Project:

Cadangan Pembinaan untuk 1 unit gudang terbuka di atas PT 860, Jalan Subang Utama 6A, Off
Persiaran Tengku Ampuan, Lion Industrial Park, Seksyen 22, 40300 Shah Alam Selangor Darul Ehsan
untuk Tetuan Generation Essentials Enterprise Sdn. Bhd.

Project No: 2005

Date: 9/23/2022

Population Equivalent Calculation

Estimated
Area Population Equivalent,
No. Type of Development No. Of Total P.E
(m2) P.E
Worker/Unit
1 Warehouse (GF) 20 3800 0.3 per worker 6
2 Canteen 100 3 per 100m2 3
3 Musollah Lelaki 10 21 0.2 per worker 2
4 Musollah Perempuan 10 21 0.2 per worker 2
5 Warehouse (Mezz.1A & 1B) 20 5835 0.3 per worker 6
6 Warehouse (1F) 20 5605 0.3 per worker 6
7 Warehouse (2F) 20 5605 0.3 per worker 6
8 Warehouse (3F) 20 5605 0.3 per worker 6
9 Office (1A) 3340 3 per 100m2 100
10 Office (2A) 3340 3 per 100m2 100
11 Office (3A) 3340 3 per 100m2 100
12 1 Unit Guard House 2 18.95 1 per unit 1
Total = 339

'file:///conversion/tmp/activity_task_scratch/614668041.xls'#$P.E
Project:
Cadangan Pembinaan untuk 1 unit gudang terbuka di atas PT 860, Jalan Subang Utama 6A, Off
Persiaran Tengku Ampuan, Lion Industrial Park, Seksyen 22, 40300 Shah Alam Selangor Darul Ehsan
untuk Tetuan Generation Essentials Enterprise Sdn. Bhd.

Job No: CM 274 Date: 9/23/2022

Sewerage System Hydraulic Design

FORMULAS

1) Manning's Equation:- Q = 1/n A (R)2/3 (S)0.5

where; n = Roughness coefficient for pipe (0.013 for VCP pipe)


A = Cross-sectional area of flow (m2)
R = Hydraulic radius
S = Slope of Hydraulic radius

2) Crimps & Bruiges Equation:- v = 1/n (R)2/3(S)0.5

where; v = Average flow (m/s)


R = Hydraulic radius
S = Slope of Hydraulic radius

3) Peak Flow Factor (PFF) 4.7×(PE/1000)-0.11

4) Design Flow (Qd) = PE×225×PFF


(24×60×60×1000)
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN BENTONG/RAUB, MUKIM
BENTONG, DAERAH BENTONG, PAHANG DARUL MAKMUR UNTUK TETUAN GOLDEN FRIEDEN
DEVELOPMENT SDN. BHD.

Project No: CM 274

Date: 5/18/2018

Sewerage Design Calculation

Flow Computation Pipe Computation Manhole and Level Comp.

