You are on page 1of 26

SL No Item description unit Floor

1 Earth work Excavation


1.a Hard Rock by chiseling incl carting of the Hard rock away
from the site. Cum
1.b
Soft Rock incl carting away out of premises of the site Cum

Earth work Excavation of all kind of soil by manually @


carting away the soil with in the premises of site Cum

Earth work Excavation of all kind of soil by mechanically


@ carting away the soil with in the premises of site Cum

Earth work Excavation of all kind of soil by mechanically


@ carting away the soil outside of the premises of site Cum

2 P.C.C Cum

3 Back filling (if earth is available at site) Cum

4 Shuttering Works

Shuttering+Deshuttering for Footing/Raft/Pedestals Sqm Basement


Shuttering+Deshuttering for Plinth Beams Sqm Basement
Shuttering+Deshuttering for Columns Cum (Only
basement Floor Beams) Sqm Basement
Shuttering+Deshuttering for Slab/Beam/Staircase/RCC
wall (Lift wall)Columns Sqm GF
Sqm 1st
Sqm 2nd
Sqm 3rd
Sqm 4th
Sqm 5th
Sqm 6th
Sqm 7th
Sqm 8th
Sqm 9th
Sqm 10th
Sqm Terrace/Abv Terrace
Shuttering+Deshuttering for Retaining wall Sqm Basement/GF
Shuttering+Deshuttering for UG sump/darin Sqm Basement

Making of Column Box Sqm All Floors


Making of Plinth Beam Sqm All Floors
Making of Beam sides/Bottom Sqm All Floors
Making of Column Box Sqm All Floors
Cutting /Remaking of Shuttering Sqm All Floors
Making of Wall forms/R/w /Rcc wall Sqm All Floors

Fixing Starter For Column Rmt All Floors

Fixing Starter For R/W- 1 side Length tobe measured Rmt All Floors
Making starter for column Nos All Floors
Making starter for R/W or core wall Rmt All Floors
All Staging works up to 30m for Shuttering Sqm All Floors
All Staging works up to 30m for De - Shuttering Sqm All Floors

Labour charge for erection around stagging for column Nos All Floors

5 Steel(Reinforcement Works )
For Footing/Pedestals MT Basement Floor/GF
For Plinth Beams MT Basement Floor/GF
For Columns Slab/Beam/Staircase/RCC wall (Lift wall) MT GF
MT 1st
MT 2nd
MT 3rd
MT 4th
MT 5th
MT 6th
MT 7th
MT 8th
MT 9th
MT 10th
MT 11th
MT 12th
MT 13th
MT 14th
MT 15th
MT 16th
MT 17th
MT 18th
MT 19th
MT 20th
MT Terrace/Abv Terrace

For Retaining wall MT Basement


For UG sump/darin MT Basement
Charges for shiting of Steel MT All floors

Lifting charges for steel Reinforcement @ I St Floor MT First Floor

Lifting charges for steel Reinforcement @ II nd Floor MT Second Floor


unloading charges for steel reinforcement MT 1Load(up to 20MT)
unloading charges for steel reinforcement MT Balance Qty
6 Supply Labour
Mason/Carpenter/Fitter Day
Helper Day
Asst. Helper Day
7 Internal Plastering

Finished smooth, with/Without Lime rendering including


preparing surface, Bull marking, scaffolding, Mesh fixing, Sqm Basement/GF
Sqm 1st
Sqm 2nd
Sqm 3rd
Sqm 4th
Sqm 5th
Sqm 6th
Sqm 7th
Sqm 8th
Sqm 9th
Sqm 10th
Sqm 11th
Sqm 12th
Sqm 13th
Sqm 14th
Sqm 15th
Sqm 16th
Sqm 17th
Sqm 18th
Sqm 19th
Sqm 20th
Sqm Terrace/Abv Terrace
8 External Plastering

