ring w/ net
1.20 x 1.80m Fiberglass Board

10mmø x 75mm SS Lag screw on 10mm Exp. Shield


75mmø Plastic or Rubber Roller

20mmø x 16" Anchor Bolts


20mmø x 12" Anchor Bolts
12mmø x 4" Bolts
12mmø x 2" Bolts
16mmø x 8" Anchor Bolts
12mmø x 8" Anchor Bolts
12mmø x 100mm Expansion Bolt
Nuts & Washers
Landscaping Works
Dwarf Coconut Trees (H = 5 ft.)
Talisay Trees (H = 4 ft.)
Garden Soil
Carabao Grass

Specialty Works
Glass Mirror 6mm thk. Electrolytically Cu Plated
Facial Mirror including 3.0mm thk. Plywood Backing
Mounting Bracket
Type 304 Stainless Steel Angle Frame
Wood Frame
Rubber Bumper Guard at Loading Dock
Rubber Bumper Guard at Column (700mm)

SUS Manhole Cover for Cistern


CI Manhole for Grease Trap
0.60m ø CI Manhole Cover

Mooring Bollard
Cleats
Rubber Dock Fender 0.60 x 3.00m

Garbage Chute (10 floors) Palmdale Heights

Full Therm System on Steel Frames


Full Therm System on Furrings
Therm or Cladding System
Direct Applied Finish System

ACI Glasswool (16kg x 50mm) and Accessories

Exterior Metal Cladding

Structural Concrete Epoxy

Stair Nosing

Rockbuilt (Spancrete) Tel # 656-84-03 (Peter)


QP Lite Hollow Core Slab, 100mm thk., 400mm wide using 6-1/4"ø 3-wire
reinforcement

Vertical Blinds
Horizontal Blinds
Dec oline Roll-up Screen

Remote Control Mechanism incl. Electronic Sensor

Other Works
Fountain Equipments

Freight : Manila to Cebu

Neoprene Gasket

150mm diameter PVC pipe


150mm PVC bends
150mm Check valve
150mm Gate valve

Skim Coat
Plastering Aid (Zembond)

Toilet Partition
Cornices

Wood Veneer (4' x 8') Add Wood Panelling


6" PVC Baseboard
Precast Concrete Moulding (40mm thk. min. thickness)
Precast Concrete Moulding (@ Ceiling)
Laminate

Solignum

12mm x 6" x 4' Wood Flooring (Pre-engineered)


Underlaying Foam 12mm thick
Joint Adhesive
Sealer and Wax
2mm x 100mm Flexible Vinyl Baseboard
3mm x 1/2" Brass Strip

Ashford Floor Hardener


300 x 300 x 3mm thk. Vinyl Tiles
300 x 300 x 3mm thk. Anti Static Vinyl Tiles
300 x 300 Vit. Ceramic Tiles
200 x 200 Vit. Unglazed Ceramic Tiles

500 x 500 x 6.5mm Carpet Tiles (Toli Series)


2.0mm x 1.82m. X 20.00m. Toli Vinyl (Mature Series)
3.0mm x 150mm x 900mm Maxwood Vinyl Planks
Toli Welding Rod (50m/roll) (1 roll for every 2 rolls of Toli Vinyl Sheet)
Levelling Compound (UZIN) Coverage 5m2/bag (max 3mm thk.)
Primer (UZIN SUPE 360) For Concrete Subfloor, cov. 0.008 pail/m2

Tire Traction and Floor Hardener


Floor Hardener
Glass Flooring

Floor Hardener (Korodur 0/4)


Light Traffic
Medium Traffic
Heavy Traffic

Ashford Formula (Tradetek) Jorge Dayrit Tel. # 810-29-91 to 95


PH & M Concrete Specialist Corp. Tel. # 541-96-73 ; Cel. # 0927-910-46-53 & 0927-910-46-55
Concrete Placing & Finishing (Using Power trowel)
Slab on Fill Formworks Installation & Stripping
Slab on Fill Reinforcing bars Installation
Construction Joint Cutting
Supply & Application of Sealant Materials for Construction Joint (6.00 x 6.00m)

Construction Nylon Net (1/4" x 2.00m x 90.00m.)

Garland

Concrete Epoxy (A & B)

Concrete Drill Bit


For 6mmø - 12mmø
For 16mmø - 25mmø

A.EQUIPMENTS:

Dozer D8H w/ ripper


Payloader
Dump trucks
Grader
Roller
Water truck
Cargo Truck
Air Compressor
Jackhammer
Plate Compactor
Water Pump
Concrete Screeder
Concrete Vibrator
Concrete Cutter
1-Bagger Mixer
Chainsaw
Portalift
Concrete Breaker
Backhoe
Trencher
Sump Pump (Tash-type)
Rebar Cutter
Rebar Bender
Tamping Rammer
One Bagger Mixer
Concrete Vibrator 2-3/8"ø, 5.0 hp including hose
Concrete Vibrator 1-1/2"ø, 3.0 hp including hose
2-3/8"ø Spare Vibrator Hose
1-1/4"ø Spare Vibrator Hose
Steel Buggy
Genset 150 Kva
Genset 150 Kva (Rental)
Backhoe 0.76 cu.m.
Backhoe 0.76 cu.m. with Breaker Line
Breaker
Mobile Crane, 50 Toner

Sump Pump (Tash-type)


Rebar Cutter
Rebar Bender
Tamping Rammer
One Bagger Mixer
Concrete Vibrator 2-3/8"ø, 5.0 hp including hose
Concrete Vibrator 1-1/2"ø, 3.0 hp including hose
2-3/8"ø Spare Vibrator Hose
1-1/4"ø Spare Vibrator Hose
Steel Buggy
Genset 150 Kva
Backhoe 0.76 cu.m.
Backhoe 0.76 cu.m. with Breaker Line
Breaker
Mobile Crane, 50 Toner

B.MANPOWER:

Foreman
Leadman
Timekeeper
Carpenter
Mason
Steelman
Laborer
Floater
Mixer Operator
Painter
Welder
Tinsmith
HE Operator
Driver
Screeder Operator
Plumber
Genset Operator

HILMARC'S CONSTRUCTION CORPORATION


1835 E. Rodriguez Sr. Ave.,Cubao,Q.C.
Tel.Nos. 726-94-71 to 73; 726-94-75 to 77;
723-84-76; 723-84-79
Fax No. 724-86-14; 723-85-39

SUB-CONTRACTORS LABOR UNIT COSTS

AS OF J U N E 2016

SMALL
SCOPE OF WORKS SCALE

I. LAYOUT OF THE BUILDING 35.00

II. CARPENTRY WORKS


A. Formworks
1. Using Lumber (incl.stripping,formoil application & nail ext.)
a. Columns/Pedestal
i.Spiral 325.00
ii.Tied 300.00
b. Footing Tie Beams & Pile Caps 235.00
c. Floor Beams 285.00
d. Floor Slab 280.00
e. Floor Beams (Above 4.00m high) 300.00
f. Floor Slab (Above 4.00m high) 300.00
g. Roof Beams 305.00
h. Gutter w/ parapet 310.00
i. Roof Deck (if coverage is not the same as floor slabs below 295.00
j. Shearwalls 300.00
k. Stair & Bleacher 325.00
l. Dentils 315.00
m. Parapet 300.00
n. Waffles 325.00
o. Stair on Fill 135.00
p. Lintel Beams & Stiff. Columns 245.00
q. Pavement 90.00
r. Slab on Fill 75.00
s. Slab Breaks, Trench
i. width 200mm & below -
ii. Width above 200mm -
t. Beam Breaks
i. Suspended Beams
ii. Footing Tie Beams
u. When forms used are scrap wood & lumber plus 15.00

2. Using Steel Forms Installation


a. Columns/Pedestal Small Sc.
i.Spiral 210.00
ii.Tied 215.00
b. Footing Tie Beams & Pile Caps 200.00
c. Floor Beams 210.00
d. Floor Slab 200.00
e. Floor Beams (Above 4.00m high) 235.00
f. Floor Slab (Above 4.00m high) 220.00
g. Roof Beams 215.00
h. Gutter w/ parapet 225.00
i. Roof Deck (if coverage is not the same as floor slabs below 210.00
j. Shearwalls 200.00
Conventional Forms -
3. Using Table Forms
a. Assembly/Disassembly (one time) -
b. Installation & Flyout -

4. H-Frames Installation/Dismantling (Steel Scaffoldings)


a. Floor / Roof Beams (including Straight Props)
i. One Layer 25.00
ii. Two Layers 30.00
iii. Three Layers 35.00
iv. Four Layers 40.00
v. Five Layers 45.00
vi. Six Layers 50.00
vii. Seven Layers 55.00
viii. Eight Layers 60.00
b. Floor Slabs
i. One Layer 20.00
ii. Two Layers 25.00
iii. Three Layers 30.00
iv. Four Layers 35.00
v. Five Layers 40.00
vi. Six Layers 45.00
vii. Seven Layers 50.00
viii. Eight Layers 55.00
ix. For Straight Props as Scaffoldings 30.00
c. Concrete Gutter Parapets (incl. Straight Props)
i. One Layer 25.00
ii. Two Layers 30.00
iii. Three Layers 35.00
iv. Four Layers 40.00
v. Five Layers 45.00
vi. Six Layers 50.00
vii. Seven Layers 55.00
viii. Eight Layers 60.00
d. If H-Frame is to rest on soil
i. For Compacted Soil Additional of P 5.0
ii. For Muddy/Loose Soil Additional of P15.0
e. Supporting Steel Deck 120.00

5. Retouching, Grinding & Preparation (Ready to accept Paints)


a. Columns 60.00
b. Beams 70.00
c. Slabs 80.00
d. Walls 60.00
e. Parapets 80.00

B. Door Jambs Installation


a. Wooden Jambs
i. On Double Walls 50.00
ii. On Concrete Walls 55.00
b. Steel Jambs 135.00
C. Window Jambs Installation
a. On Double Walls 125.00
b. On Concrete Walls 130.00
D. Steel Window Installation 215.00
E. Flush Door Installation 400.00
F. Panel Door Installation
a. Panel Door 450.00
b. Panel Door including Track 1,650.00
G. Bar Door Installation 320.00
H. Steel Door Installation
a. Single Leaf 600.00
b. Double Leaf 780.00
I. PVC Door (incl. Jambs) 550.00
J. Steel Louver Installation 225.00
K. Wooden Roof Framing
a. Fabrication & Installation 35.00
L. Double Wall Partitions
a. 1/4"thk.Ply.on 2"x3"studs(V-cut & Open Joint) 245.00
b. Narra Ply.on 2"x3"studs(V-cut & Open Joint) 245.00
c. Narra Ply.on 2"x3"studs(Open Joint @ 0.30) 325.00
d. Other Kind of D/W Partition (By Negotiation)
e. 1/4"thk.Marine Plywood Panelling w/o groove 200.00
f. 1/4"thk.Narra Plywood Panelling w/ groove 225.00
M. Baseboard
a. Kd. Tanguile 37.50
b. Narra 45.00
c. Vinyl 22.50
N. Ceiling
a. 1/4" Plywood Ceiling (Ordinary)
i. w/ ceiling truss 250.00
ii. w/o ceiling truss 225.00
b. T&G, S-cut & V-cut 300.00
c. Installation of Accoustic board 135.00
d. Ceiling Board only
i. w/ V-cut 135.00
ii.Open joint 120.00
e. Covelights (Fabrication & Installation)
i.On Ordinary Ceiling 200.00
ii.On Wood Moulding(Fiberglass Ceiling) 225.00
iii.Alum.T-runner Installation 40.00
iiii. Diffuser Installation 30.00
f. Other Ceiling
i. Ord.Plywood ceiling @ Eaves 265.00
ii. Wood Slats w/ Insect Screen (W=0.30m) 150.00
O. Installation of wooden stair handrail (narra) 175.00
P. Cabinets & Shelves
Q. Quarter C Moulding 45.00
R. 2" x 3" Wood Mouldings 60.00
S. Others
Hardwares
Door Lockset -
Door Closer -
Flush & Head Bolts -
Panic Exit Device -
Push Plates -
Door Stops -
Door Viewer -
Door Silencer -
Door Coordinator -
Threshold -
T. Installation of Vinyl Tiles -
U. Installation of Rubber Tiles (500 x 500mm) -
V. Installation of Carpet Tiles (500 x 500mm) -
W. Inst. Of Pre-Engineered Wood Flooring -
X. Inst. Of Underlying Foam -

