TOTAL WORK EXPECTED TO BE DONE

GROUND FLOOR

1 SUB STRUCTURE 494597.00

2 CONCRETE WORK. 749775.00

3 MASONRY WORK. 168911.50

4 WATER PROOFING TREATMENT. 10143.00

5 CAPENTRY & JOINARY. 635475.00

9 PLUMBING. 113575.00

10 DRAINAGE WORK. 52750.00

11 WALL & CEILING FINISHINGS. 147625.50

12 PAVING & TILING. 261260.00

13 PAINTING & DECORATING. 167204.50

14 ELECTRICAL INSTALLATIONS. 120000.00

Total 2921316.50
BOQ for building expansion - Asiri Gamage

Item Description Qty Unit Rate Amount

2A/- Super Structure.

CONCRETE WORK.
Please refer appropriate preambles.

R/F CONCRETE.
R/F concrete (G 25 - 20mm Agg: filled into
formwork well packing around bar R/F)
R/F & F/W measured seperately.

2A/1 In columns 2.16 m3 15000 32,400.00

2A/2 In 125mm thick Floor slab. 15.64 m3 15000 234,600.00

2A/3 In Floor beams. 3.02 m3 15000 45,300.00

2A/4 In Stair case / steps, waist,Landing. 2.32 m3 15000 34,800.00

FORM WORK.
Form work to have basic finish as genaral specification.

2A/5 In columns up to slab level. 43.2 m2 1500 64,800.00

2A/6 In 125mm thick Floor slab. 107.87 m2 1500 161,805.00

2A/7 In Floor beams. 20.1 m2 1500 30,150.00

2A/8 In Stair case / steps, waist,Landing. 20.35 m2 1700 34,595.00

REINFOCEMENT.
Cold worked high yield steel bar Reinforcement.
including bends, hooks, tying wire, distances blocks and ordinary spaces.

2A/9 In columns 0.192 Mt 120000 23,040.00

2A/10 In 125mm thick Floor slab. 1.4 Mt 120000 168,000.00

2A/11 In Floor beams. 0.461 Mt 120000 55,320.00

2A/12 In Stair case / steps, waist,Landing. 0.129 Mt 120000 15,480.00

Mild steel bar Reinforcement


including bends, hooks, tying wire, distances blocks and
ordinary spaces.

6 mm Dia stirrups

2A/13 In columns 0.05 Mt 120000 6,000.00

2A/14 In Floor beams. 0.09 Mt 120000 10,800.00

Lintols.
150 x 225mm. high R/f with & including
2 Nrs of 12mm dia. on bottom & 2 Nrs of 10mm dia. on top :
cold worked high yield steel bars & 6mm dia. stirrups @150mm
c/c & concrete and formwork For 200mm thick walls. 100 m 5000 500,000.00
-
1,417,090.00
2B/ MASONRY WORK.

Ordinary Brick work.


2B/2 Common bricks in cement & sand 1:5.

One brick wall. (200mm thick)


2B/3 Ground Floor. 67 m2 1800 120,600.00

2B/4 First Floor 124.46 m2 2000 248,920.00


369,520.00
One brick wall. (100mm thick)
2B/5 Ground Floor. 37 1900 70,300.00

2B/6 First Floor 69.05 2100 145,005.00


215,305.00

Total
2C/ Water Proofing Treatment
"Thoroseal water proofing treatment or
equivalent to concrete surface in toilet
areas as manufactures specification and to
the approval of the Engineer 11.27 m2 1800 20,286.00
20,286.00

Summary
Super Structure

2A/ CONCRETE WORK. Rs: 1,417,090.00

2B/ MASONRY WORK. Rs: 584,825.00

2C/ WATER PROOFING TREATMENT. Rs: 20,286.00

Rs: 2,022,201.00

Summary

Bill No 02 - Super Structure. Rs: 2,022,201.00

Total Rs: 2,022,201.00

TOTAL IN WORDS :

NAME OF THE TENDER :

SIGNATURE : DATE :