ABSTRACT: SUPERSTRUCTURE (CONCRETE FRAMES)

Unit + Page - Unit + Page -


CONCRETE WORK S/ Formwork to isolated sqaure columns of length not
C/ Reinforced concrete grade 30Mpa vertical work exceeding 5m
for columns (both ground and first floor) including 16.8 1
strike off 2
17m
23.61 1
3
24m S/ Formwork to soffits of horizontal concrete work
(Slab and attached beams) not exceeding 300mm
C/ Reinforced concrete grade 20Mpa horizontal in thickness including propping
work for slabs and beams not exceeding 360 2
2
300mm (assuming they poured at the same time) 360m
149.27 1
149m3 S/ Formwork to the sides of horizontal concrete work
(ground and first floor)
S/ Striking off and curing top of concrete slab (ground 917.44 2
2
and first floor) 917m
45.87 2 REINFORCEMENT
3
46m Kg/ Steel reinforcement to concrete slab (both ground
and first floor)
S/ Topping to concrete slab (ground and first floor) 4 031.70 1
45.87 2 11 908.80 1
46m3 14 927.00
30 848.80
PLUNKING AND STRUTTING 30 849Kg
S/ Formwork to isolated square columns of length not
exceeding 5m Kg/ Steel reinforcement to concrete beams both
161.28 1 underground and first floor
2
161m 4 066 2
1 190.88 2
4 185.88
4 186Kg