III. DRYWORKS
A. WALLS
a. Double drywall using 12mm thk. Gypsum board & 6mm thk. Ficem
board on metal frames w/ 3 pcf insulation incl. application of putty &
sanding -
- Framing -
- Boarding (2 sides) -
- Jointing (2 sides) -
- Insulation -
b. Double drywall using 6mm thk. Ficem on metal frames w/ 3 pcf
insulation incl. application of putty & sanding -
c. Double drywall using 6mm thk. Ficem board on metal frames including
application of putty & sanding -
d. Double drywall using 12mm thk. Gypsum board on metal frames
including application of putty & sanding -
e. Pipe Cladding using 6mm thk. Ficem board on metal frames
including application of putty & sanding -
f. Beam Cladding using 6mm thk. Ficem board or 12mm thk. Gypsum
board on metal frames incl. application of putty & putty -
g. Single wall using 12mm thk. Gypsum board on metal frames
including application of putty & sanding -
h. Drop wall using 12mm thk. Gypsum board on metal frames -
including application of putty & sanding -
i. Installation of 19mm thk. x 100mm KDT Wood Base -
j. Installation of 19mm thk. x 75mm KDT Peripheral Wood Bo -
k. Installation of Glasswall Partition -
l. Installation of Sealant -

B. CEILING
a. 12mm thk. Gypsum board on metal frames including application of
putty and sanding of joints -
(Note : Additional cost for ceiling more than 4.00m in height)
- Framing -
- Boarding -
- Jointing -
b. 10mm thk. Gypsum board Curve ceiling on metal frames including
application of putty and sanding of joints -
c. 10mm thk. Ficem board ceiling eaves on metal frames including
application of putty and sanding of joints -
d. Installation of 19mm thk. x 19mm KDT Wood Peripheral Reveal
including Sanding -
e. Installation of 50mm thk. x 50mm KDT Wood Peripheral Reveal
including Sanding -
f. Fab. & Inst. of 600 x 600mm Gypsum or Ficem Board Manh -
g. Acoustic Board Ceiling on Alum. T-runners
- Framing -
- Board -
h. Stop Beads -
i. Shadow Lines -
j. Bulk Heads ( Note : Additional cost if more than 4.00m height)
- By Area -
- By LM -
k. Fascia Board 12mm thk. Ficem Board -
l. Covelight -
m. 12mm thk. Gypsum Curtain Cove -
n. Access Manhole
- Fabrication -
- Installation -

IV. MASONRY WORKS (incl. hauling)

A. Hauling of materials if far from bldg. 35.00


B. CHB Laying
a. 8" CHB 225.00
b. 6" CHB 200.00
c. 4" CHB 190.00
C. CHB Laying @ Roof Beams (needs Scaffolding)
a. 6" CHB 210.00
b. 4" CHB 200.00
D. CHB Laying (irregular shape)
a. 6" CHB 235.00
b. 4" CHB 220.00
E. Plain Cement Plaster Finish
a. by area (interior CHB walls)
i. Plain Cement Finish 200.00
ii. Rough Plaster Finish 175.00
b. by area (ext. CHB walls)needs scaffolding 240.00
c. by area (conc.walls & parapet)
i. Ordinary Concrete Walls (Interior Walls) 215.00
ii. Exterior Concrete & CHB Walls & Parapets (w/ scaffoldings)
1. Ground to Fourth Floor
Up to 2-1/2" thk. -
For every add'l. 1-1/2" thk. -
2. Fourth to Seventh Floor
Up to 2-1/2" thk. -
For every add'l. 1" thk. -
3. Seventh to Tenth Floor
Up to 2-1/2" thk. -
For every add'l. 1-1/2" thk. -
4. Tenth to Fourteenth Floor
Up to 2-1/2" thk. -
For every add'l. 1-1/2" thk. -
5. Above Fourteenth Floor
Up to 2-1/2" thk. -
For every add'l. 1-1/2" thk. -
d. by area (irregular CHB walls) 245.00
e. Overhead 255.00
f. by lm.(vertical & horizontal)
i. Interior 120.00
ii. Exterior 125.00
g. by lm.(overhead) 150.00
h. Spiral columns 245.00
i. Beam plastering (sides) 200.00
j. Beam plastering (bottom) 200.00
k. Tool Joint Finish 195.00
l. Kustura Finish 185.00
m. Exterior Grooves 120.00
n. Plastering of Louver Blocks 400.00
o. Vertical Backer Rod with Sealant
p. Horizontal Backer Rod with Sealant
F. Boracay Finish (incl.liston,& other acc.)
a. By area
i.Flooring 300.00
ii.Walls
* w/scaffolding 390.00
* w/o scaffolding 340.00
b. by lm 245.00
G. Pebble Washout Finish(incl.liston & other acc.)
a. by area
i.Flooring 300.00
ii.Walls 340.00
b. by lm 200.00
H. Stair Nosing Installation (incl. preparation)
a. Brass, Angular & Checkered Plate 135.00
b. Carborandum Strip 190.00
c. Vinyl Stair Nosing -
I. Topping
a. Straight to finish 155.00
b. Plain Cement finish 185.00
Stair Tread Topping 155.00
c. Red cement w/ V-cut 200.00
d. Deck Topping (including Cant,etc.) incl. WWM inst. 310.00
e. Ramp Topping w/ Groove 400.00
f. Rough Cement Topping 135.00
J. Tileworks
a. Glazed Tiles incl. rough plaster
i. 4-1/4"x4-1/4" Glazed Tiles 360.00
ii. 4"x8" -do- 340.00
iii. Others 325.00
b. Vit.floor tiles incl. topping
i. 4-1/4"x4-1/4" Glazed Tiles 330.00
ii. 4"x8" -do- 320.00
iii. Others 300.00
c. Mosaic floor tiles incl. topping
i. Flooring 275.00
ii. Walls 300.00
d. Tile fittings 115.00
e. Stair Treads & Risers -
K. Brickworks
a. 1"x2"x8"Red bricks 325.00
b. 4"x8"Clay tiles 315.00
c. 12"x12"Red cement tiles 300.00
d. 8"x8"Clay tiles 280.00
e. 6"x6"x12"Louver blocks 285.00
f. 4"x12"x12"Decorative blocks 245.00
g. Mactan stone 315.00
h. Adobe blocks 200.00
i. Ashlar stone 315.00
j. Urra Tiles
* Ordinary Layout 375.00
* Extra-ordinary Layout (w/ many cuts) 550.00
L. Sandblasting 120.00
M. Corduroy finish 600.00
N. Marble Finish / Granite Finish
a. 4"x8"Marble tiles 510.00
b. Marble @ Walls 1,000.00
c. Marble @ Floors 550.00
d. Granite @ Counters 850.00
e. Granite Splashboard -
f. Granite Facia Board -
g. Opening for Lavatory -
h. Rounding of Edges -
i. Lavatory Holes -
j. Faucet Hole -
k. Granite @ Walls including Anchors (Dry Anchors) -
l. Granite @ Floors -
m. Granolithic Flooring -
n. Polishing & Application of Sealer -
O. Retouching
a. by area
i. Walls 50.00
ii.Exposed slab 100.00
b. by lm.(corners only) 85.00
c. Curbs & Gutter 85.00
d. Drip Mould (Cutting & Retouching) 165.00
P. Rip-rapping 650.00
Q. Synthetic Finish
a. by area
i. w/ scaffolding 485.00
ii. w/o scaffolding 450.00
b. by lm 300.00
R. Keyhole Pattern Bricks 325.00
S. 4"x8"Tiles w/ Pebble Washout Pattern 500.00
T. 200 x 200 Glass Blocks 565.00
U. Lime Stucco Finish 100.00
V. Skim Coating -

W. Shotcreting (VAT exclusive) by FFFL


a. Interior Walls
i. 6" thk. -
ii. 4" thk. -
b. Exterior Walls
i. 7" thk.
* Including Rebar installation -
* Excluding Rebar installation -
ii. 6" thk.
* Including Rebar installation -
* Excluding Rebar installation -
iii. 4" thk.
* Including Rebar installation -
* Excluding Rebar installation -
c. Polyethelene Dampcourse Proofing (DPC) Supply & Inst -
including supply & install silicone sealant, PE backer rod &
hot melt glue
d. Opening -
e. Grooves
i. Concrete Groove -
ii. PVC Plastic Groove -
f. Straight to Finish of Concrete -
g. Placing of Concrete -

For Internal Walls :


a. Dowels, reinf., plastic Lathe & comp. filler -
b. Scratch Coat -
c. Stop Beads -
d. Sprayed Concrete (both sides at 150mm thk. Wall) -
e. Sprayed Concrete (half side at 150mm thk. Wall) -
f. Sprayed Concrete (both sides at 100mm thk. Wall) -
g. Sprayed Concrete (half side at 100mm thk. Wall) -

For External Walls :


a. Dowels, reinf., plastic Lathe & comp. filler -
b. Plastic Lathe & comp. filler -
c. Scratch Coat -
d. Stop Beads -
e. Sprayed Concrete (both sides at 175mm thk. Wall) -
f. Sprayed Concrete (half side at 175mm thk. Wall) -
g. Sprayed Concrete (both sides at 150mm thk. Wall) -
h. Sprayed Concrete (half side at 150mm thk. Wall) -
i. Sprayed Concrete (both sides at 100mm thk. Wall) -
j. Sprayed Concrete (half side at 100mm thk. Wall) -

Forming of Opening
Forming of Groove

X. Miscellaneous Concreting
a. Lintel Beams -
b. Stiffener Columns -
c. Zocalo -
d. Concrete Counter -
e. Concrete Curbs -
f. Concrete Curbs & Gutter -

XI. Others
a. Installation of Thermoshield Insulating Mortar
i. 25mm thk. -
ii. 50mm thk. -
b. Installation of Toli Vinyl Sheet (2.0mm x 1.82m x 20.00m.)
c. Installation of Vinyl Tiles (3.0mm x 300 x 300mm)
d. Installation of Vinyl Tiles (3.0mm x 450 x 450mm)
e. Installation of Maxwood Vinyl Planks (3.0mm x 150 x 900mm)
f. Installation of Carpet Tiles (6.5mm x 500 x 500mm) -
g. Installation of Rubber Tiles (500 x 500mm) -
h. Inst. Of Pre-Engineered Wood Flooring -
i. Inst. Of Underlying Foam -
j. Application of Levelling Compound
c. Installation of Vinyl Tiles Anti Static / Conductive
c. Installation of 100mm Coveformer ( Antistatic / Conductice )
V. REINFORCING BARS
Subcon to supply Rebar Cutter & Rebar Bender
A. Footing & Tie Beams 4.55
B. Columns & Pedestal 5.00
C. Floor beams 5.25
D. Floor slab 5.90
E. Shearwalls 5.00
F. Slab on fill 6.50
G. Lavatory counter 8.60
H. Roof Beams 5.90
I. Gutter & Parapet 6.10
J. Wall footings 7.90
K. Stair 6.10
L. Lintel beams & Stiff.columns 10.50
M. Parapet 6.10
N. Dentils (including welding) 6.45
O. Waffles 6.45
P. Tie wires 6.00
Q. Welded Wire Mesh 50.00
R. Hauling of Rebars
a. If Construction Start from Third Floor -
b. If Construction Start from Fourth Floor -
c. Loading & Unloading to Trucks -
S. Subcon Rebars (incl. supply of Tie Wires) -
T. Equipments (Rebar Cutter & Rebar Bender) -