In two coats using CM of required thickness excluding


scaffolding & including mesh fixing, patties coving, sponge
finishing on top coat etc., (groove & drip mould extra) Sqm Basement/GF
Sqm 1st
Sqm 2nd
Sqm 3rd
Sqm 4th
Sqm 5th
Sqm 6th
Sqm 7th
Sqm 8th
Sqm 9th
Sqm 10th
Sqm 11th
Sqm 12th
Sqm 13th
Sqm 14th
Sqm 15th
Sqm 16th
Sqm 17th
Sqm 18th
Sqm 19th
Sqm 20th
Sqm Terrace/Abv Terrace
9 Ceiling Plastering
Finished smooth, with/Without Lime rendering including
scaffolding, staging/ platform etc., Sqm Basement/GF
Sqm 1st
Sqm 2nd
Sqm 3rd
Sqm 4th
Sqm 5th
Sqm 6th
Sqm 7th
Sqm 8th
Sqm 9th
Sqm 10th
Sqm 11th
Sqm 12th
Sqm 13th
Sqm 14th
Sqm 15th
Sqm 16th
Sqm 17th
Sqm 18th
Sqm 19th
Sqm 20th
Sqm Terrace/Abv Terrace

10 Rough Plaster in toilets


for dado backing with rough finish including
Scaffolding/Staging etc., Sqm All floors

11 Column Plastering

Finished smooth with/without lime rendering including


preparing surface, Bull marking, Scaffolding etc., Sqm All floors
12 Masonry

Size stone Masonry including pointing @ plinth level cum (emperian)


Solid B/W 100/150/200+ Shifting Sqm Basement/GF
Sqm 1st
Sqm 2nd
Sqm 3rd
Sqm 4th
Sqm 5th
Sqm 6th
Sqm 7th
Sqm 8th
Sqm 9th
Sqm 10th
Sqm 11th
Sqm 12th
Sqm 13th
Sqm 14th
Sqm 15th
Sqm 16th
Sqm 17th
Sqm 18th
Sqm 19th
Sqm 20th
Sqm Terrace/Abv Terrace
Rates
White hall

2500

250

120

75

85

200

50

80

80

100

100

100
100
100
110
110
110
110
120
120
120
120
100
90

50
50
50
50
30
50

30

30

40
40
10
8

40

3000
3000
3000
3800
3900
4000
4100
4200
4300
4400
4500
4600
4700
4800
4900
5000
5100
5200
5300
5400
5500
5600
5700
5800

3000
3000
100

50

100

200
50
300
225
200

65

65
65
65
65
65
70
70
70
70
70
75
75
75
75
75
80
80
80
80
80
80

120

120
120
120
130
130
130
130
140
140
140
140
150
150
150
150
160
160
160
160
160
160

70

70
70
70
70
70
75
75
75
75
75
80
80
80
80
80
85
85
85
85
85
85

50

80

325

85+20
85+20
85+20
85+20
85+20
85+20
95+20
95+20
95+20
95+20
95+20
105+20
105+20
105+20
105+20
105+20
115+20
115+20
115+20
115+20
115+20
115+20
Rates
Item description unit Floor
Skywood Midtown Harmony Gainz Empyrean
Shuttering Works
Shuttering+Deshuttering for 100 80 90 110
Footing/Raft/Pedestals Sqm Basement
Shuttering+Deshuttering for Plinth 100 80 90 130
Beams Sqm Basement
100 95 95 80
Shuttering+Deshuttering for Columns Sqm Basement
Podium slan beam Sqm GF 100
Shuttering+Deshuttering for Retaining 100 80 95
wall Sqm Basement/GF
Shuttering+Deshuttering for UG 100 90 95
sump/darin Sqm Basement