Average Cumulative Manning's Full pipe


Unit Peak Pipe Area of Gradient Hydraulic Capacity , Fall Ground Invert
Manhole to Population Total Cumulative Daily Peak Flow, Roughness Velocity, Length Depth
/Area Flow Dia. Pipe 1:X Radius Q Level Level MH Type Remarks
Manhole Equivalent, PE PE PE Contribution Qd Coeff., v (m) (m)
(m2) Factor (mmØ) (m2) (S) (m) (m3/s) (m) (m) (m)
(L//Day) (m3/s) n (m/s)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22)
MH-1 112.30 111.10 1.50 A
1837.1 3 per 100 m2 55 55 225 6.46 0.0009 225 0.0398 35 0.05625 0.013 1.91 0.0759 49 1.4 OK
MH-2 111.00 109.70 1.30 B
MH-2 111.00 109.70 1.30 B
395.37 3 per 100 m2 12 67 225 6.33 0.0011 225 0.0398 95 0.05625 0.013 1.16 0.0461 19 0.2 OK
MH-3 111.00 109.50 1.50 C
MH-3 111.00 109.50 1.50 C
1717.1 3 per 100 m2 52 118 225 5.94 0.0018 225 0.0398 65 0.05625 0.013 1.40 0.0557 57.5 0.88 OK
MH-4 110.00 108.62 1.38 B
MH-4 110.00 108.62 1.38 B
0 3 per 100 m2 0 118 225 5.94 0.0018 225 0.0398 200 0.05625 0.013 0.80 0.0318 31 0.16 OK
MH-5 110.00 108.46 1.54 E
MH-5 110.00 108.46 1.50 A
0 3 per 100 m2 0 118 225 5.94 0.0018 225 0.0398 200 0.05625 0.013 0.80 0.0318 19.5 0.1 OK
MH-6 110.40 108.36 2.04 D
MH-6 110.40 108.36 2.04 D
4916.7 3 per 100 m2 148 266 225 5.44 0.0038 225 0.0398 200 0.05625 0.013 0.80 0.0318 70 0.35 OK
MH-7 112.00 108.01 3.99 B
MH-7 112.00 108.01 3.99 B
0 3 per 100 m2 0 266 225 5.44 0.0038 225 0.0398 200 0.05625 0.013 0.80 0.0318 7 0.04 OK
MH-8 111.90 107.98 3.92 E
MH-8 111.90 107.98 3.92 E
0 3 per 100 m2 0 266 225 5.44 0.0038 225 0.0398 200 0.05625 0.013 0.80 0.0318 20 0.1 OK
MH-9 111.90 107.88 4.02 D

MH-10B 112.70 111.50 1.20 E


1693.3 3 per 100 m2 51 51 225 6.52 0.0009 225 0.0398 100 0.05625 0.013 1.13 0.0449 50 0.5 OK
MH-10A 112.20 111.00 1.20 D
MH-10A 112.20 111.00 1.20 E
792.82 3 per 100 m2 24 75 225 6.25 0.0012 225 0.0398 50 0.05625 0.013 1.60 0.0635 35 0.7 OK
MH-10 111.90 110.30 1.60 D
MH-10 111.90 110.30 1.60 E
0 3 per 100 m2 0 75 225 6.25 0.0012 225 0.0398 50 0.05625 0.013 1.60 0.0635 7.5 0.15 OK
MH-9 111.90 110.15 1.75 D

MH-9 111.90 107.88 4.02 D


0 3 per 100 m2 0 341 225 5.29 0.0047 225 0.0398 200 0.05625 0.013 0.80 0.0318 5 0.03 OK
STP
11352 341
(7) Peak Flow Factor = 4.7×(PE/1000)-0.11 (14) velocity, v = 1/n (R)2/3(S)0.5 (Manning's Equation)

(8) Design Flow, Qd = PE×225×PFF (15) Capacity, Q = 1/n A (R)2/3(S)0.5


(peak flow) (24×60×60×1000) = (14) × (10)
*Notes:
Design requirements:
Qd<Q,
0.8<V<3.00
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.

Job No: CM 274 Date: 9/23/2022

Peak Flow

Sewer capacity from MH-1 to MH-2

Data:

Sewer diameter, D = 225 mmØ


Area, A = 0.04 m2
Hydraulic Radius, R = 0.056 m
Gradient, S = 1 : 35
Manning's Roughness Coefficient,n = 0.013
Population, PE = 53 PE
Percapita = 225 Litres/P.E/Day

Peak Flow Factor, PFF = 4.7 × (P)-0.11


= 6.493

Design Flow, Qd = PE×225×PFF


(24×60×60×1000)
= 0.0009 m3/s

Using Manning's Equation = 1/n (R)2/3 (S)0.5


to find velocity, v = 1.91 m/s

to find Allowable Capacity, Q = 1/n A (R)2/3 (S)0.5 = v ×A


= 0.076 m /s
3

Allowable Capacity, Q > Design Capacity, Qd OK

Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)

Therefore;
Use VCP pipe size 225mmØ for MH-1 to MH-2 at gradient 1:35
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.

