MATERIAL COST
ITEM DESCRIPTION QTY
UNIT
STRUCTURA
I. GENERAL PRELIMINARIES
MOBILIZATION ₱12.00 ₱13.00
1. Tracking/Transpotation
Truck Rentals 1 lot
Plate Compactor 1.00 pcs
Crawler Crane (Per Hour For 1 day) 8.00 hours
Transportation
16 wheeler truck 8.00 hours
2. Temporary Facilities
A. Temporary Connection (Meralco)
Connection fees & deposit 1.00 lot
Meter Base, Wrings, Conduits, Breakers & Devices 1.00 lot
B. Water Ssupply
Water Meter, Pipes and Fittings, Fixtures 1.00 lot
C. Temporary Perimeter
CoCo Lumber ( 2"x 4" x 12" ) 85.00 pcs
CoCo Lumber ( 2"x 3" x 12" ) 65.00 pcs
Plywood Standard ( 912 x 2128 x 25 )mm 4.00 pcs
Hardware
Wood Screw (Gypsum) ( 0.137795" x 3" ) 2,000.00 pcs
Nails #1 (1") 4.00 kilos
Plain Corrugated sheet ( 3' x 12' ) 75.00 pcs
Blue Sack ( 12' x 100m ) 1.00 role
(a) Bunk House ( 2 x 1.5 )m
Plywood Standard ( 912 x 2128 x 25 )mm 5.00 pcs
CoCo Lumber ( 2" x 4" x 12" ) 4.00 pcs
Hardware
Wood Screw (Gypsum) ( 0.137795" x 3" ) 274.00 pcs
(b) Toilet
Plywood Standard ( 912 x 2128 x 25 )mm 2.00 pcs
CoCo Lumber (2" x 4" x 12" ) 2.00 pcs
Hardware
Wood Screw (Gypsum) ( 0.137795" x 3" ) 50.00 pcs
(d) Field Office
Plywood Standard ( 912 x 2128 x 25 )mm 3.00 pcs
CoCo Lumber (2" x 4" x 12" ) 6.00 pcs
3.78 cu.m
3. Back Filling Works
F-1 0.30 0.05 7.00 0.11
F-2 0.30 0.05 3.00 0.05
F-3 0.30 0.05 3.00 0.05
F-4 0.30 0.05 1.00 0.02
F-5 0.09 0.05 1.00 0.00
Total: 0.21
Portland Cement 10.00 2.15 bags
Gravel 3/4" 0.80 0.17 cu.m
White Sand 1.00 0.21 cu.m
IV. FORMWORKS
1. Columns
C-1 G/F 4x8 ft. Phenolic Board 5.00 pcs
C-2 G/F 4x8 ft. Phenolic Board 3.00 pcs
C-3 G/F 4x8 ft. Phenolic Board 5.00 pcs
C-4 G/F 4x8 ft. Phenolic Board 3.00 pcs
C-5 G/F 4x8 ft. Phenolic Board 2.00 pcs
C-1 2/F 4x8 ft. Phenolic Board 4.00 pcs
C-2 2/F 4x8 ft. Phenolic Board 2.00 pcs
C-3 2/F 4x8 ft. Phenolic Board 4.00 pcs
C-4 2/F 4x8 ft. Phenolic Board 2.00 pcs
2. Beams
2B-1 4x8 ft. Phenolic Board 3.00 pcs
2B-2 4x8 ft. Phenolic Board 3.00 pcs
2B-3 4x8 ft. Phenolic Board 3.00 pcs
2B-4 4x8 ft. Phenolic Board 3.00 pcs
2B-5 4x8 ft. Phenolic Board 3.00 pcs
2B-6 4x8 ft. Phenolic Board 3.00 pcs
2B-7 4x8 ft. Phenolic Board 6.00 pcs
2B-8 4x8 ft. Phenolic Board 3.00 pcs
2B-9 4x8 ft. Phenolic Board 3.00 pcs
2B-10 4x8 ft. Phenolic Board 6.00 pcs
2B-11 4x8 ft. Phenolic Board 3.00 pcs
2B-12 4x8 ft. Phenolic Board 3.00 pcs
2B-13 4x8 ft. Phenolic Board 3.00 pcs
2B-14 4x8 ft. Phenolic Board 6.00 pcs
2B-15 4x8 ft. Phenolic Board 3.00 pcs
2G-1 4x8 ft. Phenolic Board 6.00 pcs