Shuttering+Deshuttering for 100 95 95


Slab/Beam/Staircase/RCC wall (Lift wall) Sqm GF
Sqm 1st 80 95 95
Sqm 2nd 85 95 95
Sqm 3rd 85 95 95
Sqm 4th 85 105 105
Sqm 5th 95 105 105
Sqm 6th 95 105 105
Sqm 7th 95 105 105
Sqm 8th 105 115 115
Sqm 9th 105 115 115
Sqm 10th 105 115 115
Sqm 11th 115 - -
Sqm 12th 115 - -
Sqm 13th 115 - -
Sqm 14th 125 - -
Sqm 15th 125 - -
Sqm 16th 125 - -
Sqm 17th 135 - -
Sqm 18th 135 - -
Sqm 19th 135 - -
Sqm 20th 145 - -
Terrace/Abv 145 115 115
Sqm Terrace

Making of Column Box Sqm All Floors 50 50 50


Making of Plinth Beam Sqm All Floors 50 50 50
Making of Beam sides/Bottom Sqm All Floors 50 50 50
Making of Column Box Sqm All Floors 50 50 50
Cutting /Remaking of Shuttering Sqm All Floors 30 30 30
Making of Wall forms/R/w /Rcc wall Sqm All Floors 50 50 50

Fixing Starter For Column Nos All Floors 25 30 30


Fixing Starter For R/W- 1 side Length 25 30 30
tobe measured Rmt All Floors
Making starter for column Nos All Floors 40 40 40
Making starter for R/W or core wall Rmt All Floors 40 40 40
Staging- erection for all floors Sqm 0-30 15 8 8 8 5
Staging- erection for all floors Sqm 30-60 15 10 10 10 5
Staging- dismantling for all floors Sqm 0-30 10 8 8 8 5
Staging- dismantling for all floors Sqm 30-60 10 10 10 10 5
Hacking Sqm All Floors 4 4 4 4 5
Shuttering Works -Mivan

Basement to 105
Column/Beam/slab/Staircase/RCC
wall/Lift wall including Vertical shifting Sqm terrace floor

Above 150
Sqm terrace floor

Basement to
350
Placing concrete by RMC of all grades cum 10th floor

11th floor to
400
cum 15th floor
16th floor to 450
cum Terrace
Steel(Reinforcement Works )
Basement 3200 3000/3400 3400
For Footing/Pedestals MT Floor/GF
Basement 3200 3000/3400 3400
For Plinth Beams MT Floor/GF
For Retaining wall MT Basement 4000 3000 3250
For UG sump/drain MT Basement 3200 3000 3250
Charges for shiting of Steel MT All floors 200 200 200

For Columns Slab/Beam/Staircase/RCC 3200 3000 3400


wall (Lift wall) MT GF
MT 1st 3200 3100 3500
MT 2nd 3200 3200 3600
MT 3rd 3200 3300 3700
MT 4th 3200 3400 3800
MT 5th 3300 3400 3900
MT 6th 3300 4000 4200
MT 7th 3300 4000 4200
MT 8th 3400 4000 4200
MT 9th 3400 4000 4200
MT 10th 3400 4000 4200
MT 11th 3500 -
MT 12th 3500 -
MT 13th 3500 -
MT 14th 3650 -
MT 15th 3650 -
MT 16th 3650 -
MT 17th 3800 -
MT 18th 3800 -
MT 19th 3800 -
MT 20th 3800 -
MT Terrace 3800 4000/4400 4250
Above 4300
Terrace
Supply Labour
Skilled/Mason Day 300 300 300
Helper Day 225 200 200
Asst. Helper Day 225 175 175

Batching Plant LS Rate


Min 10 people Gang Month 95000 60000 -

Groove/Drip Mould Rmt All floors 20

Masonry
1 Sqm GF 85
8"/6"/4"thick masonry
Sqm FF 95
(For Emp 350
2 Size Stone Masonry Cum Site)
85+20 110 110
3 Solid B/W 100/150/200+ Shifting Sqm Basement/GF
Sqm 1st 85+20 110 110
Sqm 2nd 85+20 110 110
Sqm 3rd 85+20 110 110
Sqm 4th 85+20 110 110
Sqm 5th 85+20 110 110
Sqm 6th 95+20 110 110
Sqm 7th 95+20 110 110
Sqm 8th 95+20 110 110
Sqm 9th 95+20 110 110
Sqm 10th 95+20 110 110
Sqm 11th 105+20
Sqm 12th 105+20
Sqm 13th 105+20
Sqm 14th 105+20
Sqm 15th 105+20
Sqm 16th 115+20
Sqm 17th 115+20
Sqm 18th 115+20
Sqm 19th 115+20
Sqm 20th 115+20
Terrace/Abv 115+20
Sqm Terrace
Internal Plastering

