MEASUREMENT 11

BQS2001

NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY

FACULTY OF THE BUILT ENVIRONMENT

DEPARTMENT OF CONSTRUCTION ECONOMICS & MANAGEMENT

BASEMENT GROUP ASSIGNMENT 1

GROUP MEMBERS
PANASHE DASWA NO2O18378X QS CON
TASHAMISWA MAJACHANI N02015124L CM PARA
SHYLET MBEDZI N02021647Y QS CON
MIRRIAM MARUTA N02019900N QS PARA
BLESSED CHOKUFORA N02019951V QS CON
ROPAFADZO MUTO N02019847J QS CON
MEASUREMENT 11
BQS2001

BASEMENT

Take off list

1 Removal of trees
2 Site clearance
3 Top soil excavation
4 Bulk excavation-Basement
5 Disposal of excavated material
6 E.o for pickable material
7 E.o for rock
8 Foundation trench excavation
9 Scarifying and compacting
10 Planking and struting
11 Keeping excavations free from water
12 Surface treatment
13 Hardcore
14 Sand blinding
15 Asphalt tanking: horizontally
16 Cement: sand screed
17 Concrete to floating slab + reinforcement + striking off and curing
18 Concrete to basement wall + reinforcement
19 Concrete to ground beam + reinforcement
20 Formwork to the floating slab : soffits edge
21 Formwork to sides of beams
22 Formwork to one side of concrete wall
23 Concrete to slab + reinforcement + striking off and curing
24 20mm mastic asphalt laid vertically
25 50mm angle fillet
26 115 mm brickwork
27 115mm brickforce
MEASUREMENT 11
BQS2001

Cut down trees girth ecceeding 0.5m but


not exceeding 1m, measured at 1m Excavation of foundation trenches
above the natural ground level, including commencing at 150mm below ground
3/ 1.00 3.00 grubbing up roots, filling in holes 28.80 level, not exceeding 2m depth
0.50
0.05 0.72
Site clearance W/C &
Disposal of excavated material offsite,
10200 maximum distance of 1m
Add 2/1500 3000
Extra over excavation in hard pickable
13200 180.87 material
0.72
5200 181.59 x20%=36.32m3
Add 2/1500 3000
8200 Ditto in hard rock
x10%=18.16 m³

Clear site of all bushes,shrubs,


undergrowth, hedges, and trees and tree
13.20
slumps n.e. 0.5m girth, including
grubbing up of roots, disposal of
material off site and filling up in holes
Allow for removing any termite nests
within the excavations, treating surfaces
8.20 108.24 Item and subsequent soil filling

10.20
Top soil excavation to a average depth of
150mm below the natural ground level
and retaining of excavated material on
site on temporary spoil heaps, maximum Scarifying and compacting bottom of trench
of 100m from excavation 10.20 to specified density
5.20 53.04 5.20 53.04

Planking and strutting, maximum depth not


30.8 exceeding 2m
Bulk excavation W/C 2.00 61.60
2900
Planking and strutting, depth commencing
Add 580 30.80 at 2m, not exceeding 4m
3480 1.46 44.97
Less 75
Keeping all excavations free of storm and
Item flowing water
3405
Termite treatment to bottom of excavated
10.20 trench
Excavation of basement trench
commencing 150mm below natural
10.20 ground level, depth n.e 4m 5.20 53.04
5.20
3.41 180.87 10.20 Imported harcore filling including
5.20 compaction in layers n.e 150mm thick, to
& 0.20 10.61 specified density
Disposal of excavated material offsite,
maximum distance of 1m
10.20 50mm blinding
5.20 53.04
&

30mm mastic ashphalt laid horizontally

Foundation Trench excavation W/C


10200
5200
2/15400
30800
less 4/500 2000
28800
MEASUREMENT 11
BQS2001

Formwork to floating slab W/C


10200
10.20 Reinforced concrete in ground beam Less 2/230 460
5.20 9740
0.15 8.00
28.80 5200
0.50 Less2/230 460
0.05 0.72 4740
Formwork to soffits of floating slab n.e.
8.72 & 9.74 300mm thick
Reinforcement 4.74 46.17
x120kg/m3=1046.4kg
30.80 Ditto edges of floating slab
0.13 4.00
Basement slab W/C
10200 28.56 Formwork to sides of concrete slab
less 2/230 460 0.12 3.43
less 2/20 40

less 2/30 60 Formwork to sides of concrete slab W/C


9700 2/9900 19800
add 2/4900 9800
5200 29600
less 2/230 460
less 2/20 40
Formwork to inner sides of concrete walls
less 2/30 60 28.96
4700 2.75 79.64

Reinforced concrete (20MPa) to floor


9.70 slab of basement Mastic asphalt laid vertically W/C
4.70 30800
0.10 4.56 less 8/230 1840
& 28960
Reinforcement 2900
x120kg/m3=574.2 kg add 100
add 50
9.70 50mm cement, sand screed (1:3) render to concrete reinforced slab 3050
4.70 45.59
30mm mastic asphalt laid vertically on conc
28.96 wall
Basement concrete wall 3.05 88.33
Mean girth &
30800 30mm cement sand screed (1:3) render to conc reinforced wall
less 4/230 920
29880 Brickwork

Height 10200
2900 less 2/280 560
add 100 9640
add 50
3050 5200
less 460 less2/230 560
2570 4640

29.88 Reinforced concrete to basement wall


2.57 9640
0.23 17.66 4640
& 2/14280
Reinforcement 28560
x120kg/m3=2119.45 kg less 4/115 460
28100
Reinforced concrete to floating slab
W/C
115mm brickwork in hard burnt bricks
28.10 bedded in (1:3) cement sand mortar
10200 2.90 81.49
less 2/230 460 Brickforce W/C
9740 2900/75 38.67

5200 38.67/ 28.10 1086.53 Brickforce to suit 115mm wall


less 2/230 460
4740 Angle fillet W/C
10200
less 2/230 460
29.88 Reinforced concrete to floating slab 9740
0.48 5200
0.23 3.30 less 2/230 460
4740
9.74
4.74 2/9740 19480
0.13 6.00 2/4740 9480
9.30 & 28960
Reinforcement
x120kg/m3=1116 kg 28.96 28.96 50x50mm angle fillet

10.20 Strike off and cure floating slab


5.20 53.04