VI. STRUCTURAL STEEL WORKS

A. Fabrication 35.00
B. Installation 20.00
C. Bending of MS Plates

VII. LABOR WORKS

A. Excavation
a. Ordinary Soil
* Bulk 300.00
* Manual 500.00
b. Adobe 750.00
c. Dewatering (By Administration)
B. Backfilling 200.00
C. Levelling 65.00
D. Excavation of Ftg. Tie Beam & Wall Footings 450.00
E. Compaction 65.00
F. Basecoarse 225.00
G. Soil Poisoning 30.00
H. Polyethelene sheets 25.00
I. PVC Waterstop, Bentonite Strips 35.00
J. Chipping
a. From 0.01-0.10 30.00
b. From 0.11-0.20 60.00
K. Pouring/Concreting
a. Floor beams, Slab & columns
i. Pumpcrete 200.00
ii. Jobmix 750.00
iii. Ready mix 485.00
b. Columns-(Job mix) 750.00
c. Wall footings (Job mix) 750.00
d. Shearwall / Retaining Walls
i. Pumpcrete 225.00
ii. Ready Mix 500.00
iii. Job mix 750.00
e. Roof beams, Gutter & Parapet
i. Pumpcrete 300.00
ii. Job mix 750.00
iii. Ready mix 600.00
f. Footings, Pedestals & Tie Beams
i. Pumpcrete
* Volume < 200.00 cu.m. -
* Volume = 200-300 ; 300-400 ; 400 & above cu.m. 175.00
ii. Ready mix
* Using Buggy 375.00
* Direct Pouring
* Volume < 200.00 cu.m. -
* Volume = 200-300 ; 300-400 ; 400 & above cu.m. 135.00
iii. Job mix 700.00
g. Dentils (All levels)
i. Pumpcrete 250.00
ii. Job mix 850.00
h. Slab on Fill/Pavement
i. Job mix 485.00
ii. Ready mix
* Using Buggy 350.00
* Direct Pouring 200.00
iii. Pumpcrete 225.00
i. Curbs & Gutter
i. Ready mix 450.00
ii. Job mix 700.00
j. Lintel Beams, Stiff. Columns & counters 850.00
k. Stair
i. Pumpcrete 250.00
ii. Job mix 700.00
l. Cistern, Septic Tank, etc.
i. Pumpcrete 250.00
ii. Job mix 1,050.00
m. Floor Slabs
i. Placing of Concrete -
ii. Straight to Finish -
L. Cutting of Prestress Concrete Piles 850.00
M. Trimming of Mechanically Excavated Soil 250.00
N. Cutting of Concrete using Concrete Saw 125.00
O. Cutting of Concrete Sheet Piles 550.00
P. Cutting of Bored Piles
a. 0.60 to 1.00 mø 5,000.00
b. 1.20 to 1.80 mø 7,500.00
Q. Steel Deck Installation 100.00

VIII. TINSMITHRY WORKS

A. Long span Coloroof


a. Using teksrew 150.00
Ga. # 26 Multipy Material Unit Cost by wid
Ga. # 25
Ga. # 24
b. Using Roof Nails 175.00
B. Plain G.I.Shts.on roof vents 200.00
C. Ridge rolls,Flashings & Gutters 125.00
D. Ducts for Exhaust Fans 550.00
E. Roof Insulation 55.00

IX. DEMOLITION / DISMANTLING

A. Concrete
a. By Equipment 4,000.00
b. Manual (using Jackhammer) -
c. Hauling & Disposal of Debris -
B. CHB Walls 85.00
C. Corr. G.I. Sheets 60.00
D. Asbestos Roofing 75.00
E. Steel Roof Framing 100.00
F. Wooden Roof Framing 75.00
G. Wooden Floor Framing 70.00
H. Steel Windows 60.00
I. Doors 75.00
J. Double Wall Partition 50.00
K. Ceiling 50.00
L. Gutter & Flashing 35.00
M. Chipping of Floor topping 100.00
N. Cabinets,counters & shelves 75.00
O. Chipping of tiles 150.00
P. Scraping of vinyl tiles 50.00
Q. Wood parquet 60.00
R. Chipping of Synthetic Finish 50.00
S. Alum. Framed Glass 75.00
T. Blasting of Footings (by Dynamite) -
U. Blasting of Walls (by Dynamite) -
V. Cutting of Concrete -
W. Electrical
X. Plumbing

X. PAINTING WORKS (Materials & Labor) VAT included

A. Latex Paint
a. Exterior -
Up to 36 Stories -
b. Interior -
c. Dulux Masonry Paint -
B. Silicon Water Repellant
a. With Conc. Neutralizer -
C. Automotive Paint
a. By Area (Metal Doors) -
b. By LM (Metal door jambs & 2"dia.GI Pipe Railing) -
c. By LM (1/2" Square Bars) -
D. Flat Wall Enamel (Alkyd Type)
a. By Area (Plywood Ceiling & HCF Doors) -
b. By LM (Kd Tang.baseboard & Stair Railing) -
E. Quick dry enamel
a. Steel Doors or Metal Surfaces -
b. Steel Windows (One side only) -
c. Trusses -
d. Trusses -
e. 2"dia. GI Pipes -
f. 1/2" Square Bars -
F. Polyurethane Paint
a. By Area -
b. By LM -
c. Natural (Wood Parquet) -
d. With Bleach (Natural Color) -
e. With Stain & Bleach -
G. Varnishing
a. Narra (Bleach)
i. By Area (Narra Plywood Partition) -
ii. By LM (Narra Stair Handrails) -
b. Ordinary Wood
i. Lattice -
ii. Doors
Flush Door -
Panel Door -
iii. Jambs -
iv. Baseboards -
v. Inside Cabinets -
H. Duco Paint
a. By Area (Cabinets & HCF Doors) -
b. By LM (Jambs, Mouldings & Stair Handrails)
i. 10" -
ii. 7" -
iii. 3" -
I. Spraytex
a. Concrete Ceiling -
b. Plywood ceiling -
J. Epoxy Paint
a. Metal Surfaces -
b. Trusses -
c. Trusses -
d. Trusses (Epoxy Primer) -
e. Tank
Inside -
Outside -
f. Tower -
g. Floor & Walls (Ordinary) -
h. Industrial Flooring -
K. Semi-Duco (Sprayed QDE)
a. By Area -
b. By LM -
L. Xyladecor
a. By Area -
M. Reflectorized Paint
a. Pedestrian Traffic Paint -
b. Wall (Zebra Type) -
c. By Lm (4" or 6") -
d. Parking No.(Signage) -
e. Tank Signage -
N. Satin Finish -
O. Thompson Water Seal
a. On Floors -
b. On Walls -
P. Acrytex
a. Gloss -
b. Semi-gloss -
c. Plain -
d. By LM -
Q. Textured
a. Gloss & Semi-gloss -
b. Textured Acrytex or Text-a crete w/ ordinary latex paint top -
For areas less than 0.30m -
c. Textured Acrytex or Text-a crete w/ ordinary acrytex or
text-a crete paint top coat -
For areas less than 0.30m -
R. Oil Finish on Cabinets
a. By Area -
b. By LM -
c. Handrubbed w/ penetrating stain -
d. Lacquer Stained (Semi-gloss) -
(Flat) -
S. Others
a. Tilecoat (Davies) -
b. Polomix (Dutch Boy) -
-
c. Sulatone (Boysen) -
d. Plexibond -
e. Gypsum Board Paint (excluding taping) -
f. Fiber Cement Paint -
g. Revarnish (Wash-over) -
h. Revarnish (Change Color) -
i. Roof Paint (New) -
j. Roof Paint (Repainting) -
k. Repainting (Latex) -
l. Repainting (Enamel) -
m. Low Cost Housing
i. Latex -
ii. Enamel -
iii. QDE (including primer) -
n. Multipleck w/ Deck Tape -
o. Granitone -
Textured Granitone w/ Colorless Protective Gloss Coating -
Simulated Textured Granite like Paint Fin. W/ Polyurethane Top Coat
Finish w/ Std. Manufacturer's Groove -
p. Liquid Tile Textured by Davies -
q. Mal Pherson by Davies -
r. Zinc Chromate (2 coats primer for steel trusses) -
s. Zinc Epoxy -
t. Turco Rustproofing -
u. Multifleck -
v. Stonetek -
w. Floor Epoxy Coating -
XI. FABRICATED MATERIALS (Materials & Sashworks)

A. Doors & Window Jambs (All sizes)


a. Yacal Jambs (Single Groove) -
b. Kd Tanguile Jambs (Single Groove) -
B. Hollow core flush door (0.60,0.70x2.10) -
C. Hollow core flush door (0.80,0.90,1.00,1.20x2.10) -
D. Hollow core flush door (0.60,0.70x2.20) -
E. Hollow core flush door (0.80,0.90,1.00,1.20x2.20) -
F. Hollow core flush door w/ glass window -
G. Ribbon Grain Hollow Core Flush Door -
H. 0.50x0.60m Wooden Louvers -
I. Kd tanguile panel door -
J. Narra panel door -
K. Kd tanguile HCF bar door (0.60x1.20m) -
L. Kd tanguile louver bar door (0.60x1.20m) -
M. Kd tanguile louver door -
N. Steel casement windows -
O. Steel awning window -
P. Steel window grilles -
Q. Steel fixed windows -
R. Steel Casement Windows (Belgium Section) -
S. Structural Steel Works (Roof Framing) -
50.00

XII. ROADWAY WORKS (labor only)

A. Item 101-Scarifying & Removal of existing


asphalt 100.00
B. Item 102-Roadway excavation
Adobe 500.00
Ordinary Soil 300.00
C. Item 103-Structure excavation 400.00
D. Item 104-Embankment 175.00
E. Item 105-Sub-grade preparation 60.00
F. Item 200-Agg.sub-base coarse 170.00
G. Item 201-Agg.base coarse 170.00
H. Item 311-Portland Cement Conc.Pavement 170.00
I. Item 500-1 Install 12"dia.RCCP 200.00
J. Item 500-2 Install 18"dia.RCCP 200.00
K. Item 500-3 Install 24"dia.RCCP 225.00
L. Item 502-Curb Inlet Manhole 2,000.00
M. Item 504-Riprapping 700.00
N. Item 600-Curbs & Gutter 250.00
O. Item 601-Concrete Sidewalk 175.00
P. Expansion Joint Filler (PEJ) 65.00
Q. Excavation,Hauling & Disposal incl. Permit
a. Depth = 22.50m (Soft Adobe w/o Water Table) 550.00
b. Depth = 3.70m (Clay w/ 1.00m Water Table) -
c. Depth = 10.00m (Sandy w/ 1.00m Water Table) -
d. Trimming (Manual) Max. 0.20m deep -
e. Mat Foundation (ex. Hi-Cement Concrete Silo) -
f. Isolated Footings (ex. SM-Fairview Mall) -
R. Excavation,Hauling,Disposal & Trimming
a. Isolated Footings -
b. Mat Foundation -
c. Basement
i. Up to 7.50m deep -
ii. Additional of 5m -
S. Hauling & Disposal
a. W/o Loader -
b. W/ Loader 2,500.00
c. Loader only -

