Professional Documents
Culture Documents
Cadangan Pembinaan untuk 1 unit gudang terbuka di atas PT 860, Jalan Subang Utama 6A, Off
Persiaran Tengku Ampuan, Lion Industrial Park, Seksyen 22, 40300 Shah Alam Selangor Darul Ehsan
untuk Tetuan Generation Essentials Enterprise Sdn. Bhd.
Date: 9/23/2022
Estimated
Area Population Equivalent,
No. Type of Development No. Of Total P.E
(m2) P.E
Worker/Unit
1 Warehouse (GF) 20 3800 0.3 per worker 6
2 Canteen 100 3 per 100m2 3
3 Musollah Lelaki 10 21 0.2 per worker 2
4 Musollah Perempuan 10 21 0.2 per worker 2
5 Warehouse (Mezz.1A & 1B) 20 5835 0.3 per worker 6
6 Warehouse (1F) 20 5605 0.3 per worker 6
7 Warehouse (2F) 20 5605 0.3 per worker 6
8 Warehouse (3F) 20 5605 0.3 per worker 6
9 Office (1A) 3340 3 per 100m2 100
10 Office (2A) 3340 3 per 100m2 100
11 Office (3A) 3340 3 per 100m2 100
12 1 Unit Guard House 2 18.95 1 per unit 1
Total = 339
'file:///conversion/tmp/activity_task_scratch/614668041.xls'#$P.E
Project:
Cadangan Pembinaan untuk 1 unit gudang terbuka di atas PT 860, Jalan Subang Utama 6A, Off
Persiaran Tengku Ampuan, Lion Industrial Park, Seksyen 22, 40300 Shah Alam Selangor Darul Ehsan
untuk Tetuan Generation Essentials Enterprise Sdn. Bhd.
FORMULAS
Date: 5/18/2018
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22)
MH-1 112.30 111.10 1.50 A
1837.1 3 per 100 m2 55 55 225 6.46 0.0009 225 0.0398 35 0.05625 0.013 1.91 0.0759 49 1.4 OK
MH-2 111.00 109.70 1.30 B
MH-2 111.00 109.70 1.30 B
395.37 3 per 100 m2 12 67 225 6.33 0.0011 225 0.0398 95 0.05625 0.013 1.16 0.0461 19 0.2 OK
MH-3 111.00 109.50 1.50 C
MH-3 111.00 109.50 1.50 C
1717.1 3 per 100 m2 52 118 225 5.94 0.0018 225 0.0398 65 0.05625 0.013 1.40 0.0557 57.5 0.88 OK
MH-4 110.00 108.62 1.38 B
MH-4 110.00 108.62 1.38 B
0 3 per 100 m2 0 118 225 5.94 0.0018 225 0.0398 200 0.05625 0.013 0.80 0.0318 31 0.16 OK
MH-5 110.00 108.46 1.54 E
MH-5 110.00 108.46 1.50 A
0 3 per 100 m2 0 118 225 5.94 0.0018 225 0.0398 200 0.05625 0.013 0.80 0.0318 19.5 0.1 OK
MH-6 110.40 108.36 2.04 D
MH-6 110.40 108.36 2.04 D
4916.7 3 per 100 m2 148 266 225 5.44 0.0038 225 0.0398 200 0.05625 0.013 0.80 0.0318 70 0.35 OK
MH-7 112.00 108.01 3.99 B
MH-7 112.00 108.01 3.99 B
0 3 per 100 m2 0 266 225 5.44 0.0038 225 0.0398 200 0.05625 0.013 0.80 0.0318 7 0.04 OK
MH-8 111.90 107.98 3.92 E
MH-8 111.90 107.98 3.92 E
0 3 per 100 m2 0 266 225 5.44 0.0038 225 0.0398 200 0.05625 0.013 0.80 0.0318 20 0.1 OK
MH-9 111.90 107.88 4.02 D
Peak Flow
Data:
Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)
Therefore;
Use VCP pipe size 225mmØ for MH-1 to MH-2 at gradient 1:35
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.
Peak Flow
Data:
Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)
Therefore;
Use VCP pipe size 225mmØ for MH-2 to MH-3 at gradient 1:95
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.
Peak Flow
Data:
Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)
Therefore;
Use VCP pipe size 225mmØ for MH-3 to MH-4 at gradient 1:65
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.
Peak Flow
Data:
Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)
Therefore;
Use VCP pipe size 225mmØ for MH-4 to MH-5 at gradient 1:65
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.
Peak Flow
Data:
Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)
Therefore;
Use VCP pipe size 225mmØ for MH-5 to MH-6 at gradient 1:65
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.
Peak Flow
Data:
Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)
Therefore;
Use VCP pipe size 225mmØ for MH-6 to MH-7 at gradient 1:95
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.
Peak Flow
Data:
Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)
Therefore;
Use VCP pipe size 225mmØ for MH-7 to MH-8 at gradient 1:95
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.
Peak Flow
Data:
Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)
Therefore;
Use VCP pipe size 225mmØ for MH-8 to MH-9 at gradient 1:95
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.
Peak Flow
Data:
Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)
Therefore;
Use VCP pipe size 225mmØ for MH-10B to MH-10A at gradient 1:95
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.
Peak Flow
Data:
Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)
Therefore;
Use VCP pipe size 225mmØ for MH-10A to MH-10 at gradient 1:95
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.
Peak Flow
Data:
Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)
Therefore;
Use VCP pipe size 225mmØ for MH-10 to MH-9 at gradient 1:95
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.
Peak Flow
Data:
Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)
Therefore;
Use VCP pipe size 225mmØ for MH-9 to STP at gradient 1:200