2G-2 4x8 ft. Phenolic Board 6.00 pcs
2CB-1 4x8 ft. Phenolic Board 12.00 pcs
2CB-2 4x8 ft. Phenolic Board 6.00 pcs
FTB-1 4x8 ft. Phenolic Board 3.00 pcs
FTB-1 4x8 ft. Phenolic Board 3.00 pcs
FTB-1 4x8 ft. Phenolic Board 3.00 pcs
FTB-2 4x8 ft. Phenolic Board 3.00 pcs
FTB-2 4x8 ft. Phenolic Board 3.00 pcs
FTB-2 4x8 ft. Phenolic Board 3.00 pcs
TB-1 4x8 ft. Phenolic Board 3.00 pcs
TB-1 4x8 ft. Phenolic Board 3.00 pcs
TB-2 4x8 ft. Phenolic Board 3.00 pcs
RB-1 4x8 ft. Phenolic Board 3.00 pcs
RB-2 4x8 ft. Phenolic Board 3.00 pcs
RB-2 4x8 ft. Phenolic Board 3.00 pcs
RB-2 4x8 ft. Phenolic Board 3.00 pcs
RB-2 4x8 ft. Phenolic Board 3.00 pcs
RB-3 4x8 ft. Phenolic Board 3.00 pcs
RB-3 4x8 ft. Phenolic Board 3.00 pcs
RB-4 4x8 ft. Phenolic Board 3.00 pcs
RCB-1 4x8 ft. Phenolic Board 3.00 pcs
RCB-2 4x8 ft. Phenolic Board 3.00 pcs
3. Slabs
S-1 4X8 ft. Plywood 2.00 pcs
S-2 4X8 ft. Plywood 2.00 pcs
S-3 4X8 ft. Plywood 1.00 pcs
S-4 4X8 ft. Plywood 1.00 pcs
S-5 4X8 ft. Plywood 1.00 pcs
S-6 4X8 ft. Plywood 1.00 pcs
S-7 4X8 ft. Plywood 1.00 pcs
V. CONCRETE
1. Footing
F-1 1.00 1.00 0.30 4.00 1.20
F-2 1.00 1.00 0.30 2.00 0.60
F-3 1.00 1.00 0.30 4.00 1.20
F-4 1.00 1.00 0.30 2.00 0.60
F-5 0.60 0.60 0.25 2.00 0.18
WF-1 0.76 0.76
WF-2 0.68 0.68
Total: 5.22
Portland Cement 8.00 41.76 bags
Sand 0.50 2.61 cu.m
Gravel 1.00 5.22 cu.m
2. Columns
C-1 G/F 0.35 0.20 3.10 4.00 0.87
C-1 2/F 0.30 0.20 3.00 4.00 0.72
C-2 G/F 0.35 0.25 3.10 2.00 0.54
C-2 2/F 0.30 0.20 3.00 2.00 0.36
C-3 G/F 0.35 0.20 3.10 4.00 0.87
C-3 2/F 0.30 0.20 3.00 4.00 0.72
C-4 G/F 0.35 0.25 3.10 2.00 0.54
C-4 2/F 0.30 0.20 3.00 2.00 0.36
C-5 0.20 0.20 3.10 2.00 0.25
Total: 5.23
Portland Cement 8.00 41.83 bags
Sand 0.50 2.61 cu.m
Gravel 1.00 5.23 cu.m
3. Beams
ARCHITECTURAL WO
VI. MASONRY
1. Rebars
Ø 10mm x 6.0m 8.00 pcs
Ø 12mm x 6.0m 10.00 pcs
Ø 16mm x 6.0m 18.00 pcs
2. Hollow Blocks
Total Area: 242.21 3149 pcs
3. Mortar Cement
Mortar Cement 231.11 232 bags
IX. FINISHES
PAINTING WORKS
1.Exterior
Primer - Boysen Epoxy Primer #2230 Gray with Catalyst 6.00 gal
Paint - BOYSEN PERMACOAT #701 LATEX WHITE 7.00 gal
2. Interior
Primer - Boysen Epoxy Primer #2230 Gray with Catalyst 4.00 gal
Paint - BOYSEN PERMACOAT #701 LATEX WHITE 5.00 gal
X. SPECIALTIES
TILEWORKS
1. Floor Tiles
ARTE/CHO POL-SUPER GLOSS 40X40CM CSA4114 SCHOBER 6.00 pcs
CIFRE 7.5X30CM OPAL VISON REV. 15.00 pcs
CIFRE 7.5X30CM OPAL SNOW REV. 10.00 pcs
Floor Tiles Premium 12" x 12" 6.00 pcs
2. Wall Tiles