Field Density Testing (FDT) Efren Ramos


P 500.00/hole x 5 = (P 2,500.00 ; min. holes per visist)
P 2,000.00/visit (Mob/Demob) = P 2,000.00/5 = P400.00
P 500.00/diff. types of soil Laboratory Compaction=500/5=100.00

XIII. OTHERS

A. Sandblasting of Steel (incl. application of epoxy


primer) near white 45.00
B. Powder Coating
i. 2"dia. BI Pipes -
ii. 3"dia. BI Pipes -
C. Electro Galvanize
i. Ordinary -
ii. 2.0mils thickness -
iii. 3.0mils thickness -
D. Bright Zinc Plating 40.00
E. Zinchromate Plating 35.00
F. Copper Plating -
G. Silver Plating -
H. Industrial Hard Zinc Galvanize -
I. Testing of Structural Steel
i. X-ray Test -
ii. Ultrasonic Test -
-
iii. Dye Penetrant Test -
5 joints @ one face each / truss -
iv. Liquid Penetrant Test -
-
J. Structural Steelworks
i. Fabrication only 25.00
ii. Installation only 17.50
iii. Bending of MS Plates (Ga. # 16 - 22) Max. 8' long -
iv. Power brush with Red Oxide Primer -
v. Epoxy Primer -

K. Testing of Materials
i. Testing of Rebars (Length = 1.00m) (3 pcs. / 5,000 kgs.) -
ii. Testing of CHB (3 pcs. / 1,000 pcs.)
* 4" Chb -
** 6" Chb -
iii. Concrete Cylinder (Compression Test) (6 pcs. / 50.00 m -
iv. Soil Test
* Modified -
** Standard -
*** Field Density Test -

L. Precast Concrete -
-

XIV. SPECIALTY WORKS

A. Gypsum Board D/W Partition on Metal Frame 375.00


B. Gypsum Board Ceiling on Metal Studs 325.00
C. Acoustic Ceiling Board on Alum. T-runner 150.00
(Installation, Alignment, Levelling & Boardsetting)
D. Vinyl Tiles Installation (excl. supply of Vinyl Adhesive) 12.50
E. Installation of Glass Block 550.00
F. Installation of C-Joists & Metal Forms 450.00
G. Pile Driving Vertical Driving
a. PSC Piles (Single Stick) Max. Length = 20.00m 8,000.00
b. PSC Piles (Double Stick) 12,500.00
c. Follower 500.00
0.35 x 0.35 = P 350.00/lft.
0.40 x 0.40 = P 380.00/lft.
Splice can = P 3,000.00/pc.
0.30x0.30 Lead Sheet=40.00
Cutting of Piles= 4 pp/day/
2 laborers
d. Concrete Sheet Piles (0.25 x 0.60m) 3,000.00
Driving 7.5m long (20-25 pp/day) 40,000.00
12.0m long (8-10pp/day)
Cutting = 5 sht.piles/day/laborer
Capping Beam (0.30 x 0.60m) -
e. Steel Sheet Piles (12.00m) 6,500.00
Materials = P 70.00 - 90.00 /kg. 450.00
Driving of Sheet Piles = 14 pp/day

f. Wooden Sheet Piles 3,000.00


Lead Sheet :
1/2" x 14" x 14" = P1,250.00/pc.
3/4" x 14" x 14" = P 1,750.00/pc.
B. Bored Piling Works (In place) Cap.=140 tons MATERIALS
a. 0.60m dia. 3,000.00
b. 0.70m dia. 5,000.00
0.75m dia. 5,500.00
c. 0.80m dia. 2,000.00
0.85m dia. 6,000.00
d. 1.00m dia. 7,000.00
e. 1.10m dia. 8,500.00
f. 1.80m dia. 20,000.00
BP Pile Dynamic Test (2 ea.) -
BP Pile Integrity Test (3 ea.) -
I. Stone Column (1.00m ø) -
J. Cement-Sand Columns -
K. Soil Cement Columns (0.80mø) -

NOTES :
All tools,equipments,scaffolding installation,accessories,hauling & other miscellaneous
shall be shouldered by the sub-contractors.

Hauling costs are included in above unit costs up to fourth floor if it will be done
starting to ground floor,however if works started from third or fourth floor,
additional hauling cost will be given to the subcontractors.
For High Rise Building, Hauling shall be done by Tower Crane but with the help of Subcon lab

Add 12% VAT to all labor unit costs only.

Add 5%-10% to all labor unit costs if work is outside Metro-Manila.

All unit cost includes deliveries within Metro-Manila only.

(Painting) All lineal meters shall be computed once,(ex.Z-bar & sq.bar=total length=lm)
New unit costs are based on a minimum salary of P491.00/day

New unit costs are based if material is within the periphery of the building,if not
make an additional hauling costs to be computed by PE.

All items not included in above items of work shall be the responsibility of the Project
Engineer to compute and award to the contractors.

Formworks Unit Costs are based on Conventional Forms to be used,when scaffold use is
lumber add an additional of P15.00 per sq.m. of beams,slabs,Shearwall or RC Walls.

All unit costs are based on the standard construction procedures,any actual works that
deviates on standard shall be the responsibility of the PE concerned.

Differentiating Small to Medium and Large Scale construction shall be the responsibility
of the Project Job Captain involved.

Bar Bender & Bar Cutter are to be supplied by the Subcon

CONSUMABLES:
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ ^^^^^^^^^^^^^^^^^^

Nails =

Total bft. =

Total bft. =

G.I. Wires #16 =

G.I. Wires #16 =

G.I. Wires #16 =

STRUCTURAL WORKS:
D.M.=Total materials + 7% consumables
D.L.=30% of D.M. (For Roof Framing)
40% of D.M. (For Others)
D.C.=D.M.+D.L.

Indirect Cost:
Contingencies=7.5% of D.M.
Overhead/Supervision=5% of D.C.
Profit=10% of D.C.

ACTUAL PRODUCTIONS

A. Formworks
Crew: 1 Leadman
1 Carpenter
1 Laborer
Production :
a. Columns
b. Footing Tie Beams & Pile Ca
c. Floor Beams
d. Floor Slabs
e. Roof Beams
f. Gutter & Parapet
g. Shearwalls
h. Stairs
i. Lintel Beams & Stiff. Columns

B. Rebars
Crew: 1 Steelman
Production : For 8 hrs. Operation
a. Columns & Pedestals
b. Footing Tie Beams & Pile Ca
c. Floor Beams
d. Floor Slabs
e. Roof Beams
f. Gutter & Parapet
g. Shearwalls
h. Stairs
i. Lintel Beams & Stiff. Columns
j. Slab on fill

C. Laying of CHB
Crew : 4.00
4.00
Production : 30.00
D. Boracay Finish
Crew : 4.00
4.00
Production : 15.00
30.00

E. Plastering
Crew : 4.00
4.00
Production : 30.00
45.00

F. Floor Topping
Crew : 4.00
4.00
Production : 35.00

G. Black Pebbles
Crew : 4.00
4.00
Production : 17.50
30.00

H. Glazed Tiles
Crew : 4.00
4.00
Production : 30.00

I. Vit. Floor Tiles


Crew : 4.00
4.00
Production : 20.00

J. Retouching of exposed slab


Crew : 4.00
4.00
Production : 200.00

K. 4"x8"Red Bricks Flooring


Crew : 4.00
4.00
Production : 18.00

L. Installation of Steel windows & Window Jambs


Crew : 2.00
2.00
Production : 20.00

M. Installation of Door Jambs


Crew : 2.00
2.00
Production : 20.00

N. Vinyl Tiles
Crew : 2.00
1.00
Production : 45.00

O. Tinsmithry Works
Crew : 2.00
1.00
Production : 20.00

Installation = 10.00-20.00sq.m./d

P. Painting Works
Crew : 4.00
4.00
Production : 60.00
85.00

Latex & Enamel - 2.00 man-hr


Duco (by Area) - 3.00 man-hrs./
(by Lm) - 1.00 man-hrs./
Steel Windows - 3.00 man-hrs./ s

Q. Ceiling Installation
Crew : 2.00
2.00
Production : 15.00
12.50

Crew: 2 carpenters
Production = 6.50 sq.m./day (w/o
5.00 sq.m./day (w/ ceiling

R. Structural Steel
Fabrication :
Crew : 2.00
1.00
Production : 100.00

Manual Erection :
Crew : 1.00
2.00
Production : 150.00

S. Condeck
Installation
Crew : 4.00
2.00
Production : 150.00

OTHER INFORMATIONS :
FORMWORKS P

A-FRAMES P

RENTAL OF STAGING AREA = P


PARKING = 30.00 for 3 hrs.
10.00/hr. after 3
70.00/day
Area covered by Pa

Polishing of Vinyl Tiles :


Unit Price B Unit Price C Unit Remarks

217.00 bag
bag
bag 40kg/bag
bag 50kg/bag
100.00 kg.
300.00 bag

"Win Concrete" "MD Martin"


1,400.00 m3
27.00 ft3 Deliver to Site
1,400.00 m3
25.00 ft3 Deliver to Site
600.00 m3
650.00 m3
670.00 1,350.00 m3
570.00 m3
m3
650.00 m3
100.00 bag
6.00 pc.

"Betonval" Cement Factor


2,803.00 m3
3,470.00 m3 11.50
3,670.00 m3 12.75
3,940.00 m3 16.00
4,160.00 m3 17.00
4,420.00 m3 20.00
4,760.00 m3 21.00
5,390.00 m3 23.00
5,750.00 m3 24.50

225.00 bag
200.00 bag
205.00 gal.
950.00 bag
185.00 bag
250.00 m3
520.00 m3
550.00 m3

"Remieden" Allied Concrete


33.00 pc. fm = 1,200 psi
31.00 pc. fm = 1,000 psi
29.00 pc. fm = 750 psi
24.00 pc. fm = 1,000 psi
22.00 pc. fm = 750 psi
21.00 pc. fm = 650 psi
19.00 pc. fm = 450 psi
21.00 pc. fm = 750 psi
20.50 pc. fm = 650 psi
18.00 pc. fm = 450 psi
22.00 pc. fm = 1,000 psi
20.00 pc. fm = 750 psi
18.00 pc. fm = 650 psi
16.00 pc. fm = 450 psi
12.50 pc.
120.00 pc.

as of 25-Nov-10 coverage: 40pcs/m2


pc. used for Sidewalks
pc. - do -
pc. - do -
pc. - do -
pc. used for Parking Areas
pc. - do -
pc. used for Roadways
pc. - do -
pc. - do -
pc. - do -
10.50 pc.

m2
m2
m2

60.56 gal. 3,200.00 /drum


4,000.00 drum 200 ltrs./drum
800.00 bag 25 kls./bag
12,000.00 pc.
4,650.00 MT
5,500.00 drum 200 ltrs./drum
7,500.00 drum 200 ltrs./drum
8,500.00 drum 200 ltrs./drum

kg. 1.30
kg. 1.32

"Remington"
55.00 kg.
50.00 kg.
50.00 kg.
50.00 kg.

m2
m2
m2
m2

25.00 pc.
15.00 pc.
45.00 pc.
40.00 pc.
100.00 m2
120.00 m2
150.00 m2
1,130.00 pc.
1,550.00 1,610.00 pc.
550.00 pc.
900.00 pc.
400.00 pc.
500.00 pc.
350.00 pc.
65.00 bdft.
54.00 bdft.
3.50 lft.
12.00 bdft.