Job No: CM 274 Date: 9/23/2022

Peak Flow

Sewer capacity from MH-2 to MH-3

Data:

Sewer diameter, D = 225 mmØ


Area, A = 0.04 m2
Hydraulic Radius, R = 0.056 m
Gradient, S = 1 : 95
Manning's Roughness Coefficient,n = 0.013
Population, PE = 65 PE
Percapita = 225 Litres/P.E/Day

Peak Flow Factor, PFF = 4.7 × (P)-0.11


= 6.349

Design Flow, Qd = PE×225×PFF


(24×60×60×1000)
= 0.0011 m3/s

Using Manning's Equation = 1/n (R)2/3 (S)0.5


to find velocity, v = 1.16 m/s

to find Allowable Capacity, Q = 1/n A (R)2/3 (S)0.5 = v ×A


= 0.046 m /s
3

Allowable Capacity, Q > Design Capacity, Qd OK

Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)

Therefore;
Use VCP pipe size 225mmØ for MH-2 to MH-3 at gradient 1:95
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.

Job No: CM 274 Date: 9/23/2022

Peak Flow

Sewer capacity from MH-3 to MH-4

Data:

Sewer diameter, D = 225 mmØ


Area, A = 0.04 m2
Hydraulic Radius, R = 0.056 m
Gradient, S = 1 : 65
Manning's Roughness Coefficient,n = 0.013
Population, PE = 114 PE
Percapita = 225 Litres/P.E/Day

Peak Flow Factor, PFF = 4.7 × (P)-0.11


= 5.968

Design Flow, Qd = PE×225×PFF


(24×60×60×1000)
= 0.0018 m3/s

Using Manning's Equation = 1/n (R)2/3 (S)0.5


to find velocity, v = 1.40 m/s

to find Allowable Capacity, Q = 1/n A (R)2/3 (S)0.5 = v ×A


= 0.056 m /s
3

Allowable Capacity, Q > Design Capacity, Qd OK

Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)

Therefore;
Use VCP pipe size 225mmØ for MH-3 to MH-4 at gradient 1:65
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.

Job No: CM 274 Date: 9/23/2022

Peak Flow

Sewer capacity from MH-4 to MH-5

Data:

Sewer diameter, D = 225 mmØ


Area, A = 0.04 m2
Hydraulic Radius, R = 0.056 m
Gradient, S = 1 : 65
Manning's Roughness Coefficient,n = 0.013
Population, PE = 114 PE
Percapita = 225 Litres/P.E/Day

Peak Flow Factor, PFF = 4.7 × (P)-0.11


= 5.968

Design Flow, Qd = PE×225×PFF


(24×60×60×1000)
= 0.0018 m3/s

Using Manning's Equation = 1/n (R)2/3 (S)0.5


to find velocity, v = 1.40 m/s

to find Allowable Capacity, Q = 1/n A (R)2/3 (S)0.5 = v ×A


= 0.056 m /s
3

Allowable Capacity, Q > Design Capacity, Qd OK

Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)

Therefore;
Use VCP pipe size 225mmØ for MH-4 to MH-5 at gradient 1:65
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.

Job No: CM 274 Date: 9/23/2022

Peak Flow

Sewer capacity from MH-5 to MH-6

Data:

Sewer diameter, D = 225 mmØ


Area, A = 0.04 m2
Hydraulic Radius, R = 0.056 m
Gradient, S = 1 : 65
Manning's Roughness Coefficient,n = 0.013
Population, PE = 114 PE
Percapita = 225 Litres/P.E/Day

Peak Flow Factor, PFF = 4.7 × (P)-0.11


= 5.968

Design Flow, Qd = PE×225×PFF


(24×60×60×1000)
= 0.0018 m3/s

Using Manning's Equation = 1/n (R)2/3 (S)0.5


to find velocity, v = 1.40 m/s

to find Allowable Capacity, Q = 1/n A (R)2/3 (S)0.5 = v ×A


= 0.056 m /s
3

Allowable Capacity, Q > Design Capacity, Qd OK

Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)

Therefore;
Use VCP pipe size 225mmØ for MH-5 to MH-6 at gradient 1:65
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.