Floor Tiles Premium 12" x 12" 18.00 pcs
FURNITURES
1. Bedroom
Matchbox Double Bed 54x75 3.00 set
Cordova King Bed 72x75 1.00 set
Caspar Chest Of Drawer 8.00 set
Timber Wide 2Door Wardrobe 1.00 set
2. Dining Area
Randall 8 Seater Dining Set 1.00 set
3. Kitchen
Samsung RT20FARVDSA 7.4 cu.ft. Two Door Refrigerator 1.00 set
Fujidenzo FGR 5530TMB 50 cm Cooking Range 1.00 set
High Quality Stainless Kitchen Sink 1.00 set
4. Service Area
Fujidenzo JWT-801 8kg Twin Tub Washing Machine 1.00 set
MAXTEN Kitchen Sink 14x20" 3.00 set
5. Living Area
Basco Sofa 2.00 set
Zico Side Table 1.00 set
6. Toilet & Bath
HCG Avira Water Closet Special Package Set 2.00 set
Bathtub F8170 CB1 AW 1.7 1.00 set
Rosco Exposed Pipe Double Shower Set with Diverter RO-1890 1.00 set
XI. WINDOWS
1. Windows
W-1 Swing Type Steel Casement w/ Fixed Glass Panel 1.00 set
W-2 Swing Type Steel Casement w/ Fixed Glass Panel 1.00 set
W-3 Swing Type Steel Casement w/ Fixed Glass Panel 2.00 set
W-4 Swing Type Steel Casement w/ Fixed Glass Panel 4.00 set
W-5 Swing Type Steel Casement w/ Fixed Glass Panel 1.00 set
W-6 Swing Type Steel Casement w/ Fixed Glass Panel 1.00 set
W-7 Swing Type Steel Casement w/ Fixed Glass Panel 1.00 set
W-8 Swing Type Steel Casement w/ Fixed Glass Panel 2.00 set
W-9 Swing Type Steel Casement w/ Fixed Glass Panel 4.00 set
W-10 Swing Type Steel Casement w/ Fixed Glass Panel 2.00 set
XII. ROOFING
Corrugated GI Sheet 12' 57.00 pcs
XIII. MECHANICAL
1. Aircon Installation
Samsung AR09MVFHHWKNTC 5.00 pcs
2. Chiller Installation
LG GR-B202SQBB 1.00 pcs
3. Kitchen Exhaust Installation
Asahi EF 10G (10-inch, exhaust fan) 1.00 pcs
4. Toilet Exhaust Installation
Hanabishi HCDF 8SS (8-inch, exhauts fan, order basis) 2.00 pcs
XIV. ELECTRICAL
1. Generator Set Installation
United Power Gasoline Generator ECO Series 95W GG950 1.00 pcs
2. Transformer Installation
Panel Box (RPB1133) 1.00 pcs
Safety Breaker with Cover & Outlet Moulded Case (RSB30C/O) 40.00 pcs
Rectangular PVC Moulding (RPEM15X10) 20.00 pck
Utility Box 1.00 pcs
3. EE Room Wires Installation
2-3.5mm² THHN CU wire (RTN12A) 8.00 150m/box
2-5.5mm² THHN CU wire (RTN10A) 4.00 150m/box
2-8.0mm² THHN CU wire (RTN8A) 1.00 100m/box
4. Electrical System Installation
2 Gang Outlet Set (10A/25V) (WH113) 18.00 pcs
Weather Proof Plate Cover (RCP5) 1.00 pcs
1 Gang Aircon Set (16A/250V) (WH901) 7.00 pcs
Range Outlet Set 1.00 pcs
1 Gang Switch w/ LED Set (WH601) 2.00 pcs
2 Gang Switch w/ LED Set (WH603) 8.00 pcs