"Kutang Bato"
50.00 65.00 kg.
kg.
m2
m2
m2
m2
m2
m2
m2
72.51 m2 1.80m x 6.00m. 620.00
122.81 m2 1.80m x 6.00m. 1,050.00
m2

m2
m2
m2
m. "Boral"
m. "Boral"
m. "Boral"
m. "Boral"
82.00 pc.
m.
m. "Moldex PE Pipe"

m2
m2 7,020.00
18.13 m2 6,240.00
m2 6,240.00

kg.
kg.
45.00 kg.
kg.
kg.
kg.
kg.
545.00 liter
liter
kg.
kg.
kg.
kg.
475.00 bag
3,000.00 bag
148.00 bag 25 kg/bag
263.50 bag 25 kg/bag
kg.
kg.
kg.
kg.
pail 28kg/pail (1kg per 5lm-150mmwide
kg.
liter
liter
gal 4kg/gal.
set 36kg/set
gal 5kg/gal
ctg. 300ml/ctg.
ctg. 300ml/ctg.
ctg. 300ml/ctg.
ctg. 300ml/ctg.
ctg. 600ml/ctg.
kg.
kg.
kg.
kg.
70,000.00 drum 200 liters/drum
kg.
980.00 bag
kg. 11.5kg/m2-25mm thk.
850.00 bag
350.00 m2
1,000.00 bag
900.00 bag
2,000.00 drum
1,500.00 gal.
1,500.00 gal.

m2
m2
1,500.00 sheet 1/2"x3'x10'
2,500.00 sheet 3/4"x3'x10'
3,000.00 sheet 1"x3'x10'
85.00 sheet
125.00 sheet
704.00 sheet
1,056.00 sheet
2,100.00 sheet

7.50 m.
m.
m.
m.
2.65 m.
m.
m.

"Specseal"
575.00 ssg.
385.00 ssg.
250.00 ssg.
660.00 liter 1,650.00/pack (2.50 liters)
240.00 ssg.
350.00 tube 600 ml/tube

"Gyproc" "BPB"
275.00 board
board
board
280.00 310.00 board
495.00 board
465.00 board
board
board
board
board
board
board
900.00 board
board
board

"Flexboard"
285.00 board
335.00 700.00 board
450.00 750.00 board
720.00 845.00 board
1,025.00 board
1,980.00 board
2,250.00 2,700.00 board
pc.
pc.
pc.

"PETRONNE"
pc.
350.00 pc.
387.50 pc.
387.50 pc.
387.50 pc.
387.50 pc.
pc.
337.50 pc.
400.00 pc.
180.00 pc.

390.00 m2 50.00
620.00 m2 110.00
1,050.00 m2 150.00
340.00 m2 110.00
36.00 pc.
450.00 m2 35.00
800.00 pc.

board
board
board
board
board
board

board
board
board
board
board
board
board

board
board
board
board
board

Ga.22 (0.8mm) Ga.20 (1.0mm)


122.67 153.33 m. Exelcon Industries Phils., Inc.
132.67 165.67 m. - do -
144.00 179.67 m. - do -
159.00 198.67 m. - do -
167.33 209.33 m. - do -
186.80 233.60 m. - do -
211.20 264.00 m. - do -
264.00 330.40 m. - do -
432.00 pc.
396.00 pc.
108.67 135.67 m. - do -
120.67 151.00 m. - do -
132.00 165.00 m. - do -
146.33 182.67 m. - do -
155.67 194.33 m. - do -
171.08 214.24 m. - do -
195.52 244.80 m. - do -
244.80 306.28 m. - do -

Ga.24 (0.6mm) Ga.22 (0.8mm)


71.40 m. Exelcon Industries Phils., Inc.
53.80 m. - do -
46.56 m. - do -
83.76 m. - do -
35.33 45.20 m. - do - 1.4mm x 3.0m./3.60m.
46.00 60.00 m. - do -
Ga.20 (1.0mm) Ga.18 (1.2mm)
70.80 84.80 m. Exelcon Industries Phils., Inc.
70.00 pc. 23.33
125.00 pc.

135.00 pc. 45.000


240.00 pc. 66.67
313.00 pc. 62.60 /lm.
220.00 pc. 44.00 /lm.
90.50 pc.
13.90 pc.
240.00 pc.
80.00 pc.
40.00 pc.
25.00 pc.
8.00 pc.
19.00 pc.
8.00 pc.
2,500.00 m2
18.00 m.
150.00 m.

"JAEFER"
240.00 pc. CMT/Exelcon 20
80.00 pc. - do - 20
40.00 pc. - do - 20
200.00 pc. - do - 20
20.00 lft.

"JAEFER"
pc.
pc.
pc.
9.00 pc.
pc.
pc.
pc.
pc.
13.90 pc.
m.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
22.00 pc.
22.00 pc.
55.00 pc.
pc.
pc.
pc.
4.55 pc.
pc.
pc.
pc.
pc.
0.88 pc.
0.95 pc.
1.44 pc.
1.60 pc.
1.88 pc.
2.00 pc.
2.50 pc.
3.75 pc.
0.75 pc.
0.90 pc.
0.30 pc.
0.78 pc.
0.78 pc.
pc.
pc.
pc.
pc.
pc.
2.62 m.
20.34 m.
2.62 m.
0.65 m.
50.00 pc.
300.00 pc. 0.37
2.00 lft.
1,770.00 pail 110.625
6.00 pc.
860.00 pail 28kg/pail (1kg per 5lm-150mmwide

board
board
board
board
board
board
board
board
board
board

bd.ft.
bd.ft.
bd.ft.
45.00 bd.ft.
65.00 bd.ft.
3.50 lft.
bd.ft.

45.00 kg.

340.00 m.
380.00 m.

35.65 kg. 11.5kg/m2-25mm thk.

400.00 lm. (Grey)


283.00 lm. (Black)

165.00 lm.

818.50 roll 200 m/roll 4.09


1,424.50 roll 201 m/roll 7.12

22.00 m. 9.17

45.00 lft.
415.00 m2 114.80
170.00 m. 110.00
170.00 m. 110.00
255.00 m. 110.00
350.00 m2 35.00
190.00 m. 110.00
285.00 m. 110.00
380.00 m. 110.00

140.00 m2 66.00
25.00 m2 -
85.00 kg.
316.00 pc. 39.50 /lft.
236.84 pc. 29.61 /lft.
0.83 pc.
Materials Installation
set 6,720.00 2,100.00

set 5,410.00 2,100.00


set 10,150.00 3,000.00
ndle, locksets and acc. set 5,410.00 2,100.00
and acc. & insect screen set 5,125.00 2,100.00
set 4,750.00 2,100.00

16 MS Jamb) 6,000.00 set


16 MS Jamb) 8,750.00 set
0 MS Panel on Ga. # 16 MS J 5,500.00 set
eycomb Insulation on Ga. # 1 9,000.00 set
Ga. # 18 MS Tubular Framing 8,400.00 set

7,500.00 set
7,950.00 set
12,000.00 set
7,000.00 set
11,000.00 set

7,472.00 set
7,817.00 set

3,550.00 set 1,775.00 /set


6,500.00 set 3,250.00 /set
1,650.00 set
4,500.00 set
1,800.00 set

90.00 bdft.

3,500.00 m2

850.00 set Single Panel


1,000.00 set Double Panel

7,500.00 m2
4,000.00 set

100.00 pc.
25.00 pc.
6,500.00 set
4,500.00 set
3,500.00 set
1,200.00 set
1,200.00 set
700.00 pair
650.00 set
295.00 pc.
65.00 pc.
75.00 pc.
65.00 pc.
130.00 pc.
350.00 pc.
2,500.00 set
1,000.00 set
450.00 pc.

180.00 m2
120.00 m.
85.00 m2
450.00 m2
250.00 m.

50.00 liter
47.50 liter
85.00 liter

65.00 kg. Materials


300.00 lm. (Driving)
250.00 lm. (Retrieval)
120,000.00 lot (Mob. & Demob.)

650.00 lm. 1.15 lm./m2


2.00 pc. 6 pcs./m2
630.00 lm. 1.1 lm./m2
130.00 kls. 0.035 kls./m2
1,000.00 pc.

1,800.00 pc.

456.00 m2
370.00 m2
370.00 m2
900.00 m2
423.00 m2
400.00 m2
350.00 m2

pc. E.T. Pineda Enterprise

pc.
pc.
pc.
pc.

4.00 pc.
10.50 pc.
10.50 pc.
14.50 pc.
35.00 pc.
150.00 pc.
175.00 pc.
250.00 pc.
105.00 pc.

3.50 pc.
10.50 pc.
12.50 pc.
14.50 pc.
17.50 pc.
35.00 pc.
150.00 pc.
175.00 pc.
250.00 pc.
25.00 pc.
4.00 pc.

5,000.00 m2
2,500.00 m2
120.00 pc.
210.00 pc.
300.00 pc.
60.00 can
40.00 can
1,000.00 m2
1,200.00 m2

4.00 pc.
4.00 pc.
13.00 pc.

90.00 can
90.00 can
45.00 can
45.00 can
50.00 can

45.00 pc.

12.50 pc.

25.00 pc.

75.00 pc.

32.00 pc.
60.00 pc.
52.50 pc.
450.00 gal.
550.00 m2
m. Luzon Foundry Code #110
m.
m.
m.
m.

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
m2

180.00 m2
494.44 m2
611.11 m2
666.67 m2
110.00 m2

6,320.00 pc. t = 11.13mm, OD = 88.90mm, ID = 66.64mm


11,000.00 pc. 30.09 kgs.
7,500.00 pc. 22.56 kgs.
8,000.00 pc. 22.56 kgs.
6,500.00 pc. 18.80 kgs.
5,500.00 pc. 15.04 kgs.
3,000.00 pc. 8.46 kgs.
680.00 pc.
500.00 pc.
330.00 pc.
320.00 pc.
350.00 pc.
280.00 pc.
250.00 pc.
200.00 pc.
1,500.00 pc. 14.81 kgs.
1,050.00 pc. 9.43 kgs.
1,000.00 pc. 5.70 kgs.
13,000.00 pc. 148.32 kgs.
9,700.00 pc. 111.24 kgs.
6,500.00 pc. 74.16 kgs.
1,680.00 pc. 14.18 kgs.
1,150.00 pc. 10.62 kgs.
1,500.00 roll 83.33 /sq.m.
1,800.00 roll 100.00 /sq.m.
750.00 roll 52.08 /sq.m.
600.00 pc. 33.33 /sq.m.
310.00 pc. 122.53 /sq.m.
900.00 pc. 50.00 /sq.m.
920.00 pc. 85.19 /sq.m.
1,200.00 pc. 111.11 /sq.m.
890.00 pc. 82.41 /sq.m.

2,150.00 pc.
1,250.00 pc.
850.00 pc.

1,000.00 pc.
850.00 pc.
510.00 pc.
650.00 pc. 9.58 kgs.
1,000.00 pc. 14.36 kgs.
475.00 pc. 7.18 kgs.
1,250.00 pc. 19.15 kgs.
2,000.00 pc. 28.73 kgs.
1,850.00 pc. 28.73 kgs.
3,000.00 pc. 43.09 kgs.
3,200.00 pc. 38.31 kgs.
4,000.00 pc. 57.46 kgs.
1,200.00 pc. 18.69 kgs.
1,500.00 pc. 23.36 kgs.
2,400.00 pc. 35.04 kgs.
4,800.00 pc. 70.07 kgs.
3,500.00 pc. 74.16 kgs.
4,500.00 pc. 111.24 kgs.