Finished smooth, with/Without Lime


rendering including preparing surface, 65 75 75 70
Bull marking, scaffolding, Mesh fixing,
( columns+ wall) Sqm Basement/GF
Sqm 1st 65 75 75 75
Sqm 2nd 65 75 75
Sqm 3rd 65 75 75
Sqm 4th 65 75 75
Sqm 5th 65 75 75
Sqm 6th 70 75 75
Sqm 7th 70 75 75
Sqm 8th 70 75 75
Sqm 9th 70 75 75
Sqm 10th 70 75 75
Sqm 11th 75
Sqm 12th 75
Sqm 13th 75
Sqm 14th 75
Sqm 15th 75
Sqm 16th 80
Sqm 17th 80
Sqm 18th 80
Sqm 19th 80
Sqm 20th 80
Terrace/Abv 80
Sqm Terrace
Ceiling Plastering

Finished smooth, with/Without Lime


rendering including scaffolding, staging/ 70 80 80 70
platform etc., (staircase waist
slab+beam bot+ ceiling) Sqm Basement/GF
Sqm 1st 70 80 80 75
Sqm 2nd 70 80 80
Sqm 3rd 70 80 80
Sqm 4th 70 80 80
Sqm 5th 70 80 80
Sqm 6th 75 80 80
Sqm 7th 75 80 80
Sqm 8th 75 80 80
Sqm 9th 75 80 80
Sqm 10th 75 80 80
Sqm 11th 80
Sqm 12th 80
Sqm 13th 80
Sqm 14th 80
Sqm 15th 80
Sqm 16th 85
Sqm 17th 85
Sqm 18th 85
Sqm 19th 85
Sqm 20th 85
Terrace/Abv 85
Sqm Terrace
Rough Plaster in toilets
for dado backing with rough finish 50
including Scaffolding/Staging etc., Sqm All floors

Column Plastering

Finished smooth with/without lime 80 70 to 75


rendering including preparing surface, Basement
Bull marking, Scaffolding etc., Sqm only
Including Shifting. Sqm GF 80 80
Including Shifting. Sqm FF 80 -

External Plastering
In two coats using CM of required
thickness excluding scaffolding & 160 120 110
including mesh fixing, patties coving,
sponge finishing on top coat etc.,
(groove & drip mould extra) Sqm Basement/GF
Sqm 1st 160 120
Sqm 2nd 160 120
Sqm 3rd 160 120
Sqm 4th 160 130
Sqm 5th 160 130
Sqm 6th 160 130
Sqm 7th 160 130
Sqm 8th 160 140
Sqm 9th 160 140
Sqm 10th 160 140
Sqm 11th 160 140
Sqm 12th 160 150
Sqm 13th 160 150
Sqm 14th 160 150
Sqm 15th 160 150
Sqm 16th 160 160
Sqm 17th 160 160
Sqm 18th 160 160
Sqm 19th 160 160
Sqm 20th 160 160
Terrace/Abv 160 160
Sqm Terrace

Flooring+Dadoing+Granite Works
Ceramic Tiles flooring/dado sqm All floors 100
Vitrified Tiles flooring/dado sqm All floors 125
Vitrified Tile skirting Rmt All floors 25
Granite Flooring 20mm thick sqm All floors 376.6
Granite skirting, risers, borders Rmt All floors 98.4
Graite nosing, Half round Rmt All floors 70
Graite nosing,Full round Rmt All floors 130

Labour charges for cutting granite slab


for kitchen counter, making hole for 1500
sink, half round nosing with necessary
polish No. All floors

Labour charges for fabrication of MS


angle support by using ISA 50x50x6mm 12
for kitchen plat form Kgs
6 7
Floor chipping ( dead cement mortor) Sqm All floors
Placing Conctete,

100

for dumping manually Cum All floors


By pumping by RMC Cum All floors 200
Provident Harmony

Sl. Item Description Rates Unit


No.