3 Gang Switch w/ LED Set (WH605) 1.00 pcs
1 Gang 3-way Switch Set (WH703) 2.00 pcs
Duplex Universal Outlet w/ Ground (WH912) 2.00 pcs
Universal Outlet w/ Ground 2.00 pcs
XV. PLUMBING
Ø100mm PVC (3m) 6.00 pcs
Ø75mm PVC (3m) 3.00 pcs
PVC ELBOW 90° (Ø100mm) 1.00 pcs
PVC WYE REDUCER (Ø100mmX75mm) 8.00 pcs
20mmØ Polypropylene, Type 3, PN20 (3m) 2.00 pcs
20mmØ Tee 6.00 pcs
20mmØ Elbow 1.00 pcs
Vulca Seal 10.00 pc
Downspout 59.00 m
Catch Basin 9.00 pc
Septic Tank 1.00 pc
TOTAL: ₱3,234,5
SUBTOTAL COST
₱2,085.33
16,410.00
12,735.34
83,675.00
6,837.50
21,880.00
5,880.25
13,018.60
7,466.55
1,750.40
2,735.00
382.90
45,640.31
6,837.50
2,240.00
627.20
140.00
896.00
313.60
70.00
1,344.00
940.80
225,044.88
11,424.00
6,530.33
735.74
295.99
390.39
19,376.44
2,651.04
1,590.62
2,651.04
1,590.62
261.07
2,173.25
1,448.83
1,241.86
827.90
2,173.25
1,448.83
1,241.86
827.90
827.90
4,374.22
3,181.25
2,385.94
1,590.62
4,374.22
3,181.25
2,385.94
1,590.62
1,590.62
927.86
927.86
927.86
927.86
927.86
927.86
1,391.80
927.86
530.21
1,060.42
530.21
530.21
530.21
1,391.80
927.86
1,855.73
1,855.73
927.86
463.93
4,175.39
3,711.46
2,319.66
463.93
4,241.66
5,832.29
522.14
2,120.83
530.21
530.21
2,120.83
1,855.73
1,855.73
1,855.73
1,855.73
2,120.83
2,651.04
1,590.62
1,590.62
1,590.62
1,060.42
1,060.42
1,060.42
2,319.66
1,590.62
3,711.46
3,711.46
2,651.04
530.21
4,639.32
2,651.04
2,319.66
4,639.32
1,391.80
1,060.42
2,783.59
1,060.42
1,590.62
7,953.12
2,120.83
1,590.62
1,855.73
2,783.59
596.74
596.74
3,181.25
2,120.83
397.66
620.93
1,241.86
7,865.09
2,069.76
1,448.83
2,069.76
1,448.83
2,069.76
310.46
310.46
206.98
310.46
103.49
310.46
103.49
191,156.53
4,950.16
3,011.72
4,950.16
3,011.72
1,896.83
3,884.95
1,942.48
3,884.95
1,942.48
3,076.16
5,935.68
5,935.68
5,935.68
5,935.68
5,935.68
11,033.64
5,516.82
4,501.89
8,681.58
4,340.79
4,340.79
4,340.79
10,485.90
5,242.95
12,483.54
12,483.54
14,012.28
6,007.32
6,241.77
4,695.21
5,629.59
4,131.36
4,695.21
6,741.18
6,241.77
5,935.68
4,518.00
5,629.59
6,096.78
4,340.79
5,001.30
5,629.59
4,131.36
4,163.58
5,629.59
3,341.97
3,341.97
1,431.12
1,427.38
713.62
709.55
707.32
703.96
698.16
268,229.22
11,209.95
3,376.43
7,125.30
11,229.37
3,382.25
7,137.59
29,192.85
8,441.08
17,813.25
14,796.28
4,456.63
9,404.85
127,565.83
827.90
1,491.84
4,771.87
78,910.39
66,560.08
152,562.08
9,444.54
9,444.54
4,573.80
17,041.79
17,041.79
17,041.79
17,041.79
17,041.79
17,041.79
9,444.54
7,160.41
3,494.40
15,400.00
1,092.00
3,276.00