179.56 pc.

1,200.00 roll 8.89 /lm.


Call ALPS Corp. (364-30-36) Cathy
1,750.00 pc.
1,350.00 pc.
1,350.00 pc.
2,820.00 pc.
2,070.00 pc.

950.00 sheet 329.86 /sq.m.


550.00 sheet 190.97 /sq.m.
800.00 sheet 277.78 /sq.m.
500.00 sheet 173.61 /sq.m.
320.00 sheet 111.11 /sq.m.
480.00 sheet 166.67 /sq.m.
350.00 sheet 121.53 /sq.m.

90,000.00 pc.
72,900.00 pc.
13,020.00 pc.
9,000.00 pc.
52,554.33 pc.
21,021.73 pc.
6,674.40 pc.

30.00 pc. 75.00 /lm.


14.00 /ft²
450.00 kg. (12.5 kls./roll = 3,000 mts.)
5,625.00 roll
350.00 kg. (5 kls./tube = 1.00m.)
350.00 kg. (15 kls./tube)

400.00 pc. 166.67 /lm.

350.00 pc.
450.00 pc.
25.00 pc.

elefax 440-07-15
1,200.00 pc.
30,000.00 set
4,000.00 m.
2,500.00-5,000.00 m. (From Bacolod City Hall)

4,500.00 sq.m.
100.00 m.

175.00 ft2
200.00 ft2
75.00 ft2
50.00 ft2

2,500.00 pc.
1,500.00 pc.
1,000.00 m.

500.00 set
45,000.00 unit

250.00 pc.
1,250.00 pc.

150.00 pc.
115.00 pc.
15.00 pc.
7.50 pc.
50.00 pc.
30.00 pc.
65.00 pc.
10.00 pc.
800.00 pc.
150.00 pc.
350.00 m3
35.00 m2 15.00

3,500.00 m2
2,000.00 m2
150.00 no.
250.00 m.
273.42 m.
10,000.00 unit
1,500.00 unit

11,100.00 units 220.00


8,400.00 units 550.00
7,500.00 pc.

65,000.00 pc.
45,000.00 pc.
175,000.00 pc.

170,000.00 set
8,500.00 m. Stainless Steel (Hammerhead)
6,500.00 m. Fiberglass

2,500.00 m2 2,800.00 3,416.00


2,100.00 m2 2,500.00 3,050.00
1,210.00 m2 1,500.00 1,830.00
420.00 m2 750.00 915.00

160.00 m2

4,300.00 m2

950.00 gal.

250.00 m.

590.00 m.

105.00 ft2
45.00 ft2
260.00 ft2 Less 30% (As of April 2008) Add 12% VAT

100,000.00 set

750,000.00 set

1.50 kg.
37,500.00 van 20 footer Container Van

250.00 m.

510.00 m.
1,070.00 pc.
28,750.00 pc.
27,200.00 pc.

450.00 bag
288.00 gal.

4,850.00 m2
65.00 bft.

3,000.00 pc.
110.00 m.
1,800.00 - 2,400.00 m2 (Including Installation)
13,000.00 m3
850.00 m2

525.00 gal.

250.00 pc.
115.00 m2
25.00 m2
45.00 m2
23.00 lft.
30.00 lft.

450.00 m2
32.00 pc.
100.00 pc.
36.00 pc.
14.00 pc.

450.00 pc.
35,000.00 roll 972.22 /sq.m.
75.00 pc.
1,800.00 roll
980.00 bag
2,600.00 pail

180.00 m2
150.00 m2
7,500.00 m2

120.00 m2 3 kg./sq.m.
140.00 m2 4 kg./sq.m.
165.00 m2 5 kg./sq.m.

465.00 less 40% m2 279.00 fror 10,000 sq.m. up


46-53 & 0927-910-46-55
134.40 m2 Tolerance (± 3mm in every 3 sq.m.)
50.40 m2
95.20 m2 5.32 /kg. (Labor)
33.60 m2 80.00-85.00/lm.
31.36 m2 75.00-80.00/lm.

2,700.00 roll

2.50 lm.

2,500.00 gal.

1,000.00 pc.
7,000.00 pc.

RENTALS

2,500.00 /hr.
1,250.00 /hr.
850.00 /hr.
750.00 /hr.
650.00 /hr.
500.00 /hr.
900.00 /hr.
500.00 /hr.
250.00 /hr.
125.00 /hr.
100.00 /hr.
150.00 /hr.
100.00 /hr.
2,000.00 /hr.
150.00 /hr.
75.00 /hr.
350.00 /hr.
1,500.00 /hr.
1,250.00 /hr.
750.00 /hr.
500,000.00 /unit
273,240.00 /unit
268,400.00 unit
66,000.00 unit
16,500.00 unit
34,700.00 unit
25,360.00 unit
20,000.00 pc.
12,200.00 pc.
2,700.00 pc.
1,400,000.00 unit
100,000.00 /mo.
980,000.00 unit
1,200,000.00 unit
450,000.00 unit
7,300,000.00 unit

BUYING
500,000.00 /unit
273,240.00 /unit
268,400.00 unit
66,000.00 unit
16,500.00 unit
34,700.00 unit
25,360.00 unit
20,000.00 pc.
12,200.00 pc.
2,700.00 pc.
1,400,000.00 unit
980,000.00 unit
1,200,000.00 unit
450,000.00 unit
7,300,000.00 unit

DAILY RATES

750.00 /day
650.00 /day
550.00 /day
550.00 /day
550.00 /day
550.00 /day
456.00 /day
485.00 /day
475.00 /day
600.00 /day
650.00 /day
650.00 /day
750.00 /day
650.00 /day
485.00 /day
550.00 /day
550.00 /day

481.00 491.00

MEDIUM LARGE
SCALE SCALE UNITS

30.00 25.00 sq.m.

300.00 275.00 sq.m.


290.00 275.00 sq.m.
215.00 200.00 sq.m.
275.00 235.00 sq.m.
250.00 225.00 sq.m.
290.00 275.00 sq.m.
285.00 235.00 sq.m.
290.00 275.00 sq.m.
300.00 285.00 sq.m.
275.00 235.00 sq.m.
285.00 250.00 sq.m.
320.00 310.00 sq.m.
300.00 285.00 sq.m.
290.00 260.00 sq.m.
310.00 300.00 sq.m.
125.00 100.00 lm.
240.00 235.00 sq.m.
75.00 65.00 lm.
70.00 60.00 lm.

50.00 - lm.
185.00 - sq.m.

135.00 pc.
160.00 pc.
plus 15.00 plus 15.00

Installation Stripping
Big Scale
200.00 100.00 sq.m.
195.00 100.00 sq.m.
190.00 100.00 sq.m.
195.00 100.00 sq.m.
190.00 100.00 sq.m.
225.00 100.00 sq.m.
215.00 100.00 sq.m.
200.00 100.00 sq.m.
215.00 100.00 sq.m.
195.00 100.00 sq.m.
195.00 100.00 sq.m. Materials
285.00 - sq.m. 320.00
300.00
90.00 - sq.m.
265.00 - sq.m.

20.00 15.00 sq.m.


25.00 20.00 sq.m.
30.00 25.00 sq.m.
35.00 30.00 sq.m.
40.00 35.00 sq.m.
45.00 40.00 sq.m.
50.00 45.00 sq.m.
55.00 50.00 sq.m.
15.00 10.00 sq.m.
20.00 15.00 sq.m.
25.00 20.00 sq.m.
30.00 25.00 sq.m.
35.00 30.00 sq.m.
40.00 35.00 sq.m.
45.00 40.00 sq.m.
50.00 45.00 sq.m.
25.00 20.00 sq.m.

20.00 15.00 sq.m.


25.00 20.00 sq.m.
30.00 25.00 sq.m.
35.00 30.00 sq.m.
40.00 35.00 sq.m.
45.00 40.00 sq.m.
50.00 45.00 sq.m.
55.00 50.00 sq.m.

Additional of P 5.00/sq.m. sq.m.


Additional of P15.00/sq.m. sq.m.
100.00 90.00 sq.m. Materials = P 85.00/sq.m.

55.00 45.00 sq.m.


60.00 55.00 sq.m.
75.00 55.00 sq.m.
55.00 50.00 sq.m.
60.00 55.00 sq.m.

45.00 40.00 lm.


50.00 45.00 lm.
110.00 80.00 lm.

110.00 85.00 sq.m.


125.00 100.00 sq.m.
135.00 105.00 sq.m.
325.00 300.00 set

425.00 400.00 set


1,350.00 1,100.00 set
275.00 235.00 set
550.00 485.00 set
700.00 535.00 set
500.00 450.00 set
215.00 200.00 sq.m.

30.00 20.00 bft.

225.00 215.00 sq.m.


225.00 215.00 sq.m.
300.00 235.00 sq.m.
y Negotiation)
185.00 165.00 sq.m.
215.00 200.00 sq.m.

35.00 30.00 lm.


37.50 35.00 lm.
20.00 15.00 lm.

240.00 225.00 sq.m.


220.00 200.00 sq.m.
285.00 250.00 sq.m.
125.00 110.00 sq.m.

120.00 110.00 sq.m.


110.00 100.00 sq.m.

190.00 175.00 set


210.00 175.00 set
35.00 30.00 lm.
25.00 20.00 set

250.00 225.00 sq.m.


135.00 120.00 lm.
165.00 130.00 lm.
by negotiation (30 % of materials)
40.00 35.00 lm.
55.00 45.00 lm.

350.00 - set
250.00 - set
175.00 - set
600.00 - set
175.00 - set
175.00 - set
175.00 - set
175.00 - set
175.00 - set
100.00 - lm.
12.50 - pc.
30.00 - pc.
30.00 - pc.
250.00 - sq.m.
12.50 - sq.m.

450.00 - sq.m.
140.00 - sq.m.
120.00 - sq.m.
130.00 - sq.m.
60.00 - sq.m.

400.00 - sq.m.

350.00 - sq.m.

350.00 - sq.m.

350.00 - sq.m.

350.00 - sq.m.

200.00 - sq.m.
200.00 - sq.m.
135.00 - lm.
40.00 - lm.
40.00 - lm.
1,350.00 - sq.m.
55.00 - lm.

335.00 - sq.m.

135.00 - sq.m.
100.00 - sq.m.
100.00 - sq.m.
335.00 - sq.m.

315.00 - sq.m.

80.00 - lm.

80.00 - lm.
160.00 - pc.

200.00 - sq.m.
55.00 - sq.m.
50.00 - lm.
85.00 - lm.

250.00 - sq.m.
160.00 - lm.
135.00 - lm.
165.00 - pc.
165.00 - lm.

165.00 - unit
85.00 - unit

30.00 27.50 sq.m.

215.00 205.00 sq.m.


190.00 175.00 sq.m.
185.00 165.00 sq.m.

200.00 195.00 sq.m.


195.00 190.00 sq.m.

210.00 195.00 sq.m.


200.00 190.00 sq.m.

195.00 190.00 sq.m.


150.00 135.00 sq.m.
220.00 215.00 sq.m.

205.00 195.00 sq.m.

260.00 - sq.m.
45.00 - sq.m.

285.00 - sq.m.
55.00 - sq.m.

325.00 - sq.m.
75.00 - sq.m.

340.00 - sq.m.
85.00 - sq.m.

