Ready to use Wet-Micro Concrete

www.prismjohnson.in
www.hrjohnsonindia.com
Wet Micro Concrete
Ready to use Wet Micro Concrete for
Structural Strengthening & Retrofitting.

Available variants as below-

M-40 Grade
M-60 Grade

For thickness >75mm micro concrete with


premix aggregates also available

www.prismjohnson.in
www.hrjohnsonindia.com
Product Specification

● Free Flowing : 650 ± 50 mm ● 10mm Agg premixed for application >75mm

● Fresh Density : 2350 ± 50 Kg/m3 ● Cohesive & Segregation resistant

● Workable life : 3-4 Hrs @ Job Site ● Superior surface finish

● Grade : M40, M60 ● Package : 35 Kg bags


www.prismjohnson.in
www.hrjohnsonindia.com
Technical Properties
Compressive Strength (N/mm2)
Grade M 40 M 60
1 Day ≥10 ≥15
3 Day ≥20 ≥30
7 Day ≥35 ≥50
28 Day ≥40 ≥60

Flexural Strength (N/mm2)

Grade M 40 M 60 M 80
28 Day > 3-6 > 5-7 >7

Split Tensile Strength (N/mm2)


Grade M 40 M 60 M 80
28 Day > 3 to 4 > 4.5 to 6 >6

www.prismjohnson.in
www.hrjohnsonindia.com
Conventional Dry Vs. Wet micro concrete
Step 1 Step 1
Chipping the loose concrete, put
extra reinforcement and place Preparing site
form work

Step 2 Step 2

Material shifting at site


Material shifting at site

Step 3 Step 3
Shake the bag and pour it to structure
Micro concrete mixing at site

Step 4
4-5 labours for (mixing thru power mixture, shifting & Pouring)
No water addition
at site & durable
mix with longer
DD/MM/YYYY Pg
retention
www.hrjohnsonindia.com
Conventional Dry Vs. Wet micro concrete

Fresh flow ~ 650mm Flow after 30 min ~430mm Fresh flow ~ 650mm Flow after 3 Hr. ~550+mm

Dry Micro Concrete Wet Micro Concrete


• Site mixing: It requires exact W/P  Minimal site efforts: Pre mixed, (no water addition required
with proper mixing thru power mixture. & Agg. if reqd.), easy accessibility thro bags.
Challenges:  More Durable: Low water permeability and RCPT.
 Flow of mix reduces very fast, chances of honey  Consistent Mix: No honey combs & Voids.
combing & voids are high  No Wastage: No site mixing & storage, easy pouring thru
 Wastage of material during mixing and pouring bags.
 High job site efforts- high mixing time, Low retention &  Very high Productivity
low productivity  Labour: Low labour cost 3-4 labours for ( shifting & pouring)
 More Labour :4-5 labours for (mixing thru power  Workable for design service life of 4-6 hours will require pre