Professional Documents
Culture Documents
2 P.C.C Cum
4 Shuttering Works
Fixing Starter For R/W- 1 side Length tobe measured Rmt All Floors
Making starter for column Nos All Floors
Making starter for R/W or core wall Rmt All Floors
All Staging works up to 30m for Shuttering Sqm All Floors
All Staging works up to 30m for De - Shuttering Sqm All Floors
Labour charge for erection around stagging for column Nos All Floors
5 Steel(Reinforcement Works )
For Footing/Pedestals MT Basement Floor/GF
For Plinth Beams MT Basement Floor/GF
For Columns Slab/Beam/Staircase/RCC wall (Lift wall) MT GF
MT 1st
MT 2nd
MT 3rd
MT 4th
MT 5th
MT 6th
MT 7th
MT 8th
MT 9th
MT 10th
MT 11th
MT 12th
MT 13th
MT 14th
MT 15th
MT 16th
MT 17th
MT 18th
MT 19th
MT 20th
MT Terrace/Abv Terrace
11 Column Plastering
2500
250
120
75
85
200
50
80
80
100
100
100
100
100
110
110
110
110
120
120
120
120
100
90
50
50
50
50
30
50
30
30
40
40
10
8
40
3000
3000
3000
3800
3900
4000
4100
4200
4300
4400
4500
4600
4700
4800
4900
5000
5100
5200
5300
5400
5500
5600
5700
5800
3000
3000
100
50
100
200
50
300
225
200
65
65
65
65
65
65
70
70
70
70
70
75
75
75
75
75
80
80
80
80
80
80
120
120
120
120
130
130
130
130
140
140
140
140
150
150
150
150
160
160
160
160
160
160
70
70
70
70
70
70
75
75
75
75
75
80
80
80
80
80
85
85
85
85
85
85
50
80
325
85+20
85+20
85+20
85+20
85+20
85+20
95+20
95+20
95+20
95+20
95+20
105+20
105+20
105+20
105+20
105+20
115+20
115+20
115+20
115+20
115+20
115+20
Rates
Item description unit Floor
Skywood Midtown Harmony Gainz Empyrean
Shuttering Works
Shuttering+Deshuttering for 100 80 90 110
Footing/Raft/Pedestals Sqm Basement
Shuttering+Deshuttering for Plinth 100 80 90 130
Beams Sqm Basement
100 95 95 80
Shuttering+Deshuttering for Columns Sqm Basement
Podium slan beam Sqm GF 100
Shuttering+Deshuttering for Retaining 100 80 95
wall Sqm Basement/GF
Shuttering+Deshuttering for UG 100 90 95
sump/darin Sqm Basement
Basement to 105
Column/Beam/slab/Staircase/RCC
wall/Lift wall including Vertical shifting Sqm terrace floor
Above 150
Sqm terrace floor
Basement to
350
Placing concrete by RMC of all grades cum 10th floor
11th floor to
400
cum 15th floor
16th floor to 450
cum Terrace
Steel(Reinforcement Works )
Basement 3200 3000/3400 3400
For Footing/Pedestals MT Floor/GF
Basement 3200 3000/3400 3400
For Plinth Beams MT Floor/GF
For Retaining wall MT Basement 4000 3000 3250
For UG sump/drain MT Basement 3200 3000 3250
Charges for shiting of Steel MT All floors 200 200 200
Masonry
1 Sqm GF 85
8"/6"/4"thick masonry
Sqm FF 95
(For Emp 350
2 Size Stone Masonry Cum Site)
85+20 110 110
3 Solid B/W 100/150/200+ Shifting Sqm Basement/GF
Sqm 1st 85+20 110 110
Sqm 2nd 85+20 110 110
Sqm 3rd 85+20 110 110
Sqm 4th 85+20 110 110
Sqm 5th 85+20 110 110
Sqm 6th 95+20 110 110
Sqm 7th 95+20 110 110
Sqm 8th 95+20 110 110
Sqm 9th 95+20 110 110
Sqm 10th 95+20 110 110
Sqm 11th 105+20
Sqm 12th 105+20
Sqm 13th 105+20
Sqm 14th 105+20
Sqm 15th 105+20
Sqm 16th 115+20
Sqm 17th 115+20
Sqm 18th 115+20
Sqm 19th 115+20
Sqm 20th 115+20
Terrace/Abv 115+20
Sqm Terrace
Internal Plastering
Column Plastering
External Plastering
In two coats using CM of required
thickness excluding scaffolding & 160 120 110
including mesh fixing, patties coving,
sponge finishing on top coat etc.,
(groove & drip mould extra) Sqm Basement/GF
Sqm 1st 160 120
Sqm 2nd 160 120
Sqm 3rd 160 120
Sqm 4th 160 130
Sqm 5th 160 130
Sqm 6th 160 130
Sqm 7th 160 130
Sqm 8th 160 140
Sqm 9th 160 140
Sqm 10th 160 140
Sqm 11th 160 140
Sqm 12th 160 150
Sqm 13th 160 150
Sqm 14th 160 150
Sqm 15th 160 150
Sqm 16th 160 160
Sqm 17th 160 160
Sqm 18th 160 160
Sqm 19th 160 160
Sqm 20th 160 160
Terrace/Abv 160 160
Sqm Terrace
Flooring+Dadoing+Granite Works
Ceramic Tiles flooring/dado sqm All floors 100
Vitrified Tiles flooring/dado sqm All floors 125
Vitrified Tile skirting Rmt All floors 25
Granite Flooring 20mm thick sqm All floors 376.6
Granite skirting, risers, borders Rmt All floors 98.4
Graite nosing, Half round Rmt All floors 70
Graite nosing,Full round Rmt All floors 130
100
5
Supply of C-Clamp 600mm lenth using MS flat 30X5/6mm with 100mm
bend at one end 106.00 No.s
6
Supply of C-Clamp 600mm lenth using MS flat 30X5/6mm with 100mm
bend at one end 106.00 No.s
Supply of 16mm dia Tie rod of 650mm length with 200mm length
7 threading @ one end & 100mm rod welded to other end as T-bar
