From table 14.3 (Vol.5-MASMA), minimum time of concentration for roof area is;
tc = 5 minutes
tcs = 5 minutes
10
I30 = 124.5 mm/hr
10
I60 = 83.6 mm/hr
10
P30 = 62.2 mm
10
P60 = 83.6 mm
Pd = P30 - Fd(P60-P30)
10P5 = 17.9 mm
Therefore
I = 214.6 mm/hr
Using the Rational Method, the pre and post-development flows are calculated as follows :
Page 1
10ARI
PSD = a - ( a2 - 4b )1/2
2
where,
Qa Qp tc tcs a b a2 PSD
(l/s) (l/s) (mins) (mins) (l/s)
2809.02 2643.79 10 15 39340.80 63481436.98 1547698339.98 1685.87
where,
a b c d I
td (mins) 5.2993 0.4270 -0.1780 0.0082 ln(rIt) (mm/hr)
a b(lnt) c(lnt)2 d(lnt)3 50-yr ARI
5 5.299 0.687 -0.461 0.034 5.560 259.73
10 5.299 0.983 -0.944 0.100 5.439 230.18
15 5.299 1.156 -1.305 0.163 5.313 202.98
20 5.299 1.279 -1.597 0.220 5.201 181.54
25 5.299 1.374 -1.844 0.273 5.103 164.51
30 5.299 1.452 -2.059 0.323 5.015 150.67
35 5.299 1.518 -2.250 0.369 4.936 139.20
40 5.299 1.575 -2.422 0.412 4.864 129.53
45 5.299 1.625 -2.579 0.452 4.798 121.23
50 5.299 1.670 -2.724 0.491 4.737 114.04
55 5.299 1.711 -2.858 0.528 4.680 107.73
60 5.299 1.748 -2.984 0.563 4.626 102.15
Page 2
10ARI
I
td (mm/hr) Impervious Area Pervious Area SCA Qd
(mins) 50-yr ARI C A (m2) C A (m2) (l/s)
5 259.730 0.900 27720.755 0.80 27720.755 47125.28 3399.96
10 230.182 0.900 27720.755 0.79 27720.755 46848.08 2995.45
15 202.982 0.900 27720.755 0.78 27720.755 46570.87 2625.84
20 181.542 0.900 27720.755 0.77 27720.755 46293.66 2334.52
25 164.507 0.895 27720.755 0.76 27720.755 45877.85 2096.45
30 150.673 0.895 27720.755 0.75 27720.755 45600.64 1908.56
35 139.204 0.890 27720.755 0.74 27720.755 45184.83 1747.20
40 129.526 0.890 27720.755 0.73 27720.755 44907.62 1615.75
45 121.234 0.890 27720.755 0.72 27720.755 44630.42 1502.98
50 114.042 0.885 27720.755 0.71 27720.755 44214.60 1400.64
55 107.735 0.885 27720.755 0.70 27720.755 43937.40 1314.88
60 102.153 0.885 27720.755 0.69 27720.755 43660.19 1238.89
Page 3
10ARI
The primary outlet orifice is saiz to discharge the PSD assuming free outlet condition when storage is full.
The required orifice size under free outlet condition is calculated by rearranging Equation 19.3:
Where,
Therefore,
Ao = 0.868 m2
Do = 1.051 m , 1051.29910790836 mm
a b c d I
td (mins) 6.3202 -0.0778 -0.0849 0.0026 ln(rIt) (mm/hr)
a b(lnt) c(lnt)2 d(lnt)3 100-yr ARI
30 6.3202 -0.26 -0.98 0.10 5.18 177
60 6.3202 -0.32 -1.42 0.18 4.76 116
50P30 = 88 mm
50P60 = 116 mm
Page 4
10ARI
Pd = P30 - Fd(P60-P30)
50P20 = 75 mm
Therefore
50I20 = 226 mm/hr
Using the Rational Method, the major system flow is calculated as follow:
H= 1.00 m
CBCW = 1.70
B= Qd …………….(Equation 20.6)
CBCW H1.5
B= 1.740 m
Page 5
2ARI
From table 14.3 (Vol.5-MASMA), minimum time of concentration for roof area is;
tc = 5 minutes
tcs = 5 minutes
10
I30 = 98.2 mm/hr
10
I60 = 63.4 mm/hr
10
P30 = 49.1 mm
10
P60 = 63.4 mm
Pd = P30 - Fd(P60-P30)
10P5 = 19.4 mm
Therefore
I = 232.5 mm/hr
Using the Rational Method, the pre and post-development flows are calculated as follows :
Page 6
2ARI
PSD = a - ( a2 - 4b )1/2
2
where,
Qa Qp tc tcs a b a2 PSD
(l/s) (l/s) (mins) (mins) (l/s)
3043.42 2864.39 10 15 42623.48 74517508.74 1816761403.91 1826.55