1 Supplying of MS concrete bucket of capacity 0.3cum with 25mm dia solid


rod of EN 8 material for lifting etc., complete as per instructions 40,600.00 No.s

Supply, fabrication of MS waler using 2No.s ISA 50X50X6mm frame of


2 required length with 25mm uniform gap & complete as per the
instructions of PIC 790.00 No.s

Supply, fabrication & errection of labour shed as per instructions


including sheets for roofing & sides Using 24G GI sheets for roof &
3 sides, 50x50mm MS Sq
tube-verticals+door frame, 25x25mm Sq tube as horizontals,
25x5mm angle frame, 8mm sq rods,Purlins for Truss complete
bolts & joints-Roofing area to be considered for measurement
1,050.00 Sqm
Suppply of GI puddle flange made out of GI 'C' class pipe of 80mm dia as
per the drawing & instructions 13,500.00
4
Suppply of GI puddle flange made out of GI 'C' class pipe of 100mm dia as
per the drawing & instructions 16,500.00 No.s

5
Supply of C-Clamp 600mm lenth using MS flat 30X5/6mm with 100mm
bend at one end 106.00 No.s

6
Supply of C-Clamp 600mm lenth using MS flat 30X5/6mm with 100mm
bend at one end 106.00 No.s

Supply of 16mm dia Tie rod of 650mm length with 200mm length
7 threading @ one end & 100mm rod welded to other end as T-bar
including nut & washer with proper welding as per instructions 120.00 No.s

8 Roofing for site office as per instructions-Roofing at store and mechanical


room using GI sheets, 50mm dia MS pipe as purlin & vertical support with
own consumables like Gas, Welding machine, screws, bolts, & joints. 65.00 Sqm

9 Roofing for site office as per instructions-Labour charges for Roofing at


Site office, Store, Cement shed with GI sheets , 50mm dia MS Pipe as
purlin & vertical support, with own consumables like Gas, welding
machine, Screws, Bolts & Joints as per instructions at site. 80.00 Sqm

Roofing for labour shed using MS pipe , GI sheet & screws as per
instructions-GI sheet roofing at labour colony toilets & wash rooms using
25mm dia steel rod and GI sheets as per instructions. 40.00 Sqm
Cutting & giving extra rods support to place tie rods in wailer using 25mm
dua rod of 50mm length using their own consumables 4.00 Nos

10
Labour charges for making of Handrial using 60mm MS pipe, 20x20mm
MS Square pipe at PMC Office; 500kgs for making handrail using 60mm
MS pipe, 20x20mm MS sq pipe at PMS offfice 15.00 Kgs
Labour charges for making MS stand using 60mm MS pipe as per
instructions at site.; 180kg for making MS stand 12.00 Kgs

Labour charges for fabrication of M.S.Walkway jally (2.5x0.5mt) using


20mm Sq tube as per the sample at site.-Working Platform 100nos using
own consumables like Gas, welding Rod, welding machine 12.00 Kgs

Roofing for labour shed using MS pipe , GI sheet & screws as per
instructions-GI sheet roofing at labour colony toilets & wash rooms using
25mm dia steel rod and GI sheets as per instructions.- Fixing of G.I sheet
for labour school roofing with self taping screws 60.00 Sqm

Labour charges for fabrication of M.S.Walkway jally (2.5x0.5mt) using


20mm Sq tube as per the sample at site.- using own consumables like
Gas, welding Rod, welding machine 12.00 Kgs