Job No: CM 274 Date: 9/23/2022

Peak Flow

Sewer capacity from MH-6 to MH-7

Data:

Sewer diameter, D = 225 mmØ


Area, A = 0.04 m2
Hydraulic Radius, R = 0.056 m
Gradient, S = 1 : 95
Manning's Roughness Coefficient,n = 0.013
Population, PE = 257 PE
Percapita = 225 Litres/P.E/Day

Peak Flow Factor, PFF = 4.7 × (P)-0.11


= 5.458

Design Flow, Qd = PE×225×PFF


(24×60×60×1000)
= 0.0037 m3/s

Using Manning's Equation = 1/n (R)2/3 (S)0.5


to find velocity, v = 1.16 m/s

to find Allowable Capacity, Q = 1/n A (R)2/3 (S)0.5 = v ×A


= 0.046 m /s
3

Allowable Capacity, Q > Design Capacity, Qd OK

Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)

Therefore;
Use VCP pipe size 225mmØ for MH-6 to MH-7 at gradient 1:95
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.

Job No: CM 274 Date: 9/23/2022

Peak Flow

Sewer capacity from MH-7 to MH-8

Data:

Sewer diameter, D = 225 mmØ


Area, A = 0.04 m2
Hydraulic Radius, R = 0.056 m
Gradient, S = 1 : 95
Manning's Roughness Coefficient,n = 0.013
Population, PE = 257 PE
Percapita = 225 Litres/P.E/Day

Peak Flow Factor, PFF = 4.7 × (P)-0.11


= 5.458

Design Flow, Qd = PE×225×PFF


(24×60×60×1000)
= 0.0037 m3/s

Using Manning's Equation = 1/n (R)2/3 (S)0.5


to find velocity, v = 1.16 m/s

to find Allowable Capacity, Q = 1/n A (R)2/3 (S)0.5 = v ×A


= 0.046 m /s
3

Allowable Capacity, Q > Design Capacity, Qd OK

Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)

Therefore;
Use VCP pipe size 225mmØ for MH-7 to MH-8 at gradient 1:95
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.

Job No: CM 274 Date: 9/23/2022

Peak Flow

Sewer capacity from MH-8 to MH-9

Data:

Sewer diameter, D = 225 mmØ


Area, A = 0.04 m2
Hydraulic Radius, R = 0.056 m
Gradient, S = 1 : 95
Manning's Roughness Coefficient,n = 0.013
Population, PE = 257 PE
Percapita = 225 Litres/P.E/Day

Peak Flow Factor, PFF = 4.7 × (P)-0.11


= 5.458

Design Flow, Qd = PE×225×PFF


(24×60×60×1000)
= 0.0037 m3/s

Using Manning's Equation = 1/n (R)2/3 (S)0.5


to find velocity, v = 1.16 m/s

to find Allowable Capacity, Q = 1/n A (R)2/3 (S)0.5 = v ×A


= 0.046 m /s
3

Allowable Capacity, Q > Design Capacity, Qd OK

Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)

Therefore;
Use VCP pipe size 225mmØ for MH-8 to MH-9 at gradient 1:95
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.

Job No: CM 274 Date: 9/23/2022

Peak Flow

Sewer capacity from MH-10B to MH-10A

Data:

Sewer diameter, D = 225 mmØ


Area, A = 0.04 m2
Hydraulic Radius, R = 0.056 m
Gradient, S = 1 : 95
Manning's Roughness Coefficient,n = 0.013
Population, PE = 49 PE
Percapita = 225 Litres/P.E/Day

Peak Flow Factor, PFF = 4.7 × (P)-0.11


= 6.549

Design Flow, Qd = PE×225×PFF


(24×60×60×1000)
= 0.0008 m3/s

Using Manning's Equation = 1/n (R)2/3 (S)0.5


to find velocity, v = 1.16 m/s

to find Allowable Capacity, Q = 1/n A (R)2/3 (S)0.5 = v ×A


= 0.046 m /s
3

Allowable Capacity, Q > Design Capacity, Qd OK

Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)

Therefore;
Use VCP pipe size 225mmØ for MH-10B to MH-10A at gradient 1:95
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.