360.00 - sq.m.
105.00 - sq.m.
220.00 200.00 sq.m.
225.00 215.00 sq.m.

105.00 100.00 lm.


120.00 110.00 lm.
135.00 120.00 lm.
220.00 200.00 lm.
165.00 135.00 lm.
195.00 165.00 lm.
185.00 135.00 sq.m.
135.00 100.00 sq.m.
85.00 60.00 lm.
325.00 275.00 sq.m.
120.00 lm.
200.00 lm.

290.00 175.00 sq.m.

360.00 340.00 sq.m.


330.00 325.00 sq.m.
225.00 200.00 lm.

275.00 250.00 sq.m.


325.00 320.00 sq.m.
185.00 165.00 lm.

125.00 110.00 lm.


150.00 125.00 lm.
20.00 - lft.

140.00 100.00 sq.m.


180.00 145.00 sq.m.
135.00 100.00 lm.
185.00 165.00 sq.m.
300.00 280.00 sq.m.
350.00 325.00 sq.m.
125.00 115.00 sq.m.

340.00 315.00 sq.m.


300.00 290.00 sq.m.
285.00 175.00 sq.m.

300.00 285.00 sq.m.


285.00 275.00 sq.m.
275.00 225.00 sq.m.

250.00 225.00 sq.m.


275.00 250.00 sq.m.
100.00 90.00 lm.
150.00 - lm.

315.00 300.00 sq.m.


300.00 275.00 sq.m.
275.00 240.00 sq.m.
275.00 240.00 sq.m.
265.00 250.00 sq.m.
225.00 200.00 sq.m.
300.00 275.00 sq.m.
185.00 175.00 sq.m.
300.00 275.00 sq.m.

325.00 300.00 sq.m.


500.00 450.00 sq.m.
100.00 90.00 sq.m.
565.00 535.00 sq.m.

485.00 450.00 sq.m.


850.00 700.00 sq.m.
500.00 450.00 sq.m.
600.00 450.00 lm.
450.00 - lm.
450.00 - lm.
1,400.00 - set
250.00 - lm.
1,400.00 - set
400.00 - set
3,000.00 + 1,000.00 w/ fr sq.m.
1,000.00 - sq.m.
1,285.00 - sq.m.
275.00 - sq.m.

45.00 40.00 sq.m.


85.00 75.00 sq.m.
60.00 55.00 lm.
75.00 65.00 lm.
135.00 110.00 lm.
600.00 550.00 cu.m.

450.00 400.00 sq.m.


400.00 350.00 sq.m.
275.00 250.00 lm.
285.00 250.00 sq.m.
450.00 400.00 sq.m.
500.00 450.00 sq.m.
85.00 75.00 sq.m.
100.00 - sq.m. L & M = 85.00/sq.m. (Gray)
L & M = 100.00/sq.m. (White)

750.00 - sq.m.
700.00 - sq.m.

1,875.00 - sq.m.
1,750.00 - sq.m.

1,750.00 - sq.m.
1,650.00 - sq.m.

1,650.00 - sq.m.
1,500.00 - sq.m.
225.00 - lm.

550.00 - lm.

450.00 - lm.
100.00 - lm.
150.00 - sq.m.
85.00 - cu.m.
125.00 - sq.m.
125.00 - sq.m.
125.00 - sq.m.
450.00 - sq.m.
225.00 - sq.m.
375.00 - sq.m.
200.00 - sq.m.

225.00 - sq.m.
85.00 - sq.m.
225.00 - sq.m.
550.00 - sq.m.
850.00 - sq.m.
450.00 - sq.m.
750.00 - sq.m.
375.00 - sq.m.
510.00 - sq.m.
325.00 - sq.m.

600.00 lm.
415.00 lm.

250.00 - lm.
265.00 - lm.
165.00 - lm.
485.00 - lm.
190.00 - lm.
250.00 - lm.

165.00 - sq.m.
285.00 - sq.m.
120.00 sq.m.
5.00 pc.
15.00 pc.
15.00 sq.m.
100.00 - sq.m.
120.00 - sq.m.
290.00 - sq.m.
10.00 - sq.m.
40.00 - sq.m.
220.00 sq.m.
280.00 lm.
4.00 3.75 kg.
4.50 4.00 kg.
4.75 4.25 kg.
4.85 4.50 kg.
4.70 4.25 kg.
5.90 5.25 kg.
7.90 7.00 kg.
5.00 4.50 kg.
5.65 5.00 kg.
6.75 6.25 kg.
5.25 4.50 kg.
9.00 8.00 kg.
5.65 5.25 kg.
5.65 5.25 kg.
5.65 5.25 kg.
6.00 6.00 kg.
45.00 40.00 sq.m.

0.50 - kg.
0.60 - kg.
0.50 - kg.
- 4.85 kg.
0.50 - kg.

30.00 27.50 kg.


17.50 15.00 kg.
200.00 bend

275.00 250.00 cu.m.


450.00 400.00 cu.m.
550.00 500.00 cu.m.
dministration)
180.00 150.00 cu.m.
55.00 45.00 sq.m.
350.00 300.00 cu.m.
60.00 50.00 sq.m.
185.00 150.00 cu.m.
25.00 20.00 sq.m.
20.00 17.50 sq.m.
25.00 20.00 lm.

25.00 20.00 lm.


50.00 40.00 lm.

175.00 165.00 cu.m.


650.00 550.00 cu.m.
450.00 350.00 cu.m.
700.00 650.00 cu.m.
700.00 650.00 cu.m.

200.00 175.00 cu.m.


450.00 375.00 cu.m.
700.00 650.00 cu.m.

275.00 250.00 cu.m.


700.00 650.00 cu.m.
550.00 500.00 cu.m.

200.00 - cu.m.
150.00 100.00 cu.m.

285.00 250.00 cu.m.

150.00 - cu.m.
125.00 100.00 cu.m.
650.00 550.00 cu.m.

225.00 200.00 cu.m.


750.00 700.00 cu.m.

450.00 375.00 cu.m.

325.00 300.00 cu.m.


175.00 150.00 cu.m.
200.00 175.00 cu.m.

400.00 350.00 cu.m.


650.00 600.00 cu.m.
800.00 750.00 cu.m.

200.00 175.00 cu.m.


650.00 550.00 cu.m.
200.00 175.00 cu.m.
1,000.00 750.00 cu.m.

100.00 - cu.m.
150.00 - sq.m.
750.00 600.00 pp
200.00 175.00 sq.m.
100.00 85.00 lm.
500.00 350.00 pp

4,000.00 3,000.00 pp
6,000.00 4,500.00 pp
85.00 65.00 sq.m.

125.00 110.00 sq.m.


Material Unit Cost by width of bended acc. (M) 375.00 / sq.m.
(M) 480.00 / sq.m.
(M) 565.00 / sq.m.
135.00 125.00 sq.m. Acc. = (M)35.00 / sq.m.
175.00 150.00 sq.m.
85.00 75.00 lm. (M) 175.00 - (L)75.00 / lm.
500.00 450.00 pc.
50.00 45.00 sq.m. (M) 245.00 - (L)45.00 / sq.m.

3,500.00 2,000.00 cu.m.


7,500.00 - cu.m.
350.00 - cu.m.
65.00 60.00 sq.m.
50.00 40.00 sq.m.
60.00 50.00 sq.m.
75.00 60.00 sq.m.
60.00 50.00 sq.m.
65.00 60.00 sq.m.
50.00 40.00 sq.m.
65.00 60.00 set
35.00 25.00 sq.m.
35.00 30.00 sq.m.
25.00 20.00 lm.
85.00 75.00 sq.m.
50.00 35.00 sq.m.
100.00 75.00 sq.m.
35.00 30.00 sq.m.
50.00 45.00 sq.m.
40.00 35.00 sq.m.
65.00 60.00 sq.m.
2,500.00 - cu.m.
750.00 - cu.m.
100.00 - lm.
lot
lot

+ 15% Outside MM

180.00 - sq.m.
200.00 - sq.m.
180.00 - sq.m.
200.00 - sq.m.

135.00 - sq.m.

500.00 - sq.m.
280.00 - lm.
125.00 - lm.

170.00 - sq.m.
125.00 - lm.

280.00 - sq.m.
150.00 - sq.m.
150.00 - sq.m.
85.00 - lm.
125.00 - lm.
65.00 - lm.

500.00 - sq.m.
280.00 - lm.
400.00 - sq.m.
500.00 - sq.m.
500.00 - sq.m.

500.00 - sq.m.
275.00 - lm.
500.00 - sq.m.

500.00 - sq.m.
525.00 - sq.m.
280.00 - lm.
280.00 - lm.
400.00 - sq.m.

500.00 - sq.m.

280.00 - lm.
225.00 - lm.
125.00 - lm.

400.00 - sq.m.
400.00 - sq.m.

500.00 - sq.m.
500.00 - sq.m.
280.00 - lm.
0.50 - kgs.

700.00 - sq.m.
600.00 - sq.m.
700.00 - sq.m.
600.00 - sq.m.
600.00 - sq.m.

400.00 - sq.m.
250.00 - lm.

400.00 - sq.m.

450.00 - sq.m.
350.00 - sq.m.
125.00 - lm.
100.00 - no.
125.00 - letter
350.00 - sq.m.

350.00 - sq.m.
200.00 - sq.m.

400.00 - sq.m.
400.00 - sq.m.
350.00 - sq.m.
185.00 - lm.

450.00 - sq.m.
450.00 - sq.m.
200.00 - lm.

450.00 - sq.m.
200.00 - lm.

450.00 - sq.m.
250.00 - lm.
500.00 - sq.m.
400.00 - sq.m.
375.00 - sq.m.

500.00 - sq.m.
700.00 - sq.m.
250.00 - lm.
700.00 - sq.m.
500.00 - sq.m.
180.00 - sq.m.
180.00 - sq.m.
180.00 - sq.m.
450.00 - sq.m.
150.00 - sq.m.
180.00 - sq.m.
150.00 - sq.m.
150.00 - sq.m.

150.00 - sq.m.
150.00 - sq.m.
100.00 - sq.m.
850.00 - sq.m.
1,750.00 - sq.m.
750.00 - sq.m.

2,750.00 - sq.m.
700.00 - sq.m.
625.00 - sq.m.
150.00 - sq.m.
700.00 - sq.m.
35.00 - sq.m.
875.00 - sq.m.
1,000.00 - sq.m.
450.00 - sq.m.
110.00 - bd.ft.
100.00 - bd.ft.
3,100.00 - set
3,400.00 - set
3,300.00 - set
3,700.00 - set
4,600.00 - set
4,400.00 - set
750.00 - set
9,000.00 - set
15,000.00 - set
1,500.00 - set
2,000.00 - set
4,000.00 - set
175.00 - sq.ft. Labor = P 10.00 - 15.00/sq.ft.
185.00 - sq.ft.
75.00 - sq.ft.
125.00 - sq.ft.
225.00 - sq.ft.
50.00 - kgs. Materials
40.00 30.00 kgs. Fabrication & Installation

85.00 75.00 sq.m.

400.00 325.00 cu.m.


225.00 200.00 cu.m.
350.00 300.00 cu.m.
150.00 125.00 cu.m.
40.00 30.00 sq.m.
150.00 125.00 cu.m.
150.00 125.00 cu.m.
150.00 125.00 sq.m.
175.00 150.00 lm.
185.00 175.00 lm.
210.00 200.00 lm.
1,750.00 1,525.00 unit
600.00 550.00 cu.m.
225.00 185.00 lm.
150.00 135.00 sq.m.
50.00 35.00 lm.