11
Fixing of GI sheets of approved gauge, shape & size on MS pipes for
Barricating including the cost of lead, lift, tieing, etc., complete- for
compound wall with self taping screws at south and rear side, east side
of size 0.9X4m inculding horizontal bracing pipe fixing of 25mm dia and
fixing of vertical channal of ISMC 100X50mm. 60.00 Sqm

Labour charges for fabrication and welding of toilet door in labour shed
using 25mm square tube,using own consumables like gas, welding rod &
Welding machine. 12.00 Kgs
Labour charges for Fabrication of Column starter using ISMC sections-
including cutting, drilling hole of required dia, complete with one coat of
red oxide primer; 770kgs for fabrication of column starter 12.00 Kgs

Providing MS doors including hinges, lockset arrangements with one coat


of red oxide premier-Of Size 3' x 7' -3nos using 35x35x5mm angle, 18G
MS sheet, Hinges, Locking arrangements, complete with coat of Red
Oxide metal Primer; 3,225.00 No.s

Providing MS doors including hinges, lockset arrangements with one coat


12 of red oxide premier-Of Size 2' 6" x 7' 0" -1nos using 35x35x5mm angle,
18G MS sheet, Hinges, Locking arrangements, complete with coat of Red
Oxide metal Primer; 2,712.50 No.s

Providing MS windows including hinges, with one coat of red oxide


premier-Of Size 3' x 4' -4nos using Z angle, hinges, locking arrangements,
complete with coat of Red Oxide metal Primer & provision for glass
fixing. 1,140.00 No.s

Providing MS foundation Bolts/Nuts of approved size-Supplying MS


13 foundation bolts of 25MM Dia, 500mm length,100mm length thread 250.00 No.s
13

Providing MS foundation Bolts/Nuts of approved size-Supplying MS


foundation bolts of 25MM Dia, 400mm length,100mm length threading
on one side with suitable Washer & Nuts. 200.00 No.s

Providing & laying of 150mm thick soling-including, Base preparation by


Mechanical compaction, using granite hand broken metal/ Rubble and
smaller pebbles for void filling, moorum for binding as directed by the
Engineer-in-charge including watering, packing, compaction with
14 necessary rollin 165.00 Sqm

labour charges for casting solid blocks of 4"thk in CM as per proportion


approved including all machinery & labour, excluding the cost of material 2.75 No.s

labour charges for casting solid blocks of 6"thk in CM as per proportion


approved including all machinery & labour, excluding the cost of material 3.50 No.s

labour charges for casting solid blocks of 8"thk in CM as per proportion


15 approved including all machinery & labour, excluding the cost of material 4.50 No.s

16 Hire charges for transit mixer 4,500.00 Day


17 Hire charges for JCB (in Month) 80,000.00 Month

Engaging required labour for the Batching plant for feeding cement &
aggregate and fixing pipeline for concrete pumping as per requirement-
LS amount for Batching plant with gang of min 10 labours for cement
feeding & pipe line aligning. from 7th July 2012 95,000.00

Engaging required labour for the Batching plant for feeding cement &
aggregate and fixing pipeline for concrete pumping as per requirement-
LS amount for Batching plant with gang of min 12 labours for cement
18 feeding & pipe line aligning. (from 16th sept'12 to 30th sept'13) 140,000.00 Month

Drilling hole of 16 mm dia, 150mm deep and fixing 12mm dia rebar using
HILTI RE 500 chemical mortar.-Horizontal bars- For Columns as per
instructions at site. (Due revision of drawing) 176.00 Nos

Drilling hole of 20mm dia, 300mm deep and fixing 16mm dia rebar using
HILTI RE 500 chemical mortar.-Vertical bars- For Columns as per
instructions at site. (Due to revision of drawing) 744.00 Nos

Drilling hole of 25mm dia, 300mm deep and fixing 20mm dia rebar using
HILTI RE 500 chemical mortar.-Vertical bars- For Columns as per
19 instructions at site. 883.00 Nos