including nut & washer with proper welding as per instructions 120.00 No.s
Roofing for labour shed using MS pipe , GI sheet & screws as per
instructions-GI sheet roofing at labour colony toilets & wash rooms using
25mm dia steel rod and GI sheets as per instructions. 40.00 Sqm
Cutting & giving extra rods support to place tie rods in wailer using 25mm
dua rod of 50mm length using their own consumables 4.00 Nos
10
Labour charges for making of Handrial using 60mm MS pipe, 20x20mm
MS Square pipe at PMC Office; 500kgs for making handrail using 60mm
MS pipe, 20x20mm MS sq pipe at PMS offfice 15.00 Kgs
Labour charges for making MS stand using 60mm MS pipe as per
instructions at site.; 180kg for making MS stand 12.00 Kgs
Roofing for labour shed using MS pipe , GI sheet & screws as per
instructions-GI sheet roofing at labour colony toilets & wash rooms using
25mm dia steel rod and GI sheets as per instructions.- Fixing of G.I sheet
for labour school roofing with self taping screws 60.00 Sqm
11
Fixing of GI sheets of approved gauge, shape & size on MS pipes for
Barricating including the cost of lead, lift, tieing, etc., complete- for
compound wall with self taping screws at south and rear side, east side
of size 0.9X4m inculding horizontal bracing pipe fixing of 25mm dia and
fixing of vertical channal of ISMC 100X50mm. 60.00 Sqm
Labour charges for fabrication and welding of toilet door in labour shed
using 25mm square tube,using own consumables like gas, welding rod &
Welding machine. 12.00 Kgs
Labour charges for Fabrication of Column starter using ISMC sections-
including cutting, drilling hole of required dia, complete with one coat of
red oxide primer; 770kgs for fabrication of column starter 12.00 Kgs
Engaging required labour for the Batching plant for feeding cement &
aggregate and fixing pipeline for concrete pumping as per requirement-
LS amount for Batching plant with gang of min 10 labours for cement
feeding & pipe line aligning. from 7th July 2012 95,000.00
Engaging required labour for the Batching plant for feeding cement &
aggregate and fixing pipeline for concrete pumping as per requirement-
LS amount for Batching plant with gang of min 12 labours for cement
18 feeding & pipe line aligning. (from 16th sept'12 to 30th sept'13) 140,000.00 Month
Drilling hole of 16 mm dia, 150mm deep and fixing 12mm dia rebar using
HILTI RE 500 chemical mortar.-Horizontal bars- For Columns as per
instructions at site. (Due revision of drawing) 176.00 Nos
Drilling hole of 20mm dia, 300mm deep and fixing 16mm dia rebar using
HILTI RE 500 chemical mortar.-Vertical bars- For Columns as per
instructions at site. (Due to revision of drawing) 744.00 Nos
Drilling hole of 25mm dia, 300mm deep and fixing 20mm dia rebar using
HILTI RE 500 chemical mortar.-Vertical bars- For Columns as per
19 instructions at site. 883.00 Nos
21 Cleaning, Oiling & Painting of Floor Forms.-of size 1.15mtx0.6m 30.00 Nos
Charges towards pest control treatment using chemicals at
recommended proportions as directed by PIC-Bed bugs control Weekly
once for all labour rooms/sheds wall & floor area at Labour colony as
instructed in site. 2,000.00 Per Visit
Steel(Reinforcement Works )
For Columns
Slab/Beam/Staircase/RCC wall 3400
6 (Lift wall) MT GF
MT 1st 3500
MT 2nd 3600
MT 3rd 3700
MT 4th 3800
MT 5th 3900
MT 6th 4100
MT 7th 4100
MT 8th 4100
MT 9th 4100
MT 10th 4100
Sl. No. Item Description Rates Unit Wo. No.
5 Mock up-
140
Internal Door-Installation of Internal Doors by fixing in
position with 3Hinges, 1Tubular Knob inclu Architraves, Sub
Frames, fixing with Foam, Jamming& Filling the gap with
silicon sealant etc as per instructions of PIC. 800.00 each
Toilet Door-Only for supply of Toilet door 750x2100x42mm
size 7,200.00 each
Santhosh mochi
5/19/2012
Santhosh mochi
7/20/2012
All other
applicable
3/8/2012 Utkal Engineering taxes will
be payable
extra
All other
applicable
taxes will
K A Engineering be payable
3/30/2012 works extra
VAT
4/25/2011 Jupiter Wood craft payable
Pvt. Ltd.,
extra
VAT
payable
5/9/2011 Tharun engineering extra
Taxes
KVK Earth Movers Payable
3/5/2012 & Borewells extra
Taxes
Sunda Aluminum Payable
2/29/2012 Fabrications extra
VAT
payable
4/10/2012 Tharun Engineering extra
VAT
14.5%X70%
will be
payable
Sri Manjunatha extra.
Engineering Works Service Tax