C FENCING
3100mm High 50mm x 50mm x 3.3/2.8mm PVC coated mesh chain link fencing with
75mm x 75mm x 5mm thick angle post at 3000mm centres and 50mm x 50mm x
7 5mm thick bracing posts both embedded In and including 450mm x 450mm x 600mm
1 deep concrete footirgs, 150mm x 300mm deep concrete beam and 100mm x m 59.0 - -
200mm high concrete kerb with and including 4 strands of 12 SWG barbed wire and
all necessary painting
Mild Steel Gate - supply, transport and erect a complete double leaf of m.s gate to suit opening size of
2
2000 (W) x 2700 (H), comprising of 75mm x 75mm x 6mm mild steel frame and braces
No. 1.0 - -
D M&E WORKS
Supply, install, test and commision approved 60A (3phase) TNB KWH weatherproofed metering panel
complete with KHW meter mounted on and including concrete plinth with all necessary fixing and fitting
1 all in accordance with the manufacturers instructions including submission and liason with TNB, SESB & No. 1.0 - -
SESB.
*Any contribution and deposit shall be paid by Main Contractor
C GROUNDING WORKS
50mm2 earth cable using stay wire with one end to monopole leg with exposed cable run in 50mm
1 diameter galvanised iron pipe (covered with cement and stand (1:3) mortar after installation) and other LS 1.0 - -
end to 1200mm x 1200mm x 3mm thick copper plate
2 25mm copper tape to connect all chambers related for common grounding system m 50.0 - -
3 300mm x 300mm heavy duty earth chamber No 4.0 - -
4 Copper clad eathing rods - 6 feet earthing point c/w rod couplings and earth clamps No 8.0 - -
D PILING
Supply, hande, pitch, drive and out-off 250mm x 250mm precast reinforced
19 concrete piles including all necessary, testing, piing records, mobilisation m 432.0 - -
and demobilisation of piling machinery and equipment and carting away debris from site
Grand Total -