20 Dismantling the RCC work including removing of Debris 2,000.00 Cum

Cleaning of Telescopic Spans 25.00 Nos

21 Cleaning, Oiling & Painting of Floor Forms.-of size 1.15mtx0.6m 30.00 Nos
Charges towards pest control treatment using chemicals at
recommended proportions as directed by PIC-Bed bugs control Weekly
once for all labour rooms/sheds wall & floor area at Labour colony as
instructed in site. 2,000.00 Per Visit

Charges towards fog treatment using chemicals at recommended


proportions as directed by PIC.-Mosquito control (fogging) weekly once
22 for entire area at Labour colony as instructed in site. 1,800.00 Per Visit
Labour charges for applying required coats of putty and 2 coats of OBD
for internal walls & ceiling as per instructions. 25.00 Sqm
23 Applying Enamel paint for doors and windows 20.00 Sqm

Providing & injecting Anti-termite treatment by a specialized approved


agency as per IS specifications, with a guarantee for ten years
etc.,complete (only plinth area shall be measured & paid for).-For All
wings from A1 to A15 -As per detailed techical specification enclosed &
24 instructions of PIC at site. 38.00 Sqm

Removing/replacing/fixing of inside liners/Mixing blade/Discharge blade


for Mixing Drum of Miller batching plant as per direction of Mechanical
25 engineer/PIC at site. 110,000.00 No.s
805
Harmony Project

Steel(Reinforcement Works )

SL. No. Description Unit Level Rates

1 For Footing/Pedestals MT Basement Floor/GF 3400


2 For Plinth Beams MT Basement Floor/GF 3400
3 For Retaining wall MT GF 3400
4 For UG sump/drain MT GF 3400
5 Charges for shiting of Steel MT All floors 200

For Columns
Slab/Beam/Staircase/RCC wall 3400
6 (Lift wall) MT GF
MT 1st 3500
MT 2nd 3600
MT 3rd 3700
MT 4th 3800
MT 5th 3900
MT 6th 4100
MT 7th 4100
MT 8th 4100
MT 9th 4100
MT 10th 4100
Sl. No. Item Description Rates Unit Wo. No.

Water proof plastering in CM, mixed with WP compound


1 with proper surface preparation including finishing etc.,
complete as per instructions of PIC -For rain water G-Block ,
harvesting tank inside plastering 80.00 sqm WO-537

Water proof plastering in CM, mixed with WP compound


2 with proper surface preparation including finishing etc.,
complete as per instructions of PIC -For rain water H-Block ,
harvesting tank inside plastering 80.00 Sqm WO-623

Wash Basin-At site office 254.00 No.s

Laying of PVC Pipes & Fittings for Ground Floor-Collecting &


Fixing 40mm dia PVC pipes of approved class & make with
necessary specials like bend, shoe, grting, clamps, screws 35.00 Rmt

Laying of PVC Pipes & Fittings for Ground Floor-Collecting &


Fixing 75mm dia PVC pipes of approved class & make with
necessary specials like bend, shoe, grting, clamps, screws 44.00 Rmt
Laying of PVC Pipes & Fittings for Ground Floor-Collecting &
Fixing 110mm dia PVC pipes of approved class & make
with necessary specials like bend, shoe, grting, clamps,
screws 51.00 Rmt
Laying of PVC Pipes & Fittings for Ground Floor-Fixing,
Installing, testing & commissioning of 20mm dia CPVC Pipes
& fittings.-26Rmt for site office toilet and 39Rmt for H block
labour Toilet 35.00 Rmt

Sanitary Fittings for Ground Floor-Collecting, storing,


installing, testing and commissioning of approved make
white colour IWC(Orissa Pan);2 nos for Site office and 4 Nos
for Labour Toilet at H block 300.00 Nos