450.00 375.00 cu.m.


400.00 - cu.m.
500.00 - cu.m.
175.00 - sq.m.
350.00 - cu.m.
300.00 - cu.m.

375.00 - cu.m.
325.00 - cu.m.

350.00 - cu.m.
450.00 - cu.m.

1,750.00 - t/l Disposal of excavated materials :


2,000.00 1,750.00 t/l 20 t/l / night (6 hrs.) using 4 Dump Trucks
285.00 - t/l

1,500.00 /hole

40.00 30.00 sq.ft.

75.00 - lm.
125.00 - lm.

25.00 17.50 kl.


30.00 - kl.
35.00 - kl.
30.00 - kl.
30.00 25.00 kl.
50.00 - kl.
15.00 - sq.in.
40.00 - kl.

300.00 - shot
175.00 - lft.
280.00 - sq.ft.
450.00 - joint
2,250.00 - truss
200.00 - lft.
350.00 - sq.ft.

20.00 17.50 kg.


15.00 12.50 kg.
15.00 - stroke
1.60 - kg.
0.85 - kg.

250.00 - pc.

280.00 - pc.
280.00 - pc.
250.00 - pc.

2,500.00 - hole
2,500.00 - hole
500.00 - hole

25,000.00 - cu.m.
3,500.00 - sq.m.

350.00 - sq.m.
300.00 - sq.m.
135.00 - sq.m.

10.00 7.50 sq.ft.


450.00 - sq.m.
325.00 - sq.m.
Battered
5,000.00 10,000.00 pp
10,000.00 - pp
350.00 - lm.
Pile Load Test :
1) PDA (Pile Dynamic Test)
For 8 pp @ P 100,000.00/day for 2 days + P10,000.00/p
2) Static Load Test
P 80,000.00 x 3 for the first 3 piles, P 75,000.00/pp for s
+ P 80,000.00 for Mob/Demob. = P 535,000.00
3) Integrity Test Piles = 25,000.00/'pp
2,750.00 - lm.
5,000.00 4,500.00 pp

3,000.00 - lm.
5,500.00 - pp Driving
350.00 - lm.

2,500.00 - pp

BORING DIRECT COST


8,500.00 11,500.00 lm. Driving : max. 2-4 pp/wk. (50 m)
9,000.00 14,000.00 lm. Cutting of BP = 1 BP every 2 days w/ 2 laborers
9,500.00 15,000.00 lm. and 1 breaker/backhoe
12,500.00 14,500.00 lm.
13,500.00 19,500.00 lm.
15,000.00 22,000.00 lm. Driving :
15,000.00 23,500.00 lm. PSC Piles (D/S) = 5-10 pp/day
20,000.00 40,000.00 lm. CSP = 10 pp/day
300,000.00 300,000.00 test 2% of total no. of BP
65,000.00 65,000.00 test 5% of total no. of BP (Ultrasonic)
#REF! 3,750.00 lm. Conc. Sheet Piles = 0.203 x 0.457
#REF! - lm. 0.30 x 0.60
#REF! 3,000.00 lm.

r miscellaneous

h the help of Subcon labor.

total length=lm)
of the Project

hen scaffold use is


all or RC Walls.

ctual works that

he responsibility

^^^^^^^^^^^^^^^^^
BF
------------------------ = No. of kegs.
40 X 45

Vt x 192
------------------------ (For Ftb, Lintel beams & Stiff.columns)
2.40

Vt x 192
------------------------ (for all other structures)
1.60
Wt
Wires #16 = ---------------------- (For Big Scale Projects)
65x45

Wt
Wires #16 = ---------------------- (For Medium Scale Projects)
60x45

Wt
Wires #16 = ---------------------- (For Small Scale Projects)
50x45
Fabrication (Built-up I-Beam)
Production = 5 to 8 tons/day (12 welders)
Erection (Floor Framing)
Production = 8 to 12 tons / day

Production = 4 - 6 man-hrs./sq.m. For 12 hrs/day = 12/5 =

Installation
Steel Lumber
3.00 4.00
ng Tie Beams & Pile Caps 4.00 4.50
2.50 6.00
2.50 7.00
2.00 4.00
r & Parapet 2.00 3.00
3.00 3.50
3.50
Beams & Stiff. Columns 5.00

Production = 0.08 man-hrs./kg. For 12 hrs/day = 12/0.08 =

n : For 8 hrs. Operation


mns & Pedestals 130.00 kgs./day
ng Tie Beams & Pile Caps 150.00 kgs./day
125.00 kgs./day
120.00 kgs./day
110.00 kgs./day
100.00 kgs./day
140.00 kgs./day
95.00 kgs./day
Beams & Stiff. Columns 60.00 kgs./day
90.00 kgs./day

Masons 550.00 2,200.00


Laborers 456.00 1,824.00
sq.m./day 4,024.00
12% 482.88
4,506.88 /day 150.23
Masons 550.00 2,200.00
Laborers 456.00 1,824.00
sq.m./day 4,024.00
lm./day 12% 482.88
4,506.88 /day 300.46
150.23

Masons 550.00 2,200.00


Laborers 456.00 1,824.00
sq.m./day 4,024.00
lm./day 12% 482.88
4,506.88 /day 150.23
100.15

Masons 550.00 2,200.00


Laborers 456.00 1,824.00
sq.m./day 4,024.00
12% 482.88
4,506.88 /day 128.77

Masons 550.00 2,200.00


Laborers 456.00 1,824.00
sq.m./day 4,024.00
lm./day 12% 482.88
4,506.88 /day 257.54
150.23

Masons 550.00 2,200.00


Laborers 456.00 1,824.00
sq.m./day 4,024.00
12% 482.88
4,506.88 /day 150.23

Masons 550.00 2,200.00


Laborers 456.00 1,824.00
sq.m./day 4,024.00
12% 482.88
4,506.88 /day 225.34

Masons 550.00 2,200.00


Laborers 456.00 1,824.00
sq.m./day 4,024.00
12% 482.88
4,506.88 /day 22.53
Masons 550.00 2,200.00
Laborers 456.00 1,824.00
sq.m./day 4,024.00
12% 482.88
4,506.88 /day 250.38

Carpenters 550.00 1,100.00


Laborers 456.00 912.00
lm./day 2,012.00
12% 241.44
2,253.44 /day 112.67

Carpenters 550.00 1,100.00


Laborers 456.00 912.00
lm./day 2,012.00
12% 241.44
2,253.44 /day 112.67

Setters 550.00 1,100.00


Helper 456.00 456.00
sq.m./day 1,556.00
12% 186.72
1,742.72 /day 38.73

Tinsmith 650.00 1,300.00


Helper 456.00 456.00
sq.m./day 1,756.00
12% 210.72
1,966.72 /day 98.34
n = 10.00-20.00sq.m./day/tinsmith

Latex & Enamel - 2.00 man-hrs./ sq.m.


Painters 600.00 2,400.00
Helpers 456.00 1,824.00
sq.m./day 4,224.00
lm./day 12% 506.88
4,730.88 /day 78.85
55.66
Enamel - 2.00 man-hrs./ sq.m.
y Area) - 3.00 man-hrs./ sq.m.
by Lm) - 1.00 man-hrs./ lm.
ndows - 3.00 man-hrs./ sq.m.

Carpenters 550.00 1,100.00


Laborers 456.00 912.00
sq.m./day 2,012.00
sq.m./day 12% 241.44
2,253.44 /day 150.23
180.28
Acoustic Board :
n = 6.50 sq.m./day (w/o ceiling truss) Installation - 7.00 to 10.00 sq.m./day/installer
.00 sq.m./day (w/ ceiling truss)

Welders 650.00 1,300.00


Laborers 456.00 456.00
kgs./day 1,756.00
12% 210.72
1,966.72 /day 19.67

Welders 650.00 650.00


Laborers 456.00 912.00
kgs./day 1,562.00
12% 187.44
1,749.44 /day 11.66
Fabrication & Erection Cost Php 31.33

Installer 550.00 2,200.00


Helpers 456.00 912.00
sq.m./day 3,112.00
12% 373.44
3,485.44 /day 23.24

ORKS P 300.00-375.00 /SQ.M.

ES P 25.00-40.00 / SQ.M.

OF STAGING AREA = P 40.00 - 100.00/sq.m./mo. (min. of 6 mos.)


G = 30.00 for 3 hrs.
10.00/hr. after 3 hrs.
70.00/day
Area covered by Parking = 15.00 sq.m.

of Vinyl Tiles : P 1,200.00 / gal.


coverage = 2,000 tiles / gal. = 180.00 m²/gal.
For 3 coats = 35.00 / m³
Labor = P 15.00 / m³
DC = P 50.00 / m³
90kgs. @ 78.00/kg.
80kgs. @ 78.00/kg. 68.00 /kg. (80kg./roll ; I roll = 72" x 200m)
80kgs. @ 78.00/kg.
3.0m./3.60m.

/lm.

19.09 /lft.
13.41 /lft.
/lft.
/lft.
/lft.
/lft.
/m
/m

/m2
365.62 /kg.
332.38 /kg.
354.54 /kg.
345.68 /kg.
365.62 /kg.
354.54 /kg.

101.30 /kg.
111.40 /kg.
175.41 /kg.
87.65 /kg. 4,513.89 /sq.m.
87.20 /kg. 3,368.06 /sq.m.
87.65 /kg. 2,256.94 /sq.m.
118.48 /kg. 583.33 /sq.m.
108.29 /kg. 399.31 /sq.m.

93.75 /lm.
67.87 /kg.
69.61 /kg.
66.13 /kg.
65.26 /kg.
69.61 /kg.
64.39 /kg.
69.61 /kg.
83.54 /kg.
69.61 /kg.
64.22 /kg.
64.22 /kg.
68.50 /kg.
68.50 /kg.
47.20 /kg.
40.45 /kg.

PS Corp. (364-30-36) Cathy

70.07 13.56 /kg.


46.71 11.77 /kg.
46.71 17.13 /kg.
35.04 14.27 /kg.
25.69 12.45 /kg.
25.69 18.68 /kg.
21.02 16.65 /kg.
2,250.00
1,200.00
500.00
Telefax ;412-16-39
000 sq.m. up

(Bostik)
1.02
y for 2 days + P10,000.00/pp x 8 = P 280,000.00

3 piles, P 75,000.00/pp for succeeding piles


Demob. = P 535,000.00
pp/wk. (50 m)
w/ 2 laborers
1 breaker/backhoe

al no. of BP
al no. of BP (Ultrasonic)
rs/day = 12/5 = 2.40 sq.m./day

LABOR
UNIT
COST
sq.m./day 251.50
sq.m./day 223.56
sq.m./day 167.67
sq.m./day 143.71
sq.m./day 251.50
sq.m./day 335.33
sq.m./day 287.43
sq.m./day 287.43
sq.m./day 201.20

rs/day = 12/0.08 = 150 kgs./day

LABOR UNIT COST


4.23 /kg.
3.67 /kg.
4.40 /kg.
4.58 /kg.
5.00 /kg.
5.50 /kg.
3.93 /kg.
5.79 /kg.
9.17 /kg.
6.11 /kg.

/sq.m.
/sq.m.
/lm.

/sq.m.
/lm.

/sq.m.

/sq.m.
/lm.

/sq.m.

/sq.m.

/sq.m.
/sq.m.

/lm.

/lm.

/sq.m.

/lft.

/sq.m.
/lm.
/sq.m.w/o Ceiling Truss
/sq.m.w/ Ceiling Truss

./day/installer

/kg.

/kg.
/kg.

/sq.m.