PRODUCTIVITY
RESOURCES - LABOR AND EQUIPMENT
Sr. No. ITEM
Unit Qty LABOR EQUIPMENT
EXCAVATION & EARTHWORKS Operator Helper Labour Mason Shovel Digger Roller Compactor
2 Wall shutter m2 22 1 1 1
3 Beam Bottom m2 14 1 1 1
4 Beam Sides m2 20 1 1 1
Page 1 of 8
8 HRS
Sr. No. ITEM PRODUCTIVITY LABOR
Unit Qty
CONCRETE WORKS Carpenter Steel Fixer Con Mason Helper
a Formwork m2 40 1 1
b Concrete m 3
20 2 3
b Concrete m 3
40 2 3
3 Column footings / Pile Caps
a Formwork m2 30 2 2
b Reinforcement (fabrication & fix) kg 170 1
c Concrete m 3
55 2 2
4 Strip footings
a Formwork m2 25 2 2
b Reinforcement (fabrication & fix) kg 170 1
c Concrete m 3
55 2 2
5 Pedestals (Neck Columns)
a Formwork m2 25 2 1
b Reinforcement (fabrication & fix) kg 160 1
c Concrete m3 20 1 2
6 Tie Beams
a Formwork m2 30 2 1
c Concrete m3 20 2 2
7 Slab on grade
a Formwork m2 30 3 1
b Reinforcement (fabrication & fix) kg 160 1
c Concrete m3 18 1 2
d De-Shuttering m 2
9 Shear Walls
a Formwork m2
b Reinforcement (fabrication & fix) kg
c Concrete m3
d De-Shuttering m2
10 Columns upto 0.5 sqm in area (using fabricated forms)
a Formwork m2 14 2 1
b Reinforcement (fabrication & fix) kg 160 1
c Concrete m3 9 1 2
d De-Shuttering m 2
Page 2 of 8
8 HRS
Sr. No. ITEM PRODUCTIVITY LABOR
Unit Qty
CONCRETE WORKS Carpenter Steel Fixer Con Mason Helper
11 Beams
a Formwork m2 20 2 2
b Reinforcement (fabrication & fix) kg 160 1
c Concrete m3 15 1 2
d De-Shuttering m 2
12 Slabs (Solid)
a Formwork m2 15 1 1
b Reinforcement (fabrication & fix) kg 200 1
c Concrete m 3
75 3 3
d De-Shuttering m2
13 Slabs (Hourdy)
a Formwork m2
c Concrete m 3
12 1 1
15 Cantilevers
a Formwork m2 12 1 1
16 Stairs
a Formwork m2 15 1 1
18 Lintels
a Formwork m2 8 1 1
Page 3 of 8
8 HRS
Sr. No. ITEM PRODUCTIVITY LABOR
Unit Qty
BLOCK WORK Block Mason Helper
Page 4 of 8
8 HRS
Sr. No. ITEM PRODUCTIVITY LABOR
Unit Qty
TILING WORK Tiler Helper
9 Terrazzo Tiles m2 20 1 1
10 Terrazzo Skirting LM 40 1 1
Page 5 of 8
8 HRS
Sr. No. ITEM PRODUCTIVITY LABOR
Unit Qty
WOOD WORKS Joiner Helper
7 Handrail LM
5 Aluminium Cladding m2
6 Skylights m2
Page 6 of 8
MEP LABOR PRODUCTION RATES
8 HRS
Sr. No. ITEM PRODUCTIVITY LABOR
Unit Qty
PLUMBING & DRAINAGE Plumber Helper
1 Water Supply Pipes (PEX) LM
2 Water Supply Pipes (PRP) LM
3 Valves & Accessories of varying diameter No
9 Water Meter No
10 Waste Water Drainage Pipes & Fittings below grade LM
11 Waste Water Drainage Pipes & Fittings above grade LM
12 Sump Pumpset No
15 W/C - Western No 3 1 1
16 Shower set No
17 Urinal No
18 MOP sink No
19 Bidet No 3 1 1
Page 7 of 8
MEP LABOR PRODUCTION RATES
8 HRS
Sr. No. ITEM PRODUCTIVITY LABOR
Unit Qty
ELECTRICAL WORKS Electrician Helper
1 Duct Laying LM 50 1 1
2 P.V.C Conduits Layings LM 200 1 1
3 G.I Conduits Layings LM 50 1 1
13 DB Installation No 2 1 1
14 MDB/SMDB Installation No 1 4 2
15 LV Panels Installation No
16 Motor Control Centres No
17 Sockets Installation No 80 1 1
18 Switches Installation No 80 1 1
19 Light Fixtures Installation No 50 1 1
20 Earthing System No
21 Generator set No
22 Main Cable Laying LM
22 CCTV System No
23 Telephone Equipment Installation No 5 1 1
4 Sprinklers No
5 Valves & Accessories No
6 Fire Protection Pumpset No
7 Fire gas Suppression System No
8 Fire Alarm Control Panel No
Page 8 of 8