Sanitary Fittings for Ground Floor-Fixing Wall mounted EWC


with chair braket & seat cover as per approved sample & Temp.-
3 detailed specification. 446.00 Nos 454
Sanitary Fittings for Ground Floor-Collecting, fixing &
commissioning of Urinals with necessary fixtures complete
as per direction; 250.00 Nos
Labour charge for fixing PVC water Tank (Sintex make)-
1000ltr capacity at H block for labour toilet 500.00 Nos
Collecting & Fixing approved size & type of Angular Stop
Cock etc., complete as per specification. 43.00 Nos

Collecting & Fixing approved brand & size Bib Cock


including extension pipe if required as per specification.-4
short body bib cock & 1 long body bib cock 43.00 Nos
Collecting & Fixing approved brand & size Bib Cock
including extension pipe if required as per specification.4
short body bib cock & 1 long body bib cock 43.00 Nos

Collecting & Fixing approved size & type Health Fauset


including angular stop cock etc., complete as per
specification. 68.00 Nos

Collecting & Laying of SWR PVC Plain / Multi Floor Trap of P


or S type with grating and 110mm out let etc., complete as
per specification 82.00 Nos
Charges towards the hire of Builders Hoist-45m height,
2No.s 16,000.00 Months
4
Transportation & conveyance charges (For each hoist) General-
3,000.00 No.s 467
Main Door- Only for supply of main door 1050x2100x42mm
size 11,200.00 each

Main Door- Installation of Main Entrance Door by fixing in


position with 4 SS Hinges-1Mortise Lock with Handle &
1Magic Eye inclu. Architraves, Sub Frames, fixing with
Foam, Jamming & Filling the gap with silicon sealant etc. as
per instructions of PIC 800.00 each
Internal Door-Only for supply of Internal door
900x2100x42mm size 8,200.00 each

5 Mock up-
140
Internal Door-Installation of Internal Doors by fixing in
position with 3Hinges, 1Tubular Knob inclu Architraves, Sub
Frames, fixing with Foam, Jamming& Filling the gap with
silicon sealant etc as per instructions of PIC. 800.00 each
Toilet Door-Only for supply of Toilet door 750x2100x42mm
size 7,200.00 each

Toilet Door-Installation of Toilet Doors by fixing in position


with 3Hinges- 1Tubular Knob including Architraves,Sub
Frames, fixing with Foam, Jamming & Filling the gap with
silicon sealant etc.Complete as per instruction of PIC. 800.00 each

Supplying of MS concrete bucket of capacity 0.3cum with All blocks-


25mm dia solid rod of EN 8 material for lifting etc., 521
6 complete as per instructions 40,600.00 No.s

Supplying of MS concrete bucket of capacity 0.25cum with


25mm dia solid rod of EN 8 material for lifting etc.,
7 complete as per instructions 35,000.00 No.s Misc-452

Supplying of Aluminium template of required size as per General-


8 requirements and instructions @ site- 335.00 Rmt 451

Supplying of 45mm dia MS(EN19) locking pins of 325mm General-


9 lenght for Tower crane 450.00 No.s 476
10
Supply, errection of MS staircase as per drawing &
instructions-As per enclosed drawing and detailed
specification complete with a coat of red oxide metal Wing H-
primer-For LMR 80.00 kgs 825
Date of Terms &
issue of Contractor Condition
WO. s

Santhosh mochi

5/19/2012

Santhosh mochi

7/20/2012

All other
applicable
3/8/2012 Utkal Engineering taxes will
be payable
extra
All other
applicable
taxes will
K A Engineering be payable
3/30/2012 works extra

VAT
4/25/2011 Jupiter Wood craft payable
Pvt. Ltd.,
extra

VAT
payable
5/9/2011 Tharun engineering extra

Taxes
KVK Earth Movers Payable
3/5/2012 & Borewells extra

Taxes
Sunda Aluminum Payable
2/29/2012 Fabrications extra

VAT
payable
4/10/2012 Tharun Engineering extra
VAT
14.5%X70%
will be
payable
Sri Manjunatha extra.
Engineering Works Service Tax

You might also like