where,
a b c d I
td (mins) 5.2993 0.4270 -0.1780 0.0082 ln(rIt) (mm/hr)
a b(lnt) c(lnt)2 d(lnt)3 50-yr ARI
5 5.299 0.687 -0.461 0.034 5.560 259.73
10 5.299 0.983 -0.944 0.100 5.439 230.18
15 5.299 1.156 -1.305 0.163 5.313 202.98
20 5.299 1.279 -1.597 0.220 5.201 181.54
25 5.299 1.374 -1.844 0.273 5.103 164.51
30 5.299 1.452 -2.059 0.323 5.015 150.67
35 5.299 1.518 -2.250 0.369 4.936 139.20
40 5.299 1.575 -2.422 0.412 4.864 129.53
45 5.299 1.625 -2.579 0.452 4.798 121.23
50 5.299 1.670 -2.724 0.491 4.737 114.04
55 5.299 1.711 -2.858 0.528 4.680 107.73
60 5.299 1.748 -2.984 0.563 4.626 102.15
Page 7
2ARI
I
td (mm/hr) Impervious Area Pervious Area SCA Qd
(mins) 50-yr ARI C A (m2) C A (m2) (l/s)
5 259.730 0.900 27720.755 0.80 27720.755 47125.28 3399.96
10 230.182 0.900 27720.755 0.79 27720.755 46848.08 2995.45
15 202.982 0.900 27720.755 0.78 27720.755 46570.87 2625.84
20 181.542 0.900 27720.755 0.77 27720.755 46293.66 2334.52
25 164.507 0.895 27720.755 0.76 27720.755 45877.85 2096.45
30 150.673 0.895 27720.755 0.75 27720.755 45600.64 1908.56
35 139.204 0.890 27720.755 0.74 27720.755 45184.83 1747.20
40 129.526 0.890 27720.755 0.73 27720.755 44907.62 1615.75
45 121.234 0.890 27720.755 0.72 27720.755 44630.42 1502.98
50 114.042 0.885 27720.755 0.71 27720.755 44214.60 1400.64
55 107.735 0.885 27720.755 0.70 27720.755 43937.40 1314.88
60 102.153 0.885 27720.755 0.69 27720.755 43660.19 1238.89
Page 8
2ARI
The primary outlet orifice is saiz to discharge the PSD assuming free outlet condition when storage is full.
The required orifice size under free outlet condition is calculated by rearranging Equation 19.3:
Where,
Therefore,
Ao = 0.941 m2
Do = 1.094 m , 1094.28183603161 mm
a b c d I
td (mins) 6.3202 -0.0778 -0.0849 0.0026 ln(rIt) (mm/hr)
a b(lnt) c(lnt)2 d(lnt)3 100-yr ARI
30 6.3202 -0.26 -0.98 0.10 5.18 177
60 6.3202 -0.32 -1.42 0.18 4.76 116
50P30 = 88 mm
50P60 = 116 mm
Page 9
2ARI
Pd = P30 - Fd(P60-P30)
50P20 = 75 mm
Therefore
50I20 = 226 mm/hr
Using the Rational Method, the major system flow is calculated as follow:
H= 1.00 m
CBCW = 1.70
B= Qd …………….(Equation 20.6)
CBCW H1.5
B= 1.740 m
Page 10
STORMWATER DRAINAGE SYSTEM DESIGN
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (14) (16) (17) (18) (19)
Coefficient of Runoff
Overland Flow Time,
Rainfall Intensity
Equivalent Area
Concentration, tc
Time of Flow in
Length of Drain
Critical Time of
Sub-Area Node
Q = (C x A)x I
Flow Capacity
Flow Velocity
Drain Section
Invert Level
Design ARI
Discharge
(C x A)
Gradient
Area (A)
Area (A)
Number
Section
(1:n)
(I)
Size
(C)
to
td
m m2 ha Years min min mm/hr ha m3/s m3/s m/s min m, LSD
A1 a1-a2 33 1239 0.1240 5 5 0.54 6 207 0.91 0.1128 0.06 450 BD 400 0.15 0.86 will flow to BD
A2 a2-a5 90 2711 0.2713 5 5 1.49 6 207 0.91 0.2469 0.14 450 BD 400 0.15 0.86 will flow to BD
A3 a3-a4 36 1248 0.1249 5 5 0.60 6 207 0.91 0.1136 0.07 450 BD 400 0.15 0.86 will flow to BD
A4 A4-a5 58 1342 0.1343 5 5 0.97 6 207 0.91 0.1222 0.07 450 BD 400 0.15 0.86 will flow to BD
A5 a5-a6 7 162 0.0162 5 5 0.12 5 226 0.91 0.0148 0.01 450 BD 400 0.15 0.86 will flow to BC
A6 a6-a7 8 900x750 BC 200 2.18 3.23 will flow to earth drain
arth drain