MARK BAR SPACING NO. OF PCS LENGTH TOTAL LENGTH (20mm) TOTAL LENGTH (12mm) LENGTH WIDTH HEIGHT # OF PCS TOTAL LENGTH
VB1 20 mm 200 3630 136 meters Marine plywood 1/2" 7.32 2.44 12
HSB 12 mm 20 7320 146 meters Assorted lumber 8.54 9.76 95 219.6
VB2 12 mm 200 3438 129 meters Assorted CWN 7.86 kg
TBB1 20 mm 200 2230 84 meters
TBB2 20 mm 200 1340 50 meters FALSE WORKS
LBB 12 mm 11 7320 81 meters Assorted lumber 60
271 meters 356 meters Assorted CWN 3",4" 4.97 kg
12mm @200
VB2
3000
12mm @20sets
HSB
2 CONCRETE WORKS
Cement 97 bags 215 20,855.00
S1 5.5 cu.m. 450 2,475.00
G1 11 cu.m. 450 4,950.00
Material Cost 28,280.00
Labor 9,898.00
FORMWORKS
3 AND FALSE WORKS
Marine plywood 1/2" 13 pcs 650 8,450.00
Assorted Lumber 155 pcs 135 20,925.00
CWN 40.00 kg 70 2,800.00
Material Cost 32,175.00
Labor 11,261.25
4 REINFORCING BARS
20mm 50.00 pcs 655 32,750.00
12mm 66.00 pcs 250 16,500.00
#16 GI tie wire 76 kg 70 5,320.00
Material Cost 54,570.00
Labor 19,099.50
COLUMN 20 10
TIE BEAM