You are on page 1of 3

SCHEDUL OF QUANTITY OF KHEL MAIDAN STADIUM

Srno ItemId BOQDesc Quantity UOM Rate Amount

Earth work in excvation in trenches for Excavation for all


types and sizes of foundations, trenches and drains or for any
1 301 other purpose including disposal of excavated stuff upto 1.5 276.940 CM-A 154.70 42842.62
m lift and lead upto 50m (at least 5m away from the
excavated area), including dressing and leveling of pits.

filling in plinth with sand including watering ramming


2 404 consolidating and dressing complete outer perimeter wall 26.910 CM-A 429.70 11563.23
columns outer wall sitting gallery & Gate columns

Providing and laying nominal mix cement concrete with


crushed stone aggregate using concrete mixer in foundation,
3 413 (C) plinth and at ground level excluding cost of form work. 1:4:8 61.160 CM-A 2454.40 150111.10
(1 cement : 4 coarse sand : 8 graded stone aggregate 40mm
nominal size).

Providing and placing in position RCC for roof,


beams, columns column footing lintels chhajjas,
balcony, stairs etc, excluding cost of
reinforcement, centering and finishing including
curing.Rccl:1.5:3: earth 20mm motel
outer perimeter wall column Base
4 425(B) 113.000 CM-A 4323.50 488555.50
outer wall sitting gallery column
Footing
column up to ground level
outer perimeter wall columns
outer wall sitting gallery column

Providing and placing in position resreq, column


twisted steel and hot rolled deformed or plain
steel reinforcement for R.C'C. work including
cutting, bending, binding etc. as per drawings
5 904 8027.470 KG-A 66.00 529813.02
and placing in position complete up to floor
two level including casern work for rein
for cement for Rcc
work TMT bar
Providing and fixing formwork including centering,
shuttering, strutting, staging, propping bracing etc. complete
6 428 and including its removal at all levels, for: Columns, Pillars, 938.69 SQ-A 306.20 287426.88
Piers and likes- rectangular or square in shape collumn:-
above ground beam up to p.l.

Fly ash masonry in plinth and foundation.Class 25 open


605(J)+ bhatta brick masonary
7 57.550 CM-A 2867.50 165024.63
626 in c,m, 1:6 in Foundation & plinth

Fly ash masonry in supper structure above plinth level


605(J)+ up to floor two level Class 25 open bhatta brick
8 169.83 CM-A 3040.00 516283.20
606+626 masonry
in c.m. 1:6 in s/s
Srno ItemId BOQDesc Quantity UOM Rate Amount

Steel work welded in built up sections, framed


work, including cutting hoisting fixing in' ''
position in gratings, frames, guard bars,
9 902 ladders, railing, brackets and similar works & 1236.00 KG-A 132.00 163152.00
trusses and trussed purlins up to 25m span and
15 m over all height Entrance gate

Providing and fixing in position collapsible Steel


shutters with vertical channels 20mm x 1Omm x 2mm
10 909 braced with flat iron diagonals 20mm x 5mm size with 8.40 SQ-A 4128.60 34680.24
top and bottom rails of T-iron 40mm x40mm x6mm
with 38mm dia steel pulleys complete with bolts and nut
Cement concrete flooring 1:z:4 (L cement,
2sand, 4graded stone aggregate, 20mm
nominal size) laid in one layer and finished with
floating coat of neat cement ‘Cement Concrete
11 1220(B) 294.38 CM-A 255.60 75243.53
Flooring cctt2:4t
over sitting step & wall to (50 mm )
outer perimeter wall Coping
outer wall sitting gallery Coping
12mm thick cement plaster on rough side of
wall in Cement mortar 1:6 (1cement,
12 1007(D) 846.45 SQ-A 91.30 77280.89
6sand)1lmm thick cement plaster in1:6 c.m'
sides

colour washing two coat over one


13 1311 948.57 SQ-A 11.60 11003.41
coat of white wash

Prime coat to wood, iron work or walls.prime coat


14 1333 68.60 SQ-A 39.90 2737.14
gate

Painting with enamel palnt, Drusnlng, lnrerlor


to give an even shade l/n cleaning the surface
15 1335 (a) of all dirt dust and other foreign matter on 83.90 SQ-A 108.80 9128.32
steel and other metal surfaces. painting 3coat
with enamel paint
Filling foundation and around masonry work with
moorum l/c ramming layers and watering.
16 402 37.96 CM-A 222.00 8427.12
Pavalion Room
Porch
Filling available excavated earth (excluding rock) in
trenches, plinth, sides of foundation etc, in layers not
17 401 exceeding 20cm in depth consolidating each deposited 20.91 CM-A 54.70 1143.78
layers by ramming and watering lead upto 50m and lift
upto 1.5m

15mm thick cement plaster on rough side of wall in


18 1009(D) 231.17 SQ-A 103.20 23856.74
Cement mortar '1 :6 (1 cement, 6sand)

10mm thick cement plaster on rough side of wall in


19 1005(D) 138.13 SQ-A 79.30 10953.71
Cement mortar 1 :6 (1 cement, 6sand)

Extra for providing and fixing glass strips in joints of floors


20 1229(A) 257.4 SQ-A 79.80 20540.52
(a) 50 mm thick

Extra rate for finishing with a floating cot of neat


21 1017 cement slurry over cement plaster of any thickness. 58.88 SQ-A 32.00 1884.16
Top of Roof Slab
Srno ItemId BOQDesc Quantity UOM Rate Amount

Snowcem or durocem paintinq of any shade


22 1318(A) (a) 2 coats on new work 276.26 SQ-A 15.40 4254.40

Oil bound distemper of approved quality of any shade


23 1323 two coats on new works including priming coat. 136.8 SQ-A 102.20 13980.96
Pavalion ln Side

Providing and laying nominal mix reinforcement cement


concrete with crushed stone aggregate using concrete mixer
24 425(C) in all works upto floor five level excluding cost of 7.60 CM-A 3913.90 29745.64
reinforcement and form work. 1:2:4 (1 cement : 2 coarse sand
: 4 graded stone aggregate 20mm nominal size).

TOTAL :- 2679632.73