Job No: CM 274 Date: 9/23/2022

Peak Flow

Sewer capacity from MH-10A to MH-10

Data:

Sewer diameter, D = 225 mmØ


Area, A = 0.04 m2
Hydraulic Radius, R = 0.056 m
Gradient, S = 1 : 95
Manning's Roughness Coefficient,n = 0.013
Population, PE = 72 PE
Percapita = 225 Litres/P.E/Day

Peak Flow Factor, PFF = 4.7 × (P)-0.11


= 6.278

Design Flow, Qd = PE×225×PFF


(24×60×60×1000)
= 0.0012 m3/s

Using Manning's Equation = 1/n (R)2/3 (S)0.5


to find velocity, v = 1.16 m/s

to find Allowable Capacity, Q = 1/n A (R)2/3 (S)0.5 = v ×A


= 0.046 m /s
3

Allowable Capacity, Q > Design Capacity, Qd OK

Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)

Therefore;
Use VCP pipe size 225mmØ for MH-10A to MH-10 at gradient 1:95
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.

Job No: CM 274 Date: 9/23/2022

Peak Flow

Sewer capacity from MH-10 to MH-9

Data:

Sewer diameter, D = 225 mmØ


Area, A = 0.04 m2
Hydraulic Radius, R = 0.056 m
Gradient, S = 1 : 95
Manning's Roughness Coefficient,n = 0.013
Population, PE = 72 PE
Percapita = 225 Litres/P.E/Day

Peak Flow Factor, PFF = 4.7 × (P)-0.11


= 6.278

Design Flow, Qd = PE×225×PFF


(24×60×60×1000)
= 0.0012 m3/s

Using Manning's Equation = 1/n (R)2/3 (S)0.5


to find velocity, v = 1.16 m/s

to find Allowable Capacity, Q = 1/n A (R)2/3 (S)0.5 = v ×A


= 0.046 m /s
3

Allowable Capacity, Q > Design Capacity, Qd OK

Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)

Therefore;
Use VCP pipe size 225mmØ for MH-10 to MH-9 at gradient 1:95
Project:
CADANGAN PEMBANGUNAN 5 BLOK KEDAI PEJABAT (39 UNIT) YANG
MENGANDUNGI :
i ) BLOK A - KEDAI PEJABAT 3 TINGKAT - 8 UNIT
ii ) BLOK B - KEDAI PEJABAT 2&3 TINGKAT - 5 UNIT
iii ) BLOK C - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
iv ) BLOK D - KEDAI PEJABAT 2 TINGKAT - 10 UNIT
v ) BLOK E - KEDAI PEJABAT 2 TINGKAT - 8 UNIT
BERSERTA 1 UNIT PENCAWANG ELEKTRIK DIATAS LOT 17319, JALAN
BENTONG/RAUB, MUKIM BENTONG, DAERAH BENTONG, PAHANG DARUL
MAKMUR UNTUK TETUAN GOLDEN FRIEDEN DEVELOPMENT SDN. BHD.

Job No: CM 274 Date: 9/23/2022

Peak Flow

Sewer capacity from MH-9 to STP

Data:

Sewer diameter, D = 225 mmØ


Area, A = 0.04 m2
Hydraulic Radius, R = 0.056 m
Gradient, S = 1 : 200
Manning's Roughness Coefficient,n = 0.013
Population, PE = 329 PE
Percapita = 225 Litres/P.E/Day

Peak Flow Factor, PFF = 4.7 × (P)-0.11


= 5.311

Design Flow, Qd = PE×225×PFF


(24×60×60×1000)
= 0.0046 m3/s

Using Manning's Equation = 1/n (R)2/3 (S)0.5


to find velocity, v = 0.80 m/s

to find Allowable Capacity, Q = 1/n A (R)2/3 (S)0.5 = v ×A


= 0.032 m /s
3

Allowable Capacity, Q > Design Capacity, Qd OK

Thus;
The result satisfy the design requirements Design Capacity, Qd < Allowable capacity, Q and
velocity, v is higher than 0.8m/s but not more than 3m/s (0.8 < v < 3)

Therefore;
Use VCP pipe size 225mmØ for MH-9 to STP at gradient 1:200