GROUND FLOOR
9 PLUMBING. 113575.00
Total 2921316.50
BOQ for building expansion - Asiri Gamage
CONCRETE WORK.
Please refer appropriate preambles.
R/F CONCRETE.
R/F concrete (G 25 - 20mm Agg: filled into
formwork well packing around bar R/F)
R/F & F/W measured seperately.
FORM WORK.
Form work to have basic finish as genaral specification.
REINFOCEMENT.
Cold worked high yield steel bar Reinforcement.
including bends, hooks, tying wire, distances blocks and ordinary spaces.
6 mm Dia stirrups
Lintols.
150 x 225mm. high R/f with & including
2 Nrs of 12mm dia. on bottom & 2 Nrs of 10mm dia. on top :
cold worked high yield steel bars & 6mm dia. stirrups @150mm
c/c & concrete and formwork For 200mm thick walls. 100 m 5000 500,000.00
-
1,417,090.00
2B/ MASONRY WORK.
Total
2C/ Water Proofing Treatment
"Thoroseal water proofing treatment or
equivalent to concrete surface in toilet
areas as manufactures specification and to
the approval of the Engineer 11.27 m2 1800 20,286.00
20,286.00
Summary
Super Structure
Rs: 2,022,201.00
Summary
TOTAL IN WORDS :
SIGNATURE : DATE :