17,472.00
3,472.00
3,472.00
4,200.00
52,304.00
6,530.86
15,120.00
13,440.00
1,120,000.00
1,401,591.86
7,083.00
4,935.00
11,877.60
2,835.00
26,730.60
11,644.50
8,397.75
20,472.00
20,267.25
60,781.50
11,237.70
9,157.50
3,957.00
3,421.08
10,263.24
37,677.00
18,369.00
29,658.60
9,732.75
16,333.50
18,930.75
11,992.95
2,899.50
8,631.90
1,633.20
22,389.00
1,713.00
11,330.48
18,817.95
7,151.76
255,297.85
6,440.00
6,440.00
12,880.00
25,760.00
6,440.00
6,440.00
6,440.00
12,880.00
25,760.00
12,880.00
122,360.00
9,576.00
9,576.00
143,887.50
18,405.75
3,288.90
6,601.80
172,183.95
10,498.60
1,064.00
30,800.00
980.00
40.60
22,176.00
16,968.00
4,424.00
2,343.60
77.00
1,146.60
2,202.20
179.20
1,176.00
204.40
179.20
428.40
162.40
95,050.20
6,329.40
2,037.00
133.00
1,064.00
700.00
798.00
133.00
6,160.00
10,221.75
2,337.30
74,200.00
104,113.45
2,912.00
2,912.00
₱3,234,532.39
PROJECT : TWO (2) STOREY RESIDENTIAL BUILDING
LOCATION: 6182 6TH ST., FAIRLANE SUBD, SAN VICENTE, TARLAC CITY, TARLAC
WEEK NO. 1 2 3 4 5 6 7 8
% WORK SCHEDULE
CONTRACT MAR APR
VALUE 1 2 3 4 1 2 3 4
7.37% 3.69% 3.69%
0.34% 0.09% 0.15% 0.10%
5.90% 1.40% 1.90% 1.04% 0.78% 0.78%
8.35% 1.30% 2.50% 1.70% 1.55%
3.89% 0.76% 1.43%
4.70%
43.26%
0.82%
1.93%
7.87%
3.78%
0.30%
5.26%
2.93%
3.21%
0.09%
100.00%
3.69% 3.78% 1.55% 2.00% 2.34% 3.28% 3.24% 2.98%
3.69% 7.46% 9.01% 11.01% 13.35% 16.63% 19.87% 22.85%
3.69% 3.78% 1.55% 2.00% 2.34% 3.28% 3.24% 2.98%
3.69% 7.46% 9.01% 11.01% 13.35% 16.63% 19.87% 22.85%
120.00%
100.00%
80.00%
120.00%
100.00%
80.00%
60.00%
40.00%
20.00%
0.00%
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16 17 18
1.30%
1.00% 0.70%
0.50% 3.50% 0.70%
10.67% 5.38% 8.28% 8.10% 6.46% 4.37%
0.82%
0.35% 0.60% 0.98%
2.80% 4.20% 11.37% 7.48% 10.68% 10.23% 8.27% 5.57% 2.39% 2.73%
25.65% 29.85% 41.22% 48.70% 59.38% 69.62% 77.89% 83.46% 85.85% 88.57%
2.80% 4.20% 11.37% 7.48% 10.68% 10.23% 8.27% 5.57% 2.39% 2.73%
25.65% 29.85% 41.22% 48.70% 59.38% 69.62% 77.89% 83.46% 85.85% 88.57%
S-Curve
S-Curve
6 7 8 9 10 11 12 13 14 15 16 17 18 19
19 20
3 4
3.87% 4.00%
1.49% 2.07%
5.36% 6.07%
93.93% ###
5.36% 6.07%
93.93% ###
18 19 20
FCONPRO (Lab) Project Grade Parameters
Structural Estimates (Qty & Cost) Submissi 10%
Part of Midterms
Architectural Estimates (Qty & Cost) Submis 10% Grade
MEPFS Estimates (Qty & Cost) Submission 10%
Final Defense 70%
Completeness of Data 20% Part of Finals
(Estimates, Cost, Schedule, Plans) Grade
Knowledge about the Project 40%